36C10F18R0581-0001005.pdf
PDF 553 KB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 0001 14626_GRADING ENLARGEMENTS 2-CG105 GRADING PLAN 4.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGC2+
3+00
4+00
5+00
T2
GRADE BREAK
GRADE B
EAK
HP 68.58
HP 68.49
LP 67.72
0+
1+00
2+003+003+20
LP 67.32
HP 68.82
GRADE BREAK
GRADE BEAK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h t o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h s o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 8' 16' 32'
SCALE:#
DETAIL 2
DETAIL 1
1"=XX
GRADING PLAN 4
CG105Y
:\1
\1
V
A O
C
FM
P H
A S
E
D E
V O
F S
A C
R A
M E
N
TO
V A
LL
E
Y N
C \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
E N
LA
R
G E
M E
N
TS
.d w g
/1 7/
:5
A
M
MATCHLINE CG108
M A
TC
H
LI
N
E C
G
N 0 30' 60'
LEGEND
CG105
MATCHLINE CG102
COLUMBARIA COURT 3
SEE SHEETS LC104 -
LC109 FOR GRADING
EMERGENCY OVERFLOW ROUTE
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
LP 78.9
HP 78.9
1.1%
MATCH EXISTING ELEVATION
HIGH POINT ELEVATION
LOW POINT ELEVATION
ROAD/LAND GRADE
EXISTING MAJOR CONTOUR
NEW MAJOR CONTOUR
EXISTING MINOR CONTOUR
NEW MINOR CONTOUR
GRADING LIMITS
POND HIGH WATER LEVEL (HWL)
PPC
EX. 13
PPC
78.9 SPOT ELEVATION
ME 78.9
R 78.9 STORM STRUCTURE RIM ELEVATION
NEW LAND DRAINAGE DIRECTION
EOF 78.9 EMERGENCY OVERFLOW ELEVATION
1. ELEVATIONS SHOWN INDICATE TOP
BACK OF CURB ELEVATION UNLESS
OTHERWISE NOTED.
2. CONTRACTOR TO VERIFY ALL EXISTING
ELEVATIONS PRIOR TO CONSTRUCTION.
3. USE CARE DURING EARTH MOVING OR
EXCAVATING IN THE VICINITY OF
EXISTING UTILITIES, SO AS TO NOT TO
DISTURB OPERATIONS. COORDINATE
OPERATIONS WITH UTILITY OWNER / VA
COR PRIOR TO CONSTRUCTION.
NOTES
1. ALL GRADING ROLLOVER TRANSITION
ZONES ARE 30' WIDE ON CENTER OF
GRADE BREAK. TRANSITION SUBGRADE
TO MIRROR FINISHED GRADE
TRANSITION.
NOTES
C O
N S
TR
U
C
TIO
N
LIM
ITS
CAD IJW 262116
SERVICE RD.
PUTAH CREEK
WAY
JE
PS
ON P
RA
IRI
E D
R.
NEW STORM DRAIN STRUCTURE
CONSTRUCTION
STAGING AREA
GRADE TO DRAIN
AFTER REMOVAL OF
TEMPORARY GRAVEL
TEMPORARY ACCESS ROAD
File details come from the government source that posted it.