36C10F18R0581-051.pdf
PDF 2 MB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 05_SVNC2_OPERATIONS.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPC
IGC
IGC
PUTAH
CREEK
W
AY SIERRA NEVADA DR.
LA
KE
BE
RR
YE
SS
A D
RIV
E
JE
PS
ON
PR
AIR
IE
DR
EX. 1
PPC
EX. 19
IGC
EX. 20
IGC
EX. 22
IGC
EX. 16
IGC
EX. 18
TG
EX. 24
IGC
EX. 5
PPC
EX. 23
PPC
EX. 25
PPC
EX. 7
IGC
EX. 2
PPC
EX. 27
PPC
EX. 28
PPC
EX. 26
PPC
EX. 8
IGC
EX. 12
PPC
EX. 11
IGC
EX. 14
IGC
EX. 4
TG
EX. 15
IGC
EX. 3
PPC
EX. 9
IGC
EX. 10
IGC
EX. 13
PPC
EX. 21
IGC
EX. 17
IGC
EX. POND
(1.2 ac.)
PUTAH
DRIVE
ROAD A
BERRYESSA
SOLANO
SUTTER BUTTE DRIVE
SOLANO
IGC
IGC
IGC
IGC
IGC
IGC
IGC
IGC
33A
PPC
PPC
PPC
PPC
PPC
PPC
33B
LAKE
DRIVE
SOLANO
DRIVE
DRIVE
SIERRA NEVADA DR.
CREEK WAY
VF
D
SO
LA
NO
D
RI
VE
SOLANO DRIVE
FOLSOM LAKE WAY
POTAH CREEK WAY
SI
ER
RA
N
EV
AD
A
DR
IV
E
SIERRA NEVADA DRIVE
DE
LT
A W
AY
CENTRAL
VALLEY
W
AY
MIDWAY ROADMIDWAY ROAD MIDWAY ROAD
O-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
CONSTRUCTION
ACCESS & PHASING
y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
G R
A D
IN
G
O V
E R
A
LL
.d w g
/2
5/
0:
A M
24' x 60' TEMPORARY
R.E. FIELD OFFICE
TEMPORARY GRAVEL
CONSTRUCTION STAGING
AREA (120' x 160')
CEMETERY MAINTENANCE
ACCESS THROUGH
CONSTRUCTION SITE
TEMPORARY
CONSTRUCTION
FENCE TEMPORARY
CONSTRUCTION
FENCE
BERM (2017
CONSTRUCTION, TYP.)
BERM (2017
CONSTRUCTION)
LEGEND
CONSTRUCTION TRAFFIC DIRECTIONS
APPROXIMATE CONSTRUCTION LIMITS
TEMPORARY CONSTRUCTION FENCE W/SCREENING
CONSTRUCTION ZONE 1
CONSTRUCTION ZONE 2
CONSTRUCTION ZONE 3
MB EH
TEMPORARY GRAVEL
CONSTRUCTION ACCESS
ROAD (24' WIDE)
TEMPORARY POWER
ELECTRIC OVERHEAD
LINE (BY CONTRACTOR)
ROCK CONSTRUCTION
ENTRANCE
CONTRACTOR
ENTRANCE TO SITE
N 0 120' 240'
ZONE 1
ZONE 2ZONE 2
ZONE 1
TEMPORARY GRAVEL CONSTRUCTION
ACCESS ROAD (24' WIDE).
HWL
TEMPORARY
CONSTRUCTION
FENCE
TEMPORARY GRAVEL
CEMETERY MAINTENANCE
ACCESS ROAD (16' WIDE)
TEMPORARY
CONSTRUCTION
FENCE
TEMPORARY
CONSTRUCTION
ACCESS ROAD
CROSSING
END OF
CONSTRUCTION
TRAFFIC / ACCESS
SELECTIVE TREE & SHRUB REMOVAL ALLOWED TO BEST FIT
CONSTRUCTION ACCESS ROUTE. REPLACE IN KIND ALL TREES AND
SHRUBS REMOVED OR DAMAGED (CROSS-RIP RESTORED SOIL TO
12" DEPTH; COMPACT TO 85% RELATIVE DENSITY, SOILS AMENDED
AND THEN PLANTED). REPAIR AND REPLACE IN KIND IRRIGATION
EQUIPMENT, LINES, CONTROLLERS, HEADS DAMAGED BY
CONSTRUCTION ACTIVITIES. LOCATION OF TEMPORARY GRAVEL
ROAD AND REMOVALS TO BE APPROVED BY R.E.
REGRADE AND SEED
EXISTING BERM TO
ORIGINAL ELEVATION AT
COMPLETION OF PROJECT.
GRADE ACCESS THROUGH BERM
USING 4% MAX. ROAD GRADE.
TEMPORARY GRAVEL
CEMETERY MAINTENANCE
ACCESS ROAD (16' WIDE).
FIELD LOCATE FINAL
ALIGNMENT WITH INPUT
FROM RE. TO BE REMOVED
AFTER CEMETERY
CONSTRUCTION.
ADMIN EAST (NIGHT/WEEKEND WORK ONLY)
COMPLETE ALL WORK PRIOR TO START OF
CORTEGE LANE EXPANSION.
SEE O-501 FOR:
1. GENERAL NOTES
2. CONSTRUCTION PHASING
3. CRITICAL CONSTRUCTION NOTES
(NIGHT & WEEKEND HOURS)
CONTRACTOR TRAILER N.I.C.
VERIFY FINAL LOCATION
WITH RESIDENT ENGINEER.
TEMPORARY 16' WIDE
LOCKABLE GATE.
33B 33A
END FENCE AT
LANDSCAPED AREA
CONSTRUCTION LIMIT
MAINTAIN RURAL ACCESS ROUTE FOR
SCWA MAINTENANCE ACCESS.
26243
O-101
STOCKPILE IN OPEN AREAS
WITHIN THE CONSTRUCTION
LIMITS. CONFIRM LOCATION
WITH RESIDENT ENGINEER.
ZONE 3
GNSS INSTALLATION AREA.
(ZONE 3 CONSTRUCTION)
TEMPORARY
WATERMAIN BYPASS
R O
UNDA BOUT
R O
UNDA BOUT
R O
UNDA BOUT
MIDWAY ROAD
PPC
IGC
IGC
PUTAH
CREEK
W
AY
LA
KE
BE
RR
YE
SS
A D
RIV
E
JE
PS
ON
PR
AIR
IE
DR
PUTAH
IGC
IGC
COLUMBARIUM
SIERRA NEVADA DR.
CREEK WAY
ROUNDABOUT
ROAD R3
SO
LA
NO
D
RI
VE
CENTRAL
VALLEY
W
AY
EX. 1
PPC
EX. 2
PPC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
SITE ACCESS
y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _A
C C
E S
S O
V E
R A
LL
.d w g
/2 5/
0:
A
M
SCALE:1
TEMPORARY CONSTRUCTION STAGING AREA
1" = 60' (30"x42" PAPER) N
0 60' 120'
SCALE:2
SOLANO DRIVE CONSTRUCTION ACCESS
1" = 60' (30"x42" PAPER) N
0 60' 120'
SCALE:3
STAGING AREA AND TEMPORARY ACCESS SECTION
NTS
KEY NOTES
1 GRADE TEMPORARY CONSTRUCTION STAGING AREA TO DRAIN.
CONSTRUCTION ACCESS LOCATION TO ADMIN EAST. COORDINATE
USE WITH FINAL DEMOLITION OF THE ASPHALT IN THIS "U-TURN"
LOCATION.
24' x 60' TEMPORARY R.E.
FIELD OFFICE
TEMPORARY GRAVEL
CONSTRUCTION STAGING
AREA (120' x 160').
SEE DETAIL 3/L1.02.
TEMPORARY GRAVEL
CONSTRUCTION ACCESS
ROAD (24' WIDE)
TEMPORARY POWER ELECTRIC
OVERHEAD LINE (BY CONTRACTOR).
FIELD LOCATE TO BEST FIT LOCKED
CONSTRUCTION STAGING YARD.
ROCK CONSTRUCTION
ENTRANCE, 50' MIN. LENGTH
CONTRACTOR
ENTRANCE TO SITE
TEMPORARY GRAVEL
CONSTRUCTION ACCESS
ROAD (24' WIDE)
6"
6" CRUSHED AGGREGATE BASE
NATIVE SOIL
LEGEND
APPROXIMATE CONSTRUCTION LIMITS
TEMPORARY CONSTRUCTION FENCE W/SCREENING
TEMPORARY
CONSTRUCTION
FENCE
MB EH
CONTRACTOR TO OBTAIN
COUNTY R.O.W.
ACCESS/ENTRANCE PERMIT.
TEMPORARY GRAVEL
CEMETERY MAINTENANCE
ACCESS ROAD (16' WIDE)
CONTRACTOR TRAILER N.I.C.
VERIFY FINAL LOCATION
WITH RESIDENT ENGINEER.
LOCKABLE 24' GATE
26244
O-102
CONTRACTOR TO OBTAIN SOLANO
IRRIGATION DISTRICT ENCROACHMENT
PERMIT. INSTALL STEEL PLATE OVER
INVERTED SIPHON.
EXISTING CANAL
CROSS-RIP RESTORED SOIL
TO 12" DEPTH; COMPACT TO
85% RELATIVE DENSITY,
SOILS AMENDED AND THEN
PLANTED.
CROSS-RIP RESTORED SOIL
TO 12" DEPTH; COMPACT TO
85% RELATIVE DENSITY,
SOILS AMENDED AND THEN
PLANTED.
SCALE:
TEMPORARY CHAIN-LINK FENCE
NTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i l
P a t h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
SITE DETAILS
Y v a o c m p a s e d e v o f s a c r a m e n t o v a l l e y n c D w g C d C i v i l C
A
C C
E S
S
O
V E
R A
L L d w g
A
M
GENERAL NOTES
SITE ACCESS
1. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH VA SVNC
(SACRAMENTO VALLEY NATIONAL CEMETERY) AND MINIMIZE IMPACTS TO THE
CEMETERY ACTIVITIES. CONSTRUCTION ACTIVITIES MAY BE RESTRICTED DURING
COMMITTAL SERVICES AND MUST BE COORDINATED WITH SVNC ON DAILY BASIS.
2. THE CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SEQUENCE PLAN TO BE
APPROVED BY RESIDENT ENGINEER (RE) BEFORE CONSTRUCTION. THE SEQUENCING
PLAN INCLUDED IN THE CONTRACT DOCUMENTS SHALL BE INCORPORATED INTO THE
CONTRACTOR'S CONSTRUCTION SEQUENCE PLAN.
3. CONSTRUCTION TRAFFIC TO USE MIDWAY ROAD CONSTRUCTION ENTRANCE ONLY.
ALL DAMAGE TO MIDWAY ROAD SHALL BE REPAIRED TO MATCH EXISTING SECTION BY
CONTRACTOR AT NO COST TO THE GOVERNMENT.
4. ONLY CONSTRUCTION WORKER PERSONAL VEHICLES MAY PARK IN THE CONTRACTOR
PARKING AND STAGING LOTS.
5. CONSTRUCTION VEHICLE PARKING LIMITED TO WORK ZONES ONLY. NO PARKING ON
CEMETERY ROADS.
6. THE CONTRACTOR IS TO VERIFY PARKING FOR ALL CONSTRUCTION PERSONNEL WITH
RE.
7. MAINTAIN OPEN ACCESS TO ALL PARTS OF CEMETERY AT ALL TIMES. SCHEDULE
LIMITED ROAD CLOSURES FOR UTILITY WORK WITH SENIOR RESIDENT ENGINEER.
8. THE CONTRACTOR SHALL PROVIDE TEMPORARY CHAIN LINK FENCE AND TEMPORARY
SIGNAGE TO PREVENT ACCESS BY THE PUBLIC TO THE CONSTRUCTION AND STAGING
AREAS.
9. BEFORE STARTING CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE A COMPLETE
ACCESS PATH / ROUTE FROM THE PROPOSED CONSTRUCTION STAGING AREA ON SITE
TO THE AREAS OF WORK TO BE APPROVED BY RE. THE CONTRACTOR SHALL
CONSTRUCT AND USE THE APPROVED PRIMARY CONSTRUCTION ACCESS TO THE
CONSTRUCTION SITE. CONSTRUCTION VEHICLES AND EQUIPMENT ARE EXPRESSLY
PROHIBITED FROM USING THE MAIN ENTRANCE AND EXISTING CEMETERY ROADS.
10. THE CONSTRUCTION VEHICLES SHALL NOT USE EXISTING CEMETERY ROADS EXCEPT
AT DESIGNATED ROAD CROSSINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING THESE CROSSINGS FROM ANY DAMAGE. REPLACE EXISTING ROADWAY
ASPHALT USING MILL AND OVERLAY METHOD FOR ENTIRE LENGTH OF AREA USED AS
ACCESS AT NO COST TO GOVERNMENT. SEE 2/CR122.
11. IF THE EXISTING LIFE SAFETY SYSTEM IS SHUT OFF FOR CONSTRUCTION, THE
CONTRACTOR IS TO PROVIDE A 24 HOUR FIRE WATCH UNTIL THE SYSTEM IS BACK ON
LINE.
12. MAINTAIN ALL ROADS IN CLEAR, SAFE CONDITION. ONGOING STREET SWEEPING SHALL
BE EMPLOYED.
13. THE CONTRACTOR SHALL REMOVE ALL TEMPORARY FACILITIES, FENCING,
CONSTRUCTION DEBRIS AND SIGNAGE BEFORE PROJECT COMPLETION.
14. CONTRACTOR TO MAINTAIN TEMPORARY MAINTENANCE ACCESS ROAD AND
TEMPORARY GRAVEL CONSTRUCTION ACCESS ROAD DURING CONSTRUCTION.
STOCKPILES
1. CONTRACTOR SHALL DETERMINE STOCKPILE LOCATIONS, AND SUBMIT THE LOCATIONS
TO THE SENIOR RESIDENT ENGINEER FOR APPROVAL.
DELIVERIES
1. CONTRACTOR TO COORDINATE CRYPT DELIVERY IN SECTIONS TO UTILIZE STORAGE
LOT FOR THE STAGING OF CRYPTS. STORAGE OF CRYPTS IN OTHER AREAS OF THE
CEMETERY SHALL BE APPROVED BY THE SENIOR RESIDENT ENGINEER.
CONSTRUCTION PHASING NOTES
COMPLETE CONSTRUCTION IN THE FOLLOWING SEQUENCE:
ZONE 1 - MUST BE OPERATIONAL AND TURNED OVER TO CEMETERY FOR FULL USE PRIOR TO
START OF ZONE 2 WORK.
ZONE 2 - OPERATIONS IN WORK ZONE 2 CAN ONLY COMMENCE UPON COMPLETION OF ZONE 1.
COORDINATE EXACT DELINATION OF ZONE 1 AND ZONE 2 LIMIT WITH RE.
ZONE 3 - WORK ZONE 3 CAN RUN CONCURRENTLY WITH WORK IN ZONE 1 OR ZONE 2.
ENCOMPASSES ALL PROJECT WORK NOT IN ZONE 1 OR ZONE 2.
MB EH
CRITICAL CONSTRUCTION NOTES
TIE WIRES OR
CLIPS (TYP.)
LINE POST
TOP RAIL (WHEN PRIVACY BARRIER IS USED)
CHAIN-LINK FABRIC
(9 GAGE, 2" MESH)
TENSION
WIRE
LINE POST
TIE WIRES OR
HOG RINGS (TYP.)
GRADE
HOG RINGS (TYP.)
F A
B R
I C
W
I D
T H
T
Y P
10'-0" MAXIMUM
LINE POSTS TO BE EQUALLY SPACED
NOTES:
1) PROVIDE LOCKABLE SWING
GATE AT ACCESS POINTS.
FIELD LOCATE.
2) INSTALL PLASTIC FENCE
SLATS PER MANUFACTURERS
RECOMMENDATION.
PLASTIC PRIVACY SLATS
(FULL ENCLOSURE)
26245
O-501
SCALE:
30' DOUBLE BARRIER BAR GATE
NTS
15'
GATE LOCKING TABS -
TO RECEIVE PAD LOCK.
NIGHT AND WEEKEND WORK:
COMPLETE PARKING IMPROVEMENTS TO EAST SIDE OF ADMINISTRATION BUILDING AND
U-TURN IMPROVEMENTS (DEMO & INSTALL) ONLY AFTER CEMETERY NORMAL BUSINESS
HOURS.
ALL WORK ON PARKING AND U-TURN IMPROVEMENTS SHALL BE COMPLETED AND ACCEPTED
PRIOR TO START OF WORK ON CORTEGE EXPANSION NEAR WEST SIDE OF ADMINISTRATION
BUILDING.
3'
15'
18"
3'-6"
RECEIVER POST, (BEYOND)
SEE PLAN FOR LOCATION
RECEIVER POST, (BEYOND)
SEE PLAN FOR LOCATION
SCALE:
TREE PROTECTION DETAIL
NTS
ZONE A
DIA=
1/2X
ZONE B; DIA=X
ZONE C; DIA=2X
PLAN VIEW
ELEVATION
VIEW
FENCING/ROOT PROTECTION
4' HIGH FENCING SHALL BE PROVIDED AND MAINTANED AT THE
DRIPLINE OF EACH TREE OR AROUND A GROUP OF TREES AT THE
DRIPLINE OF OUTSIDE TREES.
RE APPROVAL IS REQUIRED FOR USE/ACCESS WITHIN ZONE B.
PERMISSION FOR USE/ACCESS REQUIRES SURFACE PROTECTION
FOR ALL UNFENCED, UNPAVED SURFACES WITHIN ZONE B AT ALL
TIMES.
* SURFACE PROTECTION MEASURES
1. MULCH LAYER, @ 6"-8"DEPTH
2. 3/4" PLYWOOD
3. STEEL PLATES
X
TRENCHING / EXCAVATION
ZONE A (CRITICAL ROOT ZONE)
[DEFINED AS TRUNK DIAMETER MULTIPLIED BY 0.5]
1. NO DISTURBANCE ALLOWED WITHOUT SITE-SPECIFIC
INSPECTION AND APPROVAL OF METHODS TO MINIMIZE ROOT
DAMAGE
2. SEVERANCE OF ROOTS LARGER THAN 2 INCHES IN DIAMETER
REQUIRES AN ENGINEER'S APPROVAL
3. TUNNELLING REQUIRED TO INSTALL LINES 3 FEET BELOW
GRADE OR DEEPER
ZONE B (DRIPLINE)
[MAXIMUM WIDTH OF BRANCH EXTENSION ON TREE]
1. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF
MATERIALS SUBJECT TO RE APPROVAL
2. SURFACE PROTECTION MEASURES REQUIRED
TRENCHING ALLOWED AS FOLLOWS:
- EXCAVATION BY HAND OR WITH HAND-DRIVEN TRENCHER
MAY BE REQUIRED
- LIMIT TRENCH WIDTH. DO NOT DISTURB ZONE A (CRITICAL
ROOT ZONE) MAINTAIN 2/3 OR MORE OF ZONE B (DRIPLINE) IN
UNDISTURBED CONDITION
3. TUNNELLING MAY BE REQUIRED FOR TRENCHES DEEPER
THAN 3 FOOT
4. USE OF PNEUMATIC AIR WAND AND EXCAVATION MAY BE
CONSIDERED WHERE THE TRENCH DEPTH DOES NOT EXCEED
4 FEET
ZONE C (ABSORBING ROOT ZONE)
[DEFINED AS TRUNK DIAMETER MULTIPLIED BY 2.0]
1. OPERATION OF HEAVY EQUIPMENT AND OR STOCKPILING OF
MATERIALS SUBJECT TO RE APPROVAL
2. SURFACE PROTECTION MEASURES MAY BE REQUIRED AND IS
TO BE DETERMINED BY RE
TRENCHING WITH HEAVY EQUIPMENT ALLOWED AS FOLLOWS:
- MINIMIZE TRENCH WIDTH
- MAINTAIN 2/3 OR MORE OF ZONE C IN UNDISTURBED
CONDITION
- OR AS SPECIFIED BY RE
TREE PROTECTION FENCE - 4' HT
File details come from the government source that posted it.