36C10F18R0581-059.pdf
PDF 3 MB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 10_SVNC2_STORM_CS504-CS506.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
STORM DETAILS 4
CS504y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
D R
A
IN
A G
E
D E
TA
IL
S
.d w g
/2
5/
2:
P M
CD EH
TYPICAL FOR ALL SUBMERSIBLE DRIVES
NOTES:
1.
2.
OVERALL PAD DIMENSIONS SHALL BE DETERMINED
FROM ELECTRICAL PLANS AND ADJUSTED AS REQ'D
TO SUIT EQUIP FURNISHED.
HOUSEKEEPING PADS ARE NOT REQUIRED ON
EQUIP PADS.
FINISHED GRADE
#5@12"
SCALE:1
CONCRETE GROUND ROD BOX
NTS
SCALE:2
SUBMERSIBLE PUMP CONNECTION DETAIL
NTS SCALE:3
MODULAR EQUIPMENT RACK
NTS
SCALE:4
ELECTRICAL EQUIPMENT PAD
NTS SCALE:5
PPC PUMP (CRYPT UNDERDRAINS)
NTS SCALE:6
BEDDING METHODS FOR RCP PIPE
NTS
262151
NOTE:
SEE STORM DRAIN PLAN FOR ALL INVERT ELEVATIONS AT PPC
PUMPS.
SECTION A-A
SCALE: NTS
PLAN
SCALE: NTS
8"X8"X4" NEMA 4X JB WITH
MOTOR LEAD AND MOTOR
MONITOR CONDUCTOR
TERMINALS
SST KELLEM GRIPMOTOR
CABLE
304 SST STRUT FRAME,
PEDESTAL OR GUARDRAIL
GROUND TO DRIVEN
GROUND ROD
#6 CU
NOTE:
PUMP STATION PANEL MOUNTED
ON MODULAR EQUIPMENT RACK.
FITTING
NOTES:
COMBINED EQUIPMENT LOADS PER 36" SPAN
SHALL NOT EXCEED 500 LBS.
PROVIDE GROUNDING FOR OUTDOOR INSTALLATIONS.
ANCHORS: STAINLESS STEEL, 1/2" DIAMETER,
FINISH GRADE
DOUBLE
MODULAR
STRUT
ANGULAR
FITTING
TYPICAL
3 1/2" EMBEDMENT.
1.
2.
3.
6" THICK
GRAVEL BASE
APPROVED EQUAL
CONNECTOR. CADWELD OR
GROUND ROD/ELECTRODE
ON SINGLE LINE DIAGRAM
CONDUCTOR-SIZE AS SHOWN
COPPER GROUNDING ELECTRODE
COPPER GROUND ROD
3/4" x 30'
APPROVED EQUAL
BOX, CHRISTY F8 OR
CONCRETE GROUND ROD
8-1/4"
1-3/8"
11-3/4"
9-3/4"
7-1/8"
9"
12-3/8"
2"
8-7/8"
ELECTRICAL
EQUIPMENT PAD
EQUIPMENT MOUNTED
TO MODULAR STRUT
ADDITIONAL SECTION
IF REQUIRED BY
APPLICATION
FLAT PLATE
FITTING, TYPICAL
MODULAR STRUT
RUBBER CORD
GRIP BOX FITTING
STORM DETAILS 5
CS505y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
D R
A
IN
A G
E
D E
TA
IL
S
.d w g
/2
5/
2:
P M
CD EH
SCALE:3
AREA INLET FRAME AND GRATE (R-2533)
NTS SCALE:4
CURB INLET GRATE (R-3067)
NTS
SCALE:2
STORM DRAIN MANHOLE CASTING (R-1642)
NTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
262152
SCALE:1
TIDEFLEX 18" ULTRAFLEX CHECKMATE CHECK VALVE
NTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
STORM DETAILS 6
CS506y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
D R
A
IN
A G
E
D E
TA
IL
S
.d w g
/2
5/
2:
P M
CD EH
SCALE:1
TIDEFLEX 36" ULTRAFLEX CHECKMATE CHECK VALVE
NTS
262153
SCALE:4
PIPE HEADWALL, ENDWALL WINGWALL STRUCTURE (PUMP STATION #2 OUTLET)
NTSSCALE:3
PIPE HEADWALL, ENDWALL WINGWALL STRUCTURE (STORM NETWORK 1600)
NTS
SCALE:2
PIPE HEADWALL, ENDWALL WINGWALL STRUCTURE (STORM NETWORK 1500)
NTS
File details come from the government source that posted it.