36C10F18R0581-053.pdf
PDF 14 MB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 06_SVNC2_CIVIL SITE_C-121-C-501.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
389 358
329 300
614 580 546 512 479 447 415
613 579 545 511 478 446
612 578 544 510 477
384 354 325 296 270 244 218 195 172
414 383 353 324 295 269 243 217 194 171
445 413 382 352 323 294 268 242 216 193 170
611 577 543 509 476 444 412 381 351 322 293 267 241 215 192 169 148 127 108 91 74
610 576
609 575
508 475 443 411 380542
541 507 474 442 410 379
321 292 266 240 214350
349 320 291 265 239 213
168 147 126 107 90191
190 167 146 125 106 89
72 56 42 30 19 10
608 574 540 473 441 409 378 348506 290 264 238 212 189319 145 124 105 88 71166 41 29 18 9 155
607 573 539 505 472 440 408 377 347 318 289 263 237 211 188 165 144 123 104 87 70 54 40 28 17 8
151 130 111 94 77
150 129 110 93 76
149 128 109 92 75
616 582 548 514 481 449 417
615 581 547 513 480 448
386 356 327 298 272 246 220
416 385 355 326 297 271 245 219
618 584 550 516 483 451 419
617 583 549 515 482 450
418 387
59 45 33 22 13
44 32 21 12 458
57 43 31 20 11 3
153 132
518 493
615 591
590 565 540 515 489 463 437 411 385 359 333 307 281 255 229 203638 614 151 125 100177
201612
50 25
637 613 589 564 539 514 488 462 436 410 384 358 332 306 280 254 228 202 176 150 124 99 74 49 24
624 600 576 551 526 501 475 449 423 397 371 345 319 293 267 241 215 189 163 137 111 86 61 36 11
606 572 538 504 471 439 407 376 346 317 288 262 236 210 187 164 143 122 103 86 69 53 39 27 16 7
60 46 34
196 173 152
357 328 299
593 559 525 491 458 426 394 363 333 304 275 249 223 197 174
N 0 10' 20'
SCALE:1
SECTIONS 35 & 36
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N S
6.
dw g
/2
5/
1:
A M
MBB JPN
ROAD A
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER100
LIMIT OF CRYPTS
CREMAIN - SPACE YIELD
SPACE 4'x4' 618
SECTION 35
GRAVESITE NUMBERING
SECTIONS 35 & 36
C-121
CREMAIN - SPACE YIELD
SPACE 4'x4' 638
SECTION 36
ROUNDABOUT
ROAD 2
35 SECTION NUMBER
36 35
26266
SOLANO DRIVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 10' 20'
SCALE:1
SECTION 37
1" = 10' (30"x42" PAPER)
GRAVESITE LAYOUT -
SECTION 37
C-122y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
7.
dw g
/2
5/
1:
A M
MBB JPN
ROAD A
GRAVESITE GRID POINTS
SECTION 37
.0
0'
80.00'
TYP.
2 TYP.
1 TYP.
LEGEND
1. THE GRAVE PLOT LAYOUT PATTERN IS A
4'-0" X 4'-0" INDIVIDUAL SPACE.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER
REGARDING ANY DISCREPANCIES
BETWEEN FIELD CONDITIONS AND
PLANS PRIOR TO PROCEEDING WITH
WORK. THE WRITTEN DIMENSION SHALL
SUPERSEDE THE DRAWN DIMENSION.
ALL FIELD ADJUSTMENTS MUST BE
APPROVED BY THE SENIOR RESIDENT
ENGINEER PRIOR TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF
CURB, BACK OF WALK, OR CENTER LINE
OR EDGE OF PAVING, UNLESS
OTHERWISE NOTED. ALL DIMENSIONS
ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY
OUT ENTIRE PROJECT. PERMITS SHALL
BE IN PLACE PRIOR TO ANY
CONSTRUCTION ACTIVITIES. NOTIFY
APPROPRIATE UTILITY COMPANY OF
ANY AND ALL PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
GENERAL
SECTION MARKER
GRAVES FACE (DIRECTION)
IN-GROUND CREMAIN GRAVESITE
GRAVESITE GRID MONUMENT
TYPICAL SPACE FOR EACH CREMAIN IS
4'-0" X 4'-0".
RO
UNDABO
UT
RO
AD 2
.0
0'
.0
26267
37 SECTION NUMBER
.0
0'
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
2.
TY
P
2.
TY
P
N 0 10' 20'
SCALE:1
SECTION 37
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 37
C-123y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
7.
dw g
/2
5/
1:
A M
MBB JPN
ROAD A
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER
CREMAIN - SPACE YIELD
SPACE 4'x4'
LIMIT OF CREMAIN PLOT
1,294
SECTION 37
RO
UNDABO
UT
RO
AD 2
26268
37 SECTION NUMBER
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 10' 20'
SCALE:2
SECTION 40
1" = 10' (30"x42" PAPER) y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
0.
dw g
/2
5/
1:
A M
MBB JPN
LAKE BERRYESSA DRIVE
GRAVESITE GRID POINTS
SECTION 40
1. THE GRAVE PLOT LAYOUT PATTERN IS A
3'-0" X 8'-0" INDIVIDUAL SPACE. PRECAST
CONCRETE LAWN CRYPT SHALL BE
INSTALLED CENTERED WITHIN THE
IMAGINARY GRAVE PLOT. SEE DETAILS.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER REGARDING
ANY DISCREPANCIES BETWEEN FIELD
CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN
DIMENSION SHALL SUPERSEDE THE
DRAWN DIMENSION. ALL FIELD
ADJUSTMENTS MUST BE APPROVED BY
THE SENIOR RESIDENT ENGINEER PRIOR
TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF CURB,
BACK OF WALK, OR CENTER LINE OR
EDGE OF PAVING, UNLESS OTHERWISE
NOTED. ALL DIMENSIONS ARE AT 90
DEGREES, UNLESS OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY OUT
ENTIRE PROJECT. PERMITS SHALL BE IN
PLACE PRIOR TO ANY CONSTRUCTION
ACTIVITIES. NOTIFY APPROPRIATE
UTILITY COMPANY OF ANY AND ALL
PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
GRAVESITE LAYOUT NOTES -
GENERAL
LEGEND
SECTION MARKER
GRAVES FACE (DIRECTION)
INTERIOR CRYPT
GRAVESITE GRID MONUMENT
PERIMETER CRYPT
TYPICAL SPACE FOR EACH CREMAIN IS
4'-0" X 4'-0".
2 TYP.
TYP.
.0
0'
TY
P
80.00'
TYP.
KEY MAP: N.T.S.
CREEK
CREEK
BERRYESSA
M A
TC
H
L
IN
E
S E
E P
LA
N
V
IE
W
SCALE:1
SECTION 40
1" = 10' (30"x42" PAPER)
N 0 10' 20'
TYP.
M A
TC
H
L
IN
E
S E
E P
LA
N
V
IE
W
C-124
GRAVESITE LAYOUT -
SECTION 40
26269
40 SECTION NUMBER
40LAKEDRIVE
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
SCALE:1
SECTION 40
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 40
C-125y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
0.
dw g
/2
5/
1:
A M
MBB JPN
LAKE BERRYESSA DRIVE
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER100
LIMIT OF CRYPTS
PERIMETER CRYPT
INTERIOR CRYPT
TOTAL GRAVESITES
SECTION 40
CRYPT/GRAVESITE - SPACE YIELD
1,338
1,546
KEY MAP: N.T.S.
CREEK
CREEK
26270
40 SECTION NUMBER
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 10' 20'
SCALE:1
SECTION 42
1" = 10' (30"x42" PAPER) y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
2.
dw g
/2
5/
1:
A M
MBB JPN
LAKE BER
R
YESSA D
R
IVE
GRAVESITE GRID POINTS
SECTION 42
1. THE GRAVE PLOT LAYOUT PATTERN IS A
3'-0" X 8'-0" INDIVIDUAL SPACE. PRECAST
CONCRETE LAWN CRYPT SHALL BE
INSTALLED CENTERED WITHIN THE
IMAGINARY GRAVE PLOT. SEE DETAILS.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER REGARDING
ANY DISCREPANCIES BETWEEN FIELD
CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN
DIMENSION SHALL SUPERSEDE THE
DRAWN DIMENSION. ALL FIELD
ADJUSTMENTS MUST BE APPROVED BY
THE SENIOR RESIDENT ENGINEER PRIOR
TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF CURB,
BACK OF WALK, OR CENTER LINE OR
EDGE OF PAVING, UNLESS OTHERWISE
NOTED. ALL DIMENSIONS ARE AT 90
DEGREES, UNLESS OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY OUT
ENTIRE PROJECT. PERMITS SHALL BE IN
PLACE PRIOR TO ANY CONSTRUCTION
ACTIVITIES. NOTIFY APPROPRIATE
UTILITY COMPANY OF ANY AND ALL
PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
GENERAL
LEGEND
SECTION MARKER
GRAVES FACE (DIRECTION)
INTERIOR CRYPT
GRAVESITE GRID MONUMENT
PERIMETER CRYPT
TYPICAL SPACE FOR EACH GRAVE IS 3'-0" X 8'-0".
PRECAST CRYPT IS INTENDED TO BE CENTERED
WITH IN EACH GRAVE SPACE.
.0
0'
TY
P
80.00'
TYP.
2 TYP.
TYP.
C-126
GRAVESITE LAYOUT -
SECTION 42
26271
42 SECTION NUMBER
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
SCALE:1
SECTION 42
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 42
C-127y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
2.
dw g
/2
5/
1:
A M
MBB JPN
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER100
LIMIT OF CRYPTS
PERIMETER CRYPT
INTERIOR CRYPT
TOTAL GRAVESITES
SECTION 42
CRYPT/GRAVESITE - SPACE YIELD
1,764
2,002
26272
42 SECTION NUMBER
LAKE BER
R
YESSA D
R
IVE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N
0 10' 20'
SCALE:1
SECTION 44
1" = 10' (30"x42" PAPER)
GRAVESITE LAYOUT -
SECTION 44
y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
4.
dw g
/2
5/
1:
A M
MBB JPN
LAKE BERRYESSA DRIVE
GRAVESITE GRID POINTS
SECTION 44
1. THE GRAVE PLOT LAYOUT PATTERN IS A
3'-0" X 8'-0" INDIVIDUAL SPACE. PRECAST
CONCRETE LAWN CRYPT SHALL BE
INSTALLED CENTERED WITHIN THE
IMAGINARY GRAVE PLOT. SEE DETAILS.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER REGARDING
ANY DISCREPANCIES BETWEEN FIELD
CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN
DIMENSION SHALL SUPERSEDE THE
DRAWN DIMENSION. ALL FIELD
ADJUSTMENTS MUST BE APPROVED BY
THE SENIOR RESIDENT ENGINEER PRIOR
TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF CURB,
BACK OF WALK, OR CENTER LINE OR
EDGE OF PAVING, UNLESS OTHERWISE
NOTED. ALL DIMENSIONS ARE AT 90
DEGREES, UNLESS OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY OUT
ENTIRE PROJECT. PERMITS SHALL BE IN
PLACE PRIOR TO ANY CONSTRUCTION
ACTIVITIES. NOTIFY APPROPRIATE
UTILITY COMPANY OF ANY AND ALL
PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
GENERAL
LEGEND
SECTION MARKER
GRAVES FACE (DIRECTION)
INTERIOR CRYPT
GRAVESITE GRID MONUMENT
PERIMETER CRYPT
TYPICAL SPACE FOR EACH GRAVE IS 3'-0" X 8'-0".
PRECAST CRYPT IS INTENDED TO BE CENTERED
WITH IN EACH GRAVE SPACE.
1 TYP.
2 TYP.
.0
0'
TY
P
57.00'
TYP.
C-128 26273
44 SECTION NUMBER
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
SCALE:1
SECTION 44
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 44
C-129y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
4.
dw g
/2
5/
1:
A M
MBB JPN
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER100
LIMIT OF CRYPTS
PERIMETER CRYPT
INTERIOR CRYPT
TOTAL GRAVESITES
SECTION 44
CRYPT/GRAVESITE - SPACE YIELD
1,344
1,524
26274
44 SECTION NUMBER
LAKE BERRYESSA DRIVE
4 7 11
8 12
Point ID
Northing
1,913,272.81
1,913,216.63
1,913,259.29
1,913,203.11
1,913,146.93
1,913,245.76
1,913,189.58
1,913,133.40
1,913,077.23
1,913,232.24
1,913,176.06
1,913,119.88
1,913,063.70
1,913,162.53
1,913,106.35
1,913,050.17
Easting
6,595,484.84
6,595,475.20
6,595,563.69
6,595,554.05
6,595,544.41
6,595,642.53
6,595,632.90
6,595,623.26
6,595,613.62
6,595,721.38
6,595,711.75
6,595,702.11
6,595,692.47
6,595,790.59
6,595,780.96
6,595,771.32
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 10' 20'
SCALE:1
SECTION 45 (ADD ALTERNATIVE 2)
1" = 10' (30"x42" PAPER) y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
5.
dw g
/2
5/
1:
A M
MBB JPN
SIERRA NEVADA DRIVE
GRAVESITE GRID POINTS
SECTION 45
C-130
GRAVESITE LAYOUT -
SECTION 45
1. THE GRAVE PLOT LAYOUT PATTERN IS A
3'-0" X 8'-0" INDIVIDUAL SPACE. PRECAST
CONCRETE LAWN CRYPT SHALL BE
INSTALLED CENTERED WITHIN THE
IMAGINARY GRAVE PLOT. SEE DETAILS.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER REGARDING
ANY DISCREPANCIES BETWEEN FIELD
CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN
DIMENSION SHALL SUPERSEDE THE
DRAWN DIMENSION. ALL FIELD
ADJUSTMENTS MUST BE APPROVED BY
THE SENIOR RESIDENT ENGINEER PRIOR
TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF CURB,
BACK OF WALK, OR CENTER LINE OR
EDGE OF PAVING, UNLESS OTHERWISE
NOTED. ALL DIMENSIONS ARE AT 90
DEGREES, UNLESS OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY OUT
ENTIRE PROJECT. PERMITS SHALL BE IN
PLACE PRIOR TO ANY CONSTRUCTION
ACTIVITIES. NOTIFY APPROPRIATE
UTILITY COMPANY OF ANY AND ALL
PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
GRAVESITE LAYOUT NOTES -
GENERAL
LEGEND
SECTION MARKER
GRAVES FACE (DIRECTION)
INTERIOR CRYPT
GRAVESITE GRID MONUMENT
PERIMETER CRYPT
TYPICAL SPACE FOR EACH GRAVE IS 3'-0" X 8'-0".
PRECAST CRYPT IS INTENDED TO BE CENTERED
WITH IN EACH GRAVE SPACE.
80.00'
TYP.
2 TYP.
1 TYP.
.0 0'
TY
P
RO
UNDABO
UT
RO
AD 3
26275
45 SECTION NUMBER
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
528 574
576 622
388 431
209 252
294208 251176
203171
395 438 481
665A
573 619
621 667
720 769 818 867
381 424
466 512380 423337 900 954797 846699 748604 650558 1340 13801254 13001162 12081062 11161008 15131451 14821420
289246
375332
461418
553507
645599
743694
841792
242199
328285
414371
503457
595549
690641
788739
891837
999945
11071053
11991153
12911245
13711331
237 280
162 194
105 130
544 590
452 498
366 409
886 940
783 832
685 734
1240 1286
1148 1194
1048 1102
1235 1281
1143 1189
881 935
782 831
778 827
684 733
680 729
1047 1101
1043 1097
876 930
777 826
773 822
675 724
1038 1092
407 450
321 364
674 723
235 278
542 588
541 587
539 585
538 584
534 580
533 579
406 449
404 447
403 446
399 442
275 318
274 317
270 313
269 312
104 129
103 12878
127 159
125 157
124 156
120 152
119 151
216 259
141116
309 352
264221 307
N 0 10' 20'
SCALE:1
SECTION 45 (ADD ALTERNATIVE 2)
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 45
C-131y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
5.
dw g
/2
5/
1:
A M
MBB JPN
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER100
LIMIT OF CRYPTS
PERIMETER CRYPT
INTERIOR CRYPT
TOTAL GRAVESITES
SECTION 45
CRYPT/GRAVESITE - SPACE YIELD
1,375
1,581
RO
UNDABO
UT
RO
AD 3 45
26276
45 SECTION NUMBER
SIERRA NEVADA DRIVE
P44
P45
P52
P53
P54
P60
P61
Point ID
Northing
1,912,970.39
1,913,025.59
1,912,936.61
1,912,983.92
1,913,039.11
1,913,066.71
Easting
6,595,558.59
6,595,568.06
6,595,471.62
6,595,479.74
6,595,489.21
6,595,493.94
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 10' 20'
SCALE:1
SECTION 46
1" = 10' (30"x42" PAPER) y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
6.
dw g
/2
5/
1:
A M
MBB JPN
PUTA
H C
REEK W
AY
SIERRA NEVADA DRIVE
GRAVESITE GRID POINTS
SECTION 46
GRAVESITE LAYOUT -
SECTION 46
C-132
LEGEND
1. THE GRAVE PLOT LAYOUT PATTERN IS A
4'-0" X 4'-0" INDIVIDUAL SPACE.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER
REGARDING ANY DISCREPANCIES
BETWEEN FIELD CONDITIONS AND
PLANS PRIOR TO PROCEEDING WITH
WORK. THE WRITTEN DIMENSION SHALL
SUPERSEDE THE DRAWN DIMENSION.
ALL FIELD ADJUSTMENTS MUST BE
APPROVED BY THE SENIOR RESIDENT
ENGINEER PRIOR TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF
CURB, BACK OF WALK, OR CENTER LINE
OR EDGE OF PAVING, UNLESS
OTHERWISE NOTED. ALL DIMENSIONS
ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY
OUT ENTIRE PROJECT. PERMITS SHALL
BE IN PLACE PRIOR TO ANY
CONSTRUCTION ACTIVITIES. NOTIFY
APPROPRIATE UTILITY COMPANY OF
ANY AND ALL PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
GRAVESITE LAYOUT NOTES -
GENERAL
SECTION MARKER
GRAVES FACE (DIRECTION)
IN-GROUND CREMAIN GRAVESITE
GRAVESITE GRID MONUMENT
TYPICAL SPACE FOR EACH CREMAIN IS
4'-0" X 4'-0".
80.00'
.0
0'
2 TYP.
1 TYP.
.0
0'
.0 0'
26277
46 SECTION NUMBER
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
2.
TY
P
2.
TY
P
P44
P45
P52
P53
P54
P60
P61
480511542
481512543
513544
514545
546 515
504535
505536 474
506537 475
476507
477508
478509540
479510541
524555
525556
526557
516547
517548
518549
287313
288314
262 237
263 238
396425
397426
367 340
368 341
90107
91108
75 60
76 61
167189
168190
145 126
146 127
215289315 264 239398427 369 342457 4992109 77 62169191 147 128 2536
428458
429459
316343370399
317344371400
216240265290
217241266291
129148170192
130149171193
637893110
647994111
263750
16273851
372401430
373402431
267292318345
268293319346
194218242
195219243
112131150172
113132151173
658095
668196
17283952
18294053
403432462
404433463
294320347374
295321348375
220244269
221245270
133152174196
134153175197
8297114
8398115
30415467
31425568
434464494
435465495
349376405
350377406
246271296322
247272297323
176198222
177199223
116135154
117136155
56698499
577085100
466496
467497
378407436
379408437
273298324351
274299325352
200224248
201225249
137156178
138157179
7186101118
7287102119
344558
354659
498529
499530
409438
410439
326353380
327354381
250275
251276
180202226
181203227
120139
121140
500531 470 411440 328355382 302 252277 204228
501532 471 412441 329356383 303 253278 205229
502533 472 413442 384
503 473 414443 385
335362391420
336363392421
364393422
365394423
310337
311338
395424 312339366
387416
388417
332359
333360
361 334390 183
208232257282
209233258283
234259284
235260285
186210
187211
261286 188212236
254279
230255
207256
141163
123142164
124143165
88105
144166 89106125
21120
51423
1524 6
160182
304330357
103122
N 0 10' 20'
SCALE:1
SECTION 46
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 46
C-133y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
6.
dw g
/2
5/
1:
A M
MBB JPN
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER100
LIMIT OF CRYPTS
CREMAIN - SPACE YIELD
SPACE 4'x4' 592
SECTION 46
26278
46 SECTION NUMBER
PUTA
H C
REEK W
AY
SIERRA NEVADA DRIVE
Point ID
Northing
1,913,006.24
1,912,951.04
1,913,036.08
1,912,992.71
1,912,937.52
Easting
6,595,349.64
6,595,340.17
6,595,435.93
6,595,428.49
6,595,419.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 10' 20'
SCALE:1
SECTION 47
1" = 10' (30"x42" PAPER) y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
7.
dw g
/2
5/
1:
A M
MBB JPN
PUTAH CREEK WAY
JE
PS
O N
P R
AI
R
IE
D
R
IV
E GRAVESITE GRID POINTS
SECTION 47
GRAVESITE LAYOUT -
SECTION 47
C-134
LEGEND
1. THE GRAVE PLOT LAYOUT PATTERN IS A
4'-0" X 4'-0" INDIVIDUAL SPACE.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER
REGARDING ANY DISCREPANCIES
BETWEEN FIELD CONDITIONS AND
PLANS PRIOR TO PROCEEDING WITH
WORK. THE WRITTEN DIMENSION SHALL
SUPERSEDE THE DRAWN DIMENSION.
ALL FIELD ADJUSTMENTS MUST BE
APPROVED BY THE SENIOR RESIDENT
ENGINEER PRIOR TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF
CURB, BACK OF WALK, OR CENTER LINE
OR EDGE OF PAVING, UNLESS
OTHERWISE NOTED. ALL DIMENSIONS
ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY
OUT ENTIRE PROJECT. PERMITS SHALL
BE IN PLACE PRIOR TO ANY
CONSTRUCTION ACTIVITIES. NOTIFY
APPROPRIATE UTILITY COMPANY OF
ANY AND ALL PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
GRAVESITE LAYOUT NOTES -
GENERAL
SECTION MARKER
GRAVES FACE (DIRECTION)
IN-GROUND CREMAIN GRAVESITE
GRAVESITE GRID MONUMENT
TYPICAL SPACE FOR EACH CREMAIN IS
4'-0" X 4'-0".
80.00' 56 .0
0'
2 TYP.
1 TYP.
.0
0' 26279
47 SECTION NUMBER
2.
TY
P
2.
TY
P
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
144119
143118
198171
197170
252225
251224
305279
304278
142117
141116
196169
195168
250223
249222
303277
302276
140115
139114
194167
193166
248221
247220
301275
300274
352326
20 5134 8868 138113 192165 246219 299273 351325
5033 8767 137112 191164 245218 298272 350324
4932 8666 136111 190163 244217 297271 349323 375
4831 8565 135110 189162 243216 296270 348322 374
8464 134109 188161 242215 295269 347321 373
8363 133108 187160 241214 294268 346320 398372
8262 132107 186159 240213 293267 345319 397371
10681 131
10580 130
10479 129
158 212185 239
157 211184 238
156 210183 237
266 318292 344
265 317291 343
264 316290 342
370 422396
369 421395
368 420394 445
128103 155
127102 154
126101 153
182 236209 263
181 235208 262
180 234207 261
289 341315 367
288 340314 366
287 339313 365
393 444419
392 443418
391 442417 468
100 152125 179
151 178
150 177
206 260233 286
205 259232 285
204 258231 284
312 364338 390
311 363337 389
310 362336 388
416 467441
415 466440
414 465439 491
464 490
3019 6144
149124
148123
203176
202175
257230
256229
147122
146121
201174
200173
255228
254227 281
2716 5841 9575 145120 199172 253226 280
357331
330 356
409383
408382
460435
459434
512486
511485
565539
564538
617592
616591
407381
406380
458433
457432
510484
509483
563537
562536
615590
614589
405353 379
404378
456431
455430
508482
507481
561535
560534
613588
612587
403377 454429 506480 559533 611586
376 402 453428 505479 558532 610585
401 452427 504478 557531 609584
451426 503477 556530 608583
450425
502476 555529 607582
449424 501475 554528 606581
448 500474 553527 605580
447 473 526499
446 472 525498
471 524497
496 523470
495 522
494 521
520493
552 604579
551 603578
550 602577
576 601
575 600
574 599
546 573
545 572
544 571 596
543 570
542 569 594
568 593
309283 361335 413387
282 308
360334
359333
412386
411385 462437 514488 567541
358332 410384 461436 513487 566540
42 26
28 14
29 15
32 7
1933 8
515489463438
N 0 10' 20'
SCALE:1
SECTION 47
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTION 47
C-135y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N
7.
dw g
/2
5/
1:
A M
MBB JPN
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER
CREMAIN - SPACE YIELD
SPACE 4'x4'
LIMIT OF CREMAIN PLOT
SECTION 47
26280
47 SECTION NUMBER
PUTAH CREEK WAY
JE
PS
O N
P R
AI
R
IE
D
R
IV
E
Point ID
Northing
1,913,017.06
1,913,072.25
1,913,127.44
1,913,182.64
1,913,030.58
1,913,085.77
1,913,140.97
1,913,196.16
Easting
6,595,286.56
6,595,296.03
6,595,305.50
6,595,314.96
6,595,207.71
6,595,217.18
6,595,226.65
6,595,236.12
N
0 10' 20'
SCALE:1
SECTIONS 53 & 54 (ADD ALTERNATIVE 2)
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE LAYOUT -
SECTIONS 53 & 54
C-136y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N S
4.
dw g
/2
5/
1:
A M
MBB JPN
PUTAH CREEK WAY
JEPSON PRAIRIE DRIVE
GRAVESITE GRID POINTS
SECTIONS 53 & 54
LEGEND
1. THE GRAVE PLOT LAYOUT PATTERN IS A
4'-0" X 4'-0" INDIVIDUAL SPACE.
2. CONTRACTOR SHALL CONTACT THE
SENIOR RESIDENT ENGINEER
REGARDING ANY DISCREPANCIES
BETWEEN FIELD CONDITIONS AND
PLANS PRIOR TO PROCEEDING WITH
WORK. THE WRITTEN DIMENSION SHALL
SUPERSEDE THE DRAWN DIMENSION.
ALL FIELD ADJUSTMENTS MUST BE
APPROVED BY THE SENIOR RESIDENT
ENGINEER PRIOR TO INSTALLATION.
3. ALL DIMENSIONS ARE TO BACK OF
CURB, BACK OF WALK, OR CENTER LINE
OR EDGE OF PAVING, UNLESS
OTHERWISE NOTED. ALL DIMENSIONS
ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
4. IF DISCREPANCIES OCCUR IN FIELD
BETWEEN THIS SET OF DRAWINGS AND
FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE SENIOR RESIDENT
ENGINEER TO REVIEW PRIOR TO
CONSTRUCTION.
5. ALL ELEMENTS TO BE INSTALLED PER
PLAN DETAILS AND MANUFACTURER'S
RECOMMENDATION.
6. CONTRACTOR RESPONSIBLE FOR
OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY
OUT ENTIRE PROJECT. PERMITS SHALL
BE IN PLACE PRIOR TO ANY
CONSTRUCTION ACTIVITIES. NOTIFY
APPROPRIATE UTILITY COMPANY OF
ANY AND ALL PROPOSED WORK.
GRAVESITE LAYOUT NOTES -
CONSTRUCTION
GRAVESITE LAYOUT NOTES -
GENERAL
SECTION MARKER
GRAVES FACE (DIRECTION)
IN-GROUND CREMAIN GRAVESITE
GRAVESITE GRID MONUMENT
TYPICAL SPACE FOR EACH CREMAIN IS
4'-0" X 4'-0".
56.00'
TYP.
.0
0'
TY
P
TYP.
SI
ER
RA
N
EV
AD
A
DR
IV
E
ROUNDABOUT
ROAD 3
26281
53 SECTION NUMBER
TYP.
2.00'
TYP.
2.00'
TYP.
SECTION MARKER W/APPROPRIATE
SECTION NUMBER. LAYOUT COORDINATE
IS TO CENTER OF MARKER. (SEE SIGNAGE
& WAYFINDING SHEET LS502)
GRAVESITE GRID MONUMENT SET IN
CONCRETE. (SEE CRYPT & CREMAIN
SHEET DETAILS C-501)
1514131211
10987
19181716
5A
464748
6162 60
4041 39
686970
50515253
13141516
171819202122
234567891011 1
84858687
N
0 10' 20'
SCALE:1
SECTIONS 53 & 54 (ADD ALTERNATIVE 2)
1" = 10' (30"x42" PAPER)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
GRAVESITE NUMBERING
SECTIONS 53 & 54
C-137y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
C _S
E C
TI
O
N S
4.
dw g
/2
5/
1:
A M
MBB JPN
LEGEND
GRAVES FACE (DIRECTION)
GRAVESITE NUMBER
CREMAIN - SPACE YIELD
SPACE 4'x4'
LIMIT OF CREMAIN PLOT
SECTION 53
CREMAIN - SPACE YIELD
SPACE 4'x4' 495
SECTION 54
26282
53 SECTION NUMBER
PUTAH CREEK WAY
JEPSON PRAIRIE DRIVE
SI
ER
RA
N
EV
AD
A
DR
IV
E
ROUNDABOUT
ROAD 3
.7
12+00
13+00
14+00
0+
1+00
2+00
P2-1 P2-2
P2-3 P2-4
BEGIN ACCESS ROUTE CL
SOLANO DRIVE
STA=11+95.71
Offset=12.57'L Northing=1911410.20 Easting=6596105.44
20.00 16 .8
7.8
Point #
P2-1
P2-2
P2-3
P2-4
Northing
1911254.8677
1911254.8677
1911232.7354
1911232.7354
Easting
6595979.9604
6596017.4939
6595979.9604
6596017.4939
4+
5+
6+
7+
8+
P1-1 P1-2
P1-3 P1-4
BEGIN ACCESS ROUTE CL
LAKE BERRYESSA DRIVE
STA=5+85.20
Offset=12.50'L Northing=1912452.45 Easting=6595621.37
113.52
29.70
73.28
.0
.0
Point #
P1-1
P1-2
P1-3
P1-4
Northing
1912416.2412
1912417.9856
1912388.0031
1912389.7476
Easting
6595832.2798
6595852.2036
6595834.7522
6595854.6760
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.