36C10F18R0581-060.pdf
PDF 7 MB Posted
- Solicitation number
- 36C10F18R0581
About this file
36C10F18R0581 11_SVNC2_WATER.pdf
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPC
IGC
IGC
EX. 1
PPC
EX. 19
IGC
EX. 20
IGC
EX. 22
IGC
EX. 16
IGC
EX. 18
TG
EX. 24
IGC
EX. 5
PPC
EX. 23
PPC
EX. 25
PPC
EX. 7
IGC
EX. 2
PPC
EX. 27
PPC
EX. 28
PPC
EX. 26
PPC
EX. 8
IGC
EX. 12
PPC
EX. 11
IGC
EX. 14
IGC
EX. 4
TG
EX. 15
IGC
EX. 3
PPC
EX. 9
IGC
EX. 10
IGC
EX. 13
PPC
EX. 21
IGC
EX. 17
IGC
EX. POND
(1.2 ac.)
IGC
IGC
IGC
IGC
IGC
IGC
IGC
IGC
33A
PPC
PPC
PPC
PPC
PPC
PPC
33B
VF
D
SO
LA
NO
D
RI
VE
SOLANO DRIVE
FOLSOM LAKE WAY
POTAH CREEK WAY
SI
ER
RA
N
EV
AD
A
DR
IV
E
SIERRA NEVADA DRIVE
DE
LT
A W
AY
CENTRAL
VALLEY
W
AY
MIDWAY ROAD MIDWAY ROAD
T
SWEENEY CREEK
SIERRA NEVADA DR.
JE
PS
ON
PR
AIR
IE
DR
COMMITTAL SHELTER RD.
DRIVE
ROAD A
SUTTER BUTTE DRIVE
SUTTER
SOLANO
BUTTE DRIVE
SU
TT
ER
BUTTE DRIVE
SIERRA NEVADA DR.
PUTAH
CREEK
LA
KE
BE
RR
YE
SS
A D
RIV
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h t h i n c o e f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
N 0 120' 240'
WATER PLAN - OVERALL
CW101y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
O V
E R
A
LL
.d w g
/2
5/
1:
A M
LEGEND
NOTES - GENERAL
NOTES - CONSTRUCTION
DOMESTIC WATER
1. PVC SCH 80 DOMESTIC WATER PIPE. SIZE PER PLAN.
2. CAP DOMESTIC WATER LINE FOR FUTURE CONNECTION
OR SERVICE EXTENSION.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE DRAWINGS FOR
DETAILS AND SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE DRAWINGS FOR
DETAILS AND SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
SEE SHEET CW501 FOR WATERMAIN INSTALLATION DETAILS.
MAINTAIN WATER SERVICE TO CEMETERY AT ALL TIMES EXCEPT
FOR MINOR DISRUPTION DURING CONNECT/DISCONNECTS.
COORDINATE WITH CEMETERY DIRECTOR.
ALL BURIED COMMUNICATION AND ELECTRIC LINES THAT
CROSS ENTRANCES AND WALKS/HARDSCAPE SHALL BE
SLEEVED IN PVC CONDUIT. MINIMUM COVER OVER CONDUIT
SHALL BE 2.5 FEET
CONTRACTOR RESPONSIBLE FOR OBTAINING ALL NECESSARY
CONSTRUCTION PERMITS TO CARRY OUT ENTIRE PROJECT.
PERMITS SHALL BE IN PLACE PRIOR TO ANY CONSTRUCTION
ACTIVITIES. NOTIFY APPROPRIATE UTILITY COMPANY OF ANY
AND ALL PROPOSED WORK.
LOCATIONS OF ALL UNDERGROUND FACILITIES SHOWN ON
PLANS ARE APPROXIMATE, BASED ON PROVIDED SURVEY
ELECTRONIC DRAWINGS FROM VA. DESIGN ENGINEER
ASSUMES NO LIABILITY FOR THE ACCURACY OR
COMPLETENESS OF ANY UNDERGROUND FACILITIES SHOWN.
OTHER UNDERGROUND FACILITIES MAY EXIST THAT COULD BE
UNCOVERED DURING CONSTRUCTION. CONTRACTOR SHALL
VERIFY THE LOCATION OF ALL EXISTING FACILITIES AND
IMMEDIATELY NOTIFY THE ENGINEER IF ANY SUCH FACILITIES
CONFLICT OR INTERFERE WITH THE CONSTRUCTION OF THE
PROPOSED IMPROVEMENTS. IF DIRECTED THE CONTRACTOR
SHALL STOP WORK IMMEDIATELY UNTIL REMEDIAL ACTIONS OR
REMEDIES CAN BE TAKEN. ANY COST RESULTING FROM THE
CONTRACTOR'S FAILURE TO REPORT OR FAILURE TO STOP
WORK AS DIRECTED, WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
RS ME
6" WATERMAIN
4" WATERMAIN
4" WATERMAIN
6" WATERMAIN
4" WATERMAIN
4" WATERMAIN
4" WATERMAIN
4" WATERMAIN
6" WATERMAIN
262154
KEY NOTES
1 POINT OF CONNECTION TO MAIN.
2 GATE VALVE AND VALVE BOX PER DETAIL 5, SHEET
CW501.
3 POINT OF CONNECTION TO FLOWER WATERING
STATION. REFER TO LANDSCAPE DRAWINGS FOR
CONTINUATION.
4 PRESSURE REDUCING VALVE AND BOX.
ROUNDABOUT
ROAD R2
ROUNDABOUT
ROAD R1
ROUNDABOUT
ROAD R3
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
EXISTING STORMWATER PIPE
STORMWATER PIPE
UNDERDRAIN
6" PERFORATED UNDERDRAIN PIPE
IGC
IGC
11+78
9+00
10+00
11+00
8+
6+
7+
8+
0+
1+ 00 0+00
1+
2+00
T1
V1
V2
V3
T1
V1
V2
V3
PUTAH
CREEK
W
AY
JE
PS
ON
PR
AIR
IE
Point Number
T1
V1
V2
V3
Northing
1913286.15
1913292.19
1913278.18
1913280.11
Easting
6595208.57
6595200.60
6595202.53
6595216.54
Point Number
T1
V1
V2
V3
Northing
1913286.15
1913292.19
1913278.18
1913280.11
Easting
6595208.57
6595200.60
6595202.53
6595216.54
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 1
CW102y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
.d w g
/2 5/
1:
A
M
RS ME
MATCHLINE CW104
N
0 30' 60'
SCALE:1
WATER PLAN 1
1" = 60' (30"x42" PAPER)
CW102
LEGEND
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
M A
TC
H
LI
N
E C
W
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH COVER OVER
WATERMAIN IS 3.0 FEET.
2. GATE VALVE AND VALVE BOX PER DETAIL
5, SHEET CW501.
3. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
4. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
5. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL BE
MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 6" X 6" X 4" TEE
6 POINT OF CONNECTION TO MAIN.
1 11+11
1 9+90
9+79 1
7+96 1
6+22 1
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
6" WATERMAIN
CONNECT TO EXISTING
6" WATERMAIN
4" WATERMAIN 6" WATERMAIN
262155
VALVE AND TEE COORDINATES
ROUNDABOUT
ROAD R3
STORMWATER PIPE
EX. 19
IGC
EX. 20
IGC
EX. 22
IGC
EX. 16
IGC
EX. 18
TG
EX. 21
IGC
0+00
1+00
2+00
7+00
8+00
-0 +0
3+00
4+
SIERRA NEVADA DR.
SIERRA NEVADA DR.
V4
T3
T4
V4
T3
T4
Point Number
T3
T4
V4
Northing
1913204.98
1913015.85
1913023.25
Easting
6595436.17
6595635.79
6595621.36
Point Number
T3
T4
V4
Northing
1913204.98
1913015.85
1913023.25
Easting
6595436.17
6595635.79
6595621.36
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
.d w g
/2 5/
1:
A
M
RS ME
MATCHLINE CW105
N
0 30' 60'
SCALE:1
WATER PLAN 2
1" = 30' (30"x42" PAPER)
CW103
M A
TC
H
LI
N
E C
W
CW103
WATER PLAN 2
1 7+65
6+33 1
LEGEND
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
4. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL BE
MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 6" X 6" X 4" TEE
6 TYP. FLOWER WATERING STATION. SEE
3/LF501.
7 6" X 6" X 2" TEE
8 POINT OF CONNECTION TO MAIN.
FIELD VERIFY EXIST STUB OR PIPE
LOCATION.
9 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
10 FIELD VERIFY EXISTING WATER TEE.
COORDINATE LOCATION TO MAINTAIN
SERVICE WITH NEW WATERMAIN.
6" WATERMAIN
CONNECT TO
EXISTING 6"
WATERMAIN
6" WATERMAIN
262156
VALVE AND TEE COORDINATES
6" WATERMAIN
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
UNDERDRAIN
3+00
4+00
5+00
3+
2+
T2T2
0+
1+00
2+003+003+20
JE
PS
ON
PR
AIR
IE
DR
Point Number
T2
Northing
1912901.72
Easting
6595310.78
Point Number
T2
Northing
1912901.72
Easting
6595310.78
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 3
CW104y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
.d w g
/2 5/
1:
A
M
RS ME
N
0 30' 60'
SCALE:1
WATER PLAN 3
1" = 30' (30"x42" PAPER)
CW104
MATCHLINE CW102
M A
TC
H
LI
N
E C
W
4+10 1
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION
4. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL
BE MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 4" X 4" X 4" TEE TYP. AT ALL FLOWER
WATERING STATIONS
4 TYP. FLOWER WATERING STATION PER
DETAIL 3, SHEET LF501.
5 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
4" WATERMAIN
262157
TEE COORDINATES
LEGEND
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
EX. 23
EX. 25
PPC
EX. 27
PPC
IGC
COLUMBARIUM
PPC
3+00
4+00
5+00
6+00
1+
2+
3+
4+
5+
6+
1+00
2+00
LA
KE
BE
RR
YE
SS
A D
RIV
E
T5
T6
V5
V7
V8
V9T18 T5
T6
V5
V7
V8
V9T18
PUTAH CREEK WAY
SIERRA NEVADA DR.
Point Number
T5
T6
V5
V6
V7
V8
V9
T18
Northing
1912972.43
1912428.24
1913010.54
1913012.38
1912973.19
1912965.41
1912973.36
1912987.65
Easting
6595830.07
6595599.71
6595633.00
6595644.09
6595819.00
6595829.98
6595847.50
6595618.11
Point Number
T5
T6
V5
V6
V7
V8
V9
T18
Northing
1912972.43
1912428.24
1913010.54
1913012.38
1912973.19
1912965.41
1912973.36
1912987.65
Easting
6595830.07
6595599.71
6595633.00
6595644.09
6595819.00
6595829.98
6595847.50
6595618.11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 4
CW105y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
.d w g
/2 5/
1:
A
M
RS ME
MATCHLINE CW106
N
0 30' 60'
SCALE:1
WATER PLAN 4
1" = 30' (30"x42" PAPER)
POND 1
CW105
MATCHLINE CW103
M A
TC
H
LI
N
E C
W
0+35 1
1 2+08
1 4+19 3+01 1
0+42 1
2+25 1
5+89 1
LEGEND
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. GATE VALVE AND VALVE BOX PER DETAIL
5, SHEET CW501.
4. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
5. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL BE
MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 6" X 6" X 4" TEE
3 4" X 4" X 4" TEE TYP. AT ALL FLOWER
WATERING STATIONS
5 TYP. FLOWER WATERING STATION PER
DETAIL 3, SHEET LF501.
6 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
6" WATERMAIN
34" WATERMAIN
4" WATERMAIN
262158
VALVE AND TEE COORDINATES
6" WATERMAIN
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
EX. POND
(1.2 ac.)
PPC
PPC
PPC
21+00
+0
+0
+3
7+
8+
9+00
10+00
11+00
12+00
+0
+0
T7
T8
T17
V26
T7
T8
T17
V26
SUTTER BUTTE DRIVE
Point Number
T7
T8
T17
V26
Northing
1912141.43
1911828.49
1912204.12
1912211.09
Easting
6595629.35
6595862.57
6596434.14
6596433.44
Point Number
T7
T8
T17
V26
Northing
1912141.43
1911828.49
1912204.12
1912211.09
Easting
6595629.35
6595862.57
6596434.14
6596433.44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 5
CW106y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
.d w g
/2 5/
1:
A
M
RS ME
MATCHLINE CW108
N
0 30' 60'
POND 1
MATCHLINE CW105
M A
TC
H
LI
N
E C
W
CW106
SCALE:1
WATER PLAN 5
1" = 30' (30"x42" PAPER)
9+11 1
13+10 1
1 13+26
22+80 1
LEGEND
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. GATE VALVE AND VALVE BOX PER DETAIL
5, SHEET CW501.
4. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
5. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL
BE MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 4" X 4" X 4" TEE TYP. AT ALL FLOWER
WATERING STATIONS
4 TYP. FLOWER WATERING STATION PER
DETAIL 3, SHEET LF501.
5 POINT OF CONNECTION TO MAIN.
6 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
4" WATERMAIN
262159
VALVE AND TEE COORDINATES
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
EX. 5
EX. 7
IGCEX. 28
PPC
EX. 8
IGC
IGC
IGC
PPC
VF
D
T
16+00
17+00
18+00
19+00
20+00
21+00
-0+00
1+00
2+
3+
2+00 3+00
T15
T16
V23
V24
V25
T15
T16
V23
V24
V25
SOLANO DRIVE
SUTTER BUTTE DRIVE
ROUNDABOUT
ROAD R1
Point Number
T15
T16
V23
V24
V25
Northing
1911732.33
1911917.11
1911724.22
1911742.51
1911738.15
Easting
6596770.57
6596562.92
6596764.71
6596759.12
6596778.59
Point Number
T15
T16
V23
V24
V25
Northing
1911732.33
1911917.11
1911724.22
1911742.51
1911738.15
Easting
6596770.57
6596562.92
6596764.71
6596759.12
6596778.59
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 6
CW107y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
2.
dw g
/2 5/
1:
A
M
RS ME
MATCHLINE CW109
N
0 30' 60'
POND 1
CW107
M A
TC
H
LI
N
E C
W
SCALE:1
WATER PLAN 6
1" = 30' (30"x42" PAPER)
1 19+61
1 17+02
1 16+67 2+76 1
2+00 1
0+04 1
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. GATE VALVE AND VALVE BOX PER DETAIL
5, SHEET CW501.
4. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
5. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL BE
MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 4" X 4" X 4" TEE
3 4" X 4" X 4" TEE TYP. AT ALL FLOWER
WATERING STATIONS
7 TYP. FLOWER WATERING STATION PER
DETAIL 3, SHEET LF501.
8 POINT OF CONNECTION TO MAIN.
9 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
CONNECT TO EXISTING WATERMAIN.
INSTALL 4" BLIND FLANGE WITH 3/4"
TAP AND CORPORATION STOP.
FIELD ADJUST PENDING VERIFICATION
OF EXISTING 3/4" WATERMAIN.
262160
VALVE AND TEE COORDINATES
SAWCUT ASPHALT. REPLACE
PAVEMENT SECTION IN KIND.
LEGEND
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
IGC
IGC
33A
PPC
33B
18+45
9+0010+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
7+
0+
1+00
2+00
3+00
4+00
5+00
6+
7+
+7
+0
4+90
0+00
1+
2+00 3+00
4+
T9
T10
T11
T12
T13
V10
V11
V12
V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
T9
T10
T11
T12
T13
V10
V11
V12
V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
ROUNDABOUT
ROAD R2
ROAD A
SOLANO
SOLANO DR.
DRIVE
Point Number
T9
T10
T11
T12
T13
V10
V11
V12
V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
Northing
1911636.40
1911589.55
1911507.41
1911532.46
1911449.16
1911645.85
1911632.70
1911639.93
1911601.24
1911591.95
1911577.93
1911621.56
1911524.74
1911527.92
1911541.81
1911452.84
1911442.96
1911445.78
Easting
6595842.51
6595751.75
6595785.11
6595881.31
6596045.02
6595845.78
6595852.07
6595833.15
6595756.20
6595745.23
6595749.21
6595536.61
6595874.62
6595890.22
6595884.84
6596037.78
6596041.86
6596051.65
Point Number
T9
T10
T11
T12
T13
V10
V11
V12
V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
Northing
1911636.40
1911589.55
1911507.41
1911532.46
1911449.16
1911645.85
1911632.70
1911639.93
1911601.24
1911591.95
1911577.93
1911621.56
1911524.74
1911527.92
1911541.81
1911452.84
1911442.96
1911445.78
Easting
6595842.51
6595751.75
6595785.11
6595881.31
6596045.02
6595845.78
6595852.07
6595833.15
6595756.20
6595745.23
6595749.21
6595536.61
6595874.62
6595890.22
6595884.84
6596037.78
6596041.86
6596051.65
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 7
CW108y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
2.
dw g
/2 5/
1:
A
M
RS ME
N
0 30' 60'
MATCHLINE CW106
M A
TC
H
LI
N
E C
W
CW108
SCALE:1
WATER PLAN 7
1" = 30' (30"x42" PAPER)
17+66 1
16+38 1
16+05 1
14+73 1
14+33 1
1 14+09
12+87 1
1 9+70
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. GATE VALVE AND VALVE BOX PER DETAIL
5, SHEET CW501.
4. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
5. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL
BE MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 4" X 4" X 4" TEE
3 4" X 4" X 4" TEE TYP. AT ALL FLOWER
WATERING STATIONS
7 TYP. FLOWER WATERING STATION PER
DETAIL 3, SHEET LF501.
8 BLIND FLANGE AT STUB.
9 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
STA. 11+98.84
DEFLECT WATERMAIN BELOW
10" STORM FORCEMAIN CROSSING.
MIN. 18" VERTICAL SEPARATION.
TOP WATERMAIN = 63.00 (MAX. EL.)
4 4
1+43.4 1
1 0+55
262161
VALVE AND TEE COORDINATES
LEGEND
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
9+00
10+00
11+00
12+00
13+00
14+00
15+00
6+
0+
1+
2+00
3+00
4+00
5+00
6+
4+
5+
6+00
7+00
8+00
0+00
1+
4+
T14T14
SOLANO DRIVE
SUTTER
COMMITTAL
SHELTER ROAD
BUTTE DRIVE
ROAD R1
Point Number
T14
Northing
1911663.55
Easting
6596752.23
Point Number
T14
Northing
1911663.55
Easting
6596752.23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
KEY MAP: N.T.S.
CREEK
CREEK
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER PLAN 8
CW109y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
2.
dw g
/2 5/
1:
A
M
RS ME
N
0 30' 60'
MATCHLINE CW107
CW109
M A
TC
H
LI
N
E C
W
SCALE:1
WATER PLAN 8
1" = 30' (30"x42" PAPER)
1 6+00
1 4+35
1 1+05
NOTES - GENERAL
1. SEE SHEET CW501 FOR WATERMAIN
INSTALLATION DETAILS.
NOTES - CONSTRUCTION
1. SEE SPECIFICATION SECTION 33-10-00
FOR WATERMAIN INSTALLATION AND
EXECUTION.
2. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
DOMESTIC UTILITIES
1. MINIMUM DEPTH OF COVER OVER
WATERMAIN IS 3.0 FEET.
2. PVC SCH 80 DOMESTIC WATER PIPE. SIZE
PER PLAN.
3. CAP DOMESTIC WATER LINE FOR FUTURE
CONNECTION OR SERVICE EXTENSION.
4. PRESSURE REDUCING VALVE AND BOX.
OTHER UTILITIES
1. IRRIGATION LINE. SEE IRRIGATION LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
2. ELECTRICAL LINE. SEE ELECTRICAL LINE
DRAWINGS FOR DETAILS AND
SPECIFICATIONS. SHOWN FOR
COORDINATION PURPOSES ONLY.
KEY NOTES
1 A VERTICAL SEPARATION OF 457 MM
(18 INCHES) BETWEEN THE INVERT OF
THE SEWER OR DRAIN AND THE
CROWN OF THE WATER MAIN SHALL BE
MAINTAINED WHERE A WATER MAIN
CROSSES UNDER A SEWER. (STA OF
CROSSING DENOTED).
2 4" X 4" X 4" TEE TYP. AT ALL FLOWER
WATERING STATIONS
6 TYP. FLOWER WATERING STATION PER
DETAIL 3, SHEET LF501.
7 POINT OF CONNECTION TO FLOWER
WATERING STATION. REFER TO
LANDSCAPE DRAWINGS FOR
CONTINUATION.
3 3
262162
VALVE AND TEE COORDINATES
LEGEND
IGC
HIGH WATER LINE (HWL)
CRYPT LIMITS
NEW GATE VALVE
NEW TEE
EXISTING 4" PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
NEW PVC WATERMAIN
(UNLESS OTHERWISE NOTED)
STORMWATER PIPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD Project Management, Architecture, Landscape Architecture, Cemetery Planning, Civil Engineering, Land Survey:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Structural Engineering, Electrical Engineering:
Sacramento Valley National Cemetery Phase 2 Development
5810 Midway Rd, Dixon, CA 95620
921CM2007
Project Director
JUNE 27, 2018Revisions: Date:
HDR Engineering, Inc.
2365 Iron Point Rd. #300 Folsom, CA 95630 (916)-817-4924 Duane Hodgens
Irrigation:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525 (970)-372-6104 Robert Beccard
Cost Estimating:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121 (952)-854-3663 Bryan Bertrand
Geotechnical Engineering:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100 Sacramento, CA 95834 (916)-928-4690 Robert Holmer o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
Anderson Engineering of MN, LLC 13605 1st Ave. N., Ste. 100 Plymouth, MN 55441 (763)-412-4000 Michael Brandvold, Project Manager
OF
06 / 27 / 2018
WATER DETAILS
CW501y:
\1
\1 v a oc fm p ha se d ev o f s ac ra m en to v al le y nc \D w g-
C 3d
\C iv il\
6_
W A
TE
R
M A
IN
E
N
LA
R G
E M
E N
TS
2.
dw g
/2 5/
1:
A
M
RS ME
SCALE:3
FITTINGS & THRUST BLOCKS FOR VERTICAL UPWARD BENDS
NTS SCALE:4
"CUT-IN" TEE OR CROSS DETAIL FOR LATERAL CONNECTION
NTS
SCALE:1
FITTINGS & THRUST BLOCKS FOR HORIZONTAL BENDS & TEES
NTS SCALE:2
FITTINGS & THRUST BLOCKS FOR VERTICAL DOWNWARD BENDS
NTS SCALE:5
TRAFFIC BOX AND VALVE DETAIL
NTS