36C10F18R0581-063.pdf

PDF 14 MB Posted

Attached to
Sacramento Valley National Cemetery Phase II Development
Solicitation number
36C10F18R0581
Issued by

About this file

36C10F18R0581 14_SVNC2_LANDSCAPE_L-101-L-102.pdf

View the file

Other files

File Type Posted
36C10F18R0581-0002000.docx DOCX document
36C10F18R0581-0001000.docx DOCX document
36C10F18R0581-0001001.pdf PDF
36C10F18R0581-0001006.pdf PDF
36C10F18R0581-0001008.pdf PDF
36C10F18R0581-0001009.pdf PDF
36C10F18R0581-0001007.pdf PDF
36C10F18R0581-0001002.pdf PDF
36C10F18R0581-0001004.pdf PDF
36C10F18R0581-0001003.pdf PDF
36C10F18R0581-0001005.pdf PDF
36C10F18R0581-065.pdf PDF
36C10F18R0581-080.pdf PDF
36C10F18R0581-046.pdf PDF
36C10F18R0581-059.pdf PDF
36C10F18R0581-043.pdf PDF
36C10F18R0581-073.pdf PDF
36C10F18R0581-045.docx DOCX document
36C10F18R0581-077.pdf PDF
36C10F18R0581-079.pdf PDF
36C10F18R0581-054.pdf PDF
36C10F18R0581-052.pdf PDF
36C10F18R0581-047.pdf PDF
36C10F18R0581-049.pdf PDF
36C10F18R0581-076.pdf PDF
36C10F18R0581-070.pdf PDF
36C10F18R0581-072.pdf PDF
36C10F18R0581-069.pdf PDF
36C10F18R0581-055.pdf PDF
36C10F18R0581-075.pdf PDF
36C10F18R0581-051.pdf PDF
36C10F18R0581-078.pdf PDF
36C10F18R0581-044.docx DOCX document
36C10F18R0581-053.pdf PDF
36C10F18R0581-062.pdf PDF
36C10F18R0581-060.pdf PDF
36C10F18R0581-067.pdf PDF
36C10F18R0581-068.pdf PDF
36C10F18R0581-066.pdf PDF
36C10F18R0581-042.docx DOCX document
36C10F18R0581-074.pdf PDF
36C10F18R0581-064.pdf PDF
36C10F18R0581-061.pdf PDF
36C10F18R0581-056.pdf PDF
36C10F18R0581-057.pdf PDF
36C10F18R0581-058.pdf PDF
36C10F18R0581-050.pdf PDF
36C10F18R0581-071.pdf PDF
36C10F18R0581-048.pdf PDF
36C10F18R0581-002.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VF

D

SO

LA

NO

D

RI

VE

SOLANO DRIVE

FOLSOM LAKE WAY

POTAH CREEK WAY

SI

ER

RA

N

EV

AD

A

DR

IV

E

SIERRA NEVADA DRIVE

DE

LT

A W

AY

CENTRAL

VALLEY

W

AY

MIDWAY ROADMIDWAY ROAD MIDWAY ROAD

T

SIERRA NEVADA DR.

LA

KE

BE

RR

YE

SS

A D

RIV

E

JE

PS

ON

PR

AIR

IE

DR

EX. 1

PPC

EX. 19

IGC

EX. 20

IGC

EX. 22

IGC

EX. 16

IGC

EX. 18

TG

EX. 24

IGC

EX. 5

PPC

EX. 23

PPC

EX. 25

PPC

EX. 7

IGC

EX. 2

PPC

EX. 27

PPC

EX. 28

PPC

EX. 26

PPC

EX. 8

IGC

EX. 12

PPC

EX. 11

IGC

EX. 14

IGC

EX. 4

TG

EX. 15

IGC

EX. 3

PPC

EX. 9

IGC

EX. 10

IGC

EX. 13

PPC

EX. 21

IGC

EX. 17

IGC

EX. POND

(1.2 ac.)

PUTAH

DRIVE

ROAD A

BERRYESSA

SOLANO

SUTTER BUTTE DRIVE

SOLANO

IGC

IGC

IGC

IGC

IGC

IGC

IGC

IGC

33A

PPC

PPC

PPC

PPC

PPC

PPC

33B

LAKE

DRIVE

SOLANO

DRIVE

DRIVE

SIERRA NEVADA DR.

CREEK WAY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Fi le

P at h

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Structural Engineering, Electrical Engineering:

Sacramento Valley National Cemetery Phase 2 Development

5810 Midway Rd, Dixon, CA 95620

921CM2007

Project Director

JUNE 27, 2018Revisions: Date:

HDR Engineering, Inc.

2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens

Irrigation:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard

Cost Estimating:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand

Geotechnical Engineering:

Terracon Consultants, Inc.

50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

KEY MAP: N.T.S.

CREEK

CREEK

Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager

OF

06 / 27 / 2018y:

\1

\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-

C 3d

\L an ds ca pe A rc h\

6_ L_

LA

N

D S

C A

P E

.d w g

/2

5/

2:

P M

N 0 120' 240'

SCALE:1

LANDSCAPE PLAN - OVERALL (BASE BID)

1" = 120' (30" x 42" PAPER SIZE)

LANDSCAPE PLAN - OVERALL

(BASE BID)

L-101

JDL JAF

L-113

L-114

L-115

L-110

L-109

L-105

L-104

L-106

L-108

L-107

L-111

L-112

L-116

L-117

ADD ALT.

#1

ADD ALT.

#2

LEGEND

L-103

NEW TREES

NEW SHRUBS &

GROUNDCOVERS

TREE

RELOCATION

RELOCATED TREES

NOTES

1. SEE INDIVIDUAL SHEETS FOR PLANT SCHEDULES

2. DO NOT INSTALL ANY PLANT MATERIAL UNTIL THE

IRRIGATION SYSTEM HAS BEEN INSTALLED AND

APPROVED BY THE RE IN THE LOCATIONS WHERE

PLANTINGS OPERATIONS ARE OCCURRING.

262167

L-101

VF

D

SO

LA

NO

D

RI

VE

SOLANO DRIVE

FOLSOM LAKE WAY

POTAH CREEK WAY

SI

ER

RA

N

EV

AD

A

DR

IV

E

SIERRA NEVADA DRIVE

DE

LT

A W

AY

CENTRAL

VALLEY

W

AY

MIDWAY ROADMIDWAY ROAD MIDWAY ROAD

T

SIERRA NEVADA DR.

LA

KE

BE

RR

YE

SS

A D

RIV

E

JE

PS

ON

PR

AIR

IE

DR

EX. 1

PPC

EX. 19

IGC

EX. 20

IGC

EX. 22

IGC

EX. 16

IGC

EX. 18

TG

EX. 24

IGC

EX. 5

PPC

EX. 23

PPC

EX. 25

PPC

EX. 7

IGC

EX. 2

PPC

EX. 27

PPC

EX. 28

PPC

EX. 26

PPC

EX. 8

IGC

EX. 12

PPC

EX. 11

IGC

EX. 14

IGC

EX. 4

TG

EX. 15

IGC

EX. 3

PPC

EX. 9

IGC

EX. 10

IGC

EX. 13

PPC

EX. 21

IGC

EX. 17

IGC

EX. POND

(1.2 ac.)

PUTAH

DRIVE

ROAD A

BERRYESSA

SOLANO

SUTTER BUTTE DRIVE

SOLANO

IGC

IGC

IGC

IGC

IGC

IGC

IGC

IGC

33A

PPC

PPC

PPC

PPC

PPC

PPC

33B

LAKE

DRIVE

SOLANO

DRIVE

DRIVE

SIERRA NEVADA DR.

CREEK WAY

ADD ALT.

#2

ADD ALT.

#2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Fi le

P at h

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Structural Engineering, Electrical Engineering:

Sacramento Valley National Cemetery Phase 2 Development

5810 Midway Rd, Dixon, CA 95620

921CM2007

Project Director

JUNE 27, 2018Revisions: Date:

HDR Engineering, Inc.

2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens

Irrigation:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard

Cost Estimating:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand

Geotechnical Engineering:

Terracon Consultants, Inc.

50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

KEY MAP: N.T.S.

CREEK

CREEK

Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager

OF

06 / 27 / 2018y:

\1

\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-

C 3d

\L an ds ca pe A rc h\

6_ L_

LA

N

D S

C A

P E

.d w g

/2

5/

2:

P M

N 0 120' 240'

SCALE:1

LANDSCAPE PLAN - SEEDING, SODDING & MULCHING (BASE BID)

1" = 120' (30" x 42" PAPER SIZE)

LANDSCAPE PLAN - SEEDING,

SODDING & MULCHING (BASE BID)

L-102

JDL JAF

LEGEND

NATIVE SEED MIX

SOD

TURF SEED MIX

L-117

ADD ALT.

#1

3" DEPTH MULCH

(UNLESS OTHERWISE NOTED)

L-116

L-116

MATCH ADJACENT MULCH EDGE

SPADE EDGE AT PLANTING BEDS

See 9/L-501

NOTES

1. RESTORE ALL DISTURBED AREAS TO EXISTING

CONDITIONS FOR WORK WITHIN THIS EXISTING

CEMETERY, UNLESS OTHERWISE NOTED.

2. ALL NATIVE SEED AREAS WITH NO PERMANENT

IRRIGATION SYSTEM SHALL RECEIVE TEMPORARY

IRRIGATION FOR ESTABLISHMENT, COORDINATE

W/IRRIGATION CONTRACTOR.

3. SEE SHEET CE101 FOR EROSION CONTROL BLANKET

LOCATIONS.

262168

L-102

PLANTING AND SOIL

RESTORATION (TYP.)

SEE O-101

File details come from the government source that posted it.