000110 Table of Contents seismic.pdf
PDF 17 KB Posted
- Attached to
- Z1DA--Upgrade Emergency Power 138 610-16-104
- Solicitation number
- 36C25020B0081
About this file
This document provides details for an upcoming federal contract opportunity to upgrade emergency power at the Veterans Affairs Medical Center in Marion, Indiana. The solicitation will be released on August 14, 2020 for Upgrade Emergency Power Building 138, Project 610-16-104, with bids due approximately 30 days later. The project magnitude is estimated between $5 million to $10 million. The opportunity is set aside 100% for Service-Disabled Veteran-Owned Small Businesses, who must be registered and verified in the Vendor Information Pages and System for Award Management databases. The selected contractor must be able to perform a minimum of 15% of the construction work and have no more than three serious or one repeat/willful OSHA or EPA violations in the past three years, with an Experience Modification Rate less than or equal to 1.0. The duration of the project shall not exceed 600 calendar days from receipt of the notice to proceed. Bonds in the form of performance and payment will be required.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPGRADE EMERGENCY POWER IN BUILDING 138
VAMC, MARION, IN PROJECT: 610-16-104
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-17 01 32 16.15 Project Schedules (Small Projects – Des ign/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 74 19 Construction Waste Management 09-13
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 12-15
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16 05 31 00 Steel Decking 02-16 05 50 00 Metal Fabrications 04-18
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 Roof and Deck Insulation 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 40 00 Siding Panels 10-15 07 54 16 Ethylene Interpolymer (KEE) Roofing 10-15 07 60 00 Flashing and Sheet Metal 07-14
00 01 10-2
07 71 00 Roof Specialties 10-15 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 36 23.13 Blast Resistant steel doors 08 71 00 Door Hardware 01-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-21
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC Equipm ent 02-20 23 05 41 Noise and Vibration Control for HVAC Pipin g and
Equipment 02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 09- 11 23 10 00 Facility Fuel Systems 04-20 23 21 11 Boiler Plant Piping Systems 02-20 23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 23 00 Refrigerant Piping 02-20 23 31 00 HVAC Ducts and Casings 02-20
00 01 10-3
23 33 19 Duct Silencers FFE 04-20
23 34 00 HVAC Fans 02-20 23 37 00 Air Outlets and Inlets 02-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 84 13 Self-Contained Steam Humidifiers FFE
04-20
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors an d Cables 01-17 26 05 26 Grounding and Bonding for Electrical Syste ms 01-17 26 05 33 Raceway and Boxes for Electrical Systems 0 1-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 09 23 Lighting Controls 01-18 26 11 16 Secondary Unit Substations 01-18 26 13 16 Medium-Voltage Fusible Interrupter Switche s 01-17 26 23 00 Low-Voltage Switchgear 01-17 26 24 13 Distribution Switchboards 01-18 26 24 19 Motor Control Centers 01-18 26 29 11 Motor Controllers 01-18 26 32 13 Engine Generators 01-18 26 33 53 Static Uninterruptible Power Supply 01-17 26 36 24 Energy Monitoring and Control System (ECMS ) 26 41 00 Facility Lightning Protection 01-17 26 42 00 Cathodic Protection 01-17 26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installati ons 06-15 27 31 00 Voice Communications Switching and Routing Equipment 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 – EARTHWORK
31 23 19 Dewatering 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improveme nts 08-16 32 12 16 Asphalt Paving 09-15 32 31 40 High Security Fences and Gates 08-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17
00 01 10-4
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation