This notice announces an upcoming Invitation for Bid for the Upgrade Emergency Power Building 138 project at the Northern Indiana HealthCare System VA Medical Center in Marion, Indiana.
The solicitation will be issued pursuant to a 100% Service-Disabled Veteran-Owned Small Business set-aside. Offerors must be registered and verified in VIP and SAM databases. The project magnitude is between $5-10 million with a NAICS code of 238210 and size standard of $16.5 million. The duration shall not exceed 600 calendar days from notice to proceed. Bonds will be required.
A one-time site visit will be scheduled. The solicitation, specifications and drawings will be posted on August 14, 2020 on SAM.gov, with bids due approximately 30 days later. Questions will only be answered through requests for information after posting. Offerors must monitor amendments on SAM.gov. The awarded project must meet contract documents, plans and specifications.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A DCB
D5
194MH-501
FUTURE GENERATOR
FOT-1
FUTURE DAY TANK
AAS-1
LVR-1
LVR-2
LVR-3
24"x36" ACCESS PANEL
24"x36" ACCESS PANEL
/4
(R E
F
REMOTE ALARM ANNUNCIATOR
FOR TANK LEVEL AND LEAK
DETECTION MONITORING
SYSTEM (FOR FOT-1)
RFS-1
FOF-1
FOT-2
TANK LEVEL AND
LEAK DETECTION
MONTIORING PANEL
(FOR FOT-1)
TYP
3" TF
D-1
D-2
TYP
TYP
1 1/2" DTR
1 1/2" DTS
1 1/2" DTR
1 1/2" DTS
FUTURE
PUMP SKID
PUMP SKID
1" ER
1" ES
1 1/2" DTR
1 1/2" DTS
1 1/2" FOFS
1 1/2" FOFR
D-3
(REF)
4' - 5 7/8"
(REF)
2' - 8"
DCB
2" DTR
2" DTS
3" TF
1 1/2" FOFR
3" TF
1 1/2" FOFS
UH-1
UH-2
1 2 3
TYP TYP
TYP
TYP
TYP
TYP
TYP
TYP
T
T
T
FUTURE GENERATOR
TYP
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 65
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F F
E
M a ri o n
B u ild in g s w it c h k y le
.g u g g e n h e im .r v t
/2
/2
:3
:1
A
M
194MH-102
MECHANICAL PLANS AND
SECTIONS
PP BL
1/4" = 1'-0" E1
MECHANICAL FLOOR PLAN - GENERATOR ROOM
GENERATOR ROOM CONTROLS DESCRIPTION - GENERATOR
COOLING AND HEATING/VENTILATION:
1. EMERGENCY GENERATOR SHALL BE INTERLOCKED WITH D-1,
D-2, AND LVR-3. WHEN EMERGENCY GENERATOR IS
ENERGIZED D-1, D-2, AND LVR-3 SHALL OPEN. WHEN
EMERGENCY GENERATOR IS DE-ENERGIZED D-1, D-2, AND
LVR-3 SHALL CLOSE. ALL DAMPERS SHALL BE PROVIDED
WITH LIMIT SWITCHES TO PROVE OPEN STATUS BEFORE
GENERATOR START.
2. VENTILATION EXHAUST FAN EF-1 SHALL BE INTERLOCKED
WITH D-1 AND D-2. WHEN ROOM THERMOSTAT RISES ABOVE
85°F, OPEN THE LOWER SECTIONS OF EACH D-1 AND D-2
DAMPER ARRAY, THEN ROOM EXHAUST FAN SHALL START.
WHEN ROOM THERMOSTAT DROPS BELOW 80°F, SEQUENCE
SHALL BE REVERSED. EXHAUST FAN MAY START WHEN
GENERATOR IS IN OPERATION AND LOUVERS ARE ALREADY
OPEN.
3. ELECTRIC UNIT HEATERS SHALL BE INTERLOCKED WITH
ROOM THERMOSTAT SET AT 40°F. ON A DROP IN ROOM
TEMPERATURE BELOW 38°F ELECTRIC UNIT HEATER SHALL
BE ENERGIZED. HEATER SHALL BE DE-ENERGIZED ON A RISE
IN ROOM TEMPERATURE ABOVE 42°F.
1/4" = 1'-0" E6
MECHANICAL FLOOR PLAN - GENERATOR ROOM OVERHEAD PIPING AND EQUIPMENT
DRAWING NOTES:
1 ENGINE EXHAUST AND SILENCERS SHALL BE SUPPORTED FROM ROOF FRAMING
WITH SPRING TYPE HANGERS. ADDITIONAL ROOF FRAMING IS PROVIDED FOR THIS
PURPOSE. COORDINATE SILENCER AND HANGER LOCATIONS TO ALIGN WITH
FRAMING. CONSULT WITH MANUFACTURER FOR ADDITIONAL ENGINE EXHAUST
REQUIREMENTS.
2 EXHAUST SHALL CONNECT TO ENGINE MANIFOLD VIA STAINLESS STEEL FLEXIBLE
SECTION TO LIMIT STRESS ON COMPONENTS.
3 INCLUDE Y FITTING AND DRIP LEG WITH PETCOCK BELOW SILENCER TO TRAP
CONDENSATION.
4 INSTALL DOUBLE-SLEEVED EXHAUST THIMBLE AT EXHAUST PENETRATION THRU
WALL. EXTEND BEYOND INTERIOR AND EXTERIOR OF WALL 10 INCHES OR MINIMUM
DISTANCE RECOMMENDED BY MANUFACTURER. ANY SEALANT USED AT EXHAUST
PENETRATION SHALL BE RATED FOR USE AT DESIGN EXHAUST TEMPERATURES.
5 CUT EXHAUST TERMINATION AT 45 DEGREE ANGLE OR IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATION.
6 DAY TANK VENT PIPING (NOT SHOWN) SHALL BE ROUTED THRU WALL 12' ABOVE
GRADE AT THIS LOCATION.
7 INSTALL PRIMING TEE FOR DAY TANK SUPPLY AT LOCATION SHOWN. CONTRACTOR
IS RESPONSIBLE FOR ENSURING PRIMING OF ALL FUEL SYSTEMS AND SHALL
PROVIDE PROVISIONS FOR PRIMING OTHER FUEL PIPING SYSTEMS AS REQUIRED.
8 INSTALL ANTI-SIPHON VALVE (FAIL CLOSED W/ INTEGRAL PRESSURE RELIEF) IN
HORIZONTAL ORIENTATION AT DAY TANK SUPPLY NOZZLE.
9 PROVIDE GUIDE TYPE SUPPORT FOR SUPPLY AND RETURN PIPING IN TRENCH.
10 USE FLEXIBLE CONNECTION BETWEEN STATIONARY PIPING AND GENERATOR.
11 TANK STAIR AND ACCESS PLATFORM SHALL BE PROVIDED AS SHOWN BY TANK
MANUFACTURER.
12 COORDINATE PIPE SUPPORTS WITH TANK MANUFACTURER BASED ON CONCEPTUAL
ROUTING SHOWN. SUPPORTS CONNECTED TO TANK SHALL NOT BE FABRICATED IN
THE FIELD UNLESS PROVIDED WRITTEN APPROVAL FROM TANK MANUFACTURER.
13 USE FLEXIBLE CONNECTION BETWEEN RADIATOR AND TRANSITION DUCT TO
REDUCE NOISE AND VIBRATION TRANSMISSION.
14 ACCESS PANELS PROVIDED ON EACH SIDE OF DUCT BETWEEN SILENCER BANK AND
DAMPER.
15 CONTRACTOR SHALL COORDINATE MOUNTING LOCATION OF GENERATOR TO LEAVE
ADEQUATE SPACE BETWEEN RADIATOR AND EXTERIOR WALL FOR ALL EQUIPMENT
SHOWN, INCLUDING FLEXIBLE CONNECTIONS, DUCT TRANSITION, DUCT JOINTS,
SILENCER BANK, ACCESS DUCT SECTION, DAMPER, AND LOUVER.
16 COORDINATE PIPE SUPPORT LOCATIONS WITH TANK MANUFACTURER TO SATISFY
MAXIMUM SPACING REQUIREMENTS.
17 BOTTOM OF EXHAUST FAN 16' AFF. LOCATE THERMOSTAT ON WALL 4' AFF.
18 ADDITIONAL STRUCTURAL REINFORCING IS REQUIRED FOR LOUVERS, DAMPERS,
AND SILENCERS DUE TO MULTI-HIGH/WIDE CONSTRUCTION. CONTRACTOR SHALL
STRUCTURALLY REINFORCE ALL ASSEMBLIES AS RECOMMENDED BY
MANUFACTURER.
19 CONSTRUCT GENERATOR EXHAUST DUCT IN ACCORDANCE WITH SMACNA
RECTANGULAR INDUSTRIAL DUCT CONSTRUCTION STANDARD.
20 PROVIDE CMU FOR SILENCER BANK SUPPORT. SEE STRUCTURAL DETAILS.
CONTRACTOR SHALL SET HEIGHT OF SILENCER BANK TO MATCH EXHAUST LOUVER.
21 DTS AND DTR PIPE SUPPORTED FROM SLAB APPROXIMATELY 8" AFF BETWEEN
SILENCER SUPPORTS AND EXTERIOR WALL. MAINTAIN LEVEL ELEVATION BELOW
EXHAUST DUCT.
22 ANCHOR FUEL HANDLING EQUIPMENT TO SLAB.
23 USE FLEXIBLE CONNECTION BETWEEN STATIONARY PIPING AND FUEL HANDLING
EQUIPMENT.
24 COORDINATE DUCT TRANSITION WITH EXHAUST LOUVER OPENING HEIGHTS (SEE
ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR DETAILS).
25 PROVIDE TEE FOR FUTURE DAY TANK IN DTS AND DTR RISERS AT 5' AFF. VALVE AND
CAP CLOSE TO FITTING. 2" X 1.5" REDUCER DOWNSTREAM OF TEE.
26 SPACING BETWEEN HORIZONTAL SUPPORTS FOR 2" PIPING SHALL NOT EXCEED 10
FEET. SPACING FOR 1-1/2" PIPING SHALL NOT EXCEED 9 FEET.
04/29/2020 Revisions: Date:
ADDENDUM 4 11/23/2020
ADDENDUM 10 3/24/2020
DUCT
EXTERIOR WALL
REFER TO PLANS
FOR SIZE
DUCT SLEEVE,
ANGLES, AND
CONNECTIONS PER
SPECIFICATIONS
VOID SEALED PER
SPECIFICATIONS
FLEXIBLE DUCT
CONNECTION
AIRFLOW
MOTORIZED DAMPER
WEATHERHOOD
EXTERIOR WALL
NOTE:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS
& ROUND DAMPERS.
3. SEE GENERAL NOTES ON MECHANICAL NEW WORK SHEETS REGARDING VOLUME DAMPER LOCATIONS AND
ABOUT REMOTE ADJUSTMENT DEVICE OPTION FOR INACCESSIBLE CEILINGS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE ALL
AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND ROD PIN
DUCT
STIFFEN BLADE AS
REQUIRED
SIDE ELEVATION SECTION
A
B
1"
DRAW THRU
BLOW THRU
2" [50mm] PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE
NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M UNLESS
NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
ROUTE TO FLOOR
SINK OR ROOF
DRAIN
DRAIN PAN
NOTE:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES
NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE
CONNECTED.
3. SIZE CONDENSATE PER ADOPTED IMC TABLE 307.2.2
[2 5m m
DIELECTRIC
FITTING
1/2" 1/2" 1 1/2"
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION ON
FAN SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON 12"
[300mm] CENTERS
RIVET ON 4" [100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION OF
BOLT 1 1/2" [40mm] POCKET
SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUTFLANGED
CONNECTION ON
FAN SIDE
WASHER
FLEXIBLE MATERIAL AS
SPECIFIED
NOTE:
1. DETAILS SHOWN ARE FOR STANDARD VENTILATION DUCTWORK. CONFIRM
CONSTRUCTION OF FLEXIBLE CONNECTIONS TO GENERATOR COOLING EXHAUST WITH
GENERATOR MANUFACTURER.
WATER STOP AND
ANCHOR COLLAR
PIPE
WALL SLEEVE
LINK-SEAL TYPE
PENETRATION SEAL
BUILDING EXTERIOR
CMU
GROUT SLEEVE TO MASONRY
WALLS WITH NON-SHRINK GROUT
OF PIPE
BUILDING EXTERIOR
BUILDING INTERIOR
PIPE SLEEVE
STEEL GRATE
ENGINE FUEL SUPPLY/RETURN -
PROVIDE SPACING BETWEEN
RETURN AND SUPPLY AS SHOWN
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 65
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F F
E
M a ri o n
B u ild in g s w it c h k y le
.g u g g e n h e im .r v t
/2
/2
:3
:2
A
M
194MH-501
MECHANICAL DETAILS
PP CL
NTS
B7
DUCT PENETRATION
NTS
B8
EXHAUST FAN DETAIL
NTS
B3
VOLUME DAMPER DETAIL
NTS
B1
AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS
B6
FLEXIBLE DUCT CONNECTIONS
NTS
D3
PIPE PENETRATION DETAIL
NTS
D5
TRENCH PIPING DETAIL
04/29/2020 Revisions: Date:
SINGLE PACKAGED AIR CONDITIONER ELECTRIC SCHEDULE (ROOFTOP)
MARK LOCATION
AREA AND/OR
BLDG SERVED
TYPE
TOTAL SUPPLY
AIR FLOW
MIN. OUTSIDE
AIR FLOW
EXT STATIC
PRESSURE
COOLING CAPACITY HEATING CAPACITY
AIR
FILTER
ELECTRICAL DATA
REMARKS
MIN TOTAL
CAPACITY
MIN SENS
CAPACITY MIN
SEER
EAT OSA DESIGN
TEMP COMP
Kw
MIN. NET
OUTPUT
EAT
Db
LAT
Db
INDOOR FAN
UNIT POWER
CONNECTIONDb Wb
CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] MBH [kW] °F [°C] °F [°C] HP [W] CONTROL MCA PHASE VOLT
RTU-1 B194 OUTDOOR
BLDG 194
SWITCHGEAR ROOM
PACKAGED
ROOFTOP
1200 [ 570 ] N/A N/A 0.5 [ 130 ] 37.5 [ 130 ] 22.4 [ 7 ] 14 80 [ 27 ] 70 [ 21 ] 92 [ 33 ] 2.5 27 [ 8 ] 70 [ 21 ] 91 [ 33 ] 16x25x2
(QTY:2)
0.4 [ 300 ] ECM 32 [ 3 ] 208 1
REMARKS:
1. UNIT SHALL BE PAD MOUNTED, SIDE DISCHARGE, ON 14" CURB. FOLLOW ALL MANUFACTURERS RECOMMENDATIONS FOR INSTALLING IN THIS CONFIGURATION.
AIR DEVICE SCHEDULE (SUPPLY AND RETURN)
MARK TYPE
AIR FLOW
MAX APD
MOUNTING
PANEL/FRAME SIZE
NC MAX DAMPER DEFLECTION FINISH REMARKSMIN MAX
IN x IN [mm x mm]
CFM [L/s] CFM [L/s] IN WG [Pa]
SG-1
RECTANGULAR, LONG
BLADES
300 [ 140 ] 300 [ 140 ] 0.05 [ 13 ] DUCT 10 X 6 [ 250 X 150 ] 30 NONE 0
MANUF
STANDARD
RG-1
RECTANGULAR, HEAVY
DUTY, LONG BLADES
1200 [ 570 ] 1200 [ 570 ] N/A N/A WALL 26 x 14 [ 1350 X 550 ] N/A NONE 0
MANUF
STANDARD
REMARKS:
1. PROVIDE DUCT MOUNTED MANUAL VOLUME DAMPER ON BRANCH CLOSE TO MAIN FOR BALANCING.
SPLIT SYSTEM AIR CONDITIONER HEAT PUMP SCHEDULE
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
TYPE
TOTAL SUPPLY
AIR FLOW
MIN. OUTSIDE
AIR FLOW
EXT STATIC
PRESSURE
COOLING CAPACITY
AIR
FILTER
MARK NO
ELECTRICAL DATA
SUPPLEMENTAL HEAT
REMARKS
MIN TOTAL
CAPACITY
MIN SENS
CAPACITY MIN
SEER
EAT OSA DESIGN
TEMP COMP
W
INDOOR FAN OUTDOOR UNIT
MCA PHASE VOLTDb Wb
CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] HP [W] CONTROL HP [w] CONTROL Kw PHASE VOLT
ACU-1 B175 EMCS DUCTLESS 425 [ 200 ] N/A N/A N/A N/A 12 [ 41 ] 12 [ 4 ] 15.2 75 [ 24 ] 67 [ 19 ] 95 [ 35 ] 1190 EQUIPED 0.04 [ 30 ] REMOTE 1.5 [ 1100 ] REMOTE 14 1 208/230 N/A N/A N/A 1, 2, 3
ACU-2 B175 EMCS DUCTLESS 425 [ 200 ] N/A N/A N/A N/A 12 [ 41 ] 12 [ 4 ] 15.2 75 [24] 67 95 [ 35 ] 1190 EQUIPED 0.04 [ 30 ] REMOTE 1.5 [ 1100 ] REMOTE 14 1 208/230 N/A N/A N/A 1, 2, 3
REMARKS:
1. PROVIDE WALL MOUNTED SECONDARY DRAIN PAN SIZED TO COVER LENGTH AND WIIDTH OF UNIT.
2. PROVIDE PRECHARGED REFRIGERANT LINE SET BETWEEN INDOOR UNIT AND OUTDOOR UNIT.
3. PROVIDE A WALL MOUNTED REMOTE CONTROLLER.
[ 19 ]
AIR COOLED CONDENSING UNIT SCHEDULE (AIR CONDITIONING SERVICE)
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
SYSTEM
AND/OR
SERVICE
TYPE
MIN
REFRIGERATION REFRIGERANT
OA TEMP MIN
EER
COMPRESSOR MOTOR CONDENSER FAN MOTOR
REMARKS
# COMP
NOMINAL
POWER PHASE VOLT # FANS
NOMINAL
POWER PHASE VOLT
MBH [kW] °F [°C] HP [kW] HP [W]
ACCU-1 B175 OUTDOOR EMCS ACU-1 SCROLL 12 [ 41 ] 410a 95 [ 35 ] 13 1 1.5 [ 1 ] 1 208 1 0.04 [ 30 ] 1 208 1, 2, 3
ACCU-2 B175 OUTDOOR EMCS ACU-2 SCROLL 12 [ 41 ] 410a 95 [ 35 ] 13 1 1.5 [ 1 ] 1 208 1 0.04 [ 30 ] 1 208 1, 2, 3
REMARKS:
1. PROVIDE CONCRETE PAD ON GRADE FOR MOUNTING THE ACCU ON.
2. PROVIDE LOW AMBIIENT KIT FOR COOLING OPERATION ALL YEAR.
3. PROVIDE WIND BAFFLE ACCESSORY.
CLEAN STEAM GENERATOR SCHEDULE
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
SYSTEM AND/OR
SERVICE
TYPE
SOURCE OF
MAKEUP
WATER CONDITIONS
PRODUCED
STEAM FLOW
PRODUCED
STEAM PRESS
ELECTRIC DATA BLOWER ELECTRICAL DATA
REMARKSFLOW EWT
GPM [L/s] °F [°C] LBS/HR kg/HR PSIG [kPa] KW VOLTS/PHASE/HERTZ MCA MOCP KW VOLTS/PHASE/HERTZ MCA MOCP
H-1 B175 EMSC HUMIDIFICATION
WALL MOUNTED
ELECTRODE CANISTER
DCW 0.2 [ 0. ] 50 [ 10 ] 5 [ 2 ] 1 [ 7 ] 2 120/1/60 16.8 25 0.2 120/1/60 1 15 1, 2
REMARKS:
1. PROVIDE WALL MOUNTED HUMIDISTAT.
2. PIPE STEAM AND CONDENSATE FROM H-1 OUTSIDE ROOM.
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 65
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F F
E
M a ri o n
B u ild in g s w it c h k y le
.g u g g e n h e im .r v t
/2
/2
:3
:2
A
M
194MH-601
MECHANICAL SCHEDULES I
PP PP
3504/29/2020Revisions: Date:
LOUVER SCHEDULE
MARK LOCATION SYSTEM/SERVICE TYPE
WIDTH
(in)
HEIGHT
(in)
DEPTH
(in)
MATERIAL FINISH COLOR
ACTUATOR FLOW DETAILS
NOTES
TYPE
POSITION
INIDICATING
FAIL
POSITION
POWER
FLOW
DIRECTION
Flow
(CFM)
VELOCITY
(FPM)
PD (in.
w.g.)
LVR-1
B194 GEN
ROOM
COOLING/
COMBUSTION AIR
INTAKE
STATIONARY
DRAINABLE
BLADE
128 168 6 ALUMINUM AAMA 2605 BY OWNER N/A N/A N/A N/A INTAKE 67500 682 0.07 1, 2, 3
LVR-2
B194 GEN
ROOM
COOLING/
COMBUSTION AIR
INTAKE
STATIONARY
DRAINABLE
BLADE
128 168 6 ALUMINUM AAMA 2605 BY OWNER N/A N/A N/A N/A INTAKE 67500 682 0.07 1, 2, 3
LVR-3
B194 GEN
ROOM
COOLING AIR EXHAUST
STATIONARY
DRAINABLE
BLADE
160 160 6 ALUMINUM AAMA 2605 BY OWNER N/A N/A N/A N/A EXHAUST 135000 1145 0.18 1, 2, 3
NOTES:
1. COLOR TO BE SELECTED BY OWNER FROM MANUFACTURER STANDARD COLOR OPTIONS.
2. INCLUDE BIRD SCREEN
3. CONTRACTOR SHALL PROVIDE ADDITIONAL STRUCTURAL REINFORCING MEMBERS AS REQUIRED FOR SUPPORT OF MULTI-SECTION ASSEMBLIES. CONSULT LOUVER MANUFACTURER.
DAMPER SCHEDULE
MARK LOCATION SYSTEM/SERVICE STYLE TYPE
WIDTH
(in)
HEIGHT
(in)
MATERIAL
ACTUATOR FLOW DETAILS
NOTES
TYPE
POSITION
INIDICATING
FAIL
POSITION
POWER
AIR
DIRECTION
FLOW
(CFM)
VELOCITY
(FPM)
PD (in.
w.g.)
D-1
B194 GEN
ROOM
COOLING/
COMBUSTION AIR
INTAKE
OPPOSED BLADE
LOW LEAKAGE
TWO-POS
CONTROL
128 168
16 GA GALV.
STEEL
FAST ACTING
W/ SPRING
RETURN
YES OPEN 24 VAC INTAKE 67500 452 0.003 1, 2, 3
D-2
B194 GEN
ROOM
COOLING/
COMBUSTION AIR
INTAKE
OPPOSED BLADE
LOW LEAKAGE
TWO-POS
CONTROL
128 168
16 GA GALV.
STEEL
FAST ACTING
W/ SPRING
RETURN
YES OPEN 24 VAC INTAKE 67500 452 0.003 1, 2, 3
D-3
B194 GEN
ROOM
COOLING AIR
EXHAUST
OPPOSED BLADE
LOW LEAKAGE
TWO-POS
CONTROL
160 160
16 GA GALV.
STEEL
FAST ACTING
W/ SPRING
RETURN
YES OPEN 24 VAC EXHAUST 135000 759 0.009 1, 2, 3
NOTES:
1. DAMPERS SHALL BE FAST ACTING WITH LIMIT SWITCH TO CONFIRM POSITION STATUS WITH GENERATOR CONTROLS.
2. CONTRACTOR SHALL PROVIDE ADDITIONAL STRUCTURAL REINFORCING MEMBERS AS REQUIRED FOR SUPPORT OF MULTI-SECTION ASSEMBLIES. CONSULT DAMPER MANUFACTURER.
3. DAMPER SHALL BE INSTALLED AT WALL SUCH THAT DAMPER FRAME EXPOSED TO BUILDING INTERIOR. ACTUATORS SHALL BE MOUNTED EXTERNAL TO DAMPER FRAME.
ELECTRIC UNIT HEATER SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
TYPE
AIR FLOW TEMP RISE MIN CAPACITY POWER
FAN MOTOR
REMARKSFAN POWER
PHASE VOLT
CFM L/S °F [°C] BTUH [W] AMP PHASE VOLT HP [W]
UH-1 CEILING GENERATOR ROOM
VERTICAL
DELIVERY
940 [ 440 ] 36 [ 20 ] 34000 [ 10000 ] 29 3 208 0.07 [ 50 ] 1 208 1
UH-2 CEILING GENERATOR ROOM
VERTICAL
DELIVERY
940 [ 440 ] 36 [ 20 ] 34000 [ 10000 ] 29 3 208 0.07 [ 50 ] 1 208 1
REMARKS:
1. MOUNTING HEIGHT SHALL NOT EXCEED VERTICAL THROW OF HEATER. PROVIDE WITH CONE OUTLET FOR INCREASED THROW.
FAN SCHEDULE
MARK LOCATION
AREA
AND/OR
BLDG
SERVED
SYSTEM
AND/OR
SERVICE
AIR FLOW TSP
FAN MOTOR ELECTRICAL
REMARKS
TYPE WHEEL CLASS ARRANGEMENT
DIAMETER
DRIVE
FAN
MAX
RPM
NOMINAL POWER
PHASE VOLT RPM
SPEED
CONTROL
CFM [L/s] IN [Pa] IN [mm] BHP HP [kW]
EF-1 WALL
GENERATOR
ROOM
GENERAL
EXHAUST
4991 [ 2400 ] 0.1 [ 25 ] SIDEWALL PROPELLER N/A
WALL HOUSING WITH MOTORIZED
DAMPER AND WEATHER HOOD
20 [ 500 ] DIRECT 1160 0.7 0.5 [ 0.37] 1 115 1725 CONSTANT 1
REMARKS:
1. FAN SHALL BE ACCESSED FROM INTERIOR OF BUILDING. PROVIDE MOTOR SIDE GUARD ON INTERIOR OF HOUSING AND BIRD SCREEN ON WEATHER HOOD. INSTALL WITH 1/8" SLOPE TOWARD EXTERIOR OF BUILDING.
ACOUSTIC ABSORTIVE SILENCERS
MARK LOCATION
SYSTEM AND/OR
SERVICE
TYPE
WIDTH HEIGHT LENGTH
MATERIAL
ACOUSTIC
MEDIA
LINER
INLET/OUTLET
CONNECTION
AIR
DIRECTION
FLOW VELOCITY PD DYNAMIC INSERTION LOSS (dB)
REMARKS
IN IN IN CFM FPM in. w.g. 63 125 250 500 1k 2k 4k 8k
AAS-1
B194 GEN
ROOM
COOLING AIR
EXHAUST
RECTANGULAR
DUCT SILENCER
BANK
160.00 160.00 36.00 22 GA GALV. FIBERGLASS
22 GA
PERFORATED
FLANGED/SLIP FORWARD 135000 760 0.03 6 7 9 12 9 9 8 6 1,2,3
REMARKS:
1. CONTRACTOR SHALL COORDINATE DUCT JOINT TYPES WITH GENERATOR RADIATOR AND DAMPER CONNECTIONS.
2. SILENCER ARRAY SHALL BE ASSEMBLED IN ACCORDANCE WITH MANUFACTURER RECOMMENDED PRACTICES.
3. SECURE SILENCER BANK TO SUPPORTS.
FUEL TANK SCHEDULE
MARK LOCATION
SYSTEM AND/OR
SERVICE
FUEL OIL
TYPE NO
NOM CAPACITY
TYPE CONSTRUCTION
DIMENSIONS
ALARM SYSTEM
OR LEAK
DETECTION
LEVEL
INDICATOR
PUMPS
FILL
CONTAINMENT
REMARKS
GAL [L]
FOT-1 OUTDOOR ABOVE GROUND
GENERATOR BULK
FUEL
# 2 18,000 [ 68000 ]
HORIZONTAL
CYLINDRICAL
UL-142 DOUBLE
WALL
10' (DIA) x 30.5' (L) YES, SEE DRAWING
CLOCK,
CALIBRATED
N/A RFS-1 (NOTE 4) 1, 2
FOT-2 GENERATOR ROOM
GENERATOR DAY
TANK
# 2 600 [ 2300 ] STAND-ALONE
UL-142 DOUBLE
WALL
86 x 48 x 51 (L x W x H)
YES, SEE DRAWING SPIRAL, UL LISTED SP-1, SP-2, RP-1 N/A 1,3,4,5,6,7,8
REMARKS:
1. SEE SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL REQUIREMENTS.
2. RFS-1 SHALL BE MINIMUM 15 GALLON CAPACITY WITH HINGLED LOCKABLE LID HELD OPEN BY HYDRAULIC ARM AND LOCKABLE DRAIN VALVE. CONSTRUCTION SHALL BE MINIMUM 12 GAUGE POWDERCOATED STEEL.
3. PUMPS AND CONTROLS TO BE FACTORY INSTALLED AND TESTED. COORDINATE WITH DRAWINGS AND SPECIFICATIONS.
4. DAY TANK HEIGHT SUBJECT TO REVIEW BY GENERATOR MANUFACTURER AND ENGINEER FOR COMPATABILITY WITH FUEL RETURN SYSTEM.
5. LEVEL CONTROLLER SHALL BE NEMA RATED UL 508 WITH COMPLETE LOCAL CONTROL AND INDICATION OF ALL FUNCTIONS AND ALARMS. SEE POINTS LIST FOR MINIMUM REQUIRED OUTPUTS TO BUILDING MANAGEMENT SYSTEM FOR REMOTE MONITORING.
6. PROGRAMMABLE SEQUENCES SHALL INCLUDE LEVEL, SCHEDULED SUPPLY/RETURN PRIMING, FUEL OIL TEMPERATURE CONTROL. INTIAL SETTINGS AS RECOMMENDED BY MANUFACTURER.
7. MANUAL CONTROLS SHALL INCLUDE HAND-OFF-AUTO PUMP CONTROL MODE SWITCH, PUSH TO TEST PUMP, PUMP START-STOP AUTOMATIC LEVEL CONTROL, PUMP OVERFILL CONTROL BACKUP.
8. CONTROLLER SHALL UTILIZE DISCRETE LEVEL SENSORS AND CIRCUIT PATHS FOR LEVEL ALARMS, PRIMARY PUMP CONTROL AND BACKUP PUMP CONTROL. FAILURE IN ONE SENSOR OR CIRCUIT PATH SHALL NOT DISABLE THE ENTIRE CONTROLLER.
FUEL OIL PUMP SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE MATERIAL
CAPACITY
DISCHARGE
PRESSURE FUEL
TYPE
OIL TEMP VISCOSITY
RANGE (SSU)
SUCTION LIFT MOTOR
REMARKS
GPM [L/s] PSIG [kPa] °F [°C] IN HG [mm] BHP [W] PHASE VOLT
SP-1
B194- GEN
ROOM
DAY TANK FUEL
SUPPLY
POSITIVE DISP CAST IRON 15 [ 1 ] 50 [ 350 ] DIESEL 60 [ 16 ] 30 - 75 15 [ 381 ] 1.5 [ 1100 ] 1 208 1, 2, 3
SP-2
B194- GEN
ROOM
DAY TANK FUEL
SUPPLY
POSITIVE DISP CAST IRON 15 [ 1 ] 50 [ 350 ] DIESEL 60 [ 16 ] 30 - 75 15 [ 381 ] 1.5 [ 1100 ] 1 208 1, 2, 3
RP-1
B194- GEN
ROOM
DAY TANK FUEL
RETURN
POSITIVE DISP CAST IRON 22.5 [ 1 ] 50 [ 350 ] DIESEL 60 [ 16 ] 30 - 75 15 [ 381 ] 2 [ 1500 ] 1 208 1, 2
REMARKS:
1. PUMPS SHALL BE DESIGNED FOR TRANSFER OF FUEL OIL.
2. VISCOSITY UPPER LIMIT BASED ON FUEL OIL #2 AT 20 DEG F. FUEL OIL TO BE WINTERIZED (BLENDED) FOR OPERATION BELOW FREEZING. OPERATING TEMP WILL VARY WITH AMBIENT OUTDOOR TEMPERATURE.
3. DAY TANK SUPPLY SYSTEM SHALL BE PROVIDED WITH FIXED HAND-OPERATED PUMP FOR SYSTEM PRIMING AND EMERGENCY OPERATION.
FUEL OIL QUALITY MAINTENANCE SYSTEM SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
FUEL OIL
TYPE NO
NOM CAPACITY
TYPE CONTROLS
DIMENSIONS
(in)
ALARM SYSTEM
OR LEAK
DETECTION
PUMP NOTES
GAL/H [L/H]
FOF-1
GENERATOR
ROOM
GENERATOR
BULK FUEL
# 2 / BLEND 900 [ 3400 ]
FREE STANDING
CABINET
STAND-ALONE
MICROPROCESSOR BASED
66 x 58 x 14 (H x W x D)
YES, SEE
SPECIFICATIONS
INLINE POSITIVE
DISPLACEMENT
1, 2
NOTES:
1. CONSTRUCTION AND FEATURES SHALL BE PER SPECIFICATIONS
2. PUMPS AND CONTROLS TO BE FACTORY INSTALLED AND TESTED. COORDINATE WITH DRAWINGS AND SPECIFICATIONS.
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 65
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F F
E
M a ri o n
B u ild in g s w it c h k y le
.g u g g e n h e im .r v t
/2
/2
:3
:2
A
M
194MH-602
MECHANICAL SCHEDULES II
PP PP
3604/29/2020 Revisions: Date:
ZONE TEMPERATURE SETPOINT AI X SENSOR FAILURE
ON/CANCEL
SUPPLY FAN START/STOP X BO
DX COOLING STAGE 1 X BO
OCCUPIED COOLING SETPOINT X 75°F
OCCUPIED HEATING SETPOINT X 40°F
DISCHARGE AIR TEMPERING SETPOINT X 55°F
DISCHARGE AIR TEMPERATURE CONTROL POINTS
X
BAS COMMUNICATION STATE X X X
MAINTENANCE REQUIRED X 600 HRS MAINTENANCE REQUIRED NOTE 2
DX COOLING STAGE 2 X BO
ELECTRIC HEAT STAGE 1 X BO
OUTSIDE AIR DAMPER X AO
DISCHARGE AIR TEMPERATURE X AI X X X SENSOR FAILURE
OUTDOOR AIR TEMPERATURE X AI X X X SENSOR FAILURE NOTE 1
MIXED AIR TEMPERATURE X AI X X X SENSOR FAILURE
DX COIL DEFROST X BI X
SUPPLY FAN STATUS X BI X X FAN FAILURE
FILTER STATUS X BI X DIRTY FILTER
ZONE HUMIDITY X AI X X X SENSOR FAILURE
KEY:
A = ANALOG, B = BINARY, I = INPUT, O = OUTPUT
GENERAL NOTES:
1. CAN BE A COMMUNICATED VALUE
2. USE VALUE RECOMMENDED BY MANUFACTURER
POINT TYPE ALARMS
Point Description
G R
A P
H
IC
H A
R D
W A
R E
IN
P U
T
H A
R D
W A
R E
O U
T P
U T
S O
F T
W A
R E
P O
IN
T
D E
F A
U L
T V
A L
U E
H
IG
H A
N A
L O
G L
IM
IT
L O
W A
N A
L O
G L
IM
IT
B
IN
A R
Y
L A
T C
H D
IA
G
N O
S T
IC
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
T
IO
N F
A
IL
D
IA
G N
O S
T
IC
S
NOTES
CONSTANT VOLUME AIR HANDLER UNIT, WITH DX
COOLING & ELECTRIC HEAT
ZONE SENSOR
ZONE TEMPERATURE X AI X X X SENSOR FAILURE
FILTER
DX COIL W/
DEFROST
DX COOLING (TWO
STAGE)
SUPPLY FAN
STATUS
ELECTRIC
HEATING
TT SDM
PDT
VSMC
PDT
EA
OA SA
RA
TT
OUTSIDE AIR TEMPERATURE TRANSMITTER
ZC
LTCP LOCAL TEMPERATURE CONTROL PANEL
HS
NOTE:
INSTRUMENTATION SHOWN ON THIS DIAGRAM IS FOR
REFERENCE AND IS NOT INCLUSIVE OF ALL POINTS
REQUIRED FOR THIS INSTALLATION. SEE POINTS LIST,
SEQUENCES, AND SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
CONTROLS SYMBOLS
TT TEMPERATURE TRANSMITTER - WALL MOUNT
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
VSMC VARIABLE SPEED MOTOR CONTROLLER
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
T-MA
T THERMOSTAT
TEMPERATURE SENSOR - MIXED AIR
CONTROL SIGNAL
CONTROL SEQUENCE:
COOLING: SETPOINT 75 DEG F
UPON A RISE IN SPACE TEMPERATURE ABOVE THE
OCCUPIED COOLING SETPOINT, COOLING IS INITIATED:
IF THE OUTSIDE AIR IS SUITABLE FOR FREE COOLING AS
DETERMINED BY THE OUTSIDE AIR DRY BULB
TEMPERATURE, THEN OUTSIDE AND RETURN AIR
DAMPERS MODULATE TO MAINTAIN A SUITABLE SPACE
TEMPERATURE. IF THE OUTSIDE AIR DAMPER MODULATES
FULLY OPEN AND ECONOMIZER OPERATION CANNOT
SATISFY THE COOLING NEEDS OF THE SPACE, RESULTING
IN A CALL FOR SECOND STAGE COOLING BY THE
PROGRAMMABLE THERMOSTAT, THEN FIRST STAGE DX
COOLING IS ENGAGED AS WELL. AS THE SPACE
TEMPERATURE FALLS BACK TOWARD SETPOINT, THEN DX
COOLING AND ECONOMIZER OPERATION ARE
DISENGAGED IN THE REVERSE ORDER THAT THEY WERE
ENGAGED.
IF THE OUTSIDE AIR IS NOT SUITABLE FOR FREE COOLING
AS DETERMINED BY THE OUTSIDE AIR DRY BULB
TEMPERATURE CONTROLLER, THEN OUTSIDE AIR
DAMPER REMAINS AT MINIMUM POSITION, AND FIRST
STAGE DX COOLING IS ENGAGED. UPON A FURTHER RISE
IN TEMPERATURE ABOVE THE OCCUPIED COOLING
SETPOINT, THEN SECOND STAGE DX COOLING IS
ENGAGED. AS THE SPACE TEMPERATURE FALLS BACK
TOWARD SETPOINT, THEN THE COOLING STAGES ARE
DISENGAGED IN THE REVERSE ORDER THAT THEY WERE
ENGAGED.
MECHANICAL COOLING SHALL BE LOCKED OUT BELOW 80
DEG F ROOM TEMPERATURE.
HEATING: SETPOINT 40 DEG F
UNIT HAS 1 STAGE OF ELECTRIC HEAT. WHEN THE
THERMOSTAT CALLS FOR HEATING, THE UNIT CONTROL
WILL ENERGIZE THE INDOOR FAN CONTACTOR AND THE
ELECTRIC HEAT.
CONTROL OVERVIEW:
CONTROLS SHALL BE DDC. CONTROLLER SHALL BE
INTEGRATED INTO THE BAS. FIBER DATA DROP FROM
CAMPUS NETWORK TO MEDIA CONVERTER PROVIDED BY
DIVISION 26 CONTRACTOR (LOCATED IN SWITCHGEAR ROOM).
UNIT SHALL AUTOMATICALLY SWITCH BETWEEN HEATING
AND COOLING MODES. THERE IS NO UNOCCUPIED MODE FOR
THIS APPLICATION. ECONOMIZER CONTROL SHALL BE DRY-
BULB BASED. SYSTEM SHALL CYCLE AS REQUIRED FOR
HEATING OR COOLING.
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 65
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F F
E
M a ri o n
B u ild in g s w it c h k y le
.g u g g e n h e im .r v t
/2
/2
:3
:2
A
M
194MH-603
HVAC INSTRUMENTATION AND
CONTROLS - SWITCHGEAR ROOM
PP PP
NTS
F5
POINT LIST - SWITCHGEAR ROOM HVAC
NTS
B5
CONTROL DIAGRAM - RTU-1
04/29/2020
LA
LI XA
TF 3"
4" 10"
24" 10" 2" 2" 6" 4" 2"
XA
4"
TANK AREA WALL
FUEL DELIVERY
DRIVEWAY
FUTURE GENERATOR
FUEL SUPPLY. VALVE
AND CAP.
FUTURE GENERATOR
FUEL RETURN. VALVE
AND CAP.
FOF-1
GENERATOR ENGINE
SUPPLY/RETURN
FLOOR TRENCH
PRIMING TEE
(TYP)
FUSIBLE
LINK VALVE 4"
FOT-1
FOT-2
SP-1/SP-2
RP-1
RFS-1
ANTI-SIPHON
VALVE
B191 GENERATOR ROOM (INTERIOR) TANK AREA (EXTERIOR)
B194 EXTERIOR WALL
REMOVABLE GRATING
FOFS 1.5"
2" 2"
ES 1"
ER 1"
FOFR 1.5"
DTR 2"
DTS 2"
DTR 1.5"
DTS 1.5"
FOT-2 (600 GAL UL-142 DOUBLE WALL DAY TANK)
CONNECTIONS
A. FUEL LEVEL GAUGE
B. TANK SUPPLY (x2)
C. TANK RETURN
D. ENGINE SUPPLY
E. ENGINE RETURN
F. TEMPERATURE SENSOR
G. NORMAL VENT (PRIMARY TANK)
H. EMERGENCY VENT (PRIMARY )
I. EMERGENCY VENT (INTERSTITIAL)
J. INSPECTION PORT (PRIMARY)
K. INSPECTION PORT (SECONDARY)
L. SPARE (X3)
FOT-1 (18,000 GAL UL-142 DOUBLE WALL AST)
CONNECTIONS:
A. TANK FILL W/ OVERFILL VALVE
B. DAY TANK SUPPLY
C. DAY TANK RETURN
D. FUEL FILTRATION SYSTEM SUPPLY
E. FUEL FILTRATION SYSTEM RETURN
F. MANWAY / EMERGENCY VENT (PRIMARY)
G. EMERGENCY VENT (INTERSTITIAL)
H. NORMAL VENT
I. SOUNDING PORT
J. LEVEL INDICATOR (MECHANICAL) AND LEVEL ALARM
K. INTERSTITIAL MONITORING
L. SPARE
TANK NOTES:
1. PIPING DIAGRAM DOES NOT SHOW ALL REQUIRED CONNECTIONS.
2. NOZZLE SIZES SHOWN ARE FOR REFERENCE PURPOSES ONLY. CONTRACTOR SHALL VERIFY SIZE OF TANK
CONNECTIONS WITH MANUFACTURERS AND PROVIDE SUBMITTAL TO OWNER AND ENGINEER FOR REVIEW PRIOR
TO PROCUREMENT.
3. NORMAL AND EMERGENCY VENTS SHALL BE SIZED IN ACCORDANCE WITH NFPA 30 AND PROVIDED BY TANK
MANUFACTURER.
4. ALL FILL, SUPPLY, AND RETURN CONNECTIONS SHALL HAVE INSTALLED DROP TUBES.
5. PROVIDE SEPARATION BETWEEN SUPPLY AND RETURN DROP TUBES TO PREVENT SHORT CIRCUITNG FUEL AND
RESULTING HEAT ACCUMULATION.
6. (FOT-1) DROP TUBES SHALL EXTEND FROM THE TANK NOZZLE TO AT LEAST 4 INCHES FROM BOTTOM OF TANK
WITH AN ANGLE CUT EXTENDING NO MORE THAN 6" FROM THE BOTTOM OF TANK. PROVIDE VACUUM BREAKER IN
ALL RETURN DROP TUBES ABOVE PRODUCT LEVEL FOR ANTI-SIPHON.
7. (FOT-2) NORMAL VENT SHALL BE ROUTED THROUGH NEAREST EXTERIOR WALL. TERMINATE VENT AT 12' ABOVE GRADE. ELBOW UPWARDS AND PROVIDE RAIN CAP. MINIMUM 2" SIZE OR AS RECOMMENDED BY TANK
MANUFACTURER
8. (FOT-2) EMERGENCY VENTS MAY BE LOCATED IN THE GENERATOR ROOM UNLESS REQUIRED OTHERWISE BY THE AHJ. IF REQUIRED TO BE LOCATED OUTDOORS, INCREASE PIPE SIZE FOR EMERGENCY VENT IN ACCORDANCE
WITH MANUFACTURER RECOMMENDATION TO PREVENT BACKPRESSURE.
9. SEE SPECIFICATIONS, SCHEDULES, AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS.
POINT TYPE ALARM
Point Description
G R
A P
H
IC
H A
R D
W A
IN
P U
T
H A
R D
W A
R E
O U
T P
U T
S O
F T
W A
R E
P O
IN
T
B
IN
A R
Y
C O
M M
U N
IC
A
T
IO
N F
A
IL
NOTES
GENERATOR FUEL HANDLING EQUIPMENT
CONTROLLERS
FUEL LEVEL MONITOR (SERVES FOT-1) X AI X X
WATER LEVEL X
FUEL LEVEL X
FUEL LEVEL HIGH X X
FUEL LEVEL LOW X
LEAK DETECTION (SERVES FOT-1) X AI X X
INTERSTITIAL TANK LEAK (FUEL) X X
INTERSTITIAL TANK LEAK (WATER) X X
PIPE LEAK X X
FUEL FILTRATION (SERVES FOF-1) X AI X X 1
CONTROL POWER ON X
PUMP RUN X
PUMP FAILURE X
EXCESS WATER IN FUEL X X
FILTER WATER LEVEL HIGH X X
RUPTURE BASIN LEAK X X
HIGH PRESSURE DROP IN STRAINER X X
HIGH PRESSURE DROP IN FILTERS X X
HIGH PRESSURE X X
DAY TANK LEVEL (SERVES FOT-2) X AI X X 1
PUMP RUNNING X X
FUEL LEVEL HIGH X X
FUEL LEVEL LOW X X
DAY TANK LEAK X X
NOT IN AUTO X X
KEY:
A = ANALOG, B = BINARY, I = INPUT, O = OUTPUT
GENERAL NOTES:
1. CONTROLLER SHALL BE PACKAGED WITH CONTROLLED EQUIPMENT.
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 65
C U s e rs \k y le g \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F F
E
M a ri o n
B u ild in g s w it c h k y le
.g u g g e n h e im .r v t
/2
/2
:3
:3
A
M
194MH-604
FUEL PIPING DIAGRAM AND
INSTRUMENTATION
PP CL
NTS
PIPING DIAGRAM - FUEL SYSTEMS
FUEL SYSTEMS PIPING NOTES
A. SINGLE LINE DIAGRAM IS NOT INTENDED TO PROVIDE A PHYSICAL REPRESENTATION OF EQUIPMENT OR SYSTEM LAYOUT. ACTUAL LOCATION OF TANK CONNECTIONS TO BE COORDINATED WITH TANK MANUFACTURER. SEE PLANS
FOR SYSTEM LAYOUT.
B. TANK CONNECTION SIZES AND QUANTITY SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR MUST COORINDATE
TANK NOZZLE SIZES AND CONNECTION TYPES WITH EQUIPMENT CONNECTIONS.
C. NORMAL VENTS SHALL BE LOCATED NOT LESS THAN 12 FT ABOVE ADJACENT GROUND LEVEL.
D. COUPLERS AT REMOTE FILL STATION SHALL BE DRY-DISCONNECT CAM-LOK STYLE. CONTRACTOR SHALL CORDINATE
COUPLINGS TO MATCH OWNER'S FUEL SUPPLIER STANDARD.
E. PROVIDE A TANK-TOP OPENING THAT IS EQUIPPED WITH A LOCKABLE, VAPOR-TIGHT, NON-SPARKING COVER THAT CAN BE USED TO MANUALLY GAUGE THE TANK CONTENTS (NOTED AS SOUNDING PORT). PROVIDE LABEL ON TANK FOR
THIS PORT.
F. PROVIDE PRIMING TEES AT PIPING HIGH POINTS WHERE REQUIRED FOR SYSTEM PRIMING.
NTS
CONNECTIONS - FUEL OIL TANKS
NTS
POINT LIST - B194 FUEL SYSTEMS
INSTRUMENTATION, CONTROL, AND POINTS LIST NOTES:
1. EQUIPMENT LISTED SHALL HAVE STAND-ALONE CONTROLS. POINTS LISTED HEREIN ARE FOR THE PURPOSE OF REMOTE INDICATION AND ALARM FROM CONTROLLER TO THE CENTRAL ENGINEERING CONTROL SYSTEM VIA STATION BUILDING
AUTOMATION SYSTEM.
2. CONTROLS CONTRACTOR SHALL COORDINATE WITH CONTROLLER OUTPUT COMMUNICATION TYPE AND PROVIDE ALL REQUIRED PATCH CABLING, CONTROLLERS, ROUTERS, RELAYS, OR OTHER EQUIPMENT NECESSARY TO COMPLETE THE INSTALLATION.
3. CONTROLS CONTRACTOR SHALL PROVIDE ANY EQUIPMENT AND PROGRAMMING REQUIRED FOR SIGNAL TYPE CONVERSIONS.
4. DIV 26 CONTRACTOR TO PROVIDE FIBER DATA DROP FROM CAMPUS NETWORK TO FOUR PORT (RJ-45) MEDIA CONVERTER
(LOCATED IN B194 SWITCHGEAR ROOM).
5. CONTROL AND ALARM POINTS SHALL BE LOCALLY PROGRAMMABLE. DEFAULT POINTS TO BE SET AS RECOMMENDED BY
MANUFACTURER AND PROVIDED TO OWNER.
6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
04/29/2020 Revisions: Date:
ELECTRICAL SYMBOLS
EXISTING OUTLET OR DEVICE TO REMAIN. MAINTAIN EXISTING CIRCUITING.
DASH SYMBOL INDICATES PARTICULAR OUTLET OR DEVICE TO BE REMOVED AND CIRCUITRY MADE CONTINUOUS
WHERE REQUIRED.
ELECTRICAL CONNECTION.
20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE). WHEN SHOWN, RECEPTACLE
TO HAVE "CONTROLLED" MARKINGS.
20A-125V SINGLE RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE).
SPECIAL PURPOSE RECEPTACLE. REFER TO NOTE ON PLAN.
20A-125V DOUBLE DUPLEX RECEPTACLE. NEMA 5-20R, (18" MH UNLESS NOTED OTHERWISE) TWO GANG ASSEMBLY.
20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH BOTTOM OUTLET CONTROLLED BY WALL SWITCH. (18" MH
UNLESS NOTED OTHERWISE).
20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED
OTHERWISE).
20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R (HORIZONTAL 18" MH UNLESS NOTED OTHERWISE)
WITH EXTRA DUTY GRAY COVER, VERTICAL MOUNT.
20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH
UNLESS NOTED OTHERWISE), WITH EXTRA DUTY GRAY COVER, VERTICAL MOUNT.
20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, ON EMERGENCY POWER (18" MH UNLESS NOTED OTHERWISE).
20A-125V POWERLOCK GROUNDING TYPE RECEPTACLE, HOSPITAL USE (66" MH UNLESS NOTED OTHERWISE).
20A-125V DUPLEX PEDESTAL TYPE FLOOR RECEPTACLE, NEMA 5-20R, IN FLOOR BOX WITH COVERPLATE AND
HOUSING. PROVIDE CARPET FLANGE WHERE REQUIRED.
20-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH ISOLATED GROUND (18" MH UNLESS NOTED OTHERWISE).
20A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-20R (18" MH UNLESS NOTED OTHERWISE).
30A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-30R (18" MH UNLESS NOTED OTHERWISE).
50A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-50R (18" MH UNLESS NOTED OTHERWISE).
20A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-20R (18" MH UNLESS NOTED OTHERWISE).
30A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-30R (18" MH UNLESS NOTED OTHERWISE).
50A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-50R (18" MH UNLESS NOTED OTHERWISE).
JUNCTION BOX.
MULTI-OUTLET RECEPTACLES ASSEMBLY, NEMA 5-15R (SINGLE OUTLETS ON 18" CENTERS) (46" MH UNLESS NOTED
OTHERWISE).
CLOCK HANGER OUTLET, SINGLE NEMA 5-15R RECESSED IN COVER PLATE (84" MH UNLESS NOTED OTHERWISE).
SINGLE POLE SWITCH (46" MH UNLESS NOTED OTHERWISE).
TWO POLE WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).
MULTI-WAY WALL SWITCH, # INDICATES NUMBER OF WAYS (46" MH UNLESS NOTED OTHERWISE).
SWITCH WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH UNLESS NOTED OTHERWISE).
KEY OPERATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).
LIGHTING DIMMER SWITCH (46" MH UNLESS NOTED OTHERWISE) 1000 WATTS UNLESS OTHERWISE INDICATED.
SWITCH WITH RECEPTACLE (46" MH UNLESS NOTED OTHERWISE) STANDARD TWO-GANG ASSEMBLY OF SWITCH
AND RECEPTACLE.
FLUSH FRACTIONAL HORSEPOWER MOTOR STARTER WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH
UNLESS NOTED OTHERWISE).
HP RATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).
DISCONNECT SWITCH.
MOTOR STARTER.
COMBINATION MOTOR STARTER AND DISCONNECT SWITCH.
ELECTRIC MOTOR.
ELECTRICAL PANEL OR SWITCHBOARD PER DRAWINGS.
PULL BOX.
LINE VOLTAGE THERMOSTAT.
UNIT HEATER.
FAN COIL.
ELECTRIC BASEBOARD HEATER.
AIR CONDITIONER.
CONDENSING UNIT.
UNIT VENTILATOR.
CORD REEL.
POWER POLE.
PHOTOELECTRIC SENSOR.
LIGHTING CONTACTOR.
CEILING MOUNTED OCCUPANCY SENSOR.
WALL MOUNTED OCCUPANCY SENSOR.
CEILING MOUNTED DAYLIGHT SENSOR.
OCCUPANCY SENSOR POWER PACK.
PUSHBUTTON (46" MH UNLESS NOTED OTHERWISE)(120 VOLT).
BUZZER (90" MH UNLESS NOTED OTHERWISE)(120 VOLT).
4" DIAMETER (90" MH UNLESS NOTED OTHERWISE)(120 VOLT).
GF
WP
WP/GF
EM
T
IG
20A
30A
50A
20A
50A
30A
J
P
K
DM
R
H
UH
FC
AC
CU
UV
PP
OS
OS
DS
O P
PC
T
B
20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (46" MH UNLESS NOTED OTHERWISE).
C
M
CR
LC
P/B
ELAPSED TIME INDICATOR CLOCK (90" MH UNLESS NOTED OTHERWISE) WITH RESET SWITCH (46" MH UNLESS
NOTED OTHERWISE).
INTERCOM SYSTEM DESK MOUNTED MASTER CONTROL STATION. SUBSCRIPT "W" INDICATES WALL MOUNT (46"
MH UNLESS NOTED OTHERWISE).
INTERCOM STAFF STATION (46" MH UNLESS NOTED OTHERWISE).
INTERCOM HORN TYPE SPEAKER (84" MH UNLESS NOTED OTHERWISE).
INTERCOM SPEAKER FLUSH MOUNT IN CEILING.
I
M
H
S
DUCT HEATER.H
DH
H
EB
LOW-VOLTAGE MOMENTARY WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).
L
TECHNOLOGY SYMBOLS WITH ELEC. REQUIREMENTS
P WALL MOUNTED PHONE OUTLET (46" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE CEILING PER DIV 26. JACKS, FACEPLATE AND CABLE PER DIV 27. REFER TO FACEPLATE DETAILS.
X R
WALL MOUNTED AV OUTLET (84" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT PER DIV 26. REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING PER DIV 27. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.
X V
WALL MOUNTED AV OUTLET (44" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT PER DIV 26. REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING PER DIV 27. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.
CONDUIT SLEEVE / FIRE RATED SLEEVE ASSEMBLY THRU WALL (1-2" SLEEVE UNLESS NOTED OTHERWISE) PER DIV 26.
J TELECOM BOX AND CONDUIT PER DIV 26, REFER TO PLANS.
D WALL MOUNTED VOICE/DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE CORRIDOR CEILING PER DIV 26. JACKS, FACEPLATE AND CABLE PER DIV 27. REFER TO FACEPLATE DETAILS.
X I
WALL MOUNTED AV OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUITS TO ABOVE ACCESSIBLE CEILING PER DIV 26. REFER TO FACEPLATE DETAILS. JACKS, FACEPLATE AND CABLING PER DIV 27. SUBSCRIPT
"X" INDICATES ALTERNATE CONFIGURATION.
AP
WALL MOUNTED WIRELESS ACCESS POINT (96” MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE
ACCESSIBLE CEILING PER DIV 26. WAP AND CABLE PER DIV 27.
ABBREVIATIONS
AAP - AREA ALARM PANEL - MEDICAL GAS
ACC - ACCESS
ADJ - ADJUSTABLE
AF - ARC FAULT CIRCUIT INTERRUPTER
AFCI - ARC FAULT CIRCUIT INTERRUPTER
AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM
AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATS - AUTOMATIC TRANSFER SWITCH
BLDG - BUILDING
BOE - BOTTOM OF EQUIPMENT
BOT - BOTTOM
BTWN - BETWEEN
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CKT - CIRCUIT
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CTR - CENTER
D - DEPTH
DET - DETAIL
DIA - DIAMETER
DIM - DIMENSION
DIV - DIVISION
DN - DOWN
DWG - DRAWING
EA - EACH
EC - ELECTRICAL (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATION OR ELEVATOR
EM - EMERGENCY
EQ - EQUAL
EQS - EQUIPMENT SUPPLIER
EQUIP - EQUIPMENT
ETR - EXISTING TO REMAIN
EX - EXISTING
EXP - EXPANSION
EXT - EXTERIOR
FCE - FIRE CONTROL EQUIPMENT
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
GC - GENERAL TRADES
GF - GROUND FAULT CIRCUIT INTERRUPTER
GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR
GOVERNMENT FURNISHED CONTRACTOR INSTALLED
GFFT - GROUND FAULT FEED THRU
HC - HVAC (DIVISION 23)
HP - HORSE POWER OR HIGH POINT
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
ID - INSIDE DIAMETER
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LBS - POUNDS
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
NIC - NOT IN CONTRACT
NOM - NOMINAL
NTS - NOT TO SCALE
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
PC - PLUMBING (DIVISION 22)
PLBG - PLUMBING
RAD - RADIUS
REC - RECESSED
REQD - REQUIRED
RI - ROUGH-IN
S - SURFACE MOUNTED
SC - SECURITY CONTRACTOR
SCH - SCHEDULE
SHT - SHEET
SMS - SECURITY MANAGEMENT SYSTEM
SPEC - SPECIFICATIONS
SQ - SQUARE
SS - STAINLESS STEEL
STD - STANDARD
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TC - TECHNOLOGY
TEMP - TEMPERATURE
TOE - TOP OF EQUIPMENT
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
VFD - VARIABLE FREQUENCY DRIVE
VOL - VOLUME
W/ - WITH
W/0 - WITHOUT
WP - WEATHERPROOF
ZVC - ZONE VALVE CABINET
E2
B
E2
DETAIL: B = DETAIL DESIGNATION
E2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
E2 = SHEET WHERE SECTION IS LOCATED
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
GENERAL FLOOR PLAN NOTES
WIRE & CONDUIT IN WALL OR ABOVE CEILING.
WIRE & CONDUIT IN OR BELOW SLAB OR GRADE.
EACH ARROWHEAD REPRESENTS ONE COMPLETE CIRCUIT; "X" DENOTES PANEL NAME; NUMBER(S)
DENOTES CIRCUIT(S).
LADDER TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.
CONDUIT FOR DATA CIRCUITRY.DAT
WIRE & CONDUIT FOR FIRE ALARM CIRCUITRY.FA
WIRE & CONDUIT FOR NURSE CALL CIRCUITRY.NC
EXISTING WIRE & CONDUIT TO REMAIN.EX
CONDUIT TO BE REMOVED.
WIRE & CONDUIT FOR NIGHT LIGHT CIRCUITRY.NL
CONDUIT FOR PHONE CIRCUITRY.PHO
WIRE & CONDUIT FOR SECURITY SYSTEM CIRCUITRY.SEC
WIRE RUN IN SURFACE WIREWAY.W
CABLE MANAGEMENT SYSTEM PATHWAY.CM
X - 1,2
WIRE & CONDUIT FOR EMERGENCY CIRCUITRY.EM
WIRE & CONDUIT FOR SOUND SYSTEM CIRCUITRY.S
WIRE & CONDUIT FOR INTERCOM SYSTEM CIRCUITRY.I
WIRE & CONDUIT FOR TELEVISION SYSTEM CIRCUITRY.TV
LUMINAIRE SYMBOLS
LIGHTING FIXTURE. CAPITAL LETTER DENOTES FIXTURE TYPE, LOWER CASE LETTER DENOTES
SWITCHING ARRANGEMENT.
LIGHTING FIXTURE ON NIGHT LIGHT OR EMERGENCY CIRCUIT.
EXIT LIGHTING FIXTURE, ARROWS AS INDICATED.
A a
WIREMOLD RACEWAY, AS NOTED ON PLANS.
CABLE TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.
4"
4"
4"
20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH 2 INTEGRAL USB CHARGERS (18" MH UNLESS NOTED OTHERWISE).
NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT
TO MODIFICATIONS ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT
NECESSARILY BE USED ON THIS PROJECT.
FLOOR BOX, # INDICATES TYPE, REFER TO FLOOR BOX (FB) SCHEDULE. IF NO #, PROVIDE FLUSH FLOOR BOX WITH ROUND COVERPLATE AND ONE 20A-125V DUPLEX RECEPTACLE. PROVIDE CARPET FLANGE WHERE REQD.
X
POKE-THRU PER DIV 26. # INDICATES TYPE, REFER TO POKE-THRU (PT) SCHEDULE. SUBSCRIPT "X" INDICATES
TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.
X
T2 1 ELEVATION: 1 = ELEVATION DESIGNATION
T2 = SHEET WHERE ELEVATION IS LOCATED
FLOOR BOX PER DIV 26. # INDICATES TYPE, REFER TO FLOOR BOX (FB) SCHEDULE. SUBSCRIPT "X" INDICATES
TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.
X
CUSTOM OUTLET IN SURFACE RACEWAY. SURFACE RACEWAY PER DIV 26. OUTLET JACKS, FACEPLATE AND CABLING
PER DIV 27.
W
FIRE RATED POKE-THRU, # INDICATES TYPE, REFER TO POKE-THRU (PT) SCHEDULE. IF NO #, PROVIDE 6 INCH RECESSED ACCESS POKE-THRU WITH TWO 20A-125V DUPLEX RECEPTACLES. PROVIDE CARPET FLANGE WHERE REQD.
X
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODES,AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF
VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS
ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE
DESIGN GUIDEPG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS
PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING
SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF
DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK,
CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW
CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO
ORDERING, FABRICATING OR INSTALLING NEW MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS
PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL
EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY
WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A
SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,
CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
9. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRESTOPPED AS REQUIRED BY THE RATING OF THE WALL. WHERE CONDUIT IS REMOVED
THROUGH RATED WALLS, SMOKE/FIRESTOP PENETRATION.
10. FIRESTOP ALL FLOOR PENETRATIONS AT THE END OF EACH WORKING SHIFT.
11. CONTRACTOR SHALL ENGAGE A SUB-SURFACE UTILITY MARKING COMPANY TO LOCATE ALL
UNDERGROUND LINES PRIOR TO CONSTRUCTION.
GENERAL CONSTRUCTION NOTES
GENERAL NOTES:
A. CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS
PRIOR TO STARTING PROPOSED SCHEDULE.
B. SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE
DOWNTIME OF THE BUILDING ELECTRICAL SYSTEM. CONTRACTOR IS REQUIRED TO SUBMIT A
DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE COR/ENGINEER AT THE BEGINNING
OF THE PROJECT INDICATING CUTOVER DATES, POWER OUTAGES/DURATION AND PROJECT
MILESTONES. DEVIATIONS FROM THE FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION
WILL BE REVIEWED, BUT WILL NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.
C. ALL CUTOVER WORK REQUIRING BUILDING ELECTRICAL SYSTEM OUTAGES AND/OR EMERGENCY
SYSTEM DOWNTIME SHALL BE DONE OUTSIDE OF NORMAL WORKING HOURS (7AM-7PM MONDAY-
FRIDAY). OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.
D. THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT INTENDED TO
CONVEY INSTRUCTIONS FOR EVERY ASPECT OF THE CONSTRUCTION PROJECT.
E. NO LIVE WORK WILL BE PERMITTED WITHOUT WRITTEN CONSENT OF THE MEDICAL CENTER
LEADERSHIP. REQUESTS MUST BE SUBMITTED WITH CONTRACTOR'S SAFETY PLAN AND PROOF OF
ARC FLASH LEVEL/PPE REQUIRED.
F. PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT AND CONDUITS 2" AND LARGER
WITH PATHWAYS VERIFIED IN THE FIELD AND SIGNED OFF BY THE CONTRACTOR.
G. STATION CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/HEALTHCARE FACILITY OCCUPIED 24/7
WITH INPATIENT/OUTPATIENT CARE, SURGERY, PRE/POST-OP, PSHYCIATRIC, PHARMACY,
WAREHOUSE, NURSING, SUBSTANCE ABUSE, RETAIL, CANTEEN, INTENSIVE CARE, DATA CENTER, IMAGING, PBX, KITCHEN, ETC. INCLUDE LABOR AND MATERIAL TO ACCOMMODATE PPE/ACCESS
REQUIRED FOR WORK IN THESE VARIOUS SPACES. EXTENSIVE COORDINATION MUST OCCUR TO
MINIMIZE DISRUPTION AS MUCH AS POSSIBLE.
H. 21 DAYS BEFORE ANY OUTAGE, CONTRACTOR SHALL SET UP A MEETING WITH COR AND
DEPARTMENT MANAGERS TO REVIEW WHICH LOADS WILL BE TAKEN DOWN, WHICH LOADS WILL
REMAIN ON AND OUTAGE START/END TIME. EACH DEPARTMENT MUST BE BRIEFLY SURVEYED TO
DETERMINE OVERALL IMPACT OF OUTAGE AND EXPLAINED TO COR AND MANAGERS.
SEQUENCE OF CONSTRUCTION
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
UPGRADE EMERGENCY
POWER IN BUILDING 138
#610-16-104
PROJECT NO. 2018-05034 FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
D
A Y
H L T
H C
A R
E \T e a m D a ta
\L
\2
-0
\R
E V
IT
B ld g
A E
U p g ra d e E m e rg e n c y P o w e r\
M o d e l
B ld g
A
E U p g ra d e E m e rg e n c y
P o w e r\
-0
-E le c tr ic a l C e n tr a l.
rv t
/2
/2
:2
:5
A
M
E001
LEGEND, ABBREVIATIONS & INDEX
OF DRAWINGS
12/17/2019 MSG JHSRevisions: Date:
95% REVIEW 12/17/2019
DRAWING 36 OF 60
P: 937-224-0861 www.heapy.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Services
Engineering and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Marion VA Marion, IN
#610-16-104
PROJECT NO. 2018-05034
CONSTRUCTION DOCUMENTS
04/29/2020
FULLY SPRINKLERED
UPGRADE EMERGENCY
POWER IN BUILDING 138
DRAWING OF 61
C :\U se rs
\c he ls \D oc um en ts
\F
FE
_M ar io n_
M
EP
_B ui ld in g
(2
8) _c he ls ey .g al lio n.
rv t
/2 4/
2:
:0
PM
138E-002
BUILDING 138 PANELBOARD
SCHEDULES
JB HT
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
Notes:
Total Load: 0.00 kVA 0.00 kVA 0.00 kVA 27 Space -- -- 0 VA 0 VA -- -- Space 28 25 Space -- -- 0 VA 0 VA -- -- Space 26 23 Space -- -- 0 VA 0 VA -- -- Space 24 21 Space -- -- 0 VA 0 VA -- -- Space 22 19 Space -- -- 0 VA 0 VA -- -- Space 20 17 Space -- -- 0 VA 0 VA -- -- Space 18
15 0 VA 0 VA 16
13 0 VA 0 VA 14
EXISTING 30 A 3
0 VA 0 VA
3 30 A EXISTING
9 0 VA 0 VA 10
7 0 VA 0 VA 8
SPARE 30 A 3
0 VA 0 VA
3 20 A EXISTING
3 EXISTING 20 A 1 0 VA 0 VA 4
1 EXISTING 20 A 1 0 VA 0 VA
2 20 A EXISTING
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Exist. Tub... 22" x 6" x 65.5" Exist. Mfr: GE Exist Model: NAB-BR-23223 Voltage: 120/208 Wye-3PH-4W Mains Rating: 225 A
Supply From: Enclosure: Type 1 Mains Type: MCB Location: Mounting: Surface A.I.C. Rating:
Panel: AC
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
6 Space 0.00 kVA -- -- -- -- -- -- -- -- -- 5 Space 0.00 kVA -- -- -- -- -- -- -- -- -- 4 Space 0.00 kVA -- -- -- -- -- -- -- -- -- 3 EMSC METER 0.00 kVA -- 1 20 A -- -- -- -- -- -- 2 138 PHIE 0.00 kVA -- 3 300 A -- -- -- -- -- -- 1 138 PHZE 0.00 kVA -- 3 200 A -- -- -- -- -- --
CKT
CIRCUIT
DESCRIPTION
APPROX.
CONNECTED
LOAD
FRAME
SIZE POLES
TRIP
SETTING
BREAKER
TYPE
NUMBER OF
CONDUCTORS
WIRE
SIZE
GROUND
SIZE
CONDUIT
SIZE
SEE
NOTE
Feeder Size: Spec. Ref. #:
Voltage: 120/208 Wye-3PH-4W Mains Rating: 400 A
Supply From: Enclosure: NEMA 1 Mains Type: MLO Location: Mounting: SURFACE A.I.C. Rating: 65,000A
DISTRIBUTION PANEL: EEDP
0.00 kVA
TOTAL CONNECTED ESTIMATED DEMAND
NOTES:
15 SPD 0.00 kVA -- 3 250 A -- -- -- -- -- -- 14 138 E4C 0.00 kVA -- 3 100 A -- -- -- -- -- -- 13 138 EL4CA 0.00 kVA -- 3 60 A -- -- -- -- -- -- 12 138 PE 0.00 kVA -- 3 60 A -- -- -- -- -- -- 11 138 E2C 0.00 kVA -- 3 60 A -- -- -- -- -- -- 10 138 EBB,E2B 0.00 kVA -- 3 250 A -- -- -- -- -- -- 9 EEDP 0.00 kVA -- 3 0 A -- -- -- -- -- -- 8 EM-1 0.00 kVA -- 3 400 A -- -- -- -- -- -- 7 EXISTING 0.00 kVA -- 3 250 A -- -- -- -- -- -- 6 ICU SUP FAN 0.00 kVA -- 3 30 A -- -- -- -- -- -- 5 12 XA 0.00 kVA --…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .