36C10F18R0581-056.pdf
PDF 4 MB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 09_SVNC2_EROSION.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V
F
D
SO
LA
NO
D
RI
VE
SOLANO DRIVE
POTAH CREEK WAY
SI
ER
RA
N
EV
AD
A
DR
IV
E
SIERRA NEVADA DRIVE
DE
LT
A W
AY
CENTRAL
VALLEY
W
AY
MIDWAY ROADMIDWAY ROAD MIDWAY ROAD
T
FIBER ROLLS (TYP.)
PER CASQA SE-5
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE AND EXIT
PER CASQA TC-1 & TC-3
FIBER ROLLS (TYP.)
PER CASQA SE-5
CONCRETE
WASHOUT PIT
PER CASQA WM-8
FIBER ROLLS (TYP.)
PER CASQA SE-5
CE501
CE501
CE501
CE501
FIBER ROLLS (TYP.)
PER CASQA SE-5
CE501
CE501
INLET PROTECTION (TYP.)
PER CASQA SE-10
CE501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OFJune 27, 2018
CE101
EROSION CONTROL PLAN
CVD NRT
NOTES:
1.BEST MANAGEMENT (BMP) CALLOUTS REFERENCE
CALIFORNIA STORMWATER QUALITY ASSOCIATION
(CASQA) FACT SHEET DETAILS. SEE CASQA'S
STORMWATER BEST MANAGEMENT PRACTICE
HANDBOOK SECTION 3.6 FOR BMP FACT SHEETS.
2. BMP LOCATIONS ARE SCHEMATIC AND SHOULD BE
PLACED TO MEET THE CONTRACTOR'S MEANS/METHODS
OF CONSTRUCTION WHILE STILL MEETING THE
REQUIREMENTS OF THE CONSTRUCTION GENERAL
PERMIT (CGP). IT IS THE CONTRACTOR'S
RESPONSIBILITY TO MEET THE REQUIREMENTS OF CGP.
3. ALL BMPS SHALL BE MAINTAINED BY THE
CONTRACTOR UNTIL FINAL STABILIZATION OF THE
PROJECT PER CGP REQUIREMENTS.
4. THE CONTRACTOR SHALL OBTAIN AN NPDES PERMIT
FROM THE CALIFORNIA STATE WATER RESOURCES
CONTROL BOARD PRIOR TO GROUND DISTURBANCE.
5. SEE PROJECT STORMWATER POLLUTION PREVENTION
PLAN FOR ADDITIONAL INFORMATION.
LEGEND:
FIBER ROLLS
LIMITS OF CONSTRUCTION
INLET PROTECTION PER
CASQA SE-10. SEE DETAIL
4, SHEET CE501.
CONSTRUCTION ENTRANCE/EXIT WITH TIRE WASH, CASQA TC-1 7 TC-3
NOT TO SCALE
CONCRETE WASHOUT PIT, CASQA WM-8
NOT TO SCALE
FIBER ROLLS, CASQA SE-5
NOT TO SCALE
DRAIN INLET PROTECTION, CASQA SE-10
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
ENGINEERING
ENGINEERING ARCHITECTURE LAND SURVEYING
ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE
ANDERSON
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OFJune 27, 2018
CE501
EROSION CONTROL PLAN DETAILS
TBD NRT 128 OF 262