This document is a technical drawing by Hilti Firestop Systems (UL/CUL System No. C-AJ-0070) detailing specifications for a blank opening in a concrete floor/wall or block wall assembly with a 2-hour fire rating. The drawing provides precise instructions for creating fire-resistant openings, specifically:

  1. The assembly must use lightweight or normal weight concrete floor/wall or a UL/CUL classified concrete block wall (minimum 4-1/2" thick). 2. The opening requires a minimum 4" thickness of mineral wool (with 4 PCF density) tightly packed. 3. A minimum 1/2" depth of Hilti FS-ONE MAX intumescent firestop sealant must be applied. The maximum diameter of the opening is limited to 7", and the firestop sealant is required on both sides of the wall assembly. This technical specification is part of a VA renovation project for Building 15's 2nd floor at the Asheville, NC location, with solicitation number 36C24625B0007.

View the file

Other files

File Type Posted
36C24625B0007 Amendment 0011.pdf PDF
Block 14 Cont. - VAAR 852.222-71.pdf PDF
36C24625B0007 Amendment 0010.pdf PDF
Attachment IV - Drawings Set rev w Changes Summary.pdf PDF
Attachment III - Additional Questions and Responses rev.pdf PDF
Block 14 Continuation I.pdf PDF
Block 14 Continuation II.pdf PDF
Attachment I - Questions and Responses rev.pdf PDF
36C24625B0007 0009.docx DOCX document
Attachment II - Follow-On Questions and Responses rev.pdf PDF
36C24625B0007 Amendment 0008 - Renovate Bldg 15 2nd Floor.pdf PDF
Asbestos Abatement Report 12.06.2024.pdf PDF
36C24625B0007 0007.docx DOCX document
36C24625B0007 0006.pdf PDF
36C24625B0007 0005.docx DOCX document
Follow-On Questions.docx DOCX document
01 91 00 GENERAL COMMISSIONING REQUIREMENTS - REV 1.pdf PDF
Specifications - REV 4.pdf PDF
VAMC Build 15 3rd FL ASB-LBP Report.pdf PDF
Drawings - REV 3.pdf PDF
SBA DSBS Profile Instructions.pdf PDF
Drawing Changes Identified REV 3.pdf PDF
Additional Questions and Responses.pdf PDF
36C24625B0007 0004.docx DOCX document
Asbestos Bulk Sampling Report.pdf PDF
Map for Dumpster and Temp Power Hook Up.pdf PDF
Asbestos Inspection Report.pdf PDF
36C24625B0007 0003.docx DOCX document
RFI Questions and Responses - Renovate B15 2nd Floor 2.20.2025.pdf PDF
Site Visit Sign-in Sheets - B15.pdf PDF
36C24625B0007 0002.docx DOCX document
36C24625B0007 0001.docx DOCX document
Map of Hospital - Path to B15.pdf PDF
NC Wage Determination 1.03.2025.pdf PDF
Specifications - Final.pdf PDF
36C24625B0007_1.docx DOCX document
Bid Item Cost Breakdown.xlsx XLSX spreadsheet
SOW - 637-20-103.pdf PDF
Drawings - Final.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .