1+00
2+
P1 P2
P3 P4
P5
CONTROL POINT SCHEDULE
Point #
P 1
P 2
P 3
P 4
P 5
Northing
1911818.0903
1911818.0866
1911850.0207
1911850.0207
1911661.0207
Easting
6597993.6400
6598089.5904
6598047.5904
6598447.5904
6598447.5904
Raw Description
CONTROL POINT
CONTROL POINT
CONTROL POINT
CONTROL POINT
CONTROL POINT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h t o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h s o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
SITE PLAN - HONOR GUARD &
OVER FLOW PARKING
C-105 REVY
:\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\L an ds ca pe A rc h\
6_ L_
P
LA
N E
N
LA
R G
E M
E N
TS
.d w g
/2
/2
2:
P
M
LEGEND
SIGNAGE
TYP.
NEW BURIAL SECTION HEADSTONE
DIRECTION
EXISTING BURIAL SECTION I.D.
NEW BURIAL SECTION I.D.
EXISTING BURIAL SECTION HEADSTONE
DIRECTION
PPC
EX. 13
PPC
LS501
JDL DJS
N 0 20' 40'
SCALE:2
HONOR GUARD ASPHALT AND GRAVEL OVERFLOW PARKING LOTS
1" = 20' (30"x42" PAPER)
9.0' TYP.
18.0'
TYP.
42.0' 358.0'
9.
0'
.0
R 10'
TYP.
R10'TYP.
126.0'
24.0'
OVERFLOW PARKING
ENTRANCE CURB
VEE GUTTER
TYP.
CR301
.0
SIGNAGE
TYP.
LS502
26250
ASPHALT PAVEMENT
CR301
GRAVEL SURFACING
CR301
SIGNAGE
TYP.
LS501
R5.0
NOTE: SEE SHEETS LS103-LS504 FOR
SIGNAGE SPECIFIC INFORMATION
CR503
4" WHITE PAVEMENT
MARKING, TYP.
VERIFY LOCATION OF
EXISTING CONCRETE PAD.
COORDINATE ASPHALT
INSTALLATION WITH
EXISTING CONDITIONS.