This is an asbestos re-inspection report for Building 15 at the Charles George VA Medical Center in Asheville, North Carolina, conducted by Affinity Environmental Consulting in December 2024. The report identifies seven homogeneous areas containing asbestos-containing materials (ACM) throughout the building, including floor tiles and mastic, thermal system insulation (TSI) pipe runs and fittings, tar/gravel roofing materials, joint compound on sheetrock walls, and black moisture barrier.

The report includes detailed floor plans showing the locations of ACM and notes that while the building was renovated in the mid-1990s with some TSI removal, not all ACM was removed. Specific findings include 3 broken tiles in Room SP002, 10,000 SF of white/tan floor tile and mastic throughout various areas (with some areas abated in 2012), and 12,000 SF of roofing materials. The report indicates that most floor tiles and mastics should be assumed to contain asbestos unless tested when carpet is removed. A positive composite sample of drywall joint compound (<1% Chrysotile) was found on the 2nd floor in Room 212, and the report recommends bulk sampling of individual walls prior to any disturbance.

View the file

Other files

File Type Posted
36C24625B0007 Amendment 0011.pdf PDF
Block 14 Cont. - VAAR 852.222-71.pdf PDF
36C24625B0007 Amendment 0010.pdf PDF
Attachment IV - Drawings Set rev w Changes Summary.pdf PDF
Attachment III - Additional Questions and Responses rev.pdf PDF
Block 14 Continuation I.pdf PDF
Block 14 Continuation II.pdf PDF
Attachment I - Questions and Responses rev.pdf PDF
36C24625B0007 0009.docx DOCX document
Attachment II - Follow-On Questions and Responses rev.pdf PDF
36C24625B0007 Amendment 0008 - Renovate Bldg 15 2nd Floor.pdf PDF
Asbestos Abatement Report 12.06.2024.pdf PDF
36C24625B0007 0007.docx DOCX document
36C24625B0007 0006.pdf PDF
36C24625B0007 0005.docx DOCX document
Follow-On Questions.docx DOCX document
01 91 00 GENERAL COMMISSIONING REQUIREMENTS - REV 1.pdf PDF
Specifications - REV 4.pdf PDF
Dwgs C-AJ-0070 - Floor Infill Details.pdf PDF
VAMC Build 15 3rd FL ASB-LBP Report.pdf PDF
Drawings - REV 3.pdf PDF
SBA DSBS Profile Instructions.pdf PDF
Drawing Changes Identified REV 3.pdf PDF
Additional Questions and Responses.pdf PDF
36C24625B0007 0004.docx DOCX document
Asbestos Bulk Sampling Report.pdf PDF
Map for Dumpster and Temp Power Hook Up.pdf PDF
36C24625B0007 0003.docx DOCX document
RFI Questions and Responses - Renovate B15 2nd Floor 2.20.2025.pdf PDF
Site Visit Sign-in Sheets - B15.pdf PDF
36C24625B0007 0002.docx DOCX document
36C24625B0007 0001.docx DOCX document
Map of Hospital - Path to B15.pdf PDF
NC Wage Determination 1.03.2025.pdf PDF
Specifications - Final.pdf PDF
36C24625B0007_1.docx DOCX document
Bid Item Cost Breakdown.xlsx XLSX spreadsheet
SOW - 637-20-103.pdf PDF
Drawings - Final.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Homogenous

Area

Asbestos-Containing

Material Location Description

Current

Condition

Potential for

Disturbance

Estimated

Quantity

A15-004

Weston

Off White 12" x 12" Floor

Tile & Mastic

Basement Storage Rooms on West Side of Building

MISC - NF

Localized

Damage

LPD 1,500 SF

A15-005

Weston

White/Tan 12" x 12" Floor

Tile & Mastic (Mastic Only

In Some Areas)

Basement Hallway, 1st

Floor Various Areas, &

2nd Floor Throughout

MISC - NF G LPD 10,000 SF

A15-011

Weston TSI Pipe Runs

Inside Wall & Ceiling

Chases TSI - F Unknown LPD Unknown

A15-012

Weston TSI Pipe Fittings

Inside Wall & Ceiling

Chases TSI - F Unknown LPD Unknown

A15-015

Weston

Tar/Gravel Roofing, Shingles, Flashings, & Roof MISC - NF G LPD 12,000 SF

D-15-01 Joint Compound on

Sheetrock Walls

Throughout Original Walls of Building 15 MISC-F G PD Throughout

W-01 Black Moisture Barrier

Throughout Perimeter

Walls of Building Between

Plaster & Exterior Wall

MISC - NF Hidden LPD Throughout

O&M - Drywall & Joint Compound

Positive Composite Sample < 1% Chrysotile from 2nd Floor at Room 212. All Other

Samples were None Detected. Recommend

Bulk Sample Individual Walls Prior to

Disturbance.

All visible Pipe Fittings are fiberglass-

Assumed ACM

Assumed ACM Until Tested

Sampled 10/15/19

Note: Building Was Renovated in Mid 1990's. Visible TSI was probably removed at that time. Not All ACM was removed. Floor Tiles & Mastics should be assumed ACM unless tested when carpet is to be removed. The exception being the non-asbestos mastic under HA A15-004.

ASBESTOS RE-INSEPCTION

3 Broken Tiles in Room SP002

(PPE Storage)

Majority is under carpet. 1st Floor Under

Carpet In Various Areas. Rooms 208 and

209 abated January 2012 (Some mastic remains in concrete pores in these rooms).

Has been removed from All 3rd Floor as of 12/5/2022.

All visible Pipe Runs are fiberglass-

Assumed ACM

BUILDING 15

Comments/Reccomendations

CHARLES GEORGE VAMC

ASHEVILLE, NORTH CAROLINA

SURF = Surfacing F= Friable SF = Square Feet G = Good LPD = Low Potential for Disturbance

MISC = Miscellaneous Material NF = Non-friable LF = Linear Feet D = Damaged PD = Potential for Disturbance

TSI = Thermal System Insulation CF = Cubic Feet SD = Significantly Damaged PSD = Potential of Significant Disturbance

NOTE : Quantities Listed are for inspection purposes only. Quantities should be field verified for all other uses.

AEC Project #24251

December 2024