This notice announces an upcoming Invitation for Bid for the Upgrade Emergency Power Building 138 project at the Northern Indiana HealthCare System VA Medical Center in Marion, Indiana.

The solicitation will be issued pursuant to a 100% Service-Disabled Veteran-Owned Small Business set-aside. Offerors must be registered and verified in VIP and SAM databases. The project magnitude is between $5-10 million with a NAICS code of 238210 and size standard of $16.5 million. The duration shall not exceed 600 calendar days from notice to proceed. Bonds will be required.

A one-time site visit will be scheduled. The solicitation, specifications and drawings will be posted on August 14, 2020 on SAM.gov, with bids due approximately 30 days later. Questions will only be answered through requests for information after posting. Offerors must monitor amendments on SAM.gov. The awarded project must meet contract documents, plans and specifications.

View the file

Other files

File Type Posted
36C25020B0081 0014.docx DOCX document
36C25020B0081 0013.docx DOCX document
EP001S.pdf PDF
36C25020B0081 0012.docx DOCX document
261313 MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR seismic.pdf PDF
RFIs - Responses and Answers 20210323.pdf PDF
230541 NOISE AND VIBRATION CONTROL seismic.pdf PDF
231000 FACILITY FUEL SYSTEMS seismic.pdf PDF
211313 Wet-Pipe Sprinkler Systems seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part6.pdf PDF
260533 Raceway and Boxes seismic.pdf PDF
Revised Bid Schedule.rtf RTF text file
233700 OUTLETS AND INLETS seismic.pdf PDF
238200 Convection Heating and Cooling Units seismic.pdf PDF
232113 Hydronic Piping seismic.pdf PDF
238100 DECENTRALIZED UNITARY HVAC EQUIPMENT.pdf PDF
263623 Automatic Transfer Switches seismic.pdf PDF
233100 HVAC DUCTS AND CASINGS seismic.pdf PDF
232300 REFRIGERANT PIPING seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part2.pdf PDF
230511 COMMON WORK RESULTS FOR HVAC seismic.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS seismic.pdf PDF
092216 NON-STRUCTURAL METAL FRAMING 2.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part4.pdf PDF
261313 Appendix_Concrete Pad for Metering Cabinet.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part5.pdf PDF
000110 Table of Contents seismic.pdf PDF
265100 Interior Lighting seismic.pdf PDF
238413 Self-Contained Steam Humidifiers.pdf PDF
232213 Steam and Condensate Heating Piping seismic.pdf PDF
262313 Generator Paralleling Cont seismic.pdf PDF
262200 Low Voltage Transformers seismic.pdf PDF
610-16-104 Upgrade Emergency Power Addendum Drawings 2021 0402 sealed_Part1.pdf PDF
36C25020B0081 0011.docx DOCX document
074000 Siding Panels seismic.pdf PDF
36C25020B0081 0010.docx DOCX document
36C25020B0081 0009.docx DOCX document
36C25020B0081 0008.docx DOCX document
36C25020B0081 0007.docx DOCX document
36C25020B0081 0006.docx DOCX document
EP201 - POWER - MV SWITCHGEAR ELEVATION.pdf PDF
36C25020B0081 0005.docx DOCX document
EE601 - EMCS - RISER DIAGRAM.pdf PDF
RFI Responses.docx DOCX document
194EP-100 - ELECTRICAL POWER PLAN.pdf PDF
Card Reader Specification 281300.pdf PDF
610-16-104 addendum 04 all drawings 20201201.pdf PDF
610-16-104 Fires Safety CD review and responses 20201201.pdf PDF
Tax Exemption - Indiana (FTW).pdf PDF
36C25020B0081 0004.docx DOCX document
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A DCB

D5

194MH-501

FUTURE GENERATOR

FOT-1

FUTURE DAY TANK

AAS-1

LVR-1

LVR-2

LVR-3

24"x36" ACCESS PANEL

24"x36" ACCESS PANEL

/4

(R E

F

REMOTE ALARM ANNUNCIATOR

FOR TANK LEVEL AND LEAK

DETECTION MONITORING

SYSTEM (FOR FOT-1)

RFS-1

FOF-1

FOT-2

TANK LEVEL AND

LEAK DETECTION

MONTIORING PANEL

(FOR FOT-1)

TYP

3" TF

D-1

D-2

TYP

TYP

1 1/2" DTR

1 1/2" DTS

1 1/2" DTR

1 1/2" DTS

FUTURE

PUMP SKID

PUMP SKID

1" ER

1" ES

1 1/2" DTR

1 1/2" DTS

1 1/2" FOFS

1 1/2" FOFR

D-3

(REF)

4' - 5 7/8"

(REF)

2' - 8"

DCB

2" DTR

2" DTS

3" TF

1 1/2" FOFR

3" TF

1 1/2" FOFS

UH-1

UH-2

1 2 3

TYP TYP

TYP

TYP

TYP

TYP

TYP

TYP

T

T

T

FUTURE GENERATOR

TYP

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 65

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F F

E

M a ri o n

B u ild in g s w it c h k y le

.g u g g e n h e im .r v t

/2

/2

:3

:1

A

M

194MH-102

MECHANICAL PLANS AND

SECTIONS

PP BL

1/4" = 1'-0" E1

MECHANICAL FLOOR PLAN - GENERATOR ROOM

GENERATOR ROOM CONTROLS DESCRIPTION - GENERATOR

COOLING AND HEATING/VENTILATION:

1. EMERGENCY GENERATOR SHALL BE INTERLOCKED WITH D-1,

D-2, AND LVR-3. WHEN EMERGENCY GENERATOR IS

ENERGIZED D-1, D-2, AND LVR-3 SHALL OPEN. WHEN

EMERGENCY GENERATOR IS DE-ENERGIZED D-1, D-2, AND

LVR-3 SHALL CLOSE. ALL DAMPERS SHALL BE PROVIDED

WITH LIMIT SWITCHES TO PROVE OPEN STATUS BEFORE

GENERATOR START.

2. VENTILATION EXHAUST FAN EF-1 SHALL BE INTERLOCKED

WITH D-1 AND D-2. WHEN ROOM THERMOSTAT RISES ABOVE

85°F, OPEN THE LOWER SECTIONS OF EACH D-1 AND D-2

DAMPER ARRAY, THEN ROOM EXHAUST FAN SHALL START.

WHEN ROOM THERMOSTAT DROPS BELOW 80°F, SEQUENCE

SHALL BE REVERSED. EXHAUST FAN MAY START WHEN

GENERATOR IS IN OPERATION AND LOUVERS ARE ALREADY

OPEN.

3. ELECTRIC UNIT HEATERS SHALL BE INTERLOCKED WITH

ROOM THERMOSTAT SET AT 40°F. ON A DROP IN ROOM

TEMPERATURE BELOW 38°F ELECTRIC UNIT HEATER SHALL

BE ENERGIZED. HEATER SHALL BE DE-ENERGIZED ON A RISE

IN ROOM TEMPERATURE ABOVE 42°F.

1/4" = 1'-0" E6

MECHANICAL FLOOR PLAN - GENERATOR ROOM OVERHEAD PIPING AND EQUIPMENT

DRAWING NOTES:

1 ENGINE EXHAUST AND SILENCERS SHALL BE SUPPORTED FROM ROOF FRAMING

WITH SPRING TYPE HANGERS. ADDITIONAL ROOF FRAMING IS PROVIDED FOR THIS

PURPOSE. COORDINATE SILENCER AND HANGER LOCATIONS TO ALIGN WITH

FRAMING. CONSULT WITH MANUFACTURER FOR ADDITIONAL ENGINE EXHAUST

REQUIREMENTS.

2 EXHAUST SHALL CONNECT TO ENGINE MANIFOLD VIA STAINLESS STEEL FLEXIBLE

SECTION TO LIMIT STRESS ON COMPONENTS.

3 INCLUDE Y FITTING AND DRIP LEG WITH PETCOCK BELOW SILENCER TO TRAP

CONDENSATION.

4 INSTALL DOUBLE-SLEEVED EXHAUST THIMBLE AT EXHAUST PENETRATION THRU

WALL. EXTEND BEYOND INTERIOR AND EXTERIOR OF WALL 10 INCHES OR MINIMUM

DISTANCE RECOMMENDED BY MANUFACTURER. ANY SEALANT USED AT EXHAUST

PENETRATION SHALL BE RATED FOR USE AT DESIGN EXHAUST TEMPERATURES.

5 CUT EXHAUST TERMINATION AT 45 DEGREE ANGLE OR IN ACCORDANCE WITH

MANUFACTURERS RECOMMENDATION.

6 DAY TANK VENT PIPING (NOT SHOWN) SHALL BE ROUTED THRU WALL 12' ABOVE

GRADE AT THIS LOCATION.

7 INSTALL PRIMING TEE FOR DAY TANK SUPPLY AT LOCATION SHOWN. CONTRACTOR

IS RESPONSIBLE FOR ENSURING PRIMING OF ALL FUEL SYSTEMS AND SHALL

PROVIDE PROVISIONS FOR PRIMING OTHER FUEL PIPING SYSTEMS AS REQUIRED.

8 INSTALL ANTI-SIPHON VALVE (FAIL CLOSED W/ INTEGRAL PRESSURE RELIEF) IN

HORIZONTAL ORIENTATION AT DAY TANK SUPPLY NOZZLE.

9 PROVIDE GUIDE TYPE SUPPORT FOR SUPPLY AND RETURN PIPING IN TRENCH.

10 USE FLEXIBLE CONNECTION BETWEEN STATIONARY PIPING AND GENERATOR.

11 TANK STAIR AND ACCESS PLATFORM SHALL BE PROVIDED AS SHOWN BY TANK

MANUFACTURER.

12 COORDINATE PIPE SUPPORTS WITH TANK MANUFACTURER BASED ON CONCEPTUAL

ROUTING SHOWN. SUPPORTS CONNECTED TO TANK SHALL NOT BE FABRICATED IN

THE FIELD UNLESS PROVIDED WRITTEN APPROVAL FROM TANK MANUFACTURER.

13 USE FLEXIBLE CONNECTION BETWEEN RADIATOR AND TRANSITION DUCT TO

REDUCE NOISE AND VIBRATION TRANSMISSION.

14 ACCESS PANELS PROVIDED ON EACH SIDE OF DUCT BETWEEN SILENCER BANK AND

DAMPER.

15 CONTRACTOR SHALL COORDINATE MOUNTING LOCATION OF GENERATOR TO LEAVE

ADEQUATE SPACE BETWEEN RADIATOR AND EXTERIOR WALL FOR ALL EQUIPMENT

SHOWN, INCLUDING FLEXIBLE CONNECTIONS, DUCT TRANSITION, DUCT JOINTS,

SILENCER BANK, ACCESS DUCT SECTION, DAMPER, AND LOUVER.

16 COORDINATE PIPE SUPPORT LOCATIONS WITH TANK MANUFACTURER TO SATISFY

MAXIMUM SPACING REQUIREMENTS.

17 BOTTOM OF EXHAUST FAN 16' AFF. LOCATE THERMOSTAT ON WALL 4' AFF.

18 ADDITIONAL STRUCTURAL REINFORCING IS REQUIRED FOR LOUVERS, DAMPERS,

AND SILENCERS DUE TO MULTI-HIGH/WIDE CONSTRUCTION. CONTRACTOR SHALL

STRUCTURALLY REINFORCE ALL ASSEMBLIES AS RECOMMENDED BY

MANUFACTURER.

19 CONSTRUCT GENERATOR EXHAUST DUCT IN ACCORDANCE WITH SMACNA

RECTANGULAR INDUSTRIAL DUCT CONSTRUCTION STANDARD.

20 PROVIDE CMU FOR SILENCER BANK SUPPORT. SEE STRUCTURAL DETAILS.

CONTRACTOR SHALL SET HEIGHT OF SILENCER BANK TO MATCH EXHAUST LOUVER.

21 DTS AND DTR PIPE SUPPORTED FROM SLAB APPROXIMATELY 8" AFF BETWEEN

SILENCER SUPPORTS AND EXTERIOR WALL. MAINTAIN LEVEL ELEVATION BELOW

EXHAUST DUCT.

22 ANCHOR FUEL HANDLING EQUIPMENT TO SLAB.

23 USE FLEXIBLE CONNECTION BETWEEN STATIONARY PIPING AND FUEL HANDLING

EQUIPMENT.

24 COORDINATE DUCT TRANSITION WITH EXHAUST LOUVER OPENING HEIGHTS (SEE

ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR DETAILS).

25 PROVIDE TEE FOR FUTURE DAY TANK IN DTS AND DTR RISERS AT 5' AFF. VALVE AND

CAP CLOSE TO FITTING. 2" X 1.5" REDUCER DOWNSTREAM OF TEE.

26 SPACING BETWEEN HORIZONTAL SUPPORTS FOR 2" PIPING SHALL NOT EXCEED 10

FEET. SPACING FOR 1-1/2" PIPING SHALL NOT EXCEED 9 FEET.

04/29/2020 Revisions: Date:

ADDENDUM 4 11/23/2020

ADDENDUM 10 3/24/2020

DUCT

EXTERIOR WALL

REFER TO PLANS

FOR SIZE

DUCT SLEEVE,

ANGLES, AND

CONNECTIONS PER

SPECIFICATIONS

VOID SEALED PER

SPECIFICATIONS

FLEXIBLE DUCT

CONNECTION

AIRFLOW

MOTORIZED DAMPER

WEATHERHOOD

EXTERIOR WALL

NOTE:

1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS

& ROUND DAMPERS.

3. SEE GENERAL NOTES ON MECHANICAL NEW WORK SHEETS REGARDING VOLUME DAMPER LOCATIONS AND

ABOUT REMOTE ADJUSTMENT DEVICE OPTION FOR INACCESSIBLE CEILINGS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" [6mm]

CLEARANCE ALL

AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND ROD PIN

DUCT

STIFFEN BLADE AS

REQUIRED

SIDE ELEVATION SECTION

A

B

1"

DRAW THRU

BLOW THRU

2" [50mm] PLUS X

1" [25mm]

MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE

NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M UNLESS

NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

ROUTE TO FLOOR

SINK OR ROOF

DRAIN

DRAIN PAN

NOTE:

1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES

NOT PASS THROUGH RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE

CONNECTED.

3. SIZE CONDENSATE PER ADOPTED IMC TABLE 307.2.2

[2 5m m

DIELECTRIC

FITTING

1/2" 1/2" 1 1/2"

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED CONNECTION ON

FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS ON 12"

[300mm] CENTERS

RIVET ON 4" [100mm]

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEMALTERNATE

POSITION OF

BOLT 1 1/2" [40mm] POCKET

SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUTFLANGED

CONNECTION ON

FAN SIDE

WASHER

FLEXIBLE MATERIAL AS

SPECIFIED

NOTE:

1. DETAILS SHOWN ARE FOR STANDARD VENTILATION DUCTWORK. CONFIRM

CONSTRUCTION OF FLEXIBLE CONNECTIONS TO GENERATOR COOLING EXHAUST WITH

GENERATOR MANUFACTURER.

WATER STOP AND

ANCHOR COLLAR

PIPE

WALL SLEEVE

LINK-SEAL TYPE

PENETRATION SEAL

BUILDING EXTERIOR

CMU

GROUT SLEEVE TO MASONRY

WALLS WITH NON-SHRINK GROUT

OF PIPE

BUILDING EXTERIOR

BUILDING INTERIOR

PIPE SLEEVE

STEEL GRATE

ENGINE FUEL SUPPLY/RETURN -

PROVIDE SPACING BETWEEN

RETURN AND SUPPLY AS SHOWN

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 65

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F F

E

M a ri o n

B u ild in g s w it c h k y le

.g u g g e n h e im .r v t

/2

/2

:3

:2

A

M

194MH-501

MECHANICAL DETAILS

PP CL

NTS

B7

DUCT PENETRATION

NTS

B8

EXHAUST FAN DETAIL

NTS

B3

VOLUME DAMPER DETAIL

NTS

B1

AIR HANDLING UNIT DRAIN TRAP DETAIL

NTS

B6

FLEXIBLE DUCT CONNECTIONS

NTS

D3

PIPE PENETRATION DETAIL

NTS

D5

TRENCH PIPING DETAIL

04/29/2020 Revisions: Date:

SINGLE PACKAGED AIR CONDITIONER ELECTRIC SCHEDULE (ROOFTOP)

MARK LOCATION

AREA AND/OR

BLDG SERVED

TYPE

TOTAL SUPPLY

AIR FLOW

MIN. OUTSIDE

AIR FLOW

EXT STATIC

PRESSURE

COOLING CAPACITY HEATING CAPACITY

AIR

FILTER

ELECTRICAL DATA

REMARKS

MIN TOTAL

CAPACITY

MIN SENS

CAPACITY MIN

SEER

EAT OSA DESIGN

TEMP COMP

Kw

MIN. NET

OUTPUT

EAT

Db

LAT

Db

INDOOR FAN

UNIT POWER

CONNECTIONDb Wb

CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] MBH [kW] °F [°C] °F [°C] HP [W] CONTROL MCA PHASE VOLT

RTU-1 B194 OUTDOOR

BLDG 194

SWITCHGEAR ROOM

PACKAGED

ROOFTOP

1200 [ 570 ] N/A N/A 0.5 [ 130 ] 37.5 [ 130 ] 22.4 [ 7 ] 14 80 [ 27 ] 70 [ 21 ] 92 [ 33 ] 2.5 27 [ 8 ] 70 [ 21 ] 91 [ 33 ] 16x25x2

(QTY:2)

0.4 [ 300 ] ECM 32 [ 3 ] 208 1

REMARKS:

1. UNIT SHALL BE PAD MOUNTED, SIDE DISCHARGE, ON 14" CURB. FOLLOW ALL MANUFACTURERS RECOMMENDATIONS FOR INSTALLING IN THIS CONFIGURATION.

AIR DEVICE SCHEDULE (SUPPLY AND RETURN)

MARK TYPE

AIR FLOW

MAX APD

MOUNTING

PANEL/FRAME SIZE

NC MAX DAMPER DEFLECTION FINISH REMARKSMIN MAX

IN x IN [mm x mm]

CFM [L/s] CFM [L/s] IN WG [Pa]

SG-1

RECTANGULAR, LONG

BLADES

300 [ 140 ] 300 [ 140 ] 0.05 [ 13 ] DUCT 10 X 6 [ 250 X 150 ] 30 NONE 0

MANUF

STANDARD

RG-1

RECTANGULAR, HEAVY

DUTY, LONG BLADES

1200 [ 570 ] 1200 [ 570 ] N/A N/A WALL 26 x 14 [ 1350 X 550 ] N/A NONE 0

MANUF

STANDARD

REMARKS:

1. PROVIDE DUCT MOUNTED MANUAL VOLUME DAMPER ON BRANCH CLOSE TO MAIN FOR BALANCING.

SPLIT SYSTEM AIR CONDITIONER HEAT PUMP SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

TYPE

TOTAL SUPPLY

AIR FLOW

MIN. OUTSIDE

AIR FLOW

EXT STATIC

PRESSURE

COOLING CAPACITY

AIR

FILTER

MARK NO

ELECTRICAL DATA

SUPPLEMENTAL HEAT

REMARKS

MIN TOTAL

CAPACITY

MIN SENS

CAPACITY MIN

SEER

EAT OSA DESIGN

TEMP COMP

W

INDOOR FAN OUTDOOR UNIT

MCA PHASE VOLTDb Wb

CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] HP [W] CONTROL HP [w] CONTROL Kw PHASE VOLT

ACU-1 B175 EMCS DUCTLESS 425 [ 200 ] N/A N/A N/A N/A 12 [ 41 ] 12 [ 4 ] 15.2 75 [ 24 ] 67 [ 19 ] 95 [ 35 ] 1190 EQUIPED 0.04 [ 30 ] REMOTE 1.5 [ 1100 ] REMOTE 14 1 208/230 N/A N/A N/A 1, 2, 3

ACU-2 B175 EMCS DUCTLESS 425 [ 200 ] N/A N/A N/A N/A 12 [ 41 ] 12 [ 4 ] 15.2 75 [24] 67 95 [ 35 ] 1190 EQUIPED 0.04 [ 30 ] REMOTE 1.5 [ 1100 ] REMOTE 14 1 208/230 N/A N/A N/A 1, 2, 3

REMARKS:

1. PROVIDE WALL MOUNTED SECONDARY DRAIN PAN SIZED TO COVER LENGTH AND WIIDTH OF UNIT.

2. PROVIDE PRECHARGED REFRIGERANT LINE SET BETWEEN INDOOR UNIT AND OUTDOOR UNIT.

3. PROVIDE A WALL MOUNTED REMOTE CONTROLLER.

[ 19 ]

AIR COOLED CONDENSING UNIT SCHEDULE (AIR CONDITIONING SERVICE)

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

SYSTEM

AND/OR

SERVICE

TYPE

MIN

REFRIGERATION REFRIGERANT

OA TEMP MIN

EER

COMPRESSOR MOTOR CONDENSER FAN MOTOR

REMARKS

# COMP

NOMINAL

POWER PHASE VOLT # FANS

NOMINAL

POWER PHASE VOLT

MBH [kW] °F [°C] HP [kW] HP [W]

ACCU-1 B175 OUTDOOR EMCS ACU-1 SCROLL 12 [ 41 ] 410a 95 [ 35 ] 13 1 1.5 [ 1 ] 1 208 1 0.04 [ 30 ] 1 208 1, 2, 3

ACCU-2 B175 OUTDOOR EMCS ACU-2 SCROLL 12 [ 41 ] 410a 95 [ 35 ] 13 1 1.5 [ 1 ] 1 208 1 0.04 [ 30 ] 1 208 1, 2, 3

REMARKS:

1. PROVIDE CONCRETE PAD ON GRADE FOR MOUNTING THE ACCU ON.

2. PROVIDE LOW AMBIIENT KIT FOR COOLING OPERATION ALL YEAR.

3. PROVIDE WIND BAFFLE ACCESSORY.

CLEAN STEAM GENERATOR SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

SYSTEM AND/OR

SERVICE

TYPE

SOURCE OF

MAKEUP

WATER CONDITIONS

PRODUCED

STEAM FLOW

PRODUCED

STEAM PRESS

ELECTRIC DATA BLOWER ELECTRICAL DATA

REMARKSFLOW EWT

GPM [L/s] °F [°C] LBS/HR kg/HR PSIG [kPa] KW VOLTS/PHASE/HERTZ MCA MOCP KW VOLTS/PHASE/HERTZ MCA MOCP

H-1 B175 EMSC HUMIDIFICATION

WALL MOUNTED

ELECTRODE CANISTER

DCW 0.2 [ 0. ] 50 [ 10 ] 5 [ 2 ] 1 [ 7 ] 2 120/1/60 16.8 25 0.2 120/1/60 1 15 1, 2

REMARKS:

1. PROVIDE WALL MOUNTED HUMIDISTAT.

2. PIPE STEAM AND CONDENSATE FROM H-1 OUTSIDE ROOM.

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 65

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F F

E

M a ri o n

B u ild in g s w it c h k y le

.g u g g e n h e im .r v t

/2

/2

:3

:2

A

M

194MH-601

MECHANICAL SCHEDULES I

PP PP

3504/29/2020Revisions: Date:

LOUVER SCHEDULE

MARK LOCATION SYSTEM/SERVICE TYPE

WIDTH

(in)

HEIGHT

(in)

DEPTH

(in)

MATERIAL FINISH COLOR

ACTUATOR FLOW DETAILS

NOTES

TYPE

POSITION

INIDICATING

FAIL

POSITION

POWER

FLOW

DIRECTION

Flow

(CFM)

VELOCITY

(FPM)

PD (in.

w.g.)

LVR-1

B194 GEN

ROOM

COOLING/

COMBUSTION AIR

INTAKE

STATIONARY

DRAINABLE

BLADE

128 168 6 ALUMINUM AAMA 2605 BY OWNER N/A N/A N/A N/A INTAKE 67500 682 0.07 1, 2, 3

LVR-2

B194 GEN

ROOM

COOLING/

COMBUSTION AIR

INTAKE

STATIONARY

DRAINABLE

BLADE

128 168 6 ALUMINUM AAMA 2605 BY OWNER N/A N/A N/A N/A INTAKE 67500 682 0.07 1, 2, 3

LVR-3

B194 GEN

ROOM

COOLING AIR EXHAUST

STATIONARY

DRAINABLE

BLADE

160 160 6 ALUMINUM AAMA 2605 BY OWNER N/A N/A N/A N/A EXHAUST 135000 1145 0.18 1, 2, 3

NOTES:

1. COLOR TO BE SELECTED BY OWNER FROM MANUFACTURER STANDARD COLOR OPTIONS.

2. INCLUDE BIRD SCREEN

3. CONTRACTOR SHALL PROVIDE ADDITIONAL STRUCTURAL REINFORCING MEMBERS AS REQUIRED FOR SUPPORT OF MULTI-SECTION ASSEMBLIES. CONSULT LOUVER MANUFACTURER.

DAMPER SCHEDULE

MARK LOCATION SYSTEM/SERVICE STYLE TYPE

WIDTH

(in)

HEIGHT

(in)

MATERIAL

ACTUATOR FLOW DETAILS

NOTES

TYPE

POSITION

INIDICATING

FAIL

POSITION

POWER

AIR

DIRECTION

FLOW

(CFM)

VELOCITY

(FPM)

PD (in.

w.g.)

D-1

B194 GEN

ROOM

COOLING/

COMBUSTION AIR

INTAKE

OPPOSED BLADE

LOW LEAKAGE

TWO-POS

CONTROL

128 168

16 GA GALV.

STEEL

FAST ACTING

W/ SPRING

RETURN

YES OPEN 24 VAC INTAKE 67500 452 0.003 1, 2, 3

D-2

B194 GEN

ROOM

COOLING/

COMBUSTION AIR

INTAKE

OPPOSED BLADE

LOW LEAKAGE

TWO-POS

CONTROL

128 168

16 GA GALV.

STEEL

FAST ACTING

W/ SPRING

RETURN

YES OPEN 24 VAC INTAKE 67500 452 0.003 1, 2, 3

D-3

B194 GEN

ROOM

COOLING AIR

EXHAUST

OPPOSED BLADE

LOW LEAKAGE

TWO-POS

CONTROL

160 160

16 GA GALV.

STEEL

FAST ACTING

W/ SPRING

RETURN

YES OPEN 24 VAC EXHAUST 135000 759 0.009 1, 2, 3

NOTES:

1. DAMPERS SHALL BE FAST ACTING WITH LIMIT SWITCH TO CONFIRM POSITION STATUS WITH GENERATOR CONTROLS.

2. CONTRACTOR SHALL PROVIDE ADDITIONAL STRUCTURAL REINFORCING MEMBERS AS REQUIRED FOR SUPPORT OF MULTI-SECTION ASSEMBLIES. CONSULT DAMPER MANUFACTURER.

3. DAMPER SHALL BE INSTALLED AT WALL SUCH THAT DAMPER FRAME EXPOSED TO BUILDING INTERIOR. ACTUATORS SHALL BE MOUNTED EXTERNAL TO DAMPER FRAME.

ELECTRIC UNIT HEATER SCHEDULE

MARK LOCATION

AREA AND/OR

BLDG SERVED

TYPE

AIR FLOW TEMP RISE MIN CAPACITY POWER

FAN MOTOR

REMARKSFAN POWER

PHASE VOLT

CFM L/S °F [°C] BTUH [W] AMP PHASE VOLT HP [W]

UH-1 CEILING GENERATOR ROOM

VERTICAL

DELIVERY

940 [ 440 ] 36 [ 20 ] 34000 [ 10000 ] 29 3 208 0.07 [ 50 ] 1 208 1

UH-2 CEILING GENERATOR ROOM

VERTICAL

DELIVERY

940 [ 440 ] 36 [ 20 ] 34000 [ 10000 ] 29 3 208 0.07 [ 50 ] 1 208 1

REMARKS:

1. MOUNTING HEIGHT SHALL NOT EXCEED VERTICAL THROW OF HEATER. PROVIDE WITH CONE OUTLET FOR INCREASED THROW.

FAN SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

SYSTEM

AND/OR

SERVICE

AIR FLOW TSP

FAN MOTOR ELECTRICAL

REMARKS

TYPE WHEEL CLASS ARRANGEMENT

DIAMETER

DRIVE

FAN

MAX

RPM

NOMINAL POWER

PHASE VOLT RPM

SPEED

CONTROL

CFM [L/s] IN [Pa] IN [mm] BHP HP [kW]

EF-1 WALL

GENERATOR

ROOM

GENERAL

EXHAUST

4991 [ 2400 ] 0.1 [ 25 ] SIDEWALL PROPELLER N/A

WALL HOUSING WITH MOTORIZED

DAMPER AND WEATHER HOOD

20 [ 500 ] DIRECT 1160 0.7 0.5 [ 0.37] 1 115 1725 CONSTANT 1

REMARKS:

1. FAN SHALL BE ACCESSED FROM INTERIOR OF BUILDING. PROVIDE MOTOR SIDE GUARD ON INTERIOR OF HOUSING AND BIRD SCREEN ON WEATHER HOOD. INSTALL WITH 1/8" SLOPE TOWARD EXTERIOR OF BUILDING.

ACOUSTIC ABSORTIVE SILENCERS

MARK LOCATION

SYSTEM AND/OR

SERVICE

TYPE

WIDTH HEIGHT LENGTH

MATERIAL

ACOUSTIC

MEDIA

LINER

INLET/OUTLET

CONNECTION

AIR

DIRECTION

FLOW VELOCITY PD DYNAMIC INSERTION LOSS (dB)

REMARKS

IN IN IN CFM FPM in. w.g. 63 125 250 500 1k 2k 4k 8k

AAS-1

B194 GEN

ROOM

COOLING AIR

EXHAUST

RECTANGULAR

DUCT SILENCER

BANK

160.00 160.00 36.00 22 GA GALV. FIBERGLASS

22 GA

PERFORATED

FLANGED/SLIP FORWARD 135000 760 0.03 6 7 9 12 9 9 8 6 1,2,3

REMARKS:

1. CONTRACTOR SHALL COORDINATE DUCT JOINT TYPES WITH GENERATOR RADIATOR AND DAMPER CONNECTIONS.

2. SILENCER ARRAY SHALL BE ASSEMBLED IN ACCORDANCE WITH MANUFACTURER RECOMMENDED PRACTICES.

3. SECURE SILENCER BANK TO SUPPORTS.

FUEL TANK SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

FUEL OIL

TYPE NO

NOM CAPACITY

TYPE CONSTRUCTION

DIMENSIONS

ALARM SYSTEM

OR LEAK

DETECTION

LEVEL

INDICATOR

PUMPS

FILL

CONTAINMENT

REMARKS

GAL [L]

FOT-1 OUTDOOR ABOVE GROUND

GENERATOR BULK

FUEL

# 2 18,000 [ 68000 ]

HORIZONTAL

CYLINDRICAL

UL-142 DOUBLE

WALL

10' (DIA) x 30.5' (L) YES, SEE DRAWING

CLOCK,

CALIBRATED

N/A RFS-1 (NOTE 4) 1, 2

FOT-2 GENERATOR ROOM

GENERATOR DAY

TANK

# 2 600 [ 2300 ] STAND-ALONE

UL-142 DOUBLE

WALL

86 x 48 x 51 (L x W x H)

YES, SEE DRAWING SPIRAL, UL LISTED SP-1, SP-2, RP-1 N/A 1,3,4,5,6,7,8

REMARKS:

1. SEE SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL REQUIREMENTS.

2. RFS-1 SHALL BE MINIMUM 15 GALLON CAPACITY WITH HINGLED LOCKABLE LID HELD OPEN BY HYDRAULIC ARM AND LOCKABLE DRAIN VALVE. CONSTRUCTION SHALL BE MINIMUM 12 GAUGE POWDERCOATED STEEL.

3. PUMPS AND CONTROLS TO BE FACTORY INSTALLED AND TESTED. COORDINATE WITH DRAWINGS AND SPECIFICATIONS.

4. DAY TANK HEIGHT SUBJECT TO REVIEW BY GENERATOR MANUFACTURER AND ENGINEER FOR COMPATABILITY WITH FUEL RETURN SYSTEM.

5. LEVEL CONTROLLER SHALL BE NEMA RATED UL 508 WITH COMPLETE LOCAL CONTROL AND INDICATION OF ALL FUNCTIONS AND ALARMS. SEE POINTS LIST FOR MINIMUM REQUIRED OUTPUTS TO BUILDING MANAGEMENT SYSTEM FOR REMOTE MONITORING.

6. PROGRAMMABLE SEQUENCES SHALL INCLUDE LEVEL, SCHEDULED SUPPLY/RETURN PRIMING, FUEL OIL TEMPERATURE CONTROL. INTIAL SETTINGS AS RECOMMENDED BY MANUFACTURER.

7. MANUAL CONTROLS SHALL INCLUDE HAND-OFF-AUTO PUMP CONTROL MODE SWITCH, PUSH TO TEST PUMP, PUMP START-STOP AUTOMATIC LEVEL CONTROL, PUMP OVERFILL CONTROL BACKUP.

8. CONTROLLER SHALL UTILIZE DISCRETE LEVEL SENSORS AND CIRCUIT PATHS FOR LEVEL ALARMS, PRIMARY PUMP CONTROL AND BACKUP PUMP CONTROL. FAILURE IN ONE SENSOR OR CIRCUIT PATH SHALL NOT DISABLE THE ENTIRE CONTROLLER.

FUEL OIL PUMP SCHEDULE

MARK LOCATION

SYSTEM

AND/OR

SERVICE

TYPE MATERIAL

CAPACITY

DISCHARGE

PRESSURE FUEL

TYPE

OIL TEMP VISCOSITY

RANGE (SSU)

SUCTION LIFT MOTOR

REMARKS

GPM [L/s] PSIG [kPa] °F [°C] IN HG [mm] BHP [W] PHASE VOLT

SP-1

B194- GEN

ROOM

DAY TANK FUEL

SUPPLY

POSITIVE DISP CAST IRON 15 [ 1 ] 50 [ 350 ] DIESEL 60 [ 16 ] 30 - 75 15 [ 381 ] 1.5 [ 1100 ] 1 208 1, 2, 3

SP-2

B194- GEN

ROOM

DAY TANK FUEL

SUPPLY

POSITIVE DISP CAST IRON 15 [ 1 ] 50 [ 350 ] DIESEL 60 [ 16 ] 30 - 75 15 [ 381 ] 1.5 [ 1100 ] 1 208 1, 2, 3

RP-1

B194- GEN

ROOM

DAY TANK FUEL

RETURN

POSITIVE DISP CAST IRON 22.5 [ 1 ] 50 [ 350 ] DIESEL 60 [ 16 ] 30 - 75 15 [ 381 ] 2 [ 1500 ] 1 208 1, 2

REMARKS:

1. PUMPS SHALL BE DESIGNED FOR TRANSFER OF FUEL OIL.

2. VISCOSITY UPPER LIMIT BASED ON FUEL OIL #2 AT 20 DEG F. FUEL OIL TO BE WINTERIZED (BLENDED) FOR OPERATION BELOW FREEZING. OPERATING TEMP WILL VARY WITH AMBIENT OUTDOOR TEMPERATURE.

3. DAY TANK SUPPLY SYSTEM SHALL BE PROVIDED WITH FIXED HAND-OPERATED PUMP FOR SYSTEM PRIMING AND EMERGENCY OPERATION.

FUEL OIL QUALITY MAINTENANCE SYSTEM SCHEDULE

MARK LOCATION

SYSTEM

AND/OR

SERVICE

FUEL OIL

TYPE NO

NOM CAPACITY

TYPE CONTROLS

DIMENSIONS

(in)

ALARM SYSTEM

OR LEAK

DETECTION

PUMP NOTES

GAL/H [L/H]

FOF-1

GENERATOR

ROOM

GENERATOR

BULK FUEL

# 2 / BLEND 900 [ 3400 ]

FREE STANDING

CABINET

STAND-ALONE

MICROPROCESSOR BASED

66 x 58 x 14 (H x W x D)

YES, SEE

SPECIFICATIONS

INLINE POSITIVE

DISPLACEMENT

1, 2

NOTES:

1. CONSTRUCTION AND FEATURES SHALL BE PER SPECIFICATIONS

2. PUMPS AND CONTROLS TO BE FACTORY INSTALLED AND TESTED. COORDINATE WITH DRAWINGS AND SPECIFICATIONS.

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 65

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F F

E

M a ri o n

B u ild in g s w it c h k y le

.g u g g e n h e im .r v t

/2

/2

:3

:2

A

M

194MH-602

MECHANICAL SCHEDULES II

PP PP

3604/29/2020 Revisions: Date:

ZONE TEMPERATURE SETPOINT AI X SENSOR FAILURE

ON/CANCEL

SUPPLY FAN START/STOP X BO

DX COOLING STAGE 1 X BO

OCCUPIED COOLING SETPOINT X 75°F

OCCUPIED HEATING SETPOINT X 40°F

DISCHARGE AIR TEMPERING SETPOINT X 55°F

DISCHARGE AIR TEMPERATURE CONTROL POINTS

X

BAS COMMUNICATION STATE X X X

MAINTENANCE REQUIRED X 600 HRS MAINTENANCE REQUIRED NOTE 2

DX COOLING STAGE 2 X BO

ELECTRIC HEAT STAGE 1 X BO

OUTSIDE AIR DAMPER X AO

DISCHARGE AIR TEMPERATURE X AI X X X SENSOR FAILURE

OUTDOOR AIR TEMPERATURE X AI X X X SENSOR FAILURE NOTE 1

MIXED AIR TEMPERATURE X AI X X X SENSOR FAILURE

DX COIL DEFROST X BI X

SUPPLY FAN STATUS X BI X X FAN FAILURE

FILTER STATUS X BI X DIRTY FILTER

ZONE HUMIDITY X AI X X X SENSOR FAILURE

KEY:

A = ANALOG, B = BINARY, I = INPUT, O = OUTPUT

GENERAL NOTES:

1. CAN BE A COMMUNICATED VALUE

2. USE VALUE RECOMMENDED BY MANUFACTURER

POINT TYPE ALARMS

Point Description

G R

A P

H

IC

H A

R D

W A

R E

IN

P U

T

H A

R D

W A

R E

O U

T P

U T

S O

F T

W A

R E

P O

IN

T

D E

F A

U L

T V

A L

U E

H

IG

H A

N A

L O

G L

IM

IT

L O

W A

N A

L O

G L

IM

IT

B

IN

A R

Y

L A

T C

H D

IA

G

N O

S T

IC

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

T

IO

N F

A

IL

D

IA

G N

O S

T

IC

S

NOTES

CONSTANT VOLUME AIR HANDLER UNIT, WITH DX

COOLING & ELECTRIC HEAT

ZONE SENSOR

ZONE TEMPERATURE X AI X X X SENSOR FAILURE

FILTER

DX COIL W/

DEFROST

DX COOLING (TWO

STAGE)

SUPPLY FAN

STATUS

ELECTRIC

HEATING

TT SDM

PDT

VSMC

PDT

EA

OA SA

RA

TT

OUTSIDE AIR TEMPERATURE TRANSMITTER

ZC

LTCP LOCAL TEMPERATURE CONTROL PANEL

HS

NOTE:

INSTRUMENTATION SHOWN ON THIS DIAGRAM IS FOR

REFERENCE AND IS NOT INCLUSIVE OF ALL POINTS

REQUIRED FOR THIS INSTALLATION. SEE POINTS LIST,

SEQUENCES, AND SPECIFICATIONS FOR ADDITIONAL

REQUIREMENTS.

CONTROLS SYMBOLS

TT TEMPERATURE TRANSMITTER - WALL MOUNT

M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT

TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

SD SMOKE DETECTOR

PDT PRESSURE DIFFERENTIAL TRANSMITTER

HS HAND SWITCH (HAND-OFF-AUTO SWITCH)

ZC VALVE OR DAMPER POSITION CONTROLLER

VSMC VARIABLE SPEED MOTOR CONTROLLER

MOTOR STARTER

M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE

T-MA

T THERMOSTAT

TEMPERATURE SENSOR - MIXED AIR

CONTROL SIGNAL

CONTROL SEQUENCE:

COOLING: SETPOINT 75 DEG F

UPON A RISE IN SPACE TEMPERATURE ABOVE THE

OCCUPIED COOLING SETPOINT, COOLING IS INITIATED:

IF THE OUTSIDE AIR IS SUITABLE FOR FREE COOLING AS

DETERMINED BY THE OUTSIDE AIR DRY BULB

TEMPERATURE, THEN OUTSIDE AND RETURN AIR

DAMPERS MODULATE TO MAINTAIN A SUITABLE SPACE

TEMPERATURE. IF THE OUTSIDE AIR DAMPER MODULATES

FULLY OPEN AND ECONOMIZER OPERATION CANNOT

SATISFY THE COOLING NEEDS OF THE SPACE, RESULTING

IN A CALL FOR SECOND STAGE COOLING BY THE

PROGRAMMABLE THERMOSTAT, THEN FIRST STAGE DX

COOLING IS ENGAGED AS WELL. AS THE SPACE

TEMPERATURE FALLS BACK TOWARD SETPOINT, THEN DX

COOLING AND ECONOMIZER OPERATION ARE

DISENGAGED IN THE REVERSE ORDER THAT THEY WERE

ENGAGED.

IF THE OUTSIDE AIR IS NOT SUITABLE FOR FREE COOLING

AS DETERMINED BY THE OUTSIDE AIR DRY BULB

TEMPERATURE CONTROLLER, THEN OUTSIDE AIR

DAMPER REMAINS AT MINIMUM POSITION, AND FIRST

STAGE DX COOLING IS ENGAGED. UPON A FURTHER RISE

IN TEMPERATURE ABOVE THE OCCUPIED COOLING

SETPOINT, THEN SECOND STAGE DX COOLING IS

ENGAGED. AS THE SPACE TEMPERATURE FALLS BACK

TOWARD SETPOINT, THEN THE COOLING STAGES ARE

DISENGAGED IN THE REVERSE ORDER THAT THEY WERE

ENGAGED.

MECHANICAL COOLING SHALL BE LOCKED OUT BELOW 80

DEG F ROOM TEMPERATURE.

HEATING: SETPOINT 40 DEG F

UNIT HAS 1 STAGE OF ELECTRIC HEAT. WHEN THE

THERMOSTAT CALLS FOR HEATING, THE UNIT CONTROL

WILL ENERGIZE THE INDOOR FAN CONTACTOR AND THE

ELECTRIC HEAT.

CONTROL OVERVIEW:

CONTROLS SHALL BE DDC. CONTROLLER SHALL BE

INTEGRATED INTO THE BAS. FIBER DATA DROP FROM

CAMPUS NETWORK TO MEDIA CONVERTER PROVIDED BY

DIVISION 26 CONTRACTOR (LOCATED IN SWITCHGEAR ROOM).

UNIT SHALL AUTOMATICALLY SWITCH BETWEEN HEATING

AND COOLING MODES. THERE IS NO UNOCCUPIED MODE FOR

THIS APPLICATION. ECONOMIZER CONTROL SHALL BE DRY-

BULB BASED. SYSTEM SHALL CYCLE AS REQUIRED FOR

HEATING OR COOLING.

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 65

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F F

E

M a ri o n

B u ild in g s w it c h k y le

.g u g g e n h e im .r v t

/2

/2

:3

:2

A

M

194MH-603

HVAC INSTRUMENTATION AND

CONTROLS - SWITCHGEAR ROOM

PP PP

NTS

F5

POINT LIST - SWITCHGEAR ROOM HVAC

NTS

B5

CONTROL DIAGRAM - RTU-1

04/29/2020

LA

LI XA

TF 3"

4" 10"

24" 10" 2" 2" 6" 4" 2"

XA

4"

TANK AREA WALL

FUEL DELIVERY

DRIVEWAY

FUTURE GENERATOR

FUEL SUPPLY. VALVE

AND CAP.

FUTURE GENERATOR

FUEL RETURN. VALVE

AND CAP.

FOF-1

GENERATOR ENGINE

SUPPLY/RETURN

FLOOR TRENCH

PRIMING TEE

(TYP)

FUSIBLE

LINK VALVE 4"

FOT-1

FOT-2

SP-1/SP-2

RP-1

RFS-1

ANTI-SIPHON

VALVE

B191 GENERATOR ROOM (INTERIOR) TANK AREA (EXTERIOR)

B194 EXTERIOR WALL

REMOVABLE GRATING

FOFS 1.5"

2" 2"

ES 1"

ER 1"

FOFR 1.5"

DTR 2"

DTS 2"

DTR 1.5"

DTS 1.5"

FOT-2 (600 GAL UL-142 DOUBLE WALL DAY TANK)

CONNECTIONS

A. FUEL LEVEL GAUGE

B. TANK SUPPLY (x2)

C. TANK RETURN

D. ENGINE SUPPLY

E. ENGINE RETURN

F. TEMPERATURE SENSOR

G. NORMAL VENT (PRIMARY TANK)

H. EMERGENCY VENT (PRIMARY )

I. EMERGENCY VENT (INTERSTITIAL)

J. INSPECTION PORT (PRIMARY)

K. INSPECTION PORT (SECONDARY)

L. SPARE (X3)

FOT-1 (18,000 GAL UL-142 DOUBLE WALL AST)

CONNECTIONS:

A. TANK FILL W/ OVERFILL VALVE

B. DAY TANK SUPPLY

C. DAY TANK RETURN

D. FUEL FILTRATION SYSTEM SUPPLY

E. FUEL FILTRATION SYSTEM RETURN

F. MANWAY / EMERGENCY VENT (PRIMARY)

G. EMERGENCY VENT (INTERSTITIAL)

H. NORMAL VENT

I. SOUNDING PORT

J. LEVEL INDICATOR (MECHANICAL) AND LEVEL ALARM

K. INTERSTITIAL MONITORING

L. SPARE

TANK NOTES:

1. PIPING DIAGRAM DOES NOT SHOW ALL REQUIRED CONNECTIONS.

2. NOZZLE SIZES SHOWN ARE FOR REFERENCE PURPOSES ONLY. CONTRACTOR SHALL VERIFY SIZE OF TANK

CONNECTIONS WITH MANUFACTURERS AND PROVIDE SUBMITTAL TO OWNER AND ENGINEER FOR REVIEW PRIOR

TO PROCUREMENT.

3. NORMAL AND EMERGENCY VENTS SHALL BE SIZED IN ACCORDANCE WITH NFPA 30 AND PROVIDED BY TANK

MANUFACTURER.

4. ALL FILL, SUPPLY, AND RETURN CONNECTIONS SHALL HAVE INSTALLED DROP TUBES.

5. PROVIDE SEPARATION BETWEEN SUPPLY AND RETURN DROP TUBES TO PREVENT SHORT CIRCUITNG FUEL AND

RESULTING HEAT ACCUMULATION.

6. (FOT-1) DROP TUBES SHALL EXTEND FROM THE TANK NOZZLE TO AT LEAST 4 INCHES FROM BOTTOM OF TANK

WITH AN ANGLE CUT EXTENDING NO MORE THAN 6" FROM THE BOTTOM OF TANK. PROVIDE VACUUM BREAKER IN

ALL RETURN DROP TUBES ABOVE PRODUCT LEVEL FOR ANTI-SIPHON.

7. (FOT-2) NORMAL VENT SHALL BE ROUTED THROUGH NEAREST EXTERIOR WALL. TERMINATE VENT AT 12' ABOVE GRADE. ELBOW UPWARDS AND PROVIDE RAIN CAP. MINIMUM 2" SIZE OR AS RECOMMENDED BY TANK

MANUFACTURER

8. (FOT-2) EMERGENCY VENTS MAY BE LOCATED IN THE GENERATOR ROOM UNLESS REQUIRED OTHERWISE BY THE AHJ. IF REQUIRED TO BE LOCATED OUTDOORS, INCREASE PIPE SIZE FOR EMERGENCY VENT IN ACCORDANCE

WITH MANUFACTURER RECOMMENDATION TO PREVENT BACKPRESSURE.

9. SEE SPECIFICATIONS, SCHEDULES, AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS.

POINT TYPE ALARM

Point Description

G R

A P

H

IC

H A

R D

W A

IN

P U

T

H A

R D

W A

R E

O U

T P

U T

S O

F T

W A

R E

P O

IN

T

B

IN

A R

Y

C O

M M

U N

IC

A

T

IO

N F

A

IL

NOTES

GENERATOR FUEL HANDLING EQUIPMENT

CONTROLLERS

FUEL LEVEL MONITOR (SERVES FOT-1) X AI X X

WATER LEVEL X

FUEL LEVEL X

FUEL LEVEL HIGH X X

FUEL LEVEL LOW X

LEAK DETECTION (SERVES FOT-1) X AI X X

INTERSTITIAL TANK LEAK (FUEL) X X

INTERSTITIAL TANK LEAK (WATER) X X

PIPE LEAK X X

FUEL FILTRATION (SERVES FOF-1) X AI X X 1

CONTROL POWER ON X

PUMP RUN X

PUMP FAILURE X

EXCESS WATER IN FUEL X X

FILTER WATER LEVEL HIGH X X

RUPTURE BASIN LEAK X X

HIGH PRESSURE DROP IN STRAINER X X

HIGH PRESSURE DROP IN FILTERS X X

HIGH PRESSURE X X

DAY TANK LEVEL (SERVES FOT-2) X AI X X 1

PUMP RUNNING X X

FUEL LEVEL HIGH X X

FUEL LEVEL LOW X X

DAY TANK LEAK X X

NOT IN AUTO X X

KEY:

A = ANALOG, B = BINARY, I = INPUT, O = OUTPUT

GENERAL NOTES:

1. CONTROLLER SHALL BE PACKAGED WITH CONTROLLED EQUIPMENT.

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 65

C U s e rs \k y le g \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F F

E

M a ri o n

B u ild in g s w it c h k y le

.g u g g e n h e im .r v t

/2

/2

:3

:3

A

M

194MH-604

FUEL PIPING DIAGRAM AND

INSTRUMENTATION

PP CL

NTS

PIPING DIAGRAM - FUEL SYSTEMS

FUEL SYSTEMS PIPING NOTES

A. SINGLE LINE DIAGRAM IS NOT INTENDED TO PROVIDE A PHYSICAL REPRESENTATION OF EQUIPMENT OR SYSTEM LAYOUT. ACTUAL LOCATION OF TANK CONNECTIONS TO BE COORDINATED WITH TANK MANUFACTURER. SEE PLANS

FOR SYSTEM LAYOUT.

B. TANK CONNECTION SIZES AND QUANTITY SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR MUST COORINDATE

TANK NOZZLE SIZES AND CONNECTION TYPES WITH EQUIPMENT CONNECTIONS.

C. NORMAL VENTS SHALL BE LOCATED NOT LESS THAN 12 FT ABOVE ADJACENT GROUND LEVEL.

D. COUPLERS AT REMOTE FILL STATION SHALL BE DRY-DISCONNECT CAM-LOK STYLE. CONTRACTOR SHALL CORDINATE

COUPLINGS TO MATCH OWNER'S FUEL SUPPLIER STANDARD.

E. PROVIDE A TANK-TOP OPENING THAT IS EQUIPPED WITH A LOCKABLE, VAPOR-TIGHT, NON-SPARKING COVER THAT CAN BE USED TO MANUALLY GAUGE THE TANK CONTENTS (NOTED AS SOUNDING PORT). PROVIDE LABEL ON TANK FOR

THIS PORT.

F. PROVIDE PRIMING TEES AT PIPING HIGH POINTS WHERE REQUIRED FOR SYSTEM PRIMING.

NTS

CONNECTIONS - FUEL OIL TANKS

NTS

POINT LIST - B194 FUEL SYSTEMS

INSTRUMENTATION, CONTROL, AND POINTS LIST NOTES:

1. EQUIPMENT LISTED SHALL HAVE STAND-ALONE CONTROLS. POINTS LISTED HEREIN ARE FOR THE PURPOSE OF REMOTE INDICATION AND ALARM FROM CONTROLLER TO THE CENTRAL ENGINEERING CONTROL SYSTEM VIA STATION BUILDING

AUTOMATION SYSTEM.

2. CONTROLS CONTRACTOR SHALL COORDINATE WITH CONTROLLER OUTPUT COMMUNICATION TYPE AND PROVIDE ALL REQUIRED PATCH CABLING, CONTROLLERS, ROUTERS, RELAYS, OR OTHER EQUIPMENT NECESSARY TO COMPLETE THE INSTALLATION.

3. CONTROLS CONTRACTOR SHALL PROVIDE ANY EQUIPMENT AND PROGRAMMING REQUIRED FOR SIGNAL TYPE CONVERSIONS.

4. DIV 26 CONTRACTOR TO PROVIDE FIBER DATA DROP FROM CAMPUS NETWORK TO FOUR PORT (RJ-45) MEDIA CONVERTER

(LOCATED IN B194 SWITCHGEAR ROOM).

5. CONTROL AND ALARM POINTS SHALL BE LOCALLY PROGRAMMABLE. DEFAULT POINTS TO BE SET AS RECOMMENDED BY

MANUFACTURER AND PROVIDED TO OWNER.

6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

04/29/2020 Revisions: Date:

ELECTRICAL SYMBOLS

EXISTING OUTLET OR DEVICE TO REMAIN. MAINTAIN EXISTING CIRCUITING.

DASH SYMBOL INDICATES PARTICULAR OUTLET OR DEVICE TO BE REMOVED AND CIRCUITRY MADE CONTINUOUS

WHERE REQUIRED.

ELECTRICAL CONNECTION.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE). WHEN SHOWN, RECEPTACLE

TO HAVE "CONTROLLED" MARKINGS.

20A-125V SINGLE RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE).

SPECIAL PURPOSE RECEPTACLE. REFER TO NOTE ON PLAN.

20A-125V DOUBLE DUPLEX RECEPTACLE. NEMA 5-20R, (18" MH UNLESS NOTED OTHERWISE) TWO GANG ASSEMBLY.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH BOTTOM OUTLET CONTROLLED BY WALL SWITCH. (18" MH

UNLESS NOTED OTHERWISE).

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED

OTHERWISE).

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R (HORIZONTAL 18" MH UNLESS NOTED OTHERWISE)

WITH EXTRA DUTY GRAY COVER, VERTICAL MOUNT.

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH

UNLESS NOTED OTHERWISE), WITH EXTRA DUTY GRAY COVER, VERTICAL MOUNT.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, ON EMERGENCY POWER (18" MH UNLESS NOTED OTHERWISE).

20A-125V POWERLOCK GROUNDING TYPE RECEPTACLE, HOSPITAL USE (66" MH UNLESS NOTED OTHERWISE).

20A-125V DUPLEX PEDESTAL TYPE FLOOR RECEPTACLE, NEMA 5-20R, IN FLOOR BOX WITH COVERPLATE AND

HOUSING. PROVIDE CARPET FLANGE WHERE REQUIRED.

20-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH ISOLATED GROUND (18" MH UNLESS NOTED OTHERWISE).

20A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-20R (18" MH UNLESS NOTED OTHERWISE).

30A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-30R (18" MH UNLESS NOTED OTHERWISE).

50A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-50R (18" MH UNLESS NOTED OTHERWISE).

20A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-20R (18" MH UNLESS NOTED OTHERWISE).

30A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-30R (18" MH UNLESS NOTED OTHERWISE).

50A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-50R (18" MH UNLESS NOTED OTHERWISE).

JUNCTION BOX.

MULTI-OUTLET RECEPTACLES ASSEMBLY, NEMA 5-15R (SINGLE OUTLETS ON 18" CENTERS) (46" MH UNLESS NOTED

OTHERWISE).

CLOCK HANGER OUTLET, SINGLE NEMA 5-15R RECESSED IN COVER PLATE (84" MH UNLESS NOTED OTHERWISE).

SINGLE POLE SWITCH (46" MH UNLESS NOTED OTHERWISE).

TWO POLE WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

MULTI-WAY WALL SWITCH, # INDICATES NUMBER OF WAYS (46" MH UNLESS NOTED OTHERWISE).

SWITCH WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH UNLESS NOTED OTHERWISE).

KEY OPERATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

LIGHTING DIMMER SWITCH (46" MH UNLESS NOTED OTHERWISE) 1000 WATTS UNLESS OTHERWISE INDICATED.

SWITCH WITH RECEPTACLE (46" MH UNLESS NOTED OTHERWISE) STANDARD TWO-GANG ASSEMBLY OF SWITCH

AND RECEPTACLE.

FLUSH FRACTIONAL HORSEPOWER MOTOR STARTER WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH

UNLESS NOTED OTHERWISE).

HP RATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

DISCONNECT SWITCH.

MOTOR STARTER.

COMBINATION MOTOR STARTER AND DISCONNECT SWITCH.

ELECTRIC MOTOR.

ELECTRICAL PANEL OR SWITCHBOARD PER DRAWINGS.

PULL BOX.

LINE VOLTAGE THERMOSTAT.

UNIT HEATER.

FAN COIL.

ELECTRIC BASEBOARD HEATER.

AIR CONDITIONER.

CONDENSING UNIT.

UNIT VENTILATOR.

CORD REEL.

POWER POLE.

PHOTOELECTRIC SENSOR.

LIGHTING CONTACTOR.

CEILING MOUNTED OCCUPANCY SENSOR.

WALL MOUNTED OCCUPANCY SENSOR.

CEILING MOUNTED DAYLIGHT SENSOR.

OCCUPANCY SENSOR POWER PACK.

PUSHBUTTON (46" MH UNLESS NOTED OTHERWISE)(120 VOLT).

BUZZER (90" MH UNLESS NOTED OTHERWISE)(120 VOLT).

4" DIAMETER (90" MH UNLESS NOTED OTHERWISE)(120 VOLT).

GF

WP

WP/GF

EM

T

IG

20A

30A

50A

20A

50A

30A

J

P

K

DM

R

H

UH

FC

AC

CU

UV

PP

OS

OS

DS

O P

PC

T

B

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (46" MH UNLESS NOTED OTHERWISE).

C

M

CR

LC

P/B

ELAPSED TIME INDICATOR CLOCK (90" MH UNLESS NOTED OTHERWISE) WITH RESET SWITCH (46" MH UNLESS

NOTED OTHERWISE).

INTERCOM SYSTEM DESK MOUNTED MASTER CONTROL STATION. SUBSCRIPT "W" INDICATES WALL MOUNT (46"

MH UNLESS NOTED OTHERWISE).

INTERCOM STAFF STATION (46" MH UNLESS NOTED OTHERWISE).

INTERCOM HORN TYPE SPEAKER (84" MH UNLESS NOTED OTHERWISE).

INTERCOM SPEAKER FLUSH MOUNT IN CEILING.

I

M

H

S

DUCT HEATER.H

DH

H

EB

LOW-VOLTAGE MOMENTARY WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

L

TECHNOLOGY SYMBOLS WITH ELEC. REQUIREMENTS

P WALL MOUNTED PHONE OUTLET (46" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE CEILING PER DIV 26. JACKS, FACEPLATE AND CABLE PER DIV 27. REFER TO FACEPLATE DETAILS.

X R

WALL MOUNTED AV OUTLET (84" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT PER DIV 26. REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING PER DIV 27. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.

X V

WALL MOUNTED AV OUTLET (44" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT PER DIV 26. REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING PER DIV 27. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.

CONDUIT SLEEVE / FIRE RATED SLEEVE ASSEMBLY THRU WALL (1-2" SLEEVE UNLESS NOTED OTHERWISE) PER DIV 26.

J TELECOM BOX AND CONDUIT PER DIV 26, REFER TO PLANS.

D WALL MOUNTED VOICE/DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE CORRIDOR CEILING PER DIV 26. JACKS, FACEPLATE AND CABLE PER DIV 27. REFER TO FACEPLATE DETAILS.

X I

WALL MOUNTED AV OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUITS TO ABOVE ACCESSIBLE CEILING PER DIV 26. REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING PER DIV 27. SUBSCRIPT

"X" INDICATES ALTERNATE CONFIGURATION.

AP

WALL MOUNTED WIRELESS ACCESS POINT (96” MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE

ACCESSIBLE CEILING PER DIV 26. WAP AND CABLE PER DIV 27.

ABBREVIATIONS

AAP - AREA ALARM PANEL - MEDICAL GAS

ACC - ACCESS

ADJ - ADJUSTABLE

AF - ARC FAULT CIRCUIT INTERRUPTER

AFCI - ARC FAULT CIRCUIT INTERRUPTER

AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM

AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATS - AUTOMATIC TRANSFER SWITCH

BLDG - BUILDING

BOE - BOTTOM OF EQUIPMENT

BOT - BOTTOM

BTWN - BETWEEN

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CKT - CIRCUIT

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CORR - CORRIDOR

CTR - CENTER

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DIV - DIVISION

DN - DOWN

DWG - DRAWING

EA - EACH

EC - ELECTRICAL (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATION OR ELEVATOR

EM - EMERGENCY

EQ - EQUAL

EQS - EQUIPMENT SUPPLIER

EQUIP - EQUIPMENT

ETR - EXISTING TO REMAIN

EX - EXISTING

EXP - EXPANSION

EXT - EXTERIOR

FCE - FIRE CONTROL EQUIPMENT

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

GC - GENERAL TRADES

GF - GROUND FAULT CIRCUIT INTERRUPTER

GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GFFT - GROUND FAULT FEED THRU

HC - HVAC (DIVISION 23)

HP - HORSE POWER OR HIGH POINT

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

IN - INCHES

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LBS - POUNDS

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

NIC - NOT IN CONTRACT

NOM - NOMINAL

NTS - NOT TO SCALE

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

PC - PLUMBING (DIVISION 22)

PLBG - PLUMBING

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH-IN

S - SURFACE MOUNTED

SC - SECURITY CONTRACTOR

SCH - SCHEDULE

SHT - SHEET

SMS - SECURITY MANAGEMENT SYSTEM

SPEC - SPECIFICATIONS

SQ - SQUARE

SS - STAINLESS STEEL

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TC - TECHNOLOGY

TEMP - TEMPERATURE

TOE - TOP OF EQUIPMENT

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

VFD - VARIABLE FREQUENCY DRIVE

VOL - VOLUME

W/ - WITH

W/0 - WITHOUT

WP - WEATHERPROOF

ZVC - ZONE VALVE CABINET

E2

B

E2

DETAIL: B = DETAIL DESIGNATION

E2 = SHEET WHERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

E2 = SHEET WHERE SECTION IS LOCATED

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

GENERAL FLOOR PLAN NOTES

WIRE & CONDUIT IN WALL OR ABOVE CEILING.

WIRE & CONDUIT IN OR BELOW SLAB OR GRADE.

EACH ARROWHEAD REPRESENTS ONE COMPLETE CIRCUIT; "X" DENOTES PANEL NAME; NUMBER(S)

DENOTES CIRCUIT(S).

LADDER TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.

CONDUIT FOR DATA CIRCUITRY.DAT

WIRE & CONDUIT FOR FIRE ALARM CIRCUITRY.FA

WIRE & CONDUIT FOR NURSE CALL CIRCUITRY.NC

EXISTING WIRE & CONDUIT TO REMAIN.EX

CONDUIT TO BE REMOVED.

WIRE & CONDUIT FOR NIGHT LIGHT CIRCUITRY.NL

CONDUIT FOR PHONE CIRCUITRY.PHO

WIRE & CONDUIT FOR SECURITY SYSTEM CIRCUITRY.SEC

WIRE RUN IN SURFACE WIREWAY.W

CABLE MANAGEMENT SYSTEM PATHWAY.CM

X - 1,2

WIRE & CONDUIT FOR EMERGENCY CIRCUITRY.EM

WIRE & CONDUIT FOR SOUND SYSTEM CIRCUITRY.S

WIRE & CONDUIT FOR INTERCOM SYSTEM CIRCUITRY.I

WIRE & CONDUIT FOR TELEVISION SYSTEM CIRCUITRY.TV

LUMINAIRE SYMBOLS

LIGHTING FIXTURE. CAPITAL LETTER DENOTES FIXTURE TYPE, LOWER CASE LETTER DENOTES

SWITCHING ARRANGEMENT.

LIGHTING FIXTURE ON NIGHT LIGHT OR EMERGENCY CIRCUIT.

EXIT LIGHTING FIXTURE, ARROWS AS INDICATED.

A a

WIREMOLD RACEWAY, AS NOTED ON PLANS.

CABLE TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.

4"

4"

4"

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH 2 INTEGRAL USB CHARGERS (18" MH UNLESS NOTED OTHERWISE).

NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT

TO MODIFICATIONS ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT

NECESSARILY BE USED ON THIS PROJECT.

FLOOR BOX, # INDICATES TYPE, REFER TO FLOOR BOX (FB) SCHEDULE. IF NO #, PROVIDE FLUSH FLOOR BOX WITH ROUND COVERPLATE AND ONE 20A-125V DUPLEX RECEPTACLE. PROVIDE CARPET FLANGE WHERE REQD.

X

POKE-THRU PER DIV 26. # INDICATES TYPE, REFER TO POKE-THRU (PT) SCHEDULE. SUBSCRIPT "X" INDICATES

TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.

X

T2 1 ELEVATION: 1 = ELEVATION DESIGNATION

T2 = SHEET WHERE ELEVATION IS LOCATED

FLOOR BOX PER DIV 26. # INDICATES TYPE, REFER TO FLOOR BOX (FB) SCHEDULE. SUBSCRIPT "X" INDICATES

TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.

X

CUSTOM OUTLET IN SURFACE RACEWAY. SURFACE RACEWAY PER DIV 26. OUTLET JACKS, FACEPLATE AND CABLING

PER DIV 27.

W

FIRE RATED POKE-THRU, # INDICATES TYPE, REFER TO POKE-THRU (PT) SCHEDULE. IF NO #, PROVIDE 6 INCH RECESSED ACCESS POKE-THRU WITH TWO 20A-125V DUPLEX RECEPTACLES. PROVIDE CARPET FLANGE WHERE REQD.

X

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODES,AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF

VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS

ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE

DESIGN GUIDEPG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS

PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING

SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF

DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK,

CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW

CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO

ORDERING, FABRICATING OR INSTALLING NEW MATERIALS.

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS

PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL

EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY

WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A

SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,

CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

9. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRESTOPPED AS REQUIRED BY THE RATING OF THE WALL. WHERE CONDUIT IS REMOVED

THROUGH RATED WALLS, SMOKE/FIRESTOP PENETRATION.

10. FIRESTOP ALL FLOOR PENETRATIONS AT THE END OF EACH WORKING SHIFT.

11. CONTRACTOR SHALL ENGAGE A SUB-SURFACE UTILITY MARKING COMPANY TO LOCATE ALL

UNDERGROUND LINES PRIOR TO CONSTRUCTION.

GENERAL CONSTRUCTION NOTES

GENERAL NOTES:

A. CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS

PRIOR TO STARTING PROPOSED SCHEDULE.

B. SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE

DOWNTIME OF THE BUILDING ELECTRICAL SYSTEM. CONTRACTOR IS REQUIRED TO SUBMIT A

DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE COR/ENGINEER AT THE BEGINNING

OF THE PROJECT INDICATING CUTOVER DATES, POWER OUTAGES/DURATION AND PROJECT

MILESTONES. DEVIATIONS FROM THE FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION

WILL BE REVIEWED, BUT WILL NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.

C. ALL CUTOVER WORK REQUIRING BUILDING ELECTRICAL SYSTEM OUTAGES AND/OR EMERGENCY

SYSTEM DOWNTIME SHALL BE DONE OUTSIDE OF NORMAL WORKING HOURS (7AM-7PM MONDAY-

FRIDAY). OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.

D. THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT INTENDED TO

CONVEY INSTRUCTIONS FOR EVERY ASPECT OF THE CONSTRUCTION PROJECT.

E. NO LIVE WORK WILL BE PERMITTED WITHOUT WRITTEN CONSENT OF THE MEDICAL CENTER

LEADERSHIP. REQUESTS MUST BE SUBMITTED WITH CONTRACTOR'S SAFETY PLAN AND PROOF OF

ARC FLASH LEVEL/PPE REQUIRED.

F. PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT AND CONDUITS 2" AND LARGER

WITH PATHWAYS VERIFIED IN THE FIELD AND SIGNED OFF BY THE CONTRACTOR.

G. STATION CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/HEALTHCARE FACILITY OCCUPIED 24/7

WITH INPATIENT/OUTPATIENT CARE, SURGERY, PRE/POST-OP, PSHYCIATRIC, PHARMACY,

WAREHOUSE, NURSING, SUBSTANCE ABUSE, RETAIL, CANTEEN, INTENSIVE CARE, DATA CENTER, IMAGING, PBX, KITCHEN, ETC. INCLUDE LABOR AND MATERIAL TO ACCOMMODATE PPE/ACCESS

REQUIRED FOR WORK IN THESE VARIOUS SPACES. EXTENSIVE COORDINATION MUST OCCUR TO

MINIMIZE DISRUPTION AS MUCH AS POSSIBLE.

H. 21 DAYS BEFORE ANY OUTAGE, CONTRACTOR SHALL SET UP A MEETING WITH COR AND

DEPARTMENT MANAGERS TO REVIEW WHICH LOADS WILL BE TAKEN DOWN, WHICH LOADS WILL

REMAIN ON AND OUTAGE START/END TIME. EACH DEPARTMENT MUST BE BRIEFLY SURVEYED TO

DETERMINE OVERALL IMPACT OF OUTAGE AND EXPLAINED TO COR AND MANAGERS.

SEQUENCE OF CONSTRUCTION

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

UPGRADE EMERGENCY

POWER IN BUILDING 138

#610-16-104

PROJECT NO. 2018-05034 FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

D

A Y

H L T

H C

A R

E \T e a m D a ta

\L

\2

-0

\R

E V

IT

B ld g

A E

U p g ra d e E m e rg e n c y P o w e r\

M o d e l

B ld g

A

E U p g ra d e E m e rg e n c y

P o w e r\

-0

-E le c tr ic a l C e n tr a l.

rv t

/2

/2

:2

:5

A

M

E001

LEGEND, ABBREVIATIONS & INDEX

OF DRAWINGS

12/17/2019 MSG JHSRevisions: Date:

95% REVIEW 12/17/2019

DRAWING 36 OF 60

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Services

Engineering and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Marion VA Marion, IN

#610-16-104

PROJECT NO. 2018-05034

CONSTRUCTION DOCUMENTS

04/29/2020

FULLY SPRINKLERED

UPGRADE EMERGENCY

POWER IN BUILDING 138

DRAWING OF 61

C :\U se rs

\c he ls \D oc um en ts

\F

FE

_M ar io n_

M

EP

_B ui ld in g

(2

8) _c he ls ey .g al lio n.

rv t

/2 4/

2:

:0

PM

138E-002

BUILDING 138 PANELBOARD

SCHEDULES

JB HT

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

Notes:

Total Load: 0.00 kVA 0.00 kVA 0.00 kVA 27 Space -- -- 0 VA 0 VA -- -- Space 28 25 Space -- -- 0 VA 0 VA -- -- Space 26 23 Space -- -- 0 VA 0 VA -- -- Space 24 21 Space -- -- 0 VA 0 VA -- -- Space 22 19 Space -- -- 0 VA 0 VA -- -- Space 20 17 Space -- -- 0 VA 0 VA -- -- Space 18

15 0 VA 0 VA 16

13 0 VA 0 VA 14

EXISTING 30 A 3

0 VA 0 VA

3 30 A EXISTING

9 0 VA 0 VA 10

7 0 VA 0 VA 8

SPARE 30 A 3

0 VA 0 VA

3 20 A EXISTING

3 EXISTING 20 A 1 0 VA 0 VA 4

1 EXISTING 20 A 1 0 VA 0 VA

2 20 A EXISTING

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Exist. Tub... 22" x 6" x 65.5" Exist. Mfr: GE Exist Model: NAB-BR-23223 Voltage: 120/208 Wye-3PH-4W Mains Rating: 225 A

Supply From: Enclosure: Type 1 Mains Type: MCB Location: Mounting: Surface A.I.C. Rating:

Panel: AC

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

6 Space 0.00 kVA -- -- -- -- -- -- -- -- -- 5 Space 0.00 kVA -- -- -- -- -- -- -- -- -- 4 Space 0.00 kVA -- -- -- -- -- -- -- -- -- 3 EMSC METER 0.00 kVA -- 1 20 A -- -- -- -- -- -- 2 138 PHIE 0.00 kVA -- 3 300 A -- -- -- -- -- -- 1 138 PHZE 0.00 kVA -- 3 200 A -- -- -- -- -- --

CKT

CIRCUIT

DESCRIPTION

APPROX.

CONNECTED

LOAD

FRAME

SIZE POLES

TRIP

SETTING

BREAKER

TYPE

NUMBER OF

CONDUCTORS

WIRE

SIZE

GROUND

SIZE

CONDUIT

SIZE

SEE

NOTE

Feeder Size: Spec. Ref. #:

Voltage: 120/208 Wye-3PH-4W Mains Rating: 400 A

Supply From: Enclosure: NEMA 1 Mains Type: MLO Location: Mounting: SURFACE A.I.C. Rating: 65,000A

DISTRIBUTION PANEL: EEDP

0.00 kVA

TOTAL CONNECTED ESTIMATED DEMAND

NOTES:

15 SPD 0.00 kVA -- 3 250 A -- -- -- -- -- -- 14 138 E4C 0.00 kVA -- 3 100 A -- -- -- -- -- -- 13 138 EL4CA 0.00 kVA -- 3 60 A -- -- -- -- -- -- 12 138 PE 0.00 kVA -- 3 60 A -- -- -- -- -- -- 11 138 E2C 0.00 kVA -- 3 60 A -- -- -- -- -- -- 10 138 EBB,E2B 0.00 kVA -- 3 250 A -- -- -- -- -- -- 9 EEDP 0.00 kVA -- 3 0 A -- -- -- -- -- -- 8 EM-1 0.00 kVA -- 3 400 A -- -- -- -- -- -- 7 EXISTING 0.00 kVA -- 3 250 A -- -- -- -- -- -- 6 ICU SUP FAN 0.00 kVA -- 3 30 A -- -- -- -- -- -- 5 12 XA 0.00 kVA --…