About this file

36C25219B0056 0003 36C25219B0056 0003.docx

View the file

Other files

File Type Posted
36C25219C0222-000.docx DOCX document
36C25219B0056-0005000.docx DOCX document
36C25219B0056-0004002.pdf PDF
36C25219B0056-0004000.docx DOCX document
36C25219B0056-0004001.pdf PDF
36C25219B0056-0003007.pdf PDF
36C25219B0056-0003008.pdf PDF
36C25219B0056-0003001.pdf PDF
36C25219B0056-0003003.pdf PDF
36C25219B0056-0003004.pdf PDF
36C25219B0056-0003005.pdf PDF
36C25219B0056-0003020.pdf PDF
36C25219B0056-0003015.pdf PDF
36C25219B0056-0003013.pdf PDF
36C25219B0056-0003014.pdf PDF
36C25219B0056-0003019.pdf PDF
36C25219B0056-0003006.pdf PDF
36C25219B0056-0003012.pdf PDF
36C25219B0056-0003017.pdf PDF
36C25219B0056-0003016.pdf PDF
36C25219B0056-0003011.pdf PDF
36C25219B0056-0003009.pdf PDF
36C25219B0056-0003010.pdf PDF
36C25219B0056-0003018.pdf PDF
36C25219B0056-0003002.pdf PDF
36C25219B0056-0002001.pdf PDF
36C25219B0056-0002000.docx DOCX document
36C25219B0056-0002002.pdf PDF
36C25219B0056-0001000.docx DOCX document
36C25219B0056-001.docx DOCX document
36C25219B0056-002.pdf PDF
36C25219B0056-005.pdf PDF
36C25219B0056-004.pdf PDF
36C25219B0056-003.pdf PDF
36C25219B0056-006.pdf PDF
36C25219B0056-000.docx DOCX document
36C25219B0056-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-16-2019 695-19-3-6938-0015 695-16-112 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Wm. S. Middleton Memorial VA Hospital ATTN: Stacy Hoover (90C) 2500 Overlook Terrace Madison WI 53705-2254 To all Offerors/Bidders

36C25219B0056 06-26-2019

X X X

SEE ATTACHED CONTINUATION PAGE.

Continue to monitor FBO.GOV for any and all changes to this solicitation.

Stacy Hoover Contracting Officer Amendment of Solicitation Amendment 0003 Solicitation 36C25219B0056 Building 6 Sprinkler System Replacement Project# 695-16-112 Clement J. Zablocki VAMC, Milwaukee, WI

This amendment consists of:

Adjusted Drawings (Drawings provided as single sheets); Questions and Answers; Question period extended to July 22, 2019 at 3:30pm Local Time. Questions received after this deadline may not be addressed.

DRAWINGS (attached):

The drawings have been provided as single sheets. There are no other changes to the drawings.

REQUEST FOR INFORMATION (RFI) RESPONSES:

The questions from prospective bidders collected through date of this Amendment have been answered below.

Q4: We had an employee show up for the site walk and he doesn’t see his name nor our company as being represented on the sign in sheet. Can you please correct list?

A4: No, VA cannot validate that the employee was present. All attendees were instructed to sign the sign in sheet. However, on the solicitation page on the FBO website, there is a tab labeled ‘Interested Vendors’ where interested companies can provide their information.

Q5: Despite the new .pdf drawings that came out in the amendment that just posted, I am still encountering the same issues as stated in my previous e-mail; the file still produces and error message that it tries to “flatten” the images beginning around page 11, slows to a crawl at approximately 41%, and will not go any further. Please advise.

A5: Single sheets of the drawings are provided.

Q6: Professional cleaning services are required where office spaces and rooms are occupied only, please confirm. Professional cleaning services are not required in Basements, elevator rooms, storage spaces, unoccupied office spaces, unoccupied rooms, and unoccupied restrooms. Contractors will clean construction debris in Basements, elevator rooms, storage spaces, unoccupied office spaces, unoccupied rooms, and unoccupied restrooms.

A6: Occupied spaces to be professionally cleaned and restored to its original finished condition upon completion of activity as specified.

Q7: Per sheet GI001, Code Analysis letter H, last sentence references Detail 1/GI001 and Detail 2/GI101 for wall construction information. Detail 1 and Detail 2 are not shown. Sheet GI101 does not exist. Please provide details and/or clarifications.

A7: Delete last sentence of note H. Temporary smoke barrier wall shall meet NFPA 241 and is described in phasing notes on each sheet.

Q8: Sheet FX101 per Amendment 02 is still corrupt. The single PDF sheet does not plot nor print. Please provide a single sheet digital file.

A8: Single sheets of the drawings are provided.

Q9: May construction be performed in unoccupied spaces during 1st shift hours or the hours of 6AM – 6PM Mondays thru Fridays?

A9: All work is to be completed off hours as indicated by note 2 under Phasing Notes on sheet GI102.

Q10: Please confirm what Wings: A, B, C, and D are occupied:

A10:

0. Wing A Basement Riser Room – Not Occupied

0. Wing A 1st Floor – Occupied

0. Wing A 2nd Floor – Occupied

0. Wing A Attic – Not occupied

0. Wing B Basement Riser Room – Not Occupied

0. Wing B 1st Floor – Occupied

0. Wing B 2nd Floor – Occupied

0. Wing B Attic – Not Occupied

0. Wing C Basement Riser Room – Not Occupied

0. Wing C 1st Floor – South of hallway occupied, north of hallway not occupied

0. Wing C 2nd Floor – Occupied

0. Wing C Attic – Not Occupied

0. Wing D Basement Riser room – Not Occupied

0. Wing D 1st Floor – Occupied

0. Wing D 2nd Floor – Occupied

0. Wing D Attic – Not Occupied

Q11: Painting – newly installed sprinkler piping is to be red or painted red. Any sprinkler piping above the ACT will not be painted, please confirm this is acceptable. What color are the escutcheons to be or can we keep them as is?

A11: All newly installed sprinkler piping shall be red or painted red. Refer to Specifications 21 13 13 Paragraphs 2.3 and 2.10 for wet-system escutcheon finishes. Refer to Specification 21 13 16 Paragraph 2.12 for dry-system escutcheon finishes. Wet-system wall, floor, and ceiling plates shall be chrome plated steel. Wet-system fire department connection shall have an escutcheon with integral raised letters “Automatic Sprinkler”. Dry-system wall, floor, and ceiling plates shall be chrome plated steel.

GENERAL INFORMATION:

Reminder: The bid opening will be held on Monday, July 29, 2019 at 1:00pm Local Time in Conference Room B317 (ground floor) at the William S. Middleton Memorial VA Hospital, Madison, Wisconsin. (See address in block 8 of the SF1442.) Signs will be posted directing potential bidders.

Reminder: Question period extended to July 22, 2019 at 3:30pm Local Time. Questions received after this deadline may not be addressed.

THERE ARE NO FURTHER CHANGES.

See attached document: S06 - FA100 - FIRE ALARM - MODIFICATIONS FOR SPRINKLER SYSTEM INTERFACE.

See attached document: S06 - FA200 - FIRE ALARM - MODIFICATIONS FOR SPRINKLER SYSTEM.

See attached document: S06 - FX101 - FIRE SPRINKLER RISER LOCATIONS BASEMENT FLOOR PLAN 0.

See attached document: S06 - FX102 - FIRE SPRINKLER SYSTEM RISER FLOOR PLAN 1 PLAN.

See attached document: S06 - FX103 - FIRE SPRINKLER SYSTEM RISER FLOOR 2 PLAN.

See attached document: S06 - FX104 - FIRE SPRINKLER SYSTEM RISER FLOOR 3 AND ATTIC PLAN.

See attached document: S06 - FX105 - EXISTING FIRE SPRINKLER RISER DETAILS - WING A AND WING B.

See attached document: S06 - FX106 - EXISTING FIRE SPRINKLER RISER DETAILS - WING C AND WING D.

See attached document: S06 - FX107 - TEMPORARY COMBINED NEW _ EXISTING FIRE SPRINKLER RISER DETAILS_PHASE 1.

See attached document: S06 - FX108 - FINAL NEW FIRE SPRINKLER RISER DETAILS.

See attached document: S06 - GC101 - BASEMENT FLOOR LEVEL 0 FLOOR PLAN.

See attached document: S06 - GC102 - FLOOR LEVEL 1 FLOOR PLAN.

See attached document: S06 - GC103 - FLOOR LEVEL 2 FLOOR PLAN.

See attached document: S06 - GC104 - FLOOR LEVEL 3 AND ATTIC LEVEL FLOOR PLAN.

See attached document: S06 - GI000 - Cover Sheet.

See attached document: S06 - GI001 - GENERAL INFORMATION.

See attached document: S06 - GI201 - PROJECT PHASING PLAN-BASEMENT.

See attached document: S06 - GI202 - PROJECT PHASING PLAN-FIRST FLOOR.

See attached document: S06 - GI203 - PROJECT PHASING PLAN-SECOND FLOOR.

See attached document: S06 - GI204 - PROJECT PHASING PLAN-THIRD FLOOR AND ATTIC.

ACCOMPANYING 36C25219B0056 0003 Page 4 of 4

File details come from the government source that posted it.