36C10F18R0581-0002000.docx

DOCX document 26 KB Posted

Attached to
Sacramento Valley National Cemetery Phase II Development
Solicitation number
36C10F18R0581
Issued by

About this file

36C10F18R0581 0002 36C10F18R0581 0002.docx

View the file

Other files

File Type Posted
36C10F18R0581-0001000.docx DOCX document
36C10F18R0581-0001001.pdf PDF
36C10F18R0581-0001006.pdf PDF
36C10F18R0581-0001008.pdf PDF
36C10F18R0581-0001009.pdf PDF
36C10F18R0581-0001007.pdf PDF
36C10F18R0581-0001002.pdf PDF
36C10F18R0581-0001004.pdf PDF
36C10F18R0581-0001003.pdf PDF
36C10F18R0581-0001005.pdf PDF
36C10F18R0581-065.pdf PDF
36C10F18R0581-080.pdf PDF
36C10F18R0581-046.pdf PDF
36C10F18R0581-059.pdf PDF
36C10F18R0581-043.pdf PDF
36C10F18R0581-073.pdf PDF
36C10F18R0581-045.docx DOCX document
36C10F18R0581-077.pdf PDF
36C10F18R0581-079.pdf PDF
36C10F18R0581-054.pdf PDF
36C10F18R0581-052.pdf PDF
36C10F18R0581-047.pdf PDF
36C10F18R0581-049.pdf PDF
36C10F18R0581-076.pdf PDF
36C10F18R0581-070.pdf PDF
36C10F18R0581-072.pdf PDF
36C10F18R0581-069.pdf PDF
36C10F18R0581-055.pdf PDF
36C10F18R0581-075.pdf PDF
36C10F18R0581-051.pdf PDF
36C10F18R0581-078.pdf PDF
36C10F18R0581-063.pdf PDF
36C10F18R0581-044.docx DOCX document
36C10F18R0581-053.pdf PDF
36C10F18R0581-062.pdf PDF
36C10F18R0581-060.pdf PDF
36C10F18R0581-067.pdf PDF
36C10F18R0581-068.pdf PDF
36C10F18R0581-066.pdf PDF
36C10F18R0581-042.docx DOCX document
36C10F18R0581-074.pdf PDF
36C10F18R0581-064.pdf PDF
36C10F18R0581-061.pdf PDF
36C10F18R0581-056.pdf PDF
36C10F18R0581-057.pdf PDF
36C10F18R0581-058.pdf PDF
36C10F18R0581-050.pdf PDF
36C10F18R0581-071.pdf PDF
36C10F18R0581-048.pdf PDF
36C10F18R0581-002.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SACRAMENTO VALLEY NATIONAL CEMETERY PHASE 2 CONSTRUCTION

RFP NO: 36C10F18R0581

RESPONSES to Questions/RFIs

AMENDMENT #2

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 09-19-2018 None 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street NW Washington DC 20001 101F Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001 To all Offerors/Bidders

36C10F18R0581 09-06-2018

X x X X The subject amendment is issued to post response to additional questions/RFIs.

The due date for receipt of proposlas is not extended.

All other terms and conditions remain unchanged.

Evenel Jean-Jacques Contracting Officer

CONTINUATION PAGE

QUESTION #16:

Specification section 31 32 23 – PRESSURE GROUPING SOIL STABILIZATION, Paragraph 2.2 sets specifications for the Lime Slurry, and Paragraphs 3.1 and 3.2 refer to drilling 4” diameter 3 foot deep holes in the subgrade and injecting the Lime Slurry. A conflicting note on plan sheet CR301 (108 of 262) Details 7 and 8 refer to spreading Quicklime at 4 LBS/SF and mixing it into the soil 12” deep. Additionally, the Geotech Report, Section 4.6.3, bottom of page 23, states “Lime treated materials shall conform to the requirements in Section 24 of the Caltrans Standard Specifications, latest edition. Caltrans 24-2.03C allows the Lime to be placed dry or as a slurry prior to mixing. In summary, the plans and specs call out several varying ways of doing lime treatment. We assume the specifications are the governing document which requires pressure grouting, however we cannot get subs to cover this method in California. Most Lime treatment on the west coast is done with Hydrated Lime powder or Lime slurry.

Will the contractor have the options to use either slurry lime, dry hydrated lime, or quicklime treatment for this project?

RESPONSE #16: The Contractor shall have the option of surface applied slurry lime, dry hydrated lime or quicklime treatment to be mixed in to a depth of 12” per drawing detail notes. No drilling or injecting of lime is required for this contract.

QUESTION #17:

The Subcontractor and/or Supplier are unable to determine the type of product that is needed for the divider caps and divider walls at the columbarium.

RESPONSE #17: Divider walls and caps shall be natural cut limestone.

QUESTION #18:

Unable to locate the Asphalt Escalation Clause in specs. Please advise.

RESPONSE #18: No escalation clauses of any kind is included in the RFP or resultant contract.