Addendum 001 Summary.pdf

PDF 65 KB Posted

Attached to
Z1DA--Renovate Audiology 515-23-101
Solicitation number
36C25025B0019
Issued by

About this file

This document is a Request for Information (RFI) for the Renovate Audiology Project at the Battle Creek VA Medical Center in Battle Creek, Michigan, with Project Number 515-23-101, dated 05/12/2025. The RFI details drawing and specification modifications for Addendum #1, including updates to multiple drawing sheets and specification sections. Key drawing modifications include adding wall types A3 and A4, clarifying wall types for control and exam rooms, updating walk-off mat material specifications, adjusting mirror sizes, and modifying condensate pump and air handling unit details. Specification modifications encompass changes to hollow metal doors and frames (removing lead and stainless frame references), sliding door assemblies, canopy coverings, and domestic water heat exchangers, with clarifications to basis of design products and specific technical requirements.

View the file

Other files

File Type Posted
Award email notice - 515-23-101.pdf PDF
107326 CANOPY COVERINGS V2.pdf PDF
13.12_M502 - MECHANICAL DETAILS.pdf PDF
07.13_10-AF701 - FINISH AND SIGNAGE PLAN AND SCHEDULES.pdf PDF
00.2_GI002 - WALL TYPES.pdf PDF
083400 SLIDING DOOR OPENING ASSEMBLIES.pdf PDF
081113 HOLLOW METAL DOORS AND FRAMES.pdf PDF
07.7_10-AE112 - FIRST FLOOR ENLARGED PLANS AND ELEVATIONS.pdf PDF
07.6_10-AE111 - FIRST FLOOR ENLARGED PLANS AND ELEVATIONS.pdf PDF
07.5_10-AE101 - FIRST FLOOR PLAN.pdf PDF
223500 DOMESTIC WATER HEAT EXCHANGERS.pdf PDF
07.15_10-AQ731 - EQUIPMENT PLANS.pdf PDF
36C25025B0019 0004.docx DOCX document
36C25025B0019 0003.docx DOCX document
Bid RFI 03 Attachment Install ADA Compliant Access Building 10 Hand Rail System.pdf PDF
Wage Determination - MI20240079 - 4-4-25 - Calhoun MI.pdf PDF
Bid RFI 08 Attachment B AE18665 Preliminary Design Package Rev C.pdf PDF
Bid RFI 08 Attachment A 13 12 M502 - MECHANICAL DETAILS.pdf PDF
36C25025B0019 0002.docx DOCX document
S04 - Pre Bid Site Visit Attendance Log - 515-23-101 Signed.pdf PDF
S04 - Pre-Bid Site Visit Agenda - 515-23-101.pdf PDF
36C25025B0019 0001.docx DOCX document
S02 J-A Pelco - 515-23-101.pdf PDF
S02 515-23-101 - BID DOCS 100 - Specifications - 3-27-25.pdf PDF
S02 J-A ALC DDC - 515-23-101.pdf PDF
S02 Contractor EMR Certification Form - 515-23-101.docx DOCX document
S02 RFI Form - 515-23-101.doc DOC document
36C25025B0019_1.docx DOCX document
S02 J-A Hirsch - 515-23-101.pdf PDF
S02 ATTACHMENT VAAR 852.219-75 LIMITATIONS OF SUBCONTRACTING CERT - 515-23-101.docx DOCX document
S02 Drawings - 515-23-101 - BID DOCS 100.pdf PDF
S02 J-A Simplex 515-23-101.pdf PDF
S02 J-A Kaba - 515-23-101.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05/12/2025

RENOVATE AUDIOLOGY PROJECT FOR THE

BATTLE CREEK VA – BATTLE CREEK, MI

PROJECT NUMBER: 515-23-101

RFI RESPONSES, UPDATED DRAWINGS AND SPECIFICATIONS FOR ADDENDUM #1

Date Issued: 05/12/2025

REQUEST FOR INFORMATION

DRAWING MODIFICATIONS

GI002:

1. Added Wall Types A3 and A4.

10-AE101, 10-AE111, 10-AE112, 10-AQ731:

1. Clarified wall types for control and exam rooms.

10-AF701:

1. Clarified Walk Off Mat Material

10-AQ731:

1. Clarified size of mirror.

M502:

1. In detail 2, Condensate Pumps – Piping Connections, the height of the concrete housekeeping pad for the condensate pump was updated to 6” to match the callouts on drawing M300.

2. In detail 6, 10-AHU-1 Diagram, measurements have been added to best represent the dimensions of the air handling unit.

SPECIFICATION MODIFICATIONS

08 11 13 HOLLOW METAL DOORS AND FRAMES

1. Removed references to lead and stainless frames

08 34 00 SLIDING DOOR ASSEMBLIES

1. Clarified Basis of Design or equal product.

10 73 26 CANOPY COVERINGS

1. Clarified Basis of Design or equal product.

22 35 00 DOMESTIC WATER HEAT EXCHANGERS

1. Clarified domestic water heater requirements such as storage tank, material, and control valve strategy.

- - - E N D - - -