4" DIA. PERFORATED HDPE
SUBDRAIN PIPE. SEE LC107 -
LC109 FOR INVERT ELEVATIONS
AND % SLOPE
CAP END
VARIES, SEE PLANS
COLUMBARIUM FOOTING, SEE STRUCTURAL
NATURAL STONE
VENEER DIVIDER
WALL
COLUMBARIUM
NICHES
NATURAL STONE
VENEER END WALL
COLUMBARIUM FOOTING,
SEE STRUCTURAL
2" MIN.
CLEARANCE
EQ.
EQ.
NATURAL STONE VENEER
DIVIDER WALL
4" DIA. PERFORATED
HDPE SUBDRAIN PIPE
COMPACTED
AGGREGATE BASE
THICKENED EDGE
CONCRETE SIDEWALK.
SEE 6/CR501
2" EXPANSION JOINT
4" DIA. PERFORATED HDPE
SUBDRAIN PIPE
COLUMBARIUM NICHES
END WALL (BEYOND)
COLUMBARIUM FOOTING,
SEE STRUCTURAL
THICKENED EDGE
CONCRETE SIDEWALK
PEA GRAVEL FLOWER STRIP
WRAPPED IN GEOTEXTILE
FABRIC
COMPACTED
AGGREGATE BASE
EQ.
EQ.
SEE
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F ile
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g h th in ch o n e fo o t o n e-h al f in ch o n e fo o t th re e-q u ar te rs in ch o n e fo o t
6" o n e in ch o n e fo o t o n e an d o n e-h al f in ch o n e fo o t th re e in ch es o n e fo o t
6"
6"
6"
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
STORM DETAILS 1
CS501y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
D R
A
IN
A G
E
D E
T A
IL
S
.d w g
/2 5/
2:
P
M
CD EH
SCALE:4
STORM DRAIN OUTFALL
N.T.S. SCALE:5
LOW IMPACT DEVELOPMENT BIORETENTION FILTRATION TRENCH
N.T.S.
SCALE:3
COLUMBARIUM PERFORATED UNDERDRAIN PIPE
1/2" = 1' (30"x42" PAPER)SCALE:1
STORM DRAIN MANHOLE
N.T.S. SCALE:2
STORM DRAIN MANHOLE FRAME AND COVER
N.T.S.
SCALE:6
PERFORATED UNDERDRAIN PIPE
N.T.S.
0 1' 2' 4'
COLUMBARIUM PLAN
SECTION A-A' SECTION B-B'
A-A'
CS501
B-B'
CS501
262148
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F ile
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g h th in ch o n e fo o t o n e-h al f in ch o n e fo o t th re e-q u ar te rs in ch o n e fo o t
6" o n e in ch o n e fo o t o n e an d o n e-h al f in ch o n e fo o t th re e in ch es o n e fo o t
6"
6"
6"
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
STORM DETAILS 2
CS502y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
D R
A
IN
A G
E
D E
T A
IL
S
.d w g
/2 5/
2:
P
M
CD JN
SCALE:2
STORM DRAIN CURB INLET- TYPE A PIPES > 24"
NTS SCALE:3
CURB INLET TYPE A
NTS SCALE:4
FIELD INLETS
NTS
SCALE:5
STORM DRAIN CURB INLET- TYPE A PIPES < 24"
NTS
SCALE:1
STORM DRAIN CURB INLET- TYPE A PIPES < 24"
NTS
SCALE:6
STORM DRAIN CURB INLET- TYPE A PIPES < 24"
NTS
REFER TO STORM
DRAIN PLAN SHEET
FOR RIM ELEVATIONS.
REFER TO STORM
DRAIN PLAN SHEET
FOR RIM ELEVATIONS.
4" F
O R
2"
-2 4"
P
IP
E 6"
F O
R
0" -6
0" P
IP
E
6"
M
IN
. C O
V E
R T
O R
IG
ID
P A
V E
M E
N T
, H
M
IN
. C O
V E
R T
O F
LE
X
IB
LE
P A
V E
M E
N T
, H
RECOMMENDED MINIMUM TRENCH WIDTHS
MINIMUM RECOMMENDED COVER BASED ON
VEHICLE LOADING CONDITIONS**
* VEHICLES IN EXCESS OF 75T MAY REQUIRE ADDITIONAL COVER
**SEE BACKFILL REQUIREMENTS IN NOTE 6.
NOTES:
1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW
APPLICATIONS", LATEST ADDITION
2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED.
3. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH
BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL.
4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" (100mm) FOR 4"-24" (100mm-600mm); 6" (150mm) FOR 30"-60" (750mm-1500mm).
5. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN THE PIPE ZONE EXTENDING NOT
LESS THAN 6" ABOVE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR
MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION.
6. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. FOR TRAFFIC APPLICATIONS WITH LESS THAN FOUR FEET OF COVER, EMBEDMENT OF THE PIPE SHALL BE USING ONLY A CLASS I OR CLASS II BACKFILL.
MIN. TRENCH WIDTH
(SEE TABLE)
MAXIMUM RECOMMENDED COVER BASED
ON VECHICLE LOADING CONDITIONS
FILL HEIGHT TABLE GENERATED USING AASHTO SECTION 12, LOAD
RESISTANCE FACTOR DESIGN (LRFD) PROCEDURE WITH THE
FOLLOWING ASSUMPTIONS:
NO HYDROSTATIC PRESSURE,
UNIT WEIGHT OF SOIL (Ys) = 120 PCF
SCALE:7
BEDDING METHODS FOR HDPE PIPE
NTS
262149
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F ile
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g h th in ch o n e fo o t o n e-h al f in ch o n e fo o t th re e-q u ar te rs in ch o n e fo o t
6" o n e in ch o n e fo o t o n e an d o n e-h al f in ch o n e fo o t th re e in ch es o n e fo o t
6"
6"
6"
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
STORM DETAILS 3
CS503y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
D R
A
IN
A G
E
D E
T A
IL
S
.d w g
/2 5/
2:
P
M
CD EH
4" M
IN
4"
M
IN
M A
X
M
IN
12" MIN.
M
IN
M
IN
M
IN
M
IN
M
IN
M
IN
9"
MIN.
9"
MIN.
18" MIN.
S
NOTES
1. SEE PROJECT PLANS FOR INVERT ELEVATION.
2. PIPE AND FITTINGS, EXCEPT AS OTHERWISE SHOWN ON HEREON, SHALL BE OF THE SAME MATERIAL AS THE SEWER, UNLESS APPROVED ADAPTERS ARE UTILIZED AND MAY BE ANY OF THE FOLLOWING:
A. VC PIPE
B. PE PIPE
C. ABS SOLID PIPE
D. ABS COMPOSITE PIPE
E. PVC PLASTIC PIPE
3. PIPES AND FITTINGS SHALL BE PROPERLY ALIGNED AND MAINTAINED WHILE CONCRETE IS BEING PLACED AND ALLOWED TO HARDEN. JOINTS FOR PIPES AND FITTINGS SHALL BE MADE PRIOR TO PLACING CONCRETE. CONCRETE FOR BEDDING, ENCASEMENT, AND WALL SUPPORT FOR PIPES AND FITTINGS SHALL BE PLACED UNIFORMLY AROUND
THE PIPE AND FITTINGS AS SHOWN HEREON TO MAINTAIN PROPER ALIGNMENT.
4. THE ACCESS FRAME, COVER AND CAP SHALL BE CAST IRON. THE FINGER HOLES MAY BE DRILLED OUT OR MAY BE
BLOCKED OUT PRIOR TO CASTING; THEY SHALL NOT BE PUNCHED OUT.
5. THE CONTRACTOR, AT HIS OPTION, MAY PLACE EITHER CIRCULAR OR SQUARE CONCRETE PIPE WALL SUPPORTS AS
SHOWN HEREON.
COVER
FRAME
CONCRETE
COLLAR MAY BE
SQUARE OR
CIRCULAR
CONCRETE WALL
SUPPORT FOR TRAFFIC
LOAD CONDITIONS
CONCRETE BASE
COVER AND FRAME ALHAMBRA FDRY.
A-1240 OR APPROVED EQUIVALENT
PAVEMENT PER PLAN CONCRETE
SUPPORT MAY BE LOWERED
ACCESS CAP (11" DIA. x 1/2" THICK WITH
3/4" FINGER HOLE IN CENTER)
CONC. COLLAR MAY BE
SQUARE OR CIRCULAR
OPTIONAL CONSTRUCTION JOINT
RISER SHALL BE THE SAME AS MAIN PIPE
DIAMETER BUT NOT LARGER THAN 6"
INSTALL CAP & MORTAR IF
TERMINAL CLEANOUT. INSTALL
PIPE IF IN-LINE CLEANOUT
FINISHED GRADE FULL
HEIGHT SUPPORT
CONC. WALL SUPPORT
CONC. WALL AND BASE
SUPPORT FOR TRAFFIC
LOAD CONDITION
MAIN PIPE
1/8 BEND
WYE
UNDISTURBED EARTH
INVERT ELEV.
PER PLAN
2" M
IN
2" M
IN
TOP ELEVATION
PER PLAN
HEAVY DUTY - TRAFFIC
APPLICATION
PEDESTRIAN AREA APPLICATION
PAVEMENT SECTION
ZURN Z-1474 HEAVY DUTY
CLEANOUT
OR APPROVED EQUIVALENT
CONCRETE SUPPORT 21" OUTSIDE DIA.
USE AND APPLICATION MAY
REQUIRE GAS AND/OR WATER
TIGHT THREADED PLUG
RISER SHALL BE THE
SAME AS MAIN PIPE DIA.
BUT NOT LARGER THAN 6"
U.O.N
INSTALL CAP AND
MORTAR IF TERMINAL
CLEANOUT. INSTALL PIPE
IF IN-LINE CLEANOUT.
INVERT ELEVATION PER PLAN
FINISH GRADE
ZURN "LEVEL-TROL"
ADJUSTABLE FLOOR CLEANOUT
MODEL ZN-1400, OR APPROVED
EQUIVALENT
PAVEMENT SECTION
THREAD SHIELD
REMOVABLE AFTER
SLAB IS POURED
TRAFFIC LOAD
CONDITION CONCRETE
SUPPORT
SANITARY WYE
SPECIFIED PIPE PER PLAN
SCALE:1
STANDARD CLEANOUT
NTS SCALE:2
CLEANOUT SHALLOW DEPTH- 38" OR LESS
NTS
M
IN
RISER SHALL BE 4" DIAMETER PVC SCH.
40 AND FLUSH WITH CONCRETE WALK.
TOP ELEVATION PER PLAN.
FINISHED GRADE
CONCRETE WALK
OUTLET PIPE
45 DEG.
BENDS
COLUMN FOOTING FOR
COMMITTAL SHELTER
INVERT ELEV.
PER PLAN
2" M
IN
SCALE:4
COMMITTAL SHELTER ROOF DRAIN INTAKE
NTS
CONTINUOUS 6" DIA.
PERFORATED HDPE DRAIN PIPE.
PERFORATIONS POINTED UP.
INVERT PER PLAN. (MIN SLOPE 1.0%).
2" DRAINAGE FILL
6" NATIVE
BACKFILL
CONTINUOUS 10" WIDE TRENCH OF
NO. 3 COARSE AGGREGATE PER
S.S.P.W.C. SEC. 200-1.4
SCALE:3
PERFORATED UNDERDRAIN AT COMMITTAL SHELTER
NTS
BERMING BARRIER CURB
WRAPPED IN GEOTEXTILE FILTER
FABRIC "MIRAFI 140N" OR
APPROVED EQUAL.
SCALE:5
PUMP OUTLET STRUCTURE
NTS
INV = 56.54
INV = 56.00
INV = 63.2
TOP OF SHIELD = 65.0
STAINLESS STEEL
SCOUR SHIELD
BOTTOM OF SHIELD = 60.0
62"
STAINLESS STEEL
SCOUR SHIELD
60" DIA. ROUND
ALL PIPES TO HAVE BOOTED CONNECTIONS
36" TIDEFLEX INSTALLED
25 LF DOWNSTREAM
FROM MANHOLE
SEE 1/CS506
RIM = 67.60
262150
| 10_SVNC2_STORM_CS501 |
| 10_SVNC2_STORM_CS502 |
| 10_SVNC2_STORM_CS503 |