36C10F18R0581-055.pdf
PDF 14 MB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 08_SVNC2_GRADING.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPC
IGC
IGC
PUTAH
CREEK
W
AY SIERRA NEVADA DR.
LA
KE
BE
RR
YE
SS
A D
RIV
E
JE
PS
ON
PR
AIR
IE
DR
EX. 1
PPC
EX. 19
IGC
EX. 20
IGC
EX. 22
IGC
EX. 16
IGC
EX. 18
TG
EX. 24
IGC
EX. 5
PPC
EX. 23
PPC
EX. 25
PPC
EX. 7
IGC
EX. 2
PPC
EX. 27
PPC
EX. 28
PPC
EX. 26
PPC
EX. 8
IGC
EX. 12
PPC
EX. 11
IGC
EX. 14
IGC
EX. 4
TG
EX. 15
IGC
EX. 3
PPC
EX. 9
IGC
EX. 10
IGC
EX. 13
PPC
EX. 21
IGC
EX. 17
IGC
EX. POND
(1.2 ac.)
PUTAH
DRIVE
ROAD A
BERRYESSA
SOLANO
SUTTER BUTTE DRIVE
SOLANO
IGC
IGC
IGC
IGC
IGC
IGC
IGC
IGC
33A
PPC
PPC
PPC
PPC
PPC
PPC
33B
LAKE
DRIVE
SOLANO
DRIVE
DRIVE
SIERRA NEVADA DR.
CREEK WAY
VF
D
SO
LA
NO
D
RI
VE
SOLANO DRIVE
FOLSOM LAKE WAY
POTAH CREEK WAY
SI
ER
RA
N
EV
AD
A
DR
IV
E
SIERRA NEVADA DRIVE
DE
LT
A W
AY
CENTRAL
VALLEY
W
AY
MIDWAY ROAD MIDWAY ROAD
CG101
N 0 120' 240'
SCALE:1
SITE GRADING PLAN - OVERALL
1" = 120' (30" x 42" PAPER SIZE)
SITE GRADING PLAN - OVERALL
PPC
EX. 13
PPC
LEGEND
NEW BURIAL SECTION HEADSTONE
DIRECTION
PPC
EX. 13
PPC
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
PPC
EX. 13
PPC
LP 78.9
HP 78.9
1.1%
78.9 SPOT ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
CAD IJW
POND 1
NWL = DRY
HWL = 64.5
POND 2
NWL = DRY
HWL = 64.5
COMMITTAL SHELTER #3
CONSTRUCTION LIMITS
SEE CG113
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
EXISTING POND
EXISTING POND
EXISTING POND
HONOR GUARD
ASPHALT & OVERFLOW
GRAVEL PARKING LOT
262112
CG102 CG103 CG104
CG105 CG106 CG107
CG108 CG109 CG110 CG111
CG112 CG113 CG114 CG115
NEW POND HIGH WATER LEVEL
NEW STORM DRAIN STRUCTURE
SEE CG106
IGC
IGC
V
4+90
0+00
1+
2+00
0+00
1+
9+00
10+00
11+00
11+78
67.07
67.03
HP 67.49
GRADE BREAK
6+
7+
8+
8+
EP: 8+29.52
HP 68.56
LP 68.02
LP 67.68
G R
AD
IN
G
R O
LLO
VER
TR
AN
SITIO
N
ZO
N
E
HP 68.23
LP 66.69
LP 66.52
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 1
CG102y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2
5/
:0
P M
CG102MATCHLINE CG105
M A
TC
H
LI
N
E C
G
N 0 30' 60'
CONSTRUCTION
STAGING AREA
GRADE TO DRAIN
AFTER REMOVAL OF
TEMPORARY GRAVEL
C O
N S
TR
U
C
TI
O N
L
IM
IT
S
JE
PS
ON
PR
AIR
IE
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
2. CRYPT-POND TRANSITION GRADING
SHOWN AS:
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
CONSTRUCTION LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW
10' 4:1
2%-3%
SCALE:1
CRYPT-POND GRADING TRANSITION
N.T.S.
ROLL OVER ZONE CRYPT
FIELD TO POND
GRADE BREAK PER
PLAN LOCATION
262113
SIERRA NEVADA DR.
DR
ROUNDABOUT
ROAD R3
CR
EE
K W
AY
PU
TA
H
EX. 19
IGC
EX. 20
IGC
EX. 22
IGC
EX. 16
IGC
EX. 18
TG
EX. 21
IGC
3+00
4+
0+00
1+00
2+00
7+00
8+00
HP 67.88
67.07
HP 67.49
GRADE BREAK
5:
-0 +0
GRADING
ROLLOVER
TRANSITION
ZONE HP 66.26
LP 66.70
GRADE BREAK
G
RADE BREAK
GRADE BREAK AT 69 CONTOUR
G R
AD
IN
G R
O
LL
O
VE
R
TR
AN
SI
TI
O
N Z
O N
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 2
CG103y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2
5/
:0
P M
MATCHLINE CG106
M A
TC
H
LI
N
E C
G
N 0 30' 60'
CG103
CONSTRUCTION LIMITS
TR
AN
SM
ISSIO
N
LIN
E EASEM
EN
T
TR
AN
SM
ISSIO
N
LIN
E EASEM
EN
T
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATIONCONSTRUCTION LIMITS
C O
N
STR
U C
TIO
N
LIM
ITS
CAD IJW 262114
ROUNDABOUT
ROAD R3
SIERRA NEVADA DR.
SIERRA NEVADA DR.
EX. 1
EX. 2
PPC
EX. 14
IGC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 3
CG104y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2
5/
:0
P M
MATCHLINE CG107
N 0 30' 60'
CG104
1. ELEVATIONS SHOWN INDICATE TOP
BACK OF CURB ELEVATION UNLESS
OTHERWISE NOTED.
2. CONTRACTOR TO VERIFY ALL EXISTING
ELEVATIONS PRIOR TO CONSTRUCTION.
3. USE CARE DURING EARTH MOVING OR
EXCAVATING IN THE VICINITY OF
EXISTING UTILITIES, SO AS TO NOT TO
DISTURB OPERATIONS. COORDINATE
OPERATIONS WITH UTILITY OWNER AND
RE PRIOR TO CONSTRUCTION.
4. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
C O
N S
TR
U
C
TI
O N
L
IM
IT
S
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CAD IJW
1. REFER TO SHEETS CR120 AND CR121
FOR NEW SOLANO DRIVE AND
CORTEGE LANE PAVEMENT
GEOMETRY.
CONSTRUCTION NOTES
262115
SOLANO DR.
SOLANO DR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 8' 16' 32'
SCALE:#
DETAIL 2
DETAIL 1
1"=XX
GRADING PLAN 4
CG105y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG108
M A
TC
H
LI
N
E C
G
N 0 30' 60'
LEGEND
CG105
MATCHLINE CG102
COLUMBARIA COURT 3
SEE SHEETS LC104 -
LC109 FOR GRADING
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
1. ELEVATIONS SHOWN INDICATE TOP
BACK OF CURB ELEVATION UNLESS
OTHERWISE NOTED.
2. CONTRACTOR TO VERIFY ALL EXISTING
ELEVATIONS PRIOR TO CONSTRUCTION.
3. USE CARE DURING EARTH MOVING OR
EXCAVATING IN THE VICINITY OF
EXISTING UTILITIES, SO AS TO NOT TO
DISTURB OPERATIONS. COORDINATE
OPERATIONS WITH UTILITY OWNER / VA
COR PRIOR TO CONSTRUCTION.
NOTES
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
C O
N S
TR
U
C
TIO
N
LIM
ITS
CAD IJW 262116
SERVICE RD.
PUTAH CREEK
WAY
JE
PS
ON P
RA
IRI
E D
R.
NEW STORM DRAIN STRUCTURE
CONSTRUCTION
STAGING AREA
GRADE TO DRAIN
AFTER REMOVAL OF
TEMPORARY GRAVEL
TEMPORARY ACCESS ROAD
EX. 23
EX. 25
PPC
EX. 27
PPC
IGC
COLUMBARIUM
PPC
0+00
1+00
2+00
0+00
1+
2+
3+
4+
5+
6+
3+00
4+00
5+00
6+00
G R
A D
E B
R E
A K
G
RADE BREAK
G R
A D
E
B R
E A
K
4:1
4:1
4:1
4:1
GRADING
ROLLOVER
TRANSITION
ZONE
GRA
DE
B
RE
AK
A T
C
ONT
OUR
LP 67.92
HP 68.48
HP 67.58
LP 66.95
HP 67.95
LP 66.38
LP 65.93
LP 65.60
G R
AD
IN
G R
O
LL
O
VE
R
TR
AN
SI
TI
O
N Z
O N
E
FG 78.9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 5
CG106y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG103
M A
TC
H
LI
N
E C
G
N 0 30' 60'
CG106
MATCHLINE CG109
M A
TC
H
LI
N
E C
G
POND 1
NWL = DRY
HWL = 64.50
TR
AN
SM
ISSIO
N
LIN
E EASEM
EN
T
TR
AN
SM
ISSIO
N
LIN
E EASEM
EN
T
COLUMBARIA COURT 3
SEE SHEETS LC104 -
LC109 FOR GRADING
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
2. CRYPT-POND TRANSITION GRADING
SHOWN AS:
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
POND 1
NWL = DRY
HWL = 64.50
C O
N
STR
U C
TIO
N
LIM
ITS
CAD IJW
10' 4:1
2%-3%
SCALE:1
CRYPT-POND GRADING TRANSITION
N.T.S.
ROLL OVER ZONE CRYPT
FIELD TO POND
GRADE BREAK PER
PLAN LOCATION
262117
LA
KE
BE
RR
YE
SS
A D R.
SIERRA NEVADADRIVE
PUTAH CREEK WAY
FINISHED GRADE ELEVATION
(AT PUMP STATION)
TS 78.9 TOP OF SLAB ELEVATION
(AT PUMP STATION)
EX. 3
EX. 9
IGC
EX. 10
IGC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 6
CG107y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG110 & CG111
N 0 30' 60'
CG107
MATCHLINE CG104
M A
TC
H
LI
N
E C
G
1. ELEVATIONS SHOWN INDICATE TOP
BACK OF CURB ELEVATION UNLESS
OTHERWISE NOTED.
2. CONTRACTOR TO VERIFY ALL EXISTING
ELEVATIONS PRIOR TO CONSTRUCTION.
3. USE CARE DURING EARTH MOVING OR
EXCAVATING IN THE VICINITY OF
EXISTING UTILITIES, SO AS TO NOT TO
DISTURB OPERATIONS. COORDINATE
OPERATIONS WITH UTILITY OWNER / VA
COR PRIOR TO CONSTRUCTION.
4. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
EXISTIN
G
PAVEM
EN
T
AD
M
IN
ISTR
ATIO
N
BU
ILD
IN
G
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
C O
N
STR
U C
TIO
N
LIM
ITS
CONSTRUCTION LIMITS
CAD IJW
1. REFER TO SHEETS CR120 AND CR121
FOR NEW SOLANO DRIVE AND
CORTEGE LANE PAVEMENT
GEOMETRY.
CONSTRUCTION NOTES
262118
CORTEGE LANE
BO
T
T O
M O
F S
W A
L E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 7
CG108y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG112
M A
TC
H
LI
N
E C
G
N 0 30' 60'
C O
N S
TR
U
C
TI
O N
L
IM
IT
S
CG108
MATCHLINE CG105
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW 262119
EX. POND
(1.2 ac.)
PPC
PPC
PPC
7+
8+
9+00
10+00
11+00
12+00
+0
+0
G R
AD
E BR
EAK
GRADE BREAK
4:1
LP 66.18
HP 68.01
LP 66.96
HP 67.43
G
RADE BREAK
LP
0+
1+
2+
G R
AD
E BR
EAK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 8
CG109y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG106
M A
TC
H
LI
N
E C
G
N 0 30' 60'
CG109
MATCHLINE CG113
M A
TC
H
LI
N
E C
G
POND 1
NWL = DRY
HWL = 64.50
G R
AD
IN
G R
O
LL
O
VE
R
TR
AN
SI
TI
O
N Z
O N
E3
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW
POND 1
NWL = DRY
HWL = 64.50
262120
LAKE BERRYESSA DR.
SUTTER BUTTE DR.
NEW STORM DRAIN STRUCTURE
BLEND GRADES TO FIT
EXISTING SLOPES AT
PROJECT LIMITS
EX. 5
EX. 7
IGC
EX. 28
PPC
EX. 8
IGC
IGC
IGC
PPC
VF
D
T
2+00 3+00
0+00
1+00
2+
3+
G R
A D
E B
R E A K
GRADE BREAK
G R
AD
IN
G R
O
LL
O
VE
R
TR
AN
SI
TI
O
N Z
O N
E
HP 67.29
LP 67.07LP 66.93
LP 66.96
HP 67.40
2+
3+00
4+00
5+00
6+00
7+00
7+47
HP 67.70
LP 66.23
HP 67.30
LP 66.90
GRADE BREAK
GRADE BREAK
GRADE BREAK
GRADE BREAK
GRADE BREAK AT 69 CONTOUR
G
RA
DE
B
RE
AK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 9
CG110y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG114
M A
TC
H
LI
N
E C
G
N 0 30' 60'
LEGEND
CG110
M A
TC
H
LI
N
E C
G
MATCHLINE CG107
CONSTRUCTION LIMITS
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
CAD IJW 262121
R O U N D A B O U T 1
SUTTER BUTTE DR.
SOLANO DR.
GRADE BREAK
G R
A D
E B
R E
A K
G R
A D
E
R
E A
K
0+00
1+00
2+
3+00
LP 65.63
HP 67.44
ADJUST ELECTRICAL
HAND HOLE AS
NECESSARY TO
FINISHED GRADE
VERIFY DEPTH TO ELECTRICAL
LINE. NOTIFY ENGINEER IF
CONFLICT WITH GRADING EXISTS ADJUST ELECTRICAL
HAND HOLE AS
NECESSARY TO
FINISHED GRADE
GRADE BREAK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 10
CG111y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG115
M A
TC
H
LI
N
E C
G
N 0 30' 60'
LEGEND
CG111
MATCHLINE CG107
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
CAD IJW
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
C O
N S
TR
U
C
TI
O N
L
IM
IT
S
1. REFER TO SHEETS CR120 AND CR121
FOR NEW SOLANO DRIVE AND
CORTEGE LANE PAVEMENT
GEOMETRY.
CONSTRUCTION NOTES
262122
DR
IVE
SUTTER BUTTE
CORTEGE LANE
O
TTO
M
O F S
W A
LE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 11
CG112y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
M A
TC
H
LI
N
E C
G
N
0 30' 60' CG112
MATCHLINE CG108 LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW
C O
N S
TR
U
C
TI
O N
L
IM
IT
S
262123
IGC
IGC
33A
PPC
33B
4+90
0+00
1+
2+00 3+00
4+
15+71
+0
07+31
0+00
1+00
2+00
3+00
4+00
5+00
6+
7+
18+45
9+0010+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00 18+00
BO
TTO
M O
F SW
ALE
G R
A D
E B
R E
A K
GRADING
ROLLOVER
TRANSITION
ZONE
GRADE BREAK
GRADE BREAK
HP 69.07
HP 68.55
LP 67.85
LP 67.77
HP 71.06
LP 69.34
HP 71.06
LP 68.72
LP 68.64
LP 66.66
HP 69.21
HP 69.22
LP 67.79
LP 67.76
GRADE BREAK
GRADE B
REAK
GRADE BREAK
CROSS SLOPE OF
DECOMPOSED GRANITE PATH
IS 2% TOWARDS THE SOUTH
COORDINATE FINAL EAST/WEST LOCATION OF
PIPE OUTLET WITH VA RE AND FARMER FOR
BEST PLACEMENT WITH RESPECT TO FIELD
DRAINAGE FOR AGRICULTURAL LAND TO THE
WEST. NOTIFY EOR OF FINAL LOCATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 12
CG113y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG109
M A
TC
H
LI
N
E C
G
N
0 30' 60' CG113
M A
TC
H
LI
N
E C
G
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW
POND 1
NWL = DRY
HWL = 64.50
POND 2
NWL = DRY
HWL = 64.50
CONSTRUCTION LIMITS
262124
SOLANO DR.
SOLANO DR.
ROAD A
ROUNDABOUT
ROAD R2
FG 78.9
FINISHED GRADE ELEVATION
(AT PUMP STATION)
TS 78.9 TOP OF SLAB ELEVATION
(AT PUMP STATION)
0+00
1+
4+
4+
5+
6+00
7+00
8+00
0+
1+
2+00
3+00
4+00
5+00
6+
9+00
10+00
11+00
12+00
13+00
14+00
15+00
T14
BOTTOM O
F SWA LE
GRADING
ROLLOVER
TRANSITION
ZONE
G R
A D
E B
R E
A K
HP 67.83
LP 67.19
HP 69.37
LP 67.14
LP 67.57
HP 67.40
LP 66.93 HP 67.45
LP 66.99
HP 67.95
LP 66.43HP 68.15
HP
.5
LP 67.07
HP 67.69
LP 66.07
HP 69.50
GRAD
E
BR
EA
K
G R
AD
E
BR
EA
K
GRADE BREAK
GRADE BREAKGRADE BREAK
BOTTOM OF SWALE
G
RADE BREAK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 13
CG114y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG110
M A
TC
H
LI
N
E C
G
N
0 30' 60' CG114
M A
TC
H
LI
N
E C
G
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW
POND 1
NWL = DRY
HWL = 64.50
POND 2
NWL = DRY
HWL = 64.50
COMMITTAL SHELTER #3
FFE = 71.0
SEE SHEET AG101 FOR
GRADING
262125
ROUNDABOUT
ROAD R1
SUTTER
COMMITTAL SHELTER RD.
SOLA
NO DR.
ACCESS RD.
BUTTE DR.
4+00
5+
6+
7+00
8+00
HP 67.44
LP 65.70
HP 66.78
LP 65.89
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRADING PLAN 14
CG115y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/2 5/
:0
P
M
MATCHLINE CG111
M A
TC
H
LI
N
E C
G
N
0 30' 60' CG115
LEGEND
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
CAD IJW
C O
N
ST
R U
C
TI
O N
L
IM
IT
S
CONSTRUCTION
LIMITS
262126
SUTTER BUTTE DR.
SU
TT
ER
BUTTE DR.COMMITTAL
SHELTER 2
File details come from the government source that posted it.