Attachment IV - Drawings Set rev w Changes Summary.pdf

PDF 14 MB Posted

Attached to
Y1AZ--Renovate Bldg. 15, 2nd Floor
Solicitation number
36C24625B0007
Issued by

About this file

This document is a detailed set of architectural drawings for the renovation of Building 15, 2nd Floor at the Charles George VA Medical Center in Asheville, North Carolina. The project involves comprehensive interior renovation of approximately 11,291 square feet, including demolition of existing spaces, asbestos abatement, and reconstruction of office, restroom, and support areas. Key technical details include phased construction with Infection Control Risk Assessment (ICRA) barriers, renovation of existing business occupancy spaces, and compliance with NFPA 101 Life Safety Code and VA fire protection design standards.

The drawings, dated February 9, 2024, with an addendum on April 1, 2025, cover multiple disciplinary aspects including architectural, electrical, mechanical, plumbing, telecommunications, and fire alarm systems. The renovation project is specifically identified as VA Project Number 637-20-103, with a solicitation number of 36C24625B0007. The design professional is ODELL, A LaBella Company, located in Asheville, NC, and the project involves detailed floor plan modifications, ceiling replacements, wall reconfigurations, and infrastructure updates across the second floor of the medical center building.

View the file

Other files

File Type Posted
36C24625B0007 Amendment 0011.pdf PDF
Block 14 Cont. - VAAR 852.222-71.pdf PDF
36C24625B0007 Amendment 0010.pdf PDF
Attachment III - Additional Questions and Responses rev.pdf PDF
Block 14 Continuation I.pdf PDF
Block 14 Continuation II.pdf PDF
Attachment I - Questions and Responses rev.pdf PDF
36C24625B0007 0009.docx DOCX document
Attachment II - Follow-On Questions and Responses rev.pdf PDF
36C24625B0007 Amendment 0008 - Renovate Bldg 15 2nd Floor.pdf PDF
Asbestos Abatement Report 12.06.2024.pdf PDF
36C24625B0007 0007.docx DOCX document
36C24625B0007 0006.pdf PDF
36C24625B0007 0005.docx DOCX document
Follow-On Questions.docx DOCX document
01 91 00 GENERAL COMMISSIONING REQUIREMENTS - REV 1.pdf PDF
Specifications - REV 4.pdf PDF
Dwgs C-AJ-0070 - Floor Infill Details.pdf PDF
VAMC Build 15 3rd FL ASB-LBP Report.pdf PDF
Drawings - REV 3.pdf PDF
SBA DSBS Profile Instructions.pdf PDF
Drawing Changes Identified REV 3.pdf PDF
Additional Questions and Responses.pdf PDF
36C24625B0007 0004.docx DOCX document
Asbestos Bulk Sampling Report.pdf PDF
Map for Dumpster and Temp Power Hook Up.pdf PDF
Asbestos Inspection Report.pdf PDF
36C24625B0007 0003.docx DOCX document
RFI Questions and Responses - Renovate B15 2nd Floor 2.20.2025.pdf PDF
Site Visit Sign-in Sheets - B15.pdf PDF
36C24625B0007 0002.docx DOCX document
36C24625B0007 0001.docx DOCX document
Map of Hospital - Path to B15.pdf PDF
NC Wage Determination 1.03.2025.pdf PDF
Specifications - Final.pdf PDF
36C24625B0007_1.docx DOCX document
Bid Item Cost Breakdown.xlsx XLSX spreadsheet
SOW - 637-20-103.pdf PDF
Drawings - Final.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 1, 2025 VAMC ASHNC – BLDG 15, 2nd FLOOR – PN 637-20-103 Page 1 of 1

Date: April 1, 2025

DRAWING CHANGE SUMMARY

VAMC, ASHEVILLE, NC

RENOVATE BUILDING 15, 2nd FLOOR

PROJECT NUMBER: 637-20-103

DRAWING UPDATED Addendum Number

Date

GI004 Update to type A from type B 1 4/1/2025

GI004 Added ICRA wall in front of MACPAC 1 4/1/2025

A101 Addition to Keynote A3 - Estimate Sq Ft for patching and restoring applied Fireproofing at 30 SQ FT plus or minus 10%.

1 4/1/2025

A102 RCP Graphic Legend – Removed legend graphic for window blinds as there are not any.

1 4/1/2025

A201 Deletion from Keynote A4 - remove digital graphics

1 4/1/2025

A201 Addition to Keynote A13 - Maximum Pitch on slope to drain is 1/8" per foot.

1 4/1/2025

A201 Update drawings to remove notes of Level 5 finish. 1 4/1/2025

A201 Addition to Keynote A11 - Please reference UL detail C-AJ-0070 for basis of design for floor infill detail.

1 4/1/2025

A701 Keyed details C1 and C2 ceiling details. 1 4/1/2025

A701 Removed EC1 (EPOXY PAINT) from Interior Finish Legend.

1 4/1/2025

A701 Relabeled flooring finish SF1 with LVT1. 1 4/1/2025

T101 Added MS to the sheet Legend 1 4/1/2025

SITE KEY PLAN

AREA OF WORK

PROJECT INFORMATION

PROJECT ADDRESS

CHARLES GEORGE VA MEDICAL CENTER

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

DESIGN PROFESSIONAL:

ARCHITECTURAL ODELL, A LABELLA COMPANY MICHAEL C. MONTGOMERY 012055 LIC. NO. 828-579-4426

ELECTRICAL CHARLOTTE ENGINEERS NICHOLAS G. ESPOSITO 054276 LIC. NO 704-531-3000

FIRE ALARM CHARLOTTE ENGINEERS JOHN RICHARD CALLAHAN 031042 LIC. NO 704-531-3000

PLUMBING CHARLOTTE ENGINEERS GREGORY A. TURNER 031465 LIC. NO 704-531-3000

MECHANICAL CHARLOTTE ENGINEERS GREGORY A. TURNER 031465 LIC. NO 704-531-3000

OCCUPANCY TYPE: EXISTING BUSINESS

CODES:

NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS

NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

NFPA 101 - LIFE SAFETY CODE

NFPA 5000 - BUILDING CONSTRUCTION AND SAFETY CODE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% SUBMISSION

NON-SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

NORTH

# 637-20-103

# 15

ASHEVILLE VA MEDICAL CENTER

ARCHITECT OF RECORD

A/E:

CONSULTANT

Engineering discipline:

Charlotte Engineers 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Esther Moallen Douglas Ehlers, P.E

ODELL, A LaBella Company 795 Haywood Road Asheville, NC 28806 828-579-4426 Denice Regino / Michael Montgomery

PROGRAM MANAGER

Program manager:

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2050 Richard Cantwell

B

IM

/4

-0

V A

A s h e v ill e -B u ild in g

R e n o v a ti o n s /4

-0

V

A A s h e v ill e B ld g n d F lo o r R e n o

A

R C

H

.r v t

/8

/2

:3

:5 P

M

GI001

COVER & SHEET INDEX

Approver

02/09/2024 DR SL

PROJECT NUMBER: PROJECT DATE:

ARCHITECTURAL INTERIORS

MECHANICAL PLUMBING ELECTRICAL FIRE PROTECTION

RENOVATE BUILDING 15, 2ND FLOOR

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

100% SUBMISSION

4380-001 02/09/2024

SHEET INDEX - FIRE ALARM

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

FA001 FIRE ALARM - SYMBOLS, NOTES & DRAWING INDEX 02/09/24

FA002 FIRE ALARM - DETAILS 02/09/24

FA003 FIRE ALARM INPUT/OUTPUT MATRIX & INTERIM REQMTS. 02/09/24

FA101 FIRE ALARM - SECOND FLOOR - NEW WORK 02/09/24

FAD101 FIRE ALARM - SECOND FLOOR - DEMOLITION 02/09/24

SHEET INDEX - GENERAL

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

GI001 COVER & SHEET INDEX 02/09/24

GI002 CODE ANALYSIS 02/09/24

GI003 LIFE SAFETY PLAN - SECOND FLOOR 02/09/24

GI004 SECOND FLOOR ICRA AND PHASING PLAN 02/09/24

GI005 SECOND FLOOR ASBESTOS ABATEMENT PLAN 02/09/24

SHEET INDEX - PLUMBING

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

P001 PLUMBING - SYMBOLS, NOTES, DRAWING INDEX, & DETAILS 02/09/24

P101 PLUMBING - SECOND FLOOR - NEW WORK 02/09/24

PD101 PLUMBING - SECOND FLOOR - DEMOLITION 02/09/24

SHEET INDEX - ELECTRICAL

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

E001 ELECTRICAL - SYMBOLS, NOTES & DRAWING INDEX 02/09/24

E002 ELECTRICAL - DETAILS 02/09/24

E003 ELECTRICAL - RISER DIAGRAM & LUMINAIRE SCHEDULE 02/09/24

E004 ELECTRICAL - SCHEDULES 02/09/24

ED101 ELECTRICAL - SECOND FLOOR - DEMOLITION 02/09/24

EL101 ELECTRICAL - SECOND FLOOR - NEW WORK - LIGHTING 02/09/24

EP101 ELECTRICAL - SECOND FLOOR - NEW WORK - POWER 02/09/24

SHEET INDEX - TELECOM

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

T001 TELECOMMUNICATIONS - SYMBOLS, NOTES & DWG INDEX 02/09/24

T002 TELECOMMUNICATIONS - DETAILS 02/09/24

T101 TELECOMMUNICATIONS - SECOND FLOOR - NEW WORK 02/09/24

TD101 TELECOMMUNICATIONS - SECOND FLOOR - DEMOLITION 02/09/24

SHEET INDEX - MECHANICAL

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

M001 MECHANICAL - SYMBOLS, NOTES AND DRAWING INDEX 02/09/24

M002 MECHANICAL - SCHEDULES AND DETAILS 02/09/24

MD101 MECHANICAL - SECOND FLOOR - DEMOLITION - AREA A 02/09/24

MD102 MECHANICAL - SECOND FLOOR - DEMOLITION - AREA B 02/09/24

MH101 MECHANICAL - SECOND FLOOR - NEW WORK - AREA A 02/09/24

MH102 MECHANICAL - SECOND FLOOR - NEW WORK - AREA B 02/09/24

SHEET INDEX - ARCHITECTURAL

Sheet Number Sheet Name Sheet Issue

Date Current Revision

Current Revision Date

Current Revision Description

A100 ARCHITECTURAL NOTES, SYMBOLS & ABBREVIATIONS 02/09/24

A101 SECOND FLOOR DEMO PLAN 02/09/24

A201 SECOND FLOOR PLAN & RCP - NEW WORK 02/09/24

A401 INTERIOR ELEVATIONS AND DETAILS 02/09/24

A450 ENLARGED TOILET PLAN AND STANDARDS 02/09/24

A501 INTERIOR PARTITION TYPES 02/09/24

A601 INTERIOR DOOR AND FRAME SCHEDULE 02/09/24

A701 SECOND FLOOR - FINISH PLAN AND NOTES 02/09/24

A801 SECOND FLOOR - FURNITURE PLAN (By Vendor) 02/09/24

Revisions: Date:

PROJECT IMAGE

2/9/2024

CODE REVIEW INFORMATION

NFPA 101 LIFE SAFETY CODE 2021

VA FIRE PROTECTION DESIGN MANUAL

BUILDING DATA FIRE RESISTANCE RATINGS - IIB(211)

NFPA REQ'D PROVIDED

USE DESCRIP TION EX ISTING BUSINESS

OCCUPAN CY

NFPA CH. 39 (6.1.1)

MIXED OCCUPANCY

NFPA CH. 6 (6.1.14)

NFPA REQ'D PROVIDED

NA

CLASS IF ICATION OF WORK

NFPA CH. 4 (4.6.7)

CONSTRU CTIO N TYPE NFPA 220 TABLE 4.1.1 TYPE IIB ( 211)

NO. OF S TORIES

TOTAL PR OJECT AR EA

NUMBER OF OCCUPANTS

MIN. NU MBER OF EX ITS

MIN. EX IT WIDTH PER OCC.

MIN. DOO R WIDTH

(REFER TO LIFE SAFETY PLAN)

MIN. STA IRWAY WI DTH

ONE EX IT R ULES

MIN. CO RRIDOR WIDTH

MAX. TR AVEL DI STANCE

MAX. CO MMO N PATH OF TRAVEL

MAX. D EAD END COR RIDOR

CON CEALED SPACE DRAFTSTO PPI NG

SMO KE COM PARTMENT

INTERI OR F IN ISHES CLASS

INTERIOR EXIT STAIRWAYS, RAMPS AND EXIT

PASSAGEWAYS

(REFER TO LIFE SAFETY PLAN)

(REFER TO LIFE SAFETY PLAN)

CORRIDORS AND ENCLOSURE FOR EXIT ACCESS

STAIRWAYS AND RAMPS

ROOMS AND ENCLOSED SPACES

AUTO MAT IC SPR INKLER SYSTEM

FIRE EX TINGUI SHER SPACING

STAN DPI PE SYSTEM

SMOKE AND F IR E DETECT ION

FIRE ALARM SYSTEM

VERT ICAL ACCESS REQ UIR ED

ACCESSI BLE EN TR AN CE

PASSENGER LO ADIN G ZO NES

ABBREVIATI ONS:

N/A

NC

C

NR

B

STRU CTUR AL DESI GN:

REFER TO SPEC IF IC DRAWING AND SPECI F ICATION SECT IONS FOR

ADDIT IONAL STR UCTUR AL D ESIGN CRITERIA INCLUDIN G BUT NOT

LIMI TED TO, LIVE LOAD, D EAD LOAD , AN D LATERAL LO ADS

APPL ICABLE TO THI S PR OJECT.

NOT APPL ICABLE / NO T PART O F THIS PROJ ECT

NON-COM BUSTIB LE

COM BUSTIB LE

NOT REQ UIRED

BARRI ER TO LIMIT TRANS FER OF SMOKE

CONTR ACTO R TO VERI FY /

MAINTA IN / PATCH ANY

AND ALL AR EAS OF

FIREPROOFING OR UL

ASSEMBL IES WITHIN

SCO PE OF WO RK

NOTES:

BUILDING ELEMENT TABLE

PRIM ARY STR UCTURAL FR AME

EXTERIO R BEAR ING WALLS

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

INTERIOR BEARIN G WALLS

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

COLU MNS

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

BEAM S, G IRD ERS, TR USSES, AND ARCHES

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

FLOOR -CEI LING ASSEMBL IES

ROOF -CEI LING ASSEMBL IES

INTER IOR NON-BEARI NG WALLS

EXTERIOR NON -BEARIN G WALLS

FLOOR CONSTRUCTION AND ASSOCIATED

SECONDARY MEMBERS

ROOF CONSTRUCTION AND ASSOCIATED

SECONDARY MEMBERS

FIRE WALLS

FIRE BARRIERS

FIRE PAR TITIONS

VERT ICAL EX IT ENCLOSURE

EX I T PASSAGEWAY

HORIZ ONTAL EX IT SEPARATION

INCI DEN TAL USE AR EAS

OCCUPANCY SEPAR ATI ON

SHAF T ENCLOSU RE

COR RID OR WALLS

SMOKE BARRI ERS

FIRE PR OOFING ASSEM BLIES:

BEAM S, COLU MNS , FLOOR SY STEM , R OOF SYSTEM

1. REFER TO CO DE COMPLIANCE & L IFE SAF ETY

PLANS FO R ADDIT IONAL I NFORMAT ION ON

EGRESS, P ARTIT ION RATI NGS AND O THER

CODE RELATED INFO RMAT ION.

NFPA TABLE 32.3.1.3

NFPA TABLE 7.3.1.2

NFPA 7.4.1.2 / 39.2.4.1

NFPA 7.4

NFPA 7.3.3.1

NFPA 39.2.2.2.1

7.2.1.2.3.2

MAX 3 EX IST. 3 STORIES (55 ')

SUITE = +/-11,291 SF

2 MIN. COMPLIES (4)

N/A N/A

0.3 STAIRS

0.2 OTHER

NFPA 39.2.2.3.1/

TABLE 7.2.2.1 (b) EXISTING STAIRS 36"

NFPA 39.2.3.2

44" CLEAR COM PLI ES

NFPA 39.2.6.2 / TABLE A7.6 COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA 39.2.5.2.3 / A7.6

75 ' MAX

NFPA TABLE A7.6 /

(SEE LIFE SAFETY PLAN)

NFPA 8.6.11

N/A N/A

NFPA 39.3.7

NFPA 39.3.3.2.1

COM PLI ES

NFPA 32.2.3.5.1

YES NO

(SEE LIFE SAFETY PLAN)

NFPA 32.3.3.8 / 9.9

NFPA 9.10.1

YES NO

NFPA 9.6

YES NO

NFPA 9.6

YES NO

YES

YES

CONSTR UCTION SHALL CONF ORM TO CURR ENT AN D IN- FORCE EDITIO NS OF NFPA 101 L IFE SAFETY CODE ( 2021 ED.), NFPA 7 0 Nati onal Electr ic Code, NATIONAL STAN DARD P LUMBI NG COD E, NAT IONAL F IRE ALARM COD E, AS WELL AS ALL OTH ER LOCAL, STATE AN D F EDERAL CO DES AN D R EGU LAT ION S R EFEREN CE IN THE V.A. DES IGN STAND ARD S M ANU AL. WHER E CONF LICTS OCCUR BETWEEN CODES AND STANDARDS , THE V.A. SHALL BE NO TIF IED AND A RESOLUT ION WILL B E MADE BY THE V.A.'S AUTHO RITY HAVIN G JUR ISDICTION.

EX ISTING

EX ISTING

EX ISTING

NFPA TABLE A8.2.1.2

NFPA 7.1.3.2

NFPA 7.2.6

2 HR / 1 HR

NFPA 7.2.4

N/A N/A

NFPA TABLE 32.3.3.2.2

NFPA 6.1.14

NFPA 8.6.5

2 HR ≥ 4 STORIES

1 HR < 4 STORIES

2 HR ≥ 4 STORIES

1 HR < 4 STORIES

NFPA 32.3.3.6

NFPA 32.3.3.7.9

EXISTING BUSINESS (B)

NO

RENO VAT IO N ( N O CH ANG E TO

OCCU PAN CY, USE O R EGR ESS)

50 ' MAX

200 ' MAX

EX ISTING

32"

NO SPECIAL

REQUIREMENTS

75' ; 1/3,000 SF

2HR

2 HR

2HR

3 HR

3 HR

2 HR

1 HR

1 HR

1 HR

1 HR

1 HR

1 HR

1 HR

1 HR

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

FLOO R & ROOF ASSEMBL IES

NFPA TABLE A8.2.1.2

ELEVATOR LOBBY NFPA 7.2.13 (TOWERS) / 7.15.1.1

CLASS A OR B

EX ISTING

1 HR

COM PLI ES

COM PLI ES

150 SF/PERSON 11,291 SF / 150 = 75 OCC.

75 X .3 = 22.5" 75 X .2 =15"

COM PLI ES

EXISTING

COMPLIES

NON- SPRINKLERED

EXCEPT FOR ATTIC

39.2.5.3

(SEE LIFE SAFETY PLAN)

IBC 2021 TABLE 506.2

TOTAL BUI LDIN G AR EA ( IBC) 23 ,000 SF / FLOOR EXISTING +/-11,291 SF

(ACTUAL SUITE AREA)

EXISTING 4 1/2"

CONCRETE SLAB

EX ISTING BUSINESS

EXISTING BUSINESS (B)

RENO VAT IO N ( N O CH ANG E TO

OCCU PAN CY, USE O R EGR ESS)

CLASS A OR B

CLASS A , B OR C

N/A

EX ISTING

1. MAIN STRUCTUR AL FRAME IS CON CRETE

COLUM NS AND F LOOR CON STRU CTIO N. R OOF

CONSTRUCT ION IS WOOD

FRAMED WI TH F IRE SPRIN KLER PRO TECT ION.

2. MASO NRY FACE BRICK WI TH M ASO NRY

BACK -UP STU CCO SID ING OVER F ACE BRI CK.

3. NON-STR UCTU RAL METAL STU D FR AMI NG.

1 HR

EX ISTING

1 HR

1 HR

EX ISTING

EX ISTING

EX ISTING

EX ISTING

EX ISTING

N/A N/A

N/A N/A

EX ISTING

N/A N/A

N/A N/A

EX ISTING

A-A A-A11,291 SF

VERTICAL CIRCULATION

1ST FLOOR

2ND FLOOR

3RD FLOOR

BUSINESS OCCUPANCY

BUSINESS OCCUPANCY

A-A STACK DIAGRAM

BUSINESS OCCUPANCY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% SUBMISSION

NON-SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline:

Charlotte Engineers 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000

Esther Moallen Douglas Ehlers, P.E.

ODELL, A LaBella Company 795 Haywood Road Asheville, NC 28806 828-579-4426 Denice Regino / Michael Montgomery

NORTH

# 637-20-103

# 15

ASHEVILLE VA MEDICAL CENTER

PROGRAM MANAGER

Program manager:

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2050 Richard Cantwell

KEYPLAN

NOT TO SCALE

B

IM

/4

-0

V A

A s h e v ill e -B u ild in g

R e n o v a ti o n s /4

-0

V

A A s h e v ill e B ld g n d F lo o r R e n o

A

R C

H

.r v t

/8

/2

:3

:5 P

M

GI002

CODE ANALYSIS RENOVATE BUILDING 15, 2ND FLOOR

Approver

02/09/2024 DR SLRevisions: Date: 2/9/2024

UP

FE

FE

FE

F

F

F

FIRE PROTECTION

EGRESS LEGEND

FEC

FE

EXIT EGRESS SYMBOLS

0.X"

XXX

X"

XXXXX

XXXX

XXX SF

XX OCC.

BUILDING EXIT

(MAX - 200' - 0")

199'

74'

99'

COMMON PATH OF

TRAVEL

(MAX - 75' - 0")

SUITE EXIT

(MAX - 100' - 0")

PARTITION PRIORITY

HE

LOWER PRIORITY WALL

HIGHER PRIORITY WALL

TWO HOUR FIRE RATED PARTITIONS

ONE HOUR FIRE RATED PARTITIONS

NON RATED PARTITIONS

PRIORITY 1

PRIORITY 2

PRIORITY 3

(HIGHEST)

(LOWEST)

HIGHER

PRIORITY

WALL

FIRE EXTINGUISHER

CABINET

BRACKET MOUNTED

FIRE EXTINGUISHER

CLEAR OPENING WIDTH

EXIT CAPACITY (7.3.1.2)

EGRESS LOAD (7.3.3.1)

OCCUPANCY TYPE

AREA

OCCUPANT LOAD

FACTOR (7.3.1.2)

OCCUPANT LOAD

DIRECTIONAL

ILLUMINATED EXIT

SIGN

BUILDING EXIT

DISCHARGE

SUITE EGRESS

INDICATOR

HORIZONTAL EXIT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

B.3

81' 93' 93'

61'

133'

0.2

47" 0.2

47" 0.2

47"

EXIT

REMOTENESS

192' - 8"

BUILDING

REMOTENESS

208 - '10"

6' - 3"

69'

27'

47'

5' - 5"

CORRIDOR

STAIR

S-1

OFFICE

OFFICE

TEAMS

ROOM

TR

STORAGE

ROOM

CORRIDOR

BREAKROOM

ELECTRICAL

228 TEAMS

ROOM

WOMENS

MENS

CORRIDOR

CONFERENCE

ROOM

CORRIDOR

OPEN

OFFICE

OPEN

OFFICE

OPEN

OFFICE

STAIR

S-3

CORRIDOR

PARTITION RATINGS

EXISTING PARTITION

EXISTING 1 HR - FIRE SEPARATION

EXISTING 2 HR - FIRE SEPARATION

NEW PARTITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% SUBMISSION

NON-SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline:

Charlotte Engineers 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000

Esther Moallen Douglas Ehlers, P.E.

ODELL, A LaBella Company 795 Haywood Road Asheville, NC 28806 828-579-4426 Denice Regino / Michael Montgomery

NORTH

# 637-20-103

# 15

ASHEVILLE VA MEDICAL CENTER

PROGRAM MANAGER

Program manager:

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2050 Richard Cantwell

KEYPLAN

NOT TO SCALE

B

IM

/4

-0

V A

A s h e v ill e -B u ild in g

R e n o v a ti o n s /4

-0

V

A A s h e v ill e B ld g n d F lo o r R e n o

A

R C

H

.r v t

/8

/2

:3

:5 P

M

GI003

LIFE SAFETY PLAN - SECOND

FLOOR

RENOVATE BUILDING 15, 2ND FLOOR

Approver

02/09/2024 DR SL

1/8" = 1'-0"

02 Second Floor_Life Safety Plan1

NOTE: SYSTEM FURNITURE SHOWN FOR

REFERENCE ONLY - FOR TRAVEL PATHS

Revisions: Date: 2/9/2024

FEFE

N E

C

NEC

1.

2.

3.

4.

5.

6.

7.

ENSURE RENOVATED AREA IS TO BE COMPLETELY SEALED OFF FROM SURROUNDING AREAS.

MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING CONSTRUCTION. RESTRICT ACCESS TO FLOOR FROM WITHIN STAIRWELL DURING

CONSTRUCTION.

COORDINATE PHASING SCHEDULE WITH COR PRIOR TO STARTING CONSTRUCTION. VA HAS A MAXIMUM TIME LIMIT AREAS OF CONSTRUCTION CAN BE

CLOSED.

CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS IS THE CONTRACTOR'S RESPONSIBILITY TO BE REINSTALLED TO

PRE-CONSTRUCTION CONDITIONS.

SECOND FLOOR CALL CENTER IS TO BE FULLY OPERATIONAL AND BE ABLE TO BE ACCESSED BY STAFF AT ALL TIMES. WORK THAT WOULD DISRUPT THE

SECOND FLOOR MUST BE COORDINATED WITH COR PRIOR TO CONSTRUCTION.

CONTRACTOR TO PROVDE DUST MATS AT ENTRANCE AND EXIT OF CONSTRUCTION AREAS.

ELEVATOR TO BE LOCKED OUT AT CONSTRUCTION AREA.

DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT

PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS.

THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.

FOR THE PURPOSE OF THIS RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED ADJACENT TO MEDIUM RISK AND COMPRISES WORK WHICH COULD GENERATE MODERATE TO HIGH LEVELS OF DUST NOT WITHIN THE CONFINES OF A SUITE OR OFFICE AND INCLUDES EXTENSIVE CONSTRUCTION WORK (DEMOLITION) IN BUILDING 15 THROUGHOUT THE FIRST, SECOND FLOOR CEILING AND BASEMENT. THE DUST CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.

EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF FEASIBLE SEAL OFF ADJACENT AIR INTAKES.

IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.

SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE

ENVIRONMENT (PE) AREAS.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE OF INSECTS AND FLIES, WET CEILING TILE, ETC.

TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE

CONSTRUCTION AREA AND MATERIALS.

DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-

CARE AREAS WITH PRIOR APPROVAL OF THE VAMC.

EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS SHOULD BE REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.

VENTILATION AND ENVIRONMENTAL CONTROLS

AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED

WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE- CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.

AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING FOR THE

ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE THROUGHOUT THE PROJECT.

MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE PARTITION.

CONTAMINATION OF PATIENT ROOMS

WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL

FROM THE CONSTRUCTION ZONE OR WORK AREA.

CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.

INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION

(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)

STEP #1: SELECT ACTIVITY TYPES BELOW:

CONSTRUCTION ACTIVITY TYPES:

TYPE B

SMALL SCALE, SHORT DURATION (LESS THAN 1 DAY) ACTIVITIES

WHICH CREATE MINIMAL DUST

INCLUDES, BUT NOT LIMITED TO:

INSTALLATION OF TELEPHONE AND COMPUTER CABLING

ACCESS TO CHASE SPACES

CUTTING OF WALLS OR CEILINGS WHERE DUST MIGRATION

CAN BE CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES

INCLUDES, BUT NOT LIMITED TO:

SANDING OF WALLS FOR PAINTING OR WALL COVERING

REMOVAL OF FLOOR COVERING, CEILING TILES, AND

CASEWORK

NEW WALL CONSTRUCTION

MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

MAJOR CABLING ACTIVITIES

ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A

SINGLE WORK SHIFT

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT NOT LIMITED TO:

REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED

TO 1 TILE PER 50 SQUARE FEET

PAINTING (BUT NOT SANDING)

WALL COVERING

ELECTRICAL TRIM WORK

MINOR PLUMBING

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE

CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR

VISUAL INSPECTION

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT NOT LIMITED TO:

ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.

REQUIRES HEAVY DEMOLITION OR REMOVAL OF A

COMPLETE CABLING SYSTEM.

NEW CONSTRUCTION

IT IS LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR

INFECTION WITH TUBERCULOSIS? YES / NO

IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER

SYSTEM/LINES DURING ACTIVITY? YES / NO

STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN

A.) INFECTION CONTROL RISK GROUPS

GROUP 1 - LOW - OFFICE AREAS

GROUP 2 - MEDIUM - CARDIOLOGY, ECHOCARDIOLOGY, ENDOSCOPY,

NUCLEAR MEDICINE, PHYSICAL THERAPY, RADIOLOGY / MRI,

RESPIRATORY THERAPY

GROUP 3 - HIGH RISK - CCU, EMERGENCY ROOM, LABORATORIES,

OUTPATIENT SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT,

SURGICAL UNITS

GROUP 4 - HIGHEST RISK - ANY AREA CARING FOR IMMUNOCOMPRIMISED

PATIENTS, CARDIAC CATH LABS, CENTRAL SUPPLY, INTENSIVE CARE

UNITS, MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY,

OPERATING ROOMS

STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:

CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS

** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II, III, IV

PRECAUTIONS ARE REQUIRED.

RISK LEVEL

GROUP 1

GROUP 2

GROUP 3

GROUP 4

TYPE 'A'

I

I

I

II

TYPE 'B'

II

II

II

III / IV

TYPE 'C'

II

III

III / IV

III / IV

TYPE 'D'

III / IV

IV

IV

IV

CONSTRUCTION TYPE:

D

RISK GROUP:

LOW

RISK ASSESSMENT:

III

PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL

ELECTRICAL

YES

POTABLE WATER

YES

HVAC

YES

MEDICAL VACUUM

NO

SEWER

YES

1.

2.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:

CLASS I - DURING CONSTRUCTION PROJECT

EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM

CONSTRUCTION OPERATIONS

IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL

INSPECTION

CLASS II - DURING CONSTRUCTION PROJECT

PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM

DISPERSING INTO ATMOSPHERE.

WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING

SEAL UNUSED DOORS WITH DUCT TAPE.

BLOCK OFF AND SEAL AIR VENTS.

PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

CLASS III - DURING CONSTRUCTION PROJECT

REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD,

PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING & SEALED

CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT ) BEFORE CONSTRUCTION BEGINS.

MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-

EQUIPPED AIR FILTRATION UNITS.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY

COVERED CONTAINERS.

COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS

SOLID LID IS USED.

1.

2.

3.

4.

5.

6.

7.

CLASS IV - DURING CONSTRUCTION PROJECT

ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO

SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD

(CART WITH PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH

HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZE HEPA-EQUIPPED

AIR FILTRATION UNITS.

SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS

ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE

LEAVING WORK SITE; OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT

ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE

WORK AREA.

DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY

CLEANED BY ENVIRONMENTAL MANAGEMENT.

1.

1.

2.

3.

4.

1.

2.

3.

4.

5.

CLASS I - UPON COMPLETION OF WORK

CLEAN WORK UPON COMPLETION OF TASK

CLASS II - UPON COMPLETION OF WORK

WIPE WORK SURFACES WITH DISINFECTANT.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

WET MOP AND/OR VACUUM BEFORE LEAVING WORK AREA

REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.

CLASS III - UPON COMPLETION OF WORK

DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY

CLEANED BY ENVIRONMENTAL MANAGEMENT.

REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

VACUUM WORK AREA WITH HEPA-FILTER VACUUMS.

WET MOP WITH DISINFECTANT.

REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1.

2.

3.

4.

5.

6.

CLASS IV - UPON COMPLETION OF WORK

REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT & DEBRIS ASSOCIATED

WITH CONSTRUCTION.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

WET MOP WITH DISINFECTANT.

REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CONTRACTOR'S SIGNATURE AND DATE

INFECTION CONTROL NURSE'S SIGNATURE AND DATE

INTERIM LIFE SAFETY MEASURES (ILSM) REQUIREMENTS

1. PRIOR TO BEGINNING ACTUAL WORK ACTIVITIES, THE GENERAL CONTRACTOR IS TO WALK THROUGH

THE PLANNED WORK AREA(S) WITH REPRESENTATIVES OF THE VA SAFETY STAFF AND VA

CONTRACTING OFFICERS REPRESENTATIVES TO IDENTIFY AND PLAN FOR SAFETY ISSUES THAT MAY IMPACT HOSPITAL OPERATIONS AND LIFE SAFETY. THE ASSESSMENT SHOULD ADDRESS THE FOLLOWING

ITEMS:

A. WILL ANY EGRESS PATHWAYS OR EXITS BE ALTERED OR OBSTRUCTED?

B. WILL ACCESS TO EMERGENCY SERVICES BE RESTRICTED OR REROUTED, OR WILL ACCESS

FOR EMERGENCY RESPONDERS BE IMPAIRED OR RESTRICTED?

C. WILL ANY FIRE DETECTION OR ALARMS SYSTEMS BE IMPAIRED?

D. WILL ANY PART OF THE FIRE SUPPRESSION OR SPRINKLER SYSTEM BE IMPAIRED?

E. WILL ANY SMOKE/FIRE WALLS, DOORS, OR ASSEMBLIES BE COMPROMISED?

F. WILL THE FIRE SAFETY OF PERSONNEL IN ADJACENT ARES BE AFFECTED?

G. WILL IT BE NECESSARY TO INSTALL TEMPORARY CONSTRUCTION PARTITIONS?

H. WILL THE PROJECT RESULT IN THE ACCUMULATION OF DEBRIS AND/OR MATERIALS AND

INCREASE THE COMBUSTIBLE LOAD IN THE WORK AREA?

I. WILL THE PROJECT ACTIVITY INCLUDE SIGNIFICANT IGNITION SOURCES, I.E. CUTTING,

SOLDERING, OR OTHER ACTIVITIES UTILIZING AN OPEN FLAME?

J. WILL THE PROJECT ACTIVITY RESENT ANY OTHER SAFETY-RELATED HAZARDS?

2. THE VA WILL DOCUMENT THE ILSM ASSESSMENT AND PERFORM DAILY/WEEKLY OBSERVATIONS TO EVALUATE COMPLIANCE, DATA GATHERED DURING OBSERVATIONS WILL BE TRENDED, ISSUES IN NEED OF IMPROVEMENT WILL BE SHARED WITH THE GENERAL CONTRACTOR AND/OR MAINTENANCE PERSONNEL

TO ACHIEVE IMPROVEMENT.

3. UPON CLOSEOUT AND BEFORE THE PROJECT IS TURNED OVER TO THE END USERS, ALL LIFE SAFETY

DEFICIENCIES SHALL BE SHOWN TO HAVE CORRECTED. THE FOLLOWING

CLOSEOUT CHECKLIST SHALL FACILITATE THE PROCESS:

A. ALL EXISTS SHALL BE FREE AND UNOBSTRUCTED

B. ALL EXIT SIGNS ARE OPERATIONAL AND INSTALLED AS DESIGNED. ALL TEMPORARY SIGNS

SHALL BE REMOVED.

C. ALL ACCESS TO EMERGENCY SERVICES ARE RESTORED.

D. DOCUMENTED MAINTENANCE ACCEPTANCE TESTING FOR SMOKE/SPRINKLER SYSTEMS

SHALL BE PROVIDED.

E. ENSURE THE AREA IS EQUIPPED WITH THE APPROPRIATE NUMBER OF FIRE EXTINGUISHERS

PER CODE AND DESIGN.

F. ALL CONSTRUCTION MATERIALS AND EQUIPMENT SHALL BE REMOVED.

G. ALL EMERGENCY EVACUATION SIGNS ARE INSTALLED AND UPDATED.

H. ALL CEILING TILES AREA INSTALLED.

I. SPACES ARE CLEANED AND READY FOR OCCUPANCY.

J. ALL OTHER SAFETY RELATED HAZARDS OR CONDITIONS SHALL BE REMOVED.

UNDERSIDE OF EXISTING

DECK

FIRE RESISTANT SEALANT,

BOTH SIDES

UNDERSIDE OF

EXISTING DECK

UNDERSIDE OF EXISTING

DECK

EXISTING CEILING SYSTEM

FIRE RESISTANT

SEALANT, BOTH SIDES

EXISTING CEILING SYSTEM

PROVIDE HEADER TO

SPAN BETWEEN EXISTING

WALLS

FIRE RESISTANT SEALANT,

BOTH SIDES

PROVIDE BOX HEADER AT

DOOR

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

3 5/8" INSULATED WALL

WITH 16 GAUGE METAL

STUDS @ 16" O.C. (2)

LAYERS 5/8" GYPSUM

BOARD EACH SIDE.

WALL TO EXTEND TO

UNDERSIDE OF DECK

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

5"

A

5"

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404 B

6"

SMOKE RATED C 2-HR RATED AND

SMOKE RATED

U.L. DESIGN NO. U404

5/8" FIRE RESISTANT

GYPSUM BOARD -

BOTH SIDES

EXISTING CEILING

SYSTEM

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L

D V

E R

IF

Y

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L

D V

E R

IF

Y

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L

D V

E R

IF

Y

/2

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L

D V

E R

IF

Y

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L

D V

E R

IF

Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

B.3

STAIR

S-1

STAIR

S-2ELEVATOR

ELEVATOR

STAIR

S-3

PHASING LEGEND

DESCRIPTIONSYMBOL

PHASE I - OPEN OFFICE 222,

RESTROOMS, SUPPORT

AREAS

PHASE II - OPEN OFFICE 116

& 117

PHASE III - CORRIDOR

ICRA WALL

EXISTING WALL TO BE USED

AS ICRA WALL

STICKY MAT

PARTITION RATINGS

EXISTING PARTITION

EXISTING 1 HR - FIRE SEPARATION

EXISTING 2 HR - FIRE SEPARATION

NEW PARTITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% SUBMISSION

NON-SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline:

Charlotte Engineers 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Esther Moallen Douglas Ehlers, P.E.

ODELL, A LaBella Company 795 Haywood Road Asheville, NC 28806 828-579-4426 Denice Regino / Michael Montgomery

NORTH

# 637-20-103

# 15

ASHEVILLE VA MEDICAL CENTER

PROGRAM MANAGER

Program manager:

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2050 Richard Cantwell

KEYPLAN

NOT TO SCALE

A u to d e s k D o c s /4

-0

V A

A s h e v ill e -B u ild in g

R e n o v a ti o n s /4

-0

V

A A s h e v ill e B ld g n d

F lo o r

R e n o

A

R C

H

.r v t

/1

/2

:2

:0

P M

GI004

SECOND FLOOR ICRA AND

PHASING PLAN

RENOVATE BUILDING 15, 2ND FLOOR

Approver

02/09/2024 DR SL

1/8" = 1'-0" 02 Second Floor_Phasing Plan1

12" = 1'-0" ICRA Wall Types5

ICRA KEYNOTE LEGEND

Key Value Keynote Text

01 BUILD TEMPORARY ICRA BARRIER WALL

TYPE 'B.' REMOVE WALL ONCE

CONSTRUCTION IS COMPLETE.

02 PROVIDE TEMPORARY CONSTRUCTION

DOOR IN ICRA WALL WITH STICKY MAT.

CONSTRUCTION DOOR TO BE 45 MINUTE

FIRE RATED.

03 EXISTING WALL TO BE USED AS ICRA WALL

DURING CONSTRUCTION. ALL WALL

PENETRATIONS TO BE FIRE STOPPED.

PATCH AND REPAIR ANY DAMAGE DURING

CONSTRUCTION. PAINT TO MATCH NEW

FINISHES.

04 STICKY MAT.

05 EXISTING WALL TO BE ICRA WALL DURING

CONSTRUCTION. ALL WALL PENETRATIONS

TO BE FIRE STOPPED. REMOVE AS SHOWN

UPON COMPLETION OF PHASE.

Revisions: Date:

Addendum 1 4/1/2025

'A'

4/1/2025

FEFE

N E

C

NEC

STAIR

S1

STAIR

S3

OFFICE

EXEC

OFFICE

OFFICE QM

OFFICE QM

OFFICE QM

223A

OFFICE QM

OFFICE

EXEC

OFFICE

STOR FMS

ELEC FMS

OFFICE QM

TOILET

EXEC OFF

STORAGE

STORAGE

STAIR

S2

OFFICE

MA-CPAC

OFFICE

G&EC

OFFICE QM

BREAKROOM

QA

OFFICE QM

218C

OFFICE QM

218B

CALL CTR

HAS

OFFICE

HAS

STOR FMS

OFFICE

HAS

OFFICE

MA-CPAC

212B OFFICE

MA-CPAC

212A

OFFICE

MA-CPAC

TOILET QM

STOR QM

218A

VEST

MA-CPAC

212C

STORAGE

HAS

TELE OI&T

STORAGE

MA-CPAC

200A

HAC FMS

OFFICE

HAS

TOILET

FMS

BREAKROOM

MA-CPAC

202A

TOILET

CONF

ROOM COS

OFFICE

MA-CPAC

204A

OFFICE

MA-CPAC

OFFICE

MA-CPAC

205A

OFFICE

MA-CPAC

OFFICE

EXEC

OFFICE

206A

OFFICE

EXEC

OFFICE

OFFICE

HAS

208A

Asbestos Abatement

AREAS WITH FLOOR TILE AND ASSOCIATED MASTIC UNDER CARPET

AREAS WITH FLOOR TILE AND ASSOCIATED MASTIC

NO ABATEMENT WORK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

B.3

THE SCOPE OF ABATEMENT WORK CONSISTS OF REMOVING VINYL FLOOR TILE, ASSOCIATED FLOORING MASTICS, CAULKING AROUND ROOM DOOR FRAMES, MASTIC LOCATED WITHIN THE WALKWAY, AND ASSUMED

FIRE DOORS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ALL WORK SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY - FRIDAY

EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH THE VA COR AND CPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED

WORK PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS AND CHANGES TO THE

PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO THE VA COR FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT CONTRACTOR. THE

CONTAINMENTS SHALL BE VERIFIED WITH THE VA COR AND VPIH/CIH.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR AND VPIH.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE DISPOSAL CONTAINERS SHALL BE

FIELD VERIFIED WITH THE VA COR. ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR.

ALL AIR MONITORING AND CLEARANCE SAMPLING SHALL BE CONDUCTED BY THE CPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE ABATEMENT AREAS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, CPIH, GENERAL CONTRACTOR AND

ABATEMENT CONTRACTOR SHALL BE REQUIRED.

GENERAL ABATEMENT NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

PARTITION RATINGS

EXISTING PARTITION

EXISTING 1 HR - FIRE SEPARATION

EXISTING 2 HR - FIRE SEPARATION

NEW PARTITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% SUBMISSION

NON-SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Engineering discipline:

Charlotte Engineers 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000

Esther Moallen Douglas Ehlers, P.E.

ODELL, A LaBella Company 795 Haywood Road Asheville, NC 28806 828-579-4426 Denice Regino / Michael Montgomery

NORTH

# 637-20-103

# 15

ASHEVILLE VA MEDICAL CENTER

PROGRAM MANAGER

Program manager:

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2050 Richard Cantwell

KEYPLAN

NOT TO SCALE

B

IM

/4

-0

V A

A s h e v ill e -B u ild in g

R e n o v a ti o n s /4

-0

V

A A s h e v ill e B ld g n d F lo o r R e n o

A

R C

H

.r v t

/8

/2

:3

:5 P

M

GI005

SECOND FLOOR ASBESTOS

ABATEMENT PLAN

RENOVATE BUILDING 15, 2ND FLOOR

Approver

02/09/2024 DR SEL

1/8" = 1'-0" 02 Second Floor_Asbestos Abatement Plan1

Revisions: Date:

MATERIAL SYMBOLS

CONCRETE MASONRY UNITS

(CMU)

CONCRETE

BRICK

CEMENT, SAND, GROUT, PLASTER,

OR GYPSUM WALL BOARD

EARTH

STONE, GRAVEL, OR POROUS

FILL

CARPET

PLYWOOD

WOOD (FINISHED)

WOOD (ROUGH)

RIGID INSULATION

BATT. OR LOOSE INSULATION

STEEL

WOOD (BLOCKING)

PARTICLE BOARD

ARCHITECTURAL DRAWINGS SYMBOLS

MATCH LINE

ELEVATION LINE

COLUMN LINE REFERENCES

DOOR TAGS

BUILDING SECTIONS

WALL SECTIONS

ARCHITECTURAL ABBREVIATIONS

A

X-XXX

X-XXX

X-XXX

DETAIL NO

SHEET NO

DETAIL NO

SHEET NO

A

B

FINISH FACE OF GYP

BD/STUD PARTITION

(U.O.N.)

NOMINAL FACE

OF MASONRY AND CONCRETE

WALL / PARTITIONS

(U.O.N.)

CENTER LINE

OF COLUMN

(U.O.N.)

TYPICAL PLAN DIMENSIONING

NOMINAL FACE OF

EXISTING PARTITION

(U.O.N.)

B

A: Area AB: Anchor Bolt ABV: Above ACC: Access ACOUST: Acoustical ACR: Acrylic ACST: Acoustic ACT: Acoustical Tile AD: Access Door ADH: Adhesive

ADJ: Adjust, Adjustable, Adjacent AFF: Above Finished Floor AGGR: Aggregate ALT: Alternate ALUM: Aluminum ANOD: Anodized AP: Access Panel APPROX: Approximate ATC: Acoustical Tile Ceiling

BDRM: Bedroom BETW: Between BF: Board Foot BIT: Bituminous BLDG: Building BLKG: Blocking BOT: Bottom

BPL: Bearing Plate BRG: Bearing BRK: Brick BRZ: Bronze BS: Both Sides BSMT: Basement BUR: Built-up Roof

C/C: Center to Center CAB: Cabinet CAR: Carpet CAV: Cavity CCW: Counter Clockwise CCTV: Closed Circuit TV CEM: Cement

CER: Ceramic CF: Cubic Feet CHAM: Chamfer CJ: Control Joint CK: Caulking CL: Centerline CLG: Ceiling CLKG: Caulking CLR: Clear CLR OPG: Clear Opening CMT: Ceramic Mosaic Tile CMU: Concrete Masonry Unit COL: Column CONC: Concrete CONSTR: Construction

CONT: Continuous CONTR: Contractor COP: Copper CPR: Copper CPT: Carpet CT: Ceramic Tile CW: Clockwise

EA: Each EB: Expansion Bolt EE: Each End EF: Each Face EHD Electric Hand Dryer EIFS: Exterior Insulation and Finish System EJ: Expansion Joint EL: Elevation, Elevator ELEC: Electrical ELEV: Elevator, Elevation

ENCL: Enclosure EPDM: Ethylene Propylene Diene Monomer EQ: Equal EQUIP: Equipment EW: Each Way EXG: Existing EXH: Exhaust EXIST: Existing EXP: Exposed

GA: Gauge, Gage GALV: Galvanized GC: General Contractor GL: Glass GL BLK: Glass Block

GRND: Ground GRTG: Grating GVL: Gravel GYP: Gypsum GYP BD: Gypsum Board

WINDOW TAG /

STOREFRONT TAG

DETAIL SECTIONS

X-XXX

DETAIL NO

SHEET NO

P. LAM: Plastic Laminate PAR: Parallel PBD: Particle Board PERIM: Perimeter PERP: Perpendicular PL: Plate PLBG: Plumbing PLYWD: Plywood PLUMB: Plumbing PR: Pair

PREFAB: Prefabricated PRES: Pressure PRESS: Pressure PRMLD: Premolded PRTN: Partition PSF: Pounds per square foot PSI: Pounds per square inch

PT: PAINT

PTD: Painted, Paper Towel Dispenser PTD/R: Combination Paper Towel Dispenser/Receptacle PTN: Partition

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

DETAIL CALL OUTS

DETAIL NO0

X-XXX

DETAIL NO

SHEET NO

X-XXX2 4

SHEET NO

WALL TYPE

ROOM TAGROOM #

ROOM AREA

# PLAN/ELEVATION KEYNOTE

REVISION SYMBOL AND

CLOUD

C

D

E

F

G P

H

I

J

L

M

N

O

Q

R

S

T

DBL: Double DEG: Degree DEMO: Demolition DF: Drinking Fountain DIAG: Diagonal DIA: Diameter

DIAM: Diameter DIFF: Diffuser DN: Down DR: Door DWG: Drawing DWGS: Drawings DWR: Drawer

FB: Face Brick FD: Floor drain FDC: Fire Department Connection FDN: Foundation FDTN: Foundation FE: Fire Extinguisher FEC: Fire Extinguisher Cabinet FFE: Finished Floor Elevation

FF&E: Fixtures, Furnishings & Equipment FFL: Finished Floor Line FGL: Fiberglass FHC: Fire Hose Cabinet FIN: Finish, finished FIXT: Fixture

HDCP: Handicapped (better called "Accessible") HDW: Hardware HDWD: Hardwood HGT: Height

HM: Hollow Metal HORIZ: Horizontal HR: Hour HWD: Hardwood

ID: Inside Diameter IN: Inch INCL: Include INFO: Information

INSTL: Install INSUL: Insulation INT: Interior INTERM: Intermediate

JAN: Janitor JC: Janitor's Closet JT: Joint

FINISH KEYNOTE

LAB: Laboratory, Labor LAV: Lavatory LB: Pound (weight) LBL: Label LINO: Linoleum LNTL: Lintel

MAINT: Maintenance MAN; Manual MAR: Marble MARB: Marble MAS: Masonry MAT: Material MATL: Material

MAX: Maximum MECH: Mechanical MEMB: Membrane MFD: Manufactured MFG: Manufacturer, Manufacturing MFR: Manufacture, Manufacturer MI: Malleable Iron, Miles MIKE: Microphone MIN: Minimum MIR: Mirror MISC: Miscellaneous MK: Mark ML&P: Metal Lath & Plaster MLD: Molding

MLDG: Molding MM: Millimeter MMB: Membrane MO: Masonry Opening MOD: Module MONO: Monolithic MOV: Movable MP: Metal Acoustal Panel MPS: Medium Pressure Steam MR: Mop Receptor MRD: Metal Roof Deck MT: Mount, Mounted MTD: Mounted MTL: Material, Metal

MTR: Motor MUL: Mullion MULL: Mullion MV: Mercury Vapor MWP: Maximum Working Pressure MWK: Millwork

N: North, Nitrogen NAP: Napkin NAT: Natural NATL: Natural NB: "Nota Bene" Latin phrase for "Take Special Note" NC: Normally Closed, Noise Criteria NEC: National Electrical Code NEUT: Neutral NF: Near Face NFWH: Non-freeze Wall Hydrant

NI: Nickel NIC: Not In Contract NK: Neck NMT: Non-Metallic NO: Number, Normally Open NOM: Nominal NR: Noise Reduction NRC: Noise Reduction Coefficient NTS: Not To Scale

OB: Obscure OBS: Obscure OC: On Center OD: Outside Diameter OF: Outside Face OFF: Office

OH: Overhead OHD: Overhead Door OPNG: Opening OPP: Opposite OPP H: Opposite Hand

QUAL: Quality QT: Quarry Tile, Quart QTY: Quantity

RB: Rubber Base RCP: Reflected Ceiling Plan RD: Roof Drain, Round, Receptacle Distribution Panel REBAR: Reinforcing Bar REF: Refer, Reference, Refrigerator REFL: Reflected, REFR: Refrigerate, Refrigerator REINF: Reinforcement, or Reinforce

REQD: Required RESIL: Resilient RF: Roof RGH: Rough RGH OPNG: Rough Opening RO: Rough Opening RT: Rubber Tile

SALV: Salvage SCHED: Schedule SD Soap Dispenser SF: Square Foot SHR: Shower SHT: Sheet SND: Sanitary Napkin Disposal SPEC: Specification, Specifications SPECS: Specifications SQ: Square

SS: Stainless Steel STC: Sound Transmission Class STD: Standard STL: Steel STOR: Storage STRT: Straight STRUC: Structural STRUCT: Structural SUR: Surface SUSP: Suspended, Suspend

T&B: Top and Bottom T&G: Tongue & Groove TG Tempered Glass / Glazing TB: Towel Bar TD: Trench Drain TERR: Terrazzo THK: Thick, Thickness

THRU: Through TLT: Toilet TPD: Toilet paper Dispenser TPH: Toilet Paper Holder TPTN: Toilet Partition TYP: Typical TZ: Terrazzo

UNFIN: Unfinished UNO: Unless Noted Otherwise UON: Unless Otherwise Noted UP: Unpainted UR: Urinal

VAT: Vinyl Asbestos Tile VBC: Vinyl Base (Coved) VCT: Vinyl Composition Tile VERT: Vertical VEST: Vestibule

VIF: Verify In the Field VT: Vinyl Tile VTR: Vent Through Roof VWC: Vinyl Wall Covering

W/: With W/O: Without WAINS: Wainscot WC: Watercloset WD: Wood

U

V

W

A101

SIM

CS12.0b

W-

ROOM NAME

150 SF

XXX

F FL: Floor FLR: Floor FO: Finished Opening FOF: Face of Finish FOS: Face of Studs FP: Fireproof

FRT: Fire Retardant FT: Foot, Feet, FTG: Footing, Fitting FURN: Furnish, Furniture FURR: Furring

X-XXX

DETAIL NO

SHEET NO

Name Elevation

CONSTRUCTION SHALL CONFORM TO THE “INTERNATIONAL BUILDING CODE & NFPA 101 LIFE SAFETY CODE”, LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THE PROJECT IS BEING

CONSTRUCTED.

CONSTRUCTION SHALL COMPLY WITH FEDERAL CODES AND REGULATIONS.

ALL DRAWINGS ARE GRAPHIC REPRESENTATIONS OF APPROXIMATE LOCATIONS OF NEW MATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

CONTRACTORS ARE RESPONSIBLE FOR ALL MATERIALS, CONSTRUCTION METHODS AND CRAFTSMANSHIP.

CONTRACTORS ARE TO VERIFY ALL EXISTING CONDITIONS, REQUIREMENTS, NOTES, CODES AND DIMENSIONS, PRIOR TO THE START OF CONSTRUCTION AND SHALL NOTIFY THE ARCHITECT IF CONDITIONS VARY FROM THOSE

SHOWN ON THE DOCUMENTS.

CONTRACTORS ARE TO PROVIDE ADEQUATE SUPPORT OF EXISTING FOUNDATION WALLS, LOAD BEARING WALLS

AND PARTITIONS DURING DEMOLITION AND CONSTRUCTION.

THOROUGHLY COORDINATE WORK WITH OTHER TRADES AND DETERMINE THE EXACT ROUTE AND LOCATION OF

UTILITIES, MATERIALS AND EQUIPMENT BEFORE FABRICATION AND INSTALLATION.

WHEN EXISTING CONSTRUCTION IS REMOVED, DISTURBED, DAMAGED, REPLACED OR RENOVATED IN ANY WAY, CONTRACTORS SHALL PROVIDE PATCHING, PAINTING AND MATERIALS OF SAME TYPE AND QUALITY AS TO MATCH

ADJACENT EXISTING SURFACES, UNLESS OTHERWISE NOTED.

CONTRACTORS PROVIDE ALL BLOCKING, FURRING AND SHIMMING FOR INSTALLATION AND COMPLETION OF

WORK.

ALL NEW WORK SHALL BE PLUMB, LEVEL AND SQUARE. SCRIBE AND MAKE FIT ALL NEW TO EXISTING.

CONTRACTORS VERIFY ALL DIMENSIONS BEFORE ORDERING MATERIAL OR DOING WORK. NO EXTRA COMPENSATION OR CHARGES WILL BE ACCEPTED DUE TO DIFFERENCES BETWEEN THE ACTUAL MEASUREMENTS

AND MEASUREMENTS INDICATED ON THE DRAWINGS.

ALL DETAILS ARE SUBJECT TO CHANGE DUE TO EXISTING FIELD CONDITIONS. CONTRACTOR MUST NOTIFY

ARCHITECT OF SAME.

THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CHANGES TO THESE DRAWINGS AND COMPLETION OF

COMPLIANT WORK.

CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS ASSOCIATED WITH THE WORK

OF THEIR CONTRACT.

ITEMS NOTED AS 'BY OWNER” ARE TO BE FURNISHED AND INSTALLED BY THE OWNER OR THE OWNER'S VENDOR.

GENERAL CONSTRUCTION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

UNLESS OTHERWISE NOTED, ALL MASONRY DIMENSIONING IS NOMINAL TO FACE OF MASONRY, ALL NON- MASONRY DIMENSIONING IS TO FACE OF PARTITIONS OR WALLS AND ALL CONCRETE DIMENSIONING IS FACE

TO FACE OF WALL.

ALL DIMENSIONS ARE TO THE OUTSIDE FINISH SURFACE OF WALLS OR TO COLUMN CENTERLINES.

ALL DIMENSIONS ARE FINISHES DIMENSIONS FROM FINISH FACE OF GYPSUM BOARD OR SCHEDULED WALL

FINISH UNLESS OTHERWISE NOTED.

PROVIDE CONCEALED BLOCKING IN ALL STUD PARTITIONS AND WALLS BEHIND SURFACE FOR SEMI-

RECESSED, FULLY RECESSED OR SURFACE MOUNTED ACCESSORIES AND MILLWORK.

DIMENSIONS NOTED AS “CLEAR” ARE TO FINISHED SURFACE AND ARE CRITICAL FOR ACCESSIBILITY

REQUIREMENTS OR BUILT-IN FURNISHINGS.

CONTRACTOR SHALL FIELD VERIFY FINISHED DIMENSIONS AND CLEARANCES IN SPACES INDICATED TO

RECEIVE BUILT-IN FURNISHINGS OR CASEWORK PRIOR TO FABRICATION.

ALL VERTICAL CONCRETE SURFACES WHICH WILL BE EXPOSED TO VIEW UPON COMPLETION OF WORK SHALL

RECEIVE A SMOOTH RUBBED FINISH.

ALL ENDS OF MASONRY WALLS THAT WILL BE EXPOSED TO VIEW UPON COMPLETION OF WORK SHALL BE

PLAIN END UNITS.

FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM EXCEPT WHERE

DIMENSIONED OTHERWISE.

SEALANT SHALL BE PROVIDED AT THE INTERIOR AND EXTERIOR PERIMETER OF ALL WINDOWS, DOOR FRAMES, LOUVERS OR OTHER ITEMS INSERTED IN AN EXTERIOR WALL.

SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM EACH MOST REMOTE WALL, IN EACH DIRECTION, WITH NO TILES LESS THAN 6” UNLESS OTHERWISE INDICATED.

WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK, WITHIN 2'-0” OF GRADE AND IN OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE EXPOSED TO THE WEATHER SHALL BE

PRESSURE TREATED LUMBER OR PLYWOOD.

INSTALL ALL WORK AS INDICATED AND VERIFY EXACT LOCATION AND ELEVATIONS ON THE JOB.

DO NOT SCALE DRAWINGS. REFER TO DIMENSIONS AND SPECIFIED MATERIALS. CONTACT THE ARCHITECT IF

ADDITIONAL DIMENSIONS ARE REQUIRED.

COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.

INTERIOR WALL AND CEILING FINISH MINIMAL REQUIREMENTS (FINISH CLASSIFICATIONS IN ACCORDANCE

WITH ASTM E84) ARE INDICATED ON CODE REVIEW INFORMATION MATRIX.

GENERAL ARCHITECTURAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

PARTITION RATINGS

EXISTING PARTITION

EXISTING 1 HR - FIRE SEPARATION

EXISTING 2 HR - FIRE SEPARATION

NEW PARTITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% SUBMISSION

NON-SPRINKLERED

Office of Construction and…

This is the start of the file's text. The full file is on GovTribe.