RFIs - Responses and Answers 20210323.pdf

PDF 108 KB Posted

Attached to
Z1DA--Upgrade Emergency Power 138 610-16-104
Solicitation number
36C25020B0081
Issued by

About this file

This document includes a federal contract opportunity notice and related files regarding an upgrade to emergency power systems at a Department of Veterans Affairs medical center. The solicitation will be a 100% Service-Disabled Veteran-Owned Small Business set-aside for upgrade work including emergency power generators, automatic transfer switches, and energy monitoring control systems at multiple buildings. The project magnitude is estimated between $5-10 million under North American Industry Classification System code 238210. The awarded contractor must be an SDVOSB, registered in the Vendor Information Pages and System for Award Management databases, and able to complete the work within 600 calendar days of receiving a notice to proceed.

View the file

Other files

File Type Posted
36C25020B0081 0014.docx DOCX document
36C25020B0081 0013.docx DOCX document
EP001S.pdf PDF
36C25020B0081 0012.docx DOCX document
261313 MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR seismic.pdf PDF
230541 NOISE AND VIBRATION CONTROL seismic.pdf PDF
231000 FACILITY FUEL SYSTEMS seismic.pdf PDF
211313 Wet-Pipe Sprinkler Systems seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part6.pdf PDF
260533 Raceway and Boxes seismic.pdf PDF
Revised Bid Schedule.rtf RTF text file
233700 OUTLETS AND INLETS seismic.pdf PDF
238200 Convection Heating and Cooling Units seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part3.pdf PDF
232113 Hydronic Piping seismic.pdf PDF
238100 DECENTRALIZED UNITARY HVAC EQUIPMENT.pdf PDF
263623 Automatic Transfer Switches seismic.pdf PDF
233100 HVAC DUCTS AND CASINGS seismic.pdf PDF
232300 REFRIGERANT PIPING seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part2.pdf PDF
230511 COMMON WORK RESULTS FOR HVAC seismic.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS seismic.pdf PDF
092216 NON-STRUCTURAL METAL FRAMING 2.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part4.pdf PDF
261313 Appendix_Concrete Pad for Metering Cabinet.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part5.pdf PDF
000110 Table of Contents seismic.pdf PDF
265100 Interior Lighting seismic.pdf PDF
238413 Self-Contained Steam Humidifiers.pdf PDF
232213 Steam and Condensate Heating Piping seismic.pdf PDF
262313 Generator Paralleling Cont seismic.pdf PDF
262200 Low Voltage Transformers seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part1.pdf PDF
36C25020B0081 0011.docx DOCX document
074000 Siding Panels seismic.pdf PDF
36C25020B0081 0010.docx DOCX document
36C25020B0081 0009.docx DOCX document
36C25020B0081 0008.docx DOCX document
36C25020B0081 0007.docx DOCX document
36C25020B0081 0006.docx DOCX document
EP201 - POWER - MV SWITCHGEAR ELEVATION.pdf PDF
36C25020B0081 0005.docx DOCX document
EE601 - EMCS - RISER DIAGRAM.pdf PDF
RFI Responses.docx DOCX document
194EP-100 - ELECTRICAL POWER PLAN.pdf PDF
Card Reader Specification 281300.pdf PDF
610-16-104 addendum 04 all drawings 20201201.pdf PDF
610-16-104 Fires Safety CD review and responses 20201201.pdf PDF
Tax Exemption - Indiana (FTW).pdf PDF
36C25020B0081 0004.docx DOCX document
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

610-16-104

Upgrade Emergency Power B138

RFI Log / Responses #2

Addendum Items:

• 00 01 00 TABLE OF CONTENTS – UPDATED FOR SEISMIC

• 07 40 00 SIDING PANELS – UPDATED FOR SEISMIC

• 09 22 16 NON-STRUCTURAL METAL FRAMING – UPDATED FOR SEISMIC

• 21 13 13 WET-PIPE SPRINKLER SYSTEMS – UPDATED FOR SEISMIC

• 23 05 11 COMMON WORK RESULTS FOR HVAC – UPDATED FOR SEISMIC

• 23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT – UPDATED FOR

SEISMIC

• 23 10 00 FACILITY FUEL OIL SYSTEMS– UPDATED FOR SEISMIC

• 23 21 11 BOILER PLANT PIPING SYSTEMS – UPDATED FOR SEISMIC

• 23 21 13 HYDRONIC PIPING– UPDATED FOR SEISMIC

• 23 22 13 STEAM AND CONDENSATE HEATING PIPING– UPDATED FOR SEISMIC

• 23 23 00 REFRIGERANT PIPING– UPDATED FOR SEISMIC

• 23 31 00 DUCTS AND CASINGS – UPDATED FOR SEISMIC

• 23 34 00 HVAC FANS– UPDATED FOR SEISMIC

• 23 37 00 AIR OUTLETS AND INLETS– UPDATED FOR SEISMIC

• 23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT– UPDATED FOR SEISMIC

• 23 82 00 CONVECTION HEATING AND COOLING UNITS– UPDATED FOR SEISMIC

• 23 84 13 SELF-CONTAINED STEAM HUMIDIFIERS

• 26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS – UPDATED FOR SEISMIC

• 26 13 13 MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR

• 26 22 00 LOW VOLTAGE TRANSFORMERS – UPDATED FOR SEISMIC

• 26 23 13 GENERATOR PARALLELING CONTROLS

• 26 24 16 PANELBOARDS – UPDATED FOR SEISMIC

• 26 32 13 ENGINE GENERATOR – UPDATED FOR SEISMIC AND RFIS

• 26 36 23 AUTOMATIC TRANSFER SWITCHES – UPDATED FOR SEISMIC

• 26 51 00 INTERIOR LIGHTING – UPDATED FOR SEISMIC

• Drawings:

o 194SI-101 STRUCTURAL GENERAL NOTES o 194AS100 FLOOR PLAN o 194AS-101 ENLARGED FLOOR PLANS o 194AS-200 ELEVATIONS AND SECTIONS o 194AS-201 ELEVATIONS AND SECTIONS o 194AS-300 WALL SECTIONS o 194MH-102 - MECHANICAL PLANS AND SECTIONS o 194MH-602 - MECHANICAL SCHEDULES II o 194MH-604 - FUEL PIPING DIAGRAM AND INSTRUMENTATION o EE401 - EMCS - ENLARGED ROOM PLANS o EP001S - POWER - SITE PLAN o EP201 - POWER - MV SWITCHGEAR ELEVATION o EP601 - POWER - SITE - SINGLE LINE DIAGRAM o Existing sheet 175-E72 annotated to identify existing information.

RFI 15

15 #1 Issued 10/30/20

1. Drawing EP001S note 15 & 16 show new preferred and alternate utility service feeders. Please clarify the following:

a. Is this bid package just responsible for the duct bank/manholes and the utility will pull conductors?

i. If so, will the utility pull temporary feeder (Note 21)?

ii. Who is responsible for terminations?

iii. What is utility proving (metering cabinet, new pole, etc.)?

b. If the conductors are in this package, please clarify size.

2. Drawings EE001S and EP001S do not have a scale listed. Are these drawn to scale? If so, please provide what scale to use.

3. Drawing EP401 shows a new branch panel board being installed. Please provide a size for panel

P1SG.

4. EP601 note 1 says to provide a temporary tie between switches J & S. Please clarify if conduit is required or if cabling can be laid along ground.

5. Switches J and S cannot be located on the map. Please provide a location for these.

6. On EE401 on the enlarged drawing for building 124 there is no EEDP panel. On EE601 the panel is shown. Is the EEDP panel part of building 124?

7. There is a room detail for building 127 on EE601 but there is no pathway shown on EE100. Is this building part of the bid package?

8. There is no enlarged room detail for building 138 on EE401. Is this room detail being provided?

Response: This is a duplicate RFI answered as RFI #04 in addendum 05.

15 #3 Issued 12/11/2020

1. On drawing EE601 (8) ATS’s and (3) generators are shown in building 175. On drawing EE401 detail #7 (7) ATS’s and (4) generators are shown in building 175. Please clarify the correct number of ATS’s and generators for building 175.

Response: Scope shall include three generators and eight ATS’s. See sheet 175-0E72 for reference.

2. Drawing EE401 does not include a detail for a room layout for building 127. Will a room layout be provided showing the location of the ATS in building 127?

Response: Layout provided in addendum 05

3. Drawing EE100 does not indicate a conduit path to building 127 for the EMCS system. Please clarify a conduit path for EMCS fiber routed to building 127.

Response: Conduit path added on EE101 in previous addendum.

4. On drawing EE601 (2) ATS’s are shown in building 124. On drawing EE401 detail #8, ATS’s are not shown in Room 118 for building 124. Please clarify where the ATS’s are located in Room 118 for building 124.

Response: Building 124 ATS’s have been added to EE601.

5. After discussing the EMCS system with our ATS vendor, they brought to our attention that all existing ATS’s will need to be temporarily shutdown for new EMCS controls & meters installation. No information is given if temporary power is needed. Please clarify if temporary power is needed during these shutdowns and if so, please provide a proposed phasing sequence of how temporary power is to be provided for each shutdown.

- Response: Refer to Sheet EE601, General Note “G” issued in previous addendum.

6. The Bid Form and Statement of Bid Items (1.3 in the General Requirements Specification Section

01 00 00) contradict each other for the scope of work to be included on the deduct alternates.

Please clarify which description is accurate.

Response: Use Updated Bid Form description below.

BID ITEM II: (Alternate Deduct I): Same as bid item I (base bid) except delete all of the EMCS underground ducts and raceway, fiber, power and monitoring of ATSs and generators outside of building 175. EMCS headend system shall remain sized for entire campus. Reduce

600 days in Item A above to 570 days.

BID ITEM III: (Alternate Deduct II): Same as bid item II except for the following:

Eliminate the EMCS system. Do not install EMCS headend or infrastructure. Reduce 570 days in Item B above to 540 days.

7. We are being told from our manhole vendors that the specific size listed on the drawings would be custom. Can we use a standard size manhole that is slightly larger or smaller than the dimensions listed on the drawings? If so, would the larger or smaller size be preferred?

Response: Standard manhole size close to the size on the drawings is acceptable.

15 #4

1. Section 26 08 00 references a commissioning spec provided in 01 91 00. There is no specification

01 91 00. Please provide this commissioning spec.

Response: Answer provided in addendum 05

2. Note 10 on EP001S says to remove the existing utility feed. Please clarify if the existing utility feed is all in one duct bank or if there are two separate duct banks running parallel.

Response: They are likely in one duct bank system. It is not known the exact configuration. (2) feeder running parallel.

15#5 1/4/21 Reference: 4<7HS0433

1. Drawing 4<7HS0433 shows card readers on the exterior doors. Please provide a card reader spec or clarify if these are to be rough in only.

Response: Specification provided in addendum 05

RFI 16 1/25/21

- #1 Reference EP201 (Addenda 5) Elevation Drawing, it does not match EP601 (Addenda 4) Single

Line Diagram, which is correct? EP601 (Addenda 4) Single Line Diagram requires (11) total MV

Breakers & (2) Fuses. EP201 (Addenda 5) Elevation requires a total of (14) MV Breakers & (4)

Fuses.

Response: Elevation has been revised to match single-line.

- #2 Reference EP201 (Addenda 5) Elevation Drawing Main Utility / Gen Paralleling Gear Lineup, please confirm all Medium Voltage Circuit Breakers in this lineup are required to be 50kA rated as specified in 261313 2.4.C or if 25kA rated circuit breakers would be acceptable?[MSG1][JHS2]

Response: Provide 50KAIC per 26 13 13.

- #3 Reference EP201 (Addenda 5) Elevation Drawing Main Utility / Gen Paralleling Gear Lineup, please confirm if IBC 2018 Seismic Rating is required?

Response: Yes see updated specs and details. [PHF3]

#4 Reference EP201 (Addenda 5) Elevation Drawing Main Utility / Gen Paralleling Gear Lineup, please confirm if Redundant PLC’s are required?

Response: Yes, redundant PLC controls are required. The two utility sources are 30 degrees out of phase, thus the main-tie-main MUST be provided with open transition automatic throwover with redundant PLC controls. Additional information has been added to paralleling gear spec.

- #5 Reference EP201 (Addenda 5) Elevation Drawing Main Utility / Gen Paralleling Gear Lineup, please confirm the 112.5kVA Transformers are to be provided by the contractor and installed & mounted externally to the MV Gear?

Response: Confirmed and shown on EP401 in previous addendum. Correct the transformer is externally mounted.

- #6 Reference Drawing EP601 (Addenda 5), is the new 400A 3Pole ATS feeding Panel P1SG required to be Bypass Isolation per Spec 264624?

Response: Yes. Bypass isolation type.

- #7 Reference Drawing 138E-005, please confirm if ATS-LSDP 200A is new? If yes then is this required to be Bypass Isolation per Spec 264624?

Response: ATS-LSDP is new. Switch shall be bypass isolation type.

- #8 Reference Drawing 138E-005, please confirm if 138-ATS-9 is new? If yes then Is this required to be Bypass Isolation per Spec 264624?

Response: 138- ATS-9 is existing.

- #9 Reference Transfer Switch Spec 264624, are circuit breaker style transfer switches acceptable or are contactor based required?

Response: There is no 264624 spec section in the project. Transfer switches in section 263623 are switch type not breaker based ATS’s are NOT acceptable per 26 36 23-2.1 (A) (1). type.

- #10 Are all new Transfer Switches required to be Open Transition or Closed Transition?

Response: Open transition.

- #11 There are approximately (18) existing Transfer Switches that do not currently have the capability to output the required information to the EMCS system. With regards to EMCS Spec

263624, are all existing Transfer Switch upgrades required to be the responsibility of the EMCS

Vendor?

Response: WHO provides the upgrades is up to the bidding contractor. We cannot divide responsibility. The specified upgrades do need included.

- #12 With regards to the EMCS Base Bid Deduct #1 (All EMCS, Fiber, etc is deleted except for

Building 175), if this deduct is accepted then what Fiber/Connectivity infrastructure is still to remain in place?

Response: Refer to bid updated form.

- #13 Are Neutral Grounding Resistors required for the MV Generator?

Response: No.