This document is a mechanical details drawing for the Battle Creek VA Medical Center Audiology renovation project. The drawing contains multiple technical diagrams and details related to mechanical systems, including:

Specific details include vibration isolation bases, condensate pump piping connections, floor-mounted expansion tank piping connections, and a security bar ductwork detail. The drawing provides technical specifications for mechanical infrastructure, with notes about insulation, structural steel members, isolation units, and installation requirements. The document is part of the bid documents for a fully sprinklered renovation of the Audiology area, prepared by FFE Engineering & Architecture, and dated January 17, 2025 with an addendum on May 8, 2025.

View the file

Other files

File Type Posted
Award email notice - 515-23-101.pdf PDF
083400 SLIDING DOOR OPENING ASSEMBLIES.pdf PDF
081113 HOLLOW METAL DOORS AND FRAMES.pdf PDF
07.7_10-AE112 - FIRST FLOOR ENLARGED PLANS AND ELEVATIONS.pdf PDF
07.6_10-AE111 - FIRST FLOOR ENLARGED PLANS AND ELEVATIONS.pdf PDF
Addendum 001 Summary.pdf PDF
07.5_10-AE101 - FIRST FLOOR PLAN.pdf PDF
107326 CANOPY COVERINGS V2.pdf PDF
07.13_10-AF701 - FINISH AND SIGNAGE PLAN AND SCHEDULES.pdf PDF
00.2_GI002 - WALL TYPES.pdf PDF
223500 DOMESTIC WATER HEAT EXCHANGERS.pdf PDF
07.15_10-AQ731 - EQUIPMENT PLANS.pdf PDF
36C25025B0019 0004.docx DOCX document
36C25025B0019 0003.docx DOCX document
Wage Determination - MI20240079 - 4-4-25 - Calhoun MI.pdf PDF
Bid RFI 03 Attachment Install ADA Compliant Access Building 10 Hand Rail System.pdf PDF
Bid RFI 08 Attachment B AE18665 Preliminary Design Package Rev C.pdf PDF
Bid RFI 08 Attachment A 13 12 M502 - MECHANICAL DETAILS.pdf PDF
36C25025B0019 0002.docx DOCX document
S04 - Pre Bid Site Visit Attendance Log - 515-23-101 Signed.pdf PDF
S04 - Pre-Bid Site Visit Agenda - 515-23-101.pdf PDF
36C25025B0019 0001.docx DOCX document
S02 J-A ALC DDC - 515-23-101.pdf PDF
S02 Contractor EMR Certification Form - 515-23-101.docx DOCX document
S02 RFI Form - 515-23-101.doc DOC document
36C25025B0019_1.docx DOCX document
S02 J-A Hirsch - 515-23-101.pdf PDF
S02 ATTACHMENT VAAR 852.219-75 LIMITATIONS OF SUBCONTRACTING CERT - 515-23-101.docx DOCX document
S02 Drawings - 515-23-101 - BID DOCS 100.pdf PDF
S02 J-A Pelco - 515-23-101.pdf PDF
S02 515-23-101 - BID DOCS 100 - Specifications - 3-27-25.pdf PDF
S02 J-A Simplex 515-23-101.pdf PDF
S02 J-A Kaba - 515-23-101.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H O

T W

A T

E R

C O

IL

H U

M

ID

IF

IE

R

PLAN VIEW

C O

O

LIN

G C

O

IL

ELEVATION A - A

RETURN

R E

L

IE

F

O U

T S

ID

E

M

IN

O A

E C

O N

O A

SUPPLY

SUPPLY

12" M E

R V

14 F

ILT

E R

S

SUPPLY FAN

18" CLEAR OPENING DOOR

2" M E

R V

8 & 12" M

E R

V 11 F

ILT

E

R S

RETURN FAN

RETURN

BASIS OF DESIGN PROVIDED FROM AIR ENTERPRISES

72" [6']

6"

360" [30']

60" [5']

D

D

MV

FLOOR MOUNTING BASE RING WITH DRAIN

ACCESS OPENING SHOWN. ANGLE IRON

LEGS MAY BE USED AS AN OPTION.

150mm [6"]

HOUSEKEEPING PAD

COLD WATER FILL LINE. SEE

EXPANSION TANK SCHEDULE FOR

SIZE

DRAIN

FROM SYSTEM

RUN DRAIN LINE TO

NEAREST FD

UNLESSINDICATED

OTHERWISE

DRAIN

TO PUMP

SUCTION

AIR SEPARATOR

SEE NOTES 1 & 2

HANGER RODS

(TYP)

CONNECTOR PIPE.

BLADDER EXPANSION

TANK

REDUCED PRESSURE ZONE BACKFLOW

PREVENTER

NC

BUTTERFLY OR

BALL ISOLATION

VALVE

RUN DRAIN LINE TO

NEAREST FD

AIR CHARGING

SHRAEDER VALVE

AUTO. AIR VENT TO DRAIN

PI

OMIT PRESSURE GAUGE LINE

IF STRAINER IS NOT

INCLUDED.

NOTES:

1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR

COMPONENT SIZES.

2. FOR HOT WATER SYSTEMS 50mm [2"] AND SMALLER

AND CHILLED WATER SYSTEMS USE IN-LINE AIR

PURGER IN LIEU OF AIR SEPARATOR.

3. SET PRESSURE REDUCING VALVE SO PRESSURE AT

HIGHEST POINT IN SYSTEM HAS A MINIMUM OF 28kPa

[4 PSIG].

4. PROVIDE STRAINER IN AIR SEPARATOR IF INDICATED

IN EXPANSION TANK SCHEDULE.

5. RELIEF VALVE FOR CHILLED WATER SYSTEM IS

SHOWN. OMIT WHEN RELIEF VALVE IS SHOWN ON

HEAT EXCHANGER DETAIL AND SYSTEM IS USED

ONLY FOR HOT WATER HEATING.

PIPE HANGERS - PROVIDE DOUBLE DEFLECTION

NEOPRENE (TYPE HN) FOR FIRST TWO ON EACH

SIDE OF PUMP (SEE NOTE NO. 1)

PRESSURE GAGE

1/2" [15mm]

STRAINERFLEXIBLE

CONNECTIONBALL OR

BUTTERFLY TYP.

NOTES:

1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.

BALANCING

DEVICE

153mm [6"] THICK

CONCRETE

HOUSEKEEPING

PAD

LPR

FLOOR

20mm [3/4"] DRAIN, DISCHARGE INTO NEAREST

FLOOR DRAIN, NC.

THERMOMETER

GRAVITY RETURN

FROM FLASH TANK

IF SHOWN ON

FLOOR PLAN

SCHEDULE 80

PUMP DISCHARGE

TO PLANT

CONTROL CABINET

VENT

RECEIVER

WATER LEVEL GAUGE

THERMOMETER

FLUSHING

CONNECTION

SCHEDULE 80

STEEL PIPE

SCHEDULE 80

STEEL PIPE

TYPICAL STRUCTURAL

STEEL MEMBER FOR

EQUIPMENT

NUMBER OF ISOLATION

UNITS AS REQUIRED

MOTORSHAFT

DRIVEN

EQUIPMENT

SPRING

ISOLATOR

SLEEVE ANCHOR

BOLT

REINFORCING BARSSTRUCTURAL

STEEL FRAME

ALL WELDED

STEEL FRAMEWORK

TYPICAL STRUCTURAL

STEEL MEMBER FOR

EQUIPMENT

NUMBER OF ISOLATION

UNITS AS REQUIRED

TYPE "B"

WELDED STEEL BASE

SECTION A - A

TYPE "1"

CONCRETE INERTIA BASE

MOTORSHAFT

NOTE:

1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

2. SEE KEYNOTES ON SHEET 136-MH101 FOR EXACT LOCATIONS OF SECURITY BARS LOCATED IN DUCWORK.

3. SECURITY BARS TO BE IN LINE WITH WHERE THE DUCTWORK CROSSES THE INTERIOR WALL.

INSULATION SEE

SPECIFICATION

1/8" [6mm]

CLEARANCE ALL

AROUND

DUCT

SIDE ELEVATION SECTION

METAL

SECURITY

BARS

INTEROIR WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

A u to d e s k D o c s

/B a tt le

C re e k V

A

R e n o v a te A u d io lo g y B

/F

F E

B a tt le C re e k

R e n o v a te A u d io lo g y

M E

P rv t

/8

/2

:1

:3

P M

M502

MECHANICAL DETAILS

01/17/2025 KF JV

RENOVATE AUDIOLOGY 515-23-101

5500 Armstrong Rd, Battle Creek, MI

BID DOCUMENTS 100%BATTLE

CREEK VA

MEDICAL

CENTER

Approved: Veteran's Affairs Medical Center

NTS

10-AHU-1 Diagram

NTS

FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS

NTS

IN-LINE PUMPS - CONNECTIONS

NTS

CONDENSATE PUMPS - PIPING CONNECTIONS

NTS

VIBRATION ISOLATION BASES

NTS

SECURITY BAR DUCTWORK DETAIL

0 BID DOCUMENTS 01/17/2025

1 ADDENDUM #1 05/08/2025

05/08/2025

Sheets
M502 - MECHANICAL DETAILS

File details come from the government source that posted it. Updated .