About this file

36C25219B0056 0003 S06 - GI203 - PROJECT PHASING PLAN-SECOND FLOOR.pdf

View the file

Other files

File Type Posted
36C25219C0222-000.docx DOCX document
36C25219B0056-0005000.docx DOCX document
36C25219B0056-0004002.pdf PDF
36C25219B0056-0004000.docx DOCX document
36C25219B0056-0004001.pdf PDF
36C25219B0056-0003007.pdf PDF
36C25219B0056-0003008.pdf PDF
36C25219B0056-0003001.pdf PDF
36C25219B0056-0003003.pdf PDF
36C25219B0056-0003004.pdf PDF
36C25219B0056-0003005.pdf PDF
36C25219B0056-0003020.pdf PDF
36C25219B0056-0003015.pdf PDF
36C25219B0056-0003013.pdf PDF
36C25219B0056-0003014.pdf PDF
36C25219B0056-0003006.pdf PDF
36C25219B0056-0003012.pdf PDF
36C25219B0056-0003017.pdf PDF
36C25219B0056-0003016.pdf PDF
36C25219B0056-0003011.pdf PDF
36C25219B0056-0003009.pdf PDF
36C25219B0056-0003010.pdf PDF
36C25219B0056-0003018.pdf PDF
36C25219B0056-0003002.pdf PDF
36C25219B0056-0003000.docx DOCX document
36C25219B0056-0002001.pdf PDF
36C25219B0056-0002000.docx DOCX document
36C25219B0056-0002002.pdf PDF
36C25219B0056-0001000.docx DOCX document
36C25219B0056-001.docx DOCX document
36C25219B0056-002.pdf PDF
36C25219B0056-005.pdf PDF
36C25219B0056-004.pdf PDF
36C25219B0056-003.pdf PDF
36C25219B0056-006.pdf PDF
36C25219B0056-000.docx DOCX document
36C25219B0056-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 5

PHASE 4

PHASE 10

PHASE 8

PHASE 13

WING A WING B WING C WING D

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CLEMENT J. ZABLOCKI VAMC

#6 o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number 695-16-112

FIRE SPRINKLER ENGINEER

RTM CONSULTANTS, INC

6640 Parkdale Place, Suite J, Indianapolis, IN 46254

PHONE: (317) 329-7700

905 N. CAPITOL AVE. SUITE 100 INDIANAPOLIS, IN. 46204

317.800.6388 WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

CLEMENT J. ZABLOCKI VA MEDICAL CENTER

MILWAUKEE, WISCONSIN

C :\U se rs

\k al le n\

D oc um en ts \1

4.

.0

Bl dg .S pr in kl er

R ep la ce m en t 6

-1 6-

2_ ka lle n.

rv t

GI203

FDCMC

PROJECT PHASING PLAN - SECOND FLOOR 14.1020.06BUILDING 6 FIRE

SPRINKLER REPLACEMENT

SCALE: 1/16" = 1'-0"GI203

1 PROJECT PHASING PLAN - SECOND FLOOR

N

CRITICAL PATH METHOD/ PHASING

THE CONSTRUCTION WILL BE PHASED FOR CONTINUED OCCUPANCY OF THE BUILDING. THE BUILDING IS CURRENTLY UNDER FIRE WATCH. IN AN EFFORT TO LIMIT CORING OF FLOORS AND CUTTING OF WALLS TO AVOID UNKNOWN HAZARDOUS MATERIALS EXISTING PIPING PENETRATIONS WILL BE REUSED. FIRE PROTECTION SYSTEMS SERVICES WILL BE DISRUPTED.

PROCEDURES WILL BE INCORPORATED TO MAINTAIN EQUIVALENT LEVELS OF SAFETY WHILE SYSTEMS ARE DOWN. AREAS WHERE THE SPRINKLER SYSTEM IS OUT OF SERVICE WILL BE SEPARATED BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NON- COMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL

BE ONE-HOUR FIRE RATED

IN ORDER TO LIMIT THE AFFECTED AREA, THE SPRINKLER SYSTEM WILL BE REPLACED BY “ZONES”, BY FLOOR AND BUILDING. IN THE FIRST PHASE THE EXISTING INCOMING SERVICE RISERS WILL BE REPLACED AND NEW RISERS WILL BE INSTALLED IN THE STAIRWAY OF EACH WING. AFTER INSTALLATION OF THE NEW RISERS THE EXISTING SPRINKLERS SYSTEMS PROTECTING THE BUILDING WILL BE REMOVED IN THE FOLLOWING ORDER AND REPLACED. EXISTING PENETRATIONS OF WALLS AND FLOORS WILL

BE REUSED TO LIMIT ADDITIONAL DAMAGE TO EXISTING BUILDING.

PHASE 1: INSTALL NEW RISERS FOR WINGS A, B, C AND D IN BASEMENT AND INSTALL NEW DRY PIPE RISERS TO SERVE NEW ATTIC DRY PIPE SYSTEMS IN A AND C WINGS. PROVIDE/INSTALL/PROGRAM/TEST NEW FIRE ALARM DEVICES IN ELEVATOR MACHINE ROOMS (3) AND MODIFY EXISTING FIRE ALARM SYSTEM TO MONITOR NEW FLOW AND TAMPER

SWITCHES.

PHASE 2: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING A BASEMENT.

PHASE 3: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING A FIRST FLOOR.

PHASE 4: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING A SECOND FLOOR AND

ATTIC.

PHASE 5: INSTALL NEW DRY PIPE SPRINKLER SYSTEM TO SERVE SOUTHWING EXTERIOR PORCH AT FIRST AND SECOND

FLOOR LEVELS AND REPLACE EXISTING DRY PIPE SPRINKLER SYSTEM BELOW SOUTHWING PORCH IN WING A PHASE 6: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING C BASEMENT AND

WAREHOUSE

PHASE 7: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING C FIRST FLOOR.

PHASE 8: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING C SECOND FLOOR PHASE 9: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING C THIRD FLOOR AND ATTIC.

PHASE 10: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING B SECOND FLOOR AND

ATTIC.

PHASE 11: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING B FIRST FLOOR.

PHASE 12: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING B BASEMENT.

PHASE 13: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING D SECOND FLOOR AND

ATTIC.

PHASE 14: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING D FIRST FLOOR.

PHASE 15: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING D BASEMENT.

PHASING NOTES:

1. PHASES 1-5 MUST OCCUR FIRST BUT CONTRACTOR MAY ALTER ORDER OF REMAINING PHASES AS NEEDED. ANY CHANGES

TO PHASING SCHEDULE SHALL BE APPROVED BY THE CONTRACTING OFFICER.

2. ALL WORK SHALL BE CONDUCTED OFF HOURS AND ON WEEKENDS. SOME AREAS REQUIRE MONITORED ACCESS.

3. CONTRACTOR SHALL REMOVE ALL DEBRIS GENERATED DAILY AND SHALL CLEAN WORK AREA EACH DAY PRIOR TO LEAVING

THE JOBSITE.

4. EXISTING SPRINKLER SYSTEM SHALL BE REMOVED IN ITS ENTIRETY PRIOR TO THE INSTALLATION OF NEW SPRINKLERS AND PIPING IN EACH PHASE. PHASES SERVING OCCUPIED FLOORS OF WINGS A AND C MAY BE DIVIDED INTO TWO SEPARATE AREAS TO MINIMIZE TIME EACH AREA IS UNPROTECTED. CONTRACTOR SHALL PROVIDE CONNECTIONS AS REQUIRED TO

MAINTAIN CONTINUITY OF SPRINKLER COVERAGE FOR SPACES IN ADJACENT PHASES.

5. FLOOR AND WING UNDER CONSTRUCTION WILL BE PERMITTED TO BE WITHOUT SPRINKLER PROTECTION DURING

CONSTRUCTION. EXISTING HANGARS AND WALL PENETRATIONS MAY BE REUSED.

CONSTRUCTION WILL BE PHASED AS NECESSARY TO ENSURE THAT OBSTRUCTION OF EXITS IS MINIMIZED OR AVOIDED. IF EXITS ARE OBSTRUCTED DURING CONSTRUCTION, ALTERNATE EXIT ROUTES DURING EACH PHASE OF CONSTRUCTION WILL BE PROVIDED AND IDENTIFIED ON THE CONSTRUCTION DRAWINGS. FIRE PROTECTION SYSTEMS SERVICES WILL BE DISRUPTED.

PROCEDURES WILL BE INCORPORATED TO MAINTAIN EQUIVALENT LEVELS OF SAFETY WHILE SYSTEMS ARE DOWN. AREAS WHERE THE SPRINKLER SYSTEM IS OUT OF SERVICE WILL BE SEPARATED BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NON- COMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL BE FULL HEIGHT, EXTENDING TO SUSPENDED CEILINGS OR TO THE FLOOR SLAB OR ROOF DECK ABOVE.

MAXIMUM TIME AND AREAS THAT MAY BE OUT OF SERVICE PER PHASE AS FOLLOWS:

PHASE: DURATION: APPROXIMATE COVERAGE AREA:

PHASE:1 6 WEEKS STAIRWELLS (NOT SHOWN ON DRAWING)

PHASE:2 3 WEEKS 10,950 FT2

PHASE:3 3 WEEKS 11,700 FT2

PHASE:4 3 WEEKS 27,550 FT2

PHASE:5 NO RESTRICTION 10,250 FT2

PHASE:6 3 WEEKS 15,350 FT2

PHASE:7 3 WEEKS 16,100 FT2

PHASE:8 3 WEEKS 8,750 FT2

PHASE:9 3 WEEKS 16,700 FT2

PHASE:10 2 WEEKS 5,150 FT2

PHASE:11 2 WEEKS 10,350 FT2

PHASE:12 2 WEEKS 4,900 FT2

PHASE:13 2 WEEKS 10,300 FT2

PHASE:14 2 WEEKS 5,150 FT2

PHASE:15 2 WEEKS 5,150 FT2

BID DOCUMENTS

COR : MATTHEW OSGOOD

5/20/2019

P M

ACCOMPANYING 36C25219B0056 0003