This document is a technical specification for hollow metal doors and frames for the Battle Creek VA Medical Center Audiology Renovation project (Project No. 515-23-101). The specification provides detailed requirements for hollow metal door and frame materials, fabrication, and installation, including performance standards for smoke control, sound transmission, and thermal efficiency. Key technical specifications include:

Doors must be 44 mm thick, with interior doors using Level 2 heavy-duty seamless construction and vertical steel stiffeners, while exterior doors require galvanized sheet steel with polystyrene or polyurethane cores. Frames are to be manufactured according to ANSI A250.8 standards, with specific thickness requirements for interior and exterior applications. Sustainable construction requirements mandate minimum recycled content percentages: 30% for steel, 70% for stainless steel, and 50% for aluminum. The specification also includes detailed installation instructions, emphasizing proper anchoring, alignment, and finishing techniques, with specific provisions for sound-rated doors, fire doors, and smoke control doors.

View the file

Other files

File Type Posted
Award email notice - 515-23-101.pdf PDF
107326 CANOPY COVERINGS V2.pdf PDF
13.12_M502 - MECHANICAL DETAILS.pdf PDF
07.13_10-AF701 - FINISH AND SIGNAGE PLAN AND SCHEDULES.pdf PDF
00.2_GI002 - WALL TYPES.pdf PDF
07.5_10-AE101 - FIRST FLOOR PLAN.pdf PDF
223500 DOMESTIC WATER HEAT EXCHANGERS.pdf PDF
07.15_10-AQ731 - EQUIPMENT PLANS.pdf PDF
36C25025B0019 0004.docx DOCX document
083400 SLIDING DOOR OPENING ASSEMBLIES.pdf PDF
07.7_10-AE112 - FIRST FLOOR ENLARGED PLANS AND ELEVATIONS.pdf PDF
07.6_10-AE111 - FIRST FLOOR ENLARGED PLANS AND ELEVATIONS.pdf PDF
Addendum 001 Summary.pdf PDF
36C25025B0019 0003.docx DOCX document
Bid RFI 03 Attachment Install ADA Compliant Access Building 10 Hand Rail System.pdf PDF
Wage Determination - MI20240079 - 4-4-25 - Calhoun MI.pdf PDF
Bid RFI 08 Attachment B AE18665 Preliminary Design Package Rev C.pdf PDF
Bid RFI 08 Attachment A 13 12 M502 - MECHANICAL DETAILS.pdf PDF
36C25025B0019 0002.docx DOCX document
S04 - Pre Bid Site Visit Attendance Log - 515-23-101 Signed.pdf PDF
S04 - Pre-Bid Site Visit Agenda - 515-23-101.pdf PDF
36C25025B0019 0001.docx DOCX document
S02 J-A Pelco - 515-23-101.pdf PDF
S02 515-23-101 - BID DOCS 100 - Specifications - 3-27-25.pdf PDF
S02 J-A Hirsch - 515-23-101.pdf PDF
S02 ATTACHMENT VAAR 852.219-75 LIMITATIONS OF SUBCONTRACTING CERT - 515-23-101.docx DOCX document
S02 Drawings - 515-23-101 - BID DOCS 100.pdf PDF
S02 J-A Simplex 515-23-101.pdf PDF
S02 J-A Kaba - 515-23-101.pdf PDF
S02 J-A ALC DDC - 515-23-101.pdf PDF
S02 Contractor EMR Certification Form - 515-23-101.docx DOCX document
S02 RFI Form - 515-23-101.doc DOC document
36C25025B0019_1.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Addendum #1 BATTLE CREEK VA MEDICAL CENTER

RENOVATE AUDIOLOGY

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 1

SECTION 08 11 13

HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Hollow metal doors and transom panels hung in hollow metal frames at interior and exterior locations.

2. Hollow metal door frames for wood doors and at interior locations.

3. Glazed openings in hollow metal doors.

1.2 RELATED WORK

A. Section 05 50 00, METAL FABRICATIONS: Frames fabricated of structural steel.

B. Section 08 71 00, DOOR HARDWARE: Door Hardware:

C. Section 08 80 00, GLAZING: Glazing.

D. Card Readers and Biometric Devices: Section 28 13 00, PHYSICAL ACCESS

CONTROL SYSTEM.

E. Security Monitors: Section 28 23 00, VIDEO SURVEILLANCE.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standard Institute (ANSI):

A250.8-2014.............Standard Steel Doors and Frames

C. ASTM International (ASTM):

A240/A240M-15b..........Chromium and Chromium-Nickel Stainless Steel

Plate, Sheet, and Strip for Pressure Vessels and for General Applications

A653/A653M-15...........Steel Sheet, Zinc-Coated (Galvanized) or

Zinc-Iron Alloy-Coated (Galvannealed) by the

Hot-Dip

A1008/A1008M-15.........Steel, Sheet, Cold-Rolled, Carbon, Structural, High Strength Low Alloy and High Strength Low

Alloy with Improved Formability, Solution

Hardened, and Bake Hardenable

B209-21.................Aluminum and Aluminum-Alloy Sheet and Plate

B209M-21................Aluminum and Aluminum-Alloy Sheet and Plate

(Metric)

B221-21.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 2

B221M-21................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

D3656/D3656M-13.........Insect Screening and Louver Cloth Woven from

Vinyl Coated Glass Yarns

E90-09..................Laboratory Measurement of Airborne Sound

Transmission Loss of Building Partitions and

Elements

D. Federal Specifications (Fed. Spec.):

L-S-125B................Screening, Insect, Nonmetallic

E. Master Painters Institute (MPI):

No. 18..................Primer, Zinc Rich, Organic

F. National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-06..............Metal Finishes Manual

G. National Fire Protection Association (NFPA):

80-16...................Fire Doors and Other Opening Protectives

H. UL LLC (UL):

10C-09..................Positive Pressure Fire Tests of Door Assemblies

1784-15.................Air Leakage Tests of Door Assemblies and Other

Opening Protectives

I. Department of Veterans Affairs

VA Physical Security and Resiliency Design Manual October 1, 2020

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and fabrication and installation details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Include schedule showing each door and frame requirements fire label and smoke control label for openings.

3. Installation instructions.

D. Sustainable Construction Submittals:

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

E. Test reports: Certify products comply with specifications.

1. Sound rated door.

F. Qualifications: Substantiate qualifications comply with specifications.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 3

1. Manufacturer.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications:

1. Regularly manufactures specified products.

2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.

1.6 DELIVERY

A. Fasten temporary steel spreaders across the bottom of each door frame before shipment.

B. Deliver products in manufacturer's original sealed packaging.

C. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

D. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.7 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight conditioned facility.

B. Protect products from damage during handling and construction operations.

1.8 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

1.9 PRE-INSTALLATION COORDINATION

A. Host an on-site, pre-installation, coordination meeting between door frame installer, gypsum contractor, and plaster contractor.

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. Design hollow metal doors and frames complying with specified performance:

1. Smoke Control Doors and Frames: UL 1784; NFPA 80 labeled, maximum

0.15424 cubic meter/second/square meter (3.0 cubic feet/minute/square foot) at 24.9 Pa (0.10 inches water gauge) pressure differential.

2. Sound Rated Doors and Frames: Minimum 45 sound transmission class

(STC) when tested according to ASTM E90.

3. Thermal Transmittance: Maximum 0.2 U-value, maximum at exterior doors.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 4

2.2 MATERIALS

A. Sheet Steel: ASTM A1008/A1008M, cold-rolled.

B. Galvanized Sheet Steel: ASTM A653.

2.3 PRODUCTS - GENERAL

A. Provide hollow metal doors and frames from one manufacturer.

B. Sustainable Construction Requirements:

1. Steel Recycled Content: 30 percent total recycled content, minimum.

2. Stainless Steel Recycled Content: 70 percent total recycled content, minimum.

3. Aluminum Recycled Content:50 percent total recycled content, minimum.

2.4 HOLLOW METAL DOORS

A. Hollow Metal Doors: ANSI A250.8; 44 mm (1-3/4 inches) thick. See drawings for sizes and designs.

1. Interior Doors: Level 2 and Physical Performance Level B, heavy duty; Model 2, seamless at all locations.

B. Door Faces:

1. Interior Doors: Sheet steel

2. Exterior Doors: Galvanized sheet steel minimum Z120 or ZF120 (G40 or A40) coating.

C. Door Cores:

1. Interior Doors: Vertical steel stiffeners.

2. Exterior Doors: Polystyrene or polyurethane.

2.5 HOLLOW METAL FRAMES

A. Hollow Metal Frames: ANSI A250.8; Knock-down face welded. See drawings for sizes and designs.

1. Interior Frames:

a. Level 2 Hollow Metal Doors: 1.3 mm (0.053 inch) thick.

b. Wood Doors: 1.0 mm (0.042 inch) thick.

2. Interior Borrowed Light Frames: 1.3 mm (0.051 inch) thick.

B. Frame Materials:

1. Interior Frames: Sheet steel.

2. Exterior Frames: Galvanized sheet steel minimum Z120 or ZF120 (G40 or A40 coating.

2.6 FABRICATION

A. Hardware Preparation: ANSI A250.8; for hardware specified in Section

08 71 00, DOOR HARDWARE.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 5

B. Hollow Metal Door Fabrication:

1. Close top edge of exterior doors flush and seal to prevent water intrusion.

2. Fill spaces between vertical steel stiffeners with insulation.

C. Smoke Control Doors:

1. Close top and vertical edges flush.

2. Apply steel astragal to active leaf at pair and double egress doors.

a. Exception: Where vertical rod exit devices are specified for both leaves swinging in same direction.

3. Fire and Smoke Control Door Clearances: NFPA 80.

D. Sound Rated Doors:

1. Seals: Integral spring type automatic door bottom seal.

2. Fabricate vision panel cutouts and frames to receive double glazing as shown on drawings.

E. Transom Panel Fabrication:

1. Fabricate panels as specified for doors.

2. Fabricate bottom edge with rabbet stop where no transom bar occurs.

F. Hollow Metal Frame Fabrication:

1. Fasten mortar guards to back of hardware reinforcements, except on lead-lined frames.

2. Concealed Closers in Head Frame: Provide 1 mm (0.042 inch) thick steel removable stop sections for access to concealed face plates and control valves, except when cover plates are furnished with closer.

3. Terminated Stops: ANSI A250.8.

4. Borrowed Light and Panel Opening Frames:

a. Provide integral stop on exterior, corridor, or secure side of door.

b. Design rabbet width and depth to receive glazing material or panel shown on drawings.

5. Frame Anchors:

a. Floor anchors:

1) Provide extension type floor anchors to compensate for depth of floor fills.

2) Provide 1.3 mm (0.053 inch) thick steel clip angles welded to jamb and drilled to receive floor fasteners.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 6

3) Provide 50 mm by 50 mm by 9 mm (2 inch by 2 inch by 3/8 inch) clip angle for lead lined frames, drilled for floor fasteners.

4) Provide mullion 2.3 mm (0.093 inch) thick steel channel anchors, drilled for two floor fasteners and frame anchor screws.

5) Provide continuous 1 mm (0.042 inch) thick steel rough bucks drilled for floor fasteners and frame anchor screws for sill sections.

a) Space floor bolts50 mm (24 inches) on center.

b. Jamb anchors:

1) Place anchors on jambs:

a) Near top and bottom of each frame.

b) At intermediate points at maximum 600 mm (24 inches) spacing.

2) Form jamb anchors from steel minimum 1 mm (0.042 inch) thick.

3) Anchors set in masonry: Provide adjustable anchors designed for friction fit against frame and extended into masonry minimum 250 mm (10 inches). Provide one of following types:

a) Wire Loop Type: 5 mm (3/16 inch) diameter wire.

b) T-Shape type.

c) Strap and stirrup type: Corrugated or perforated sheet steel.

4) Anchors for stud partitions: Provide tabs for securing anchor to sides of studs. Provide one of the following:

a) Welded type.

b) Lock-in snap-in type.

5) Anchors for frames set in prepared openings:

a) Steel pipe spacers 6 mm (1/4 inch) inside diameter, welded to plate reinforcing at jamb stops, or hat shaped formed strap spacers 50 mm (2 inches) wide, welded to jamb near stop.

b) Drill jamb stop and strap spacers for 6 mm (1/4 inch) flat head bolts to pass through frame and spacers.

c) Two piece frames: Subframe or rough buck drilled for 6 mm

(1/4 inch) bolts.

6) Anchors for observation windows and other continuous frames set in stud partitions.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 7

a) Weld clip anchors to sills and heads of continuous frames over 1200 mm (4 feet) long.

b) Space maximum 600 mm (24 inches) on centers.

7) Modify frame anchors to fit special frame and wall construction.

8) Provide special anchors where shown on drawings and where required to suit application.

G. Sound Rated Door Frames:

1. Seals: Integral continuous gaskets on frames.

H. Louver Fabrication:

1. Fabricate louvers as complete units.

2. Weld stationary blades to frames.

3. Factory install louvers in door cutouts, welded to door.

I. Louver Screen Fabrication:

1. Fabricate frame to hold wire fabric in channel with retaining bar anchor and to mount on surface of door with screws.

2. Do not lap frame over louver opening.

3. Miter frame corners and join by concealed mechanical fastenings extending about 57 mm (2-1/4 inches) into ends of each member.

4. Drill frame and doors for screw attachment:

5. Space screws 50 mm (2 inches) from end of each leg of frame and maximum 300 mm (12 inches) on center.

6. Insect Screens: Fasten insect screens to interior side of doors with retaining bar against door and not exposed to view.

7. Wire Guards: Fasten wire guard to exterior side of door with retaining bar against door and not exposed to view.

2.7 FINISHES

A. Steel and Galvanized Steel: ANSI A250.8; shop primed.

B. Stainless Steel: NAAMM AMP 500; No. 4 polished finish.

1. Blend welds to match adjacent finish.

C. Finish exposed surfaces after fabrication.

D. Aluminum Anodized Finish: NAAMM AMP 500.

1. Clear Anodized Finish: AA-C22A41; Class I Architectural, 0.018 mm

(0.7 mil) thick.

2. Color Anodized Finish: AA-C22A42 or AA-C22A44; Class I

Architectural, 0.018 mm (0.7 mil) thick.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 8

3. Clear Anodized Finish: AA-C22A31; Class II Architectural, 0.01 mm

(0.4 mil) thick.

4. Color Anodized Finish: AA-C22A32 or AA-C22A34; Class II

Architectural, 0.01 mm (0.4 mil) thick.

2.8 ACCESSORIES

A. Primers: ANSI A250.8.

B. Barrier Coating: ASTM D1187/D1187M.

C. Welding Materials: AWS D1.1/D1.1M, type to suit application.

D. Clips Connecting Members and Sleeves: Match door faces.

E. Fasteners: Galvanized steel or stainless steel.

1. Metal Framing: Steel drill screws.

2. Masonry and Concrete: Expansion bolts and power actuated drive pins.

F. Anchors: Galvanized steel and stainless steel.

G. Galvanizing Repair Paint: MPI No. 18.

H. Insulation: Unfaced mineral wool.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

C. Apply barrier coating to metal surfaces in contact with cementitious materials to minimum 0.7 mm (30 mils) dry film thickness.

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

2. Install fire doors and frames according to NFPA 80.

3. Install smoke control doors and frames according to NFPA 105.

3.3 FRAME INSTALLATION

A. Apply barrier coating to concealed surfaces of frames built into masonry.

B. Plumb, align, and brace frames until permanent anchors are set.

1. Use triangular bracing near each corner on both sides of frames with temporary wood spreaders at midpoint.

2. Use wood spreaders at bottom of frame when shipping spreader is removed.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 9

3. Where construction permits concealment, leave shipping spreaders in place after installation, otherwise remove spreaders when frames are set and anchored.

4. Remove wood spreaders and braces when walls are built and jamb anchors are secured.

C. Floor Anchors:

1. Anchor frame jambs to floor with two expansion bolts.

a. Lead Lined Frames: Use 9 mm (3/8 inch) diameter bolts.

b. Other Frames: Use 6 mm (1/4 inch) diameter bolts.

2. Power actuated drive pins are acceptable to secure frame anchors to concrete floors.

D. Jamb Anchors:

1. Masonry Walls:

a. Embed anchors in mortar.

b. Fill space between frame and masonry with grout or mortar as walls are built.

2. Metal Framed Walls: Secure anchors to sides of studs with two fasteners through anchor tabs.

3. Prepared Masonry and Concrete Openings:

a. Direct Securement: 6 mm (1/4 inch) diameter expansion bolts through spacers.

b. Subframe or Rough Buck Securement:

1) 6 mm (1/4 inch) diameter expansion bolts on 600 mm (24 inch) centers.

2) Power activated drive pins on 600 mm (24 inches) centers.

c. Secure two-piece frames to subframe or rough buck with machine screws on both faces.

E. Frames for Sound Rated Doors: Fill frames with insulation.

F. Touch up damaged factory finishes.

1. Repair galvanized surfaces with galvanized repair paint.

2. Repair painted surfaces with touch up primer.

3.4 DOOR INSTALLATION

A. Install doors plumb and level.

B. Adjust doors for smooth operation.

C. Touch up damaged factory finishes.

1. Repair galvanized surfaces with galvanized repair paint.

2. Repair painted surfaces with touch up primer.

PROJECT NO. 515-23-101

01-01-21

HOLLOW METAL DOORS AND FRAMES

08 11 13 - 10

3.5 CLEANING

A. Clean exposed door and frame surfaces. Remove contaminants and stains.

3.6 PROTECTION

A. Protect doors and frames from construction operations.

B. Remove protective materials immediately before acceptance.

C. Repair damage.

- - - E N D - - -