25061 - Addendum 3_ Arch-struct-MEP summary.pdf
PDF 318 KB Posted
- Solicitation number
- US.254234
- Issued by
- Lancaster County, Pennsylvania
About this file
This Addendum No. 3, issued by Beers + Hoffman architects on October 23, 2026, modifies the contract documents for the Operations Facilities Expansion project for the City of Lancaster Department of Public Works. The addendum supersedes the original bid documents dated September 8, 2026, along with Addendum Nos. 1 and 2, and provides revisions to specifications and drawings for the construction of five new buildings including a salt shed, covered shed, material shed, warehouse, and associated infrastructure. The modifications include changes to multiple specification sections covering exterior painting, window shades, countertops, post-frame and pre-engineered metal building systems, and pallet storage racks. Revised architectural, structural, mechanical, and fire protection drawings are provided as attachments. Key specification changes include removing field office/trailer requirements for the general contractor, adding excavation-related requirements, assigning temporary heating, cooling, and ventilation responsibility to the general contractor with owner-paid utilities, requiring general contractor responsibility for exterior panel penetrations and access doors, deleting fixed window shade panels, reducing countertop warranty to one year, and incorporating preservative-treated wood and approved equal manufacturers for metal building systems.
The addendum reflects significant design refinements and clarifications to the original contract documents, with extensive modifications to drawing details including slab edges, foundation details, framing plans, wall sections, and notes regarding plywood sheathing and pressure-treated lumber throughout multiple structure types. These revisions ensure consistency across the architectural, structural, mechanical, and fire protection design documents and clarify contractor responsibilities for site preparation, temporary facilities, and material specifications. No pricing adjustments, set-asides, or funding information is addressed in this addendum document, which serves solely as a clarification and modification instrument to the underlying contract documents for the multiprime construction project.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LITITZ LANCASTER LEBANON
www.BEERSHOFFMAN.com
Beers + Hoffman
Scott L. Shonk, AIA, LEED AP
Peter D. Kerekgyarto, AIA, LEED AP
Robert P. Hoffman, AIA
BH Project #: 25-061
Operations Facilities Expansion City of Lancaster – Department of Public Works
Addendum No. 3
23 October 2026
Notice to all bidders
This Addendum forms a part of the Contract Documents and modifies the original Bid documents dated September 8, 2026; Addendum No. 1, dated October 6, 2026; and Addendum No. 2, dated October 16, 2026. The Contract Documents for the above-referenced Project are being modified as set forth in this Addendum.
This addendum is issued to clarify, amend, or supersede the drawings and specifications as applicable and shall become a part of the Contract Documents for the subject project as if fully incorporated and bound therein.
ATTACHMENTS:
Revised Specifications:
o Section 011200 – MULTIPLE CONTRACT SUMMARY o Section 099113 – EXTERIOR PAINTING o Section 122400 – WINDOW SHADES o Section 123600 – COUNTERTOPS o Section 133418 – POST FRAME BUILDING SYSTEMS o Section 133419 – PRE-ENGINEERED METAL BUILDING SYSTEMS
Revised Drawings:
o A000 – COVER SHEET o A103 – (S) SALT SHED PLAN - PROPOSED, EXTERIOR ELEVATIONS, MISC. INFO.
o A104 – (C) COVERED SHED PLAN – PROPOSED & EXTERIOR ELEVATIONS o A105 – (M) MATERIAL SHED PLAN - PROPOSED & EXTERIOR ELEVATIONS o A303 – (S) SALT, (C) COVERED & (M) MATERIAL SHEDS – BUILDING SECTIONS o A511 – (W) WAREHOUSE – WALL SECTIONS & DETAILS o A512 - (W) WAREHOUSE – WALL SECTIONS & DETAILS o A513 – (S) SALT SHED – WALL SECTIONS & DETAILS o A514 – (C) COVERED & (M) MATERIAL SHED – WALL SECTIONS & DETAILS o S001 - GENERAL STRUCTURAL NOTES o S002 – GENERAL STRUCTURAL NOTES AND SCHEDULES o S101 – WAREHOUSE FOUNDATION PLAN o S102 – WAREHOUSE MEZZANINE FRAMING PLAN o S104 – COVERED SHED FOUNDATION PLAN o S202 - FOUNDATION SECTIONS o H001 – HVAC LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS o FP100– FIRST FLOOR PLAN – FIRE PROTECTION
SPECIFICATION CHANGES:
Section 011200 – MULTIPLE CONTRACT SUMMARY: Delete Section in its entirety and replace with revised section.
a. Remove field office/trailer requirement for GC.
b. Add excavation-related requirement details.
c. General Contractor to be responsible for temporary heating, cooling, and ventilation.
d. Owner to pay utility costs.
e. Penetrations in exterior panels by GC.
f. Lintels and access doors by GC.
Section 099113 – EXTERIOR PAINTING: Delete Section in its entirety and replace with revised section.
a. Add covered steel structure under included steel substrates.
Section 105629.16 – PALLET STORAGE RACKS: Delete Section in its entirety and replace with revised section.
a. Add covered steel structure under included steel substrates.
Section 122400 – WINDOW SHADES: Delete Section in its entirety and replace with revised section.
a. Fixed window shade panels deleted.
Section 123600 – COUNTERTOPS: Delete Section in its entirety and replace with revised section.
a. Warranty revised to be one-year period.
Section 133418 – POST FRAME METAL BUILDING SYSTEMS: Delete Section in its entirety and replace with revised section.
a. Add preservative-treated wood.
Section 133419 – PRE-ENGINEERED METAL BUILDING SYSTEMS: Delete Section in its entirety and replace with revised section.
a. Add approved equal manufacturers.
b. Relocate metal liner panels within section.
DRAWING CHANGES: Replace all sheets listed with new sheets.
Drawing A001
a. Add – building key plan
Drawing A103
a. Modifications to elevation material notes
Drawing A104
a. Add painting note for steel structure painting
Drawing A105
a. Add – notes for plywood sheathing
Drawing A303
a. Add – notes for covered shed frame painting
b. Add – notes for sheathing and pressure treated lumber & trusses
Drawing A511
a. Modify slab edge and foundation details
Drawing A512
a. Modify slab edge and foundation details
Drawing A513
a. Modify plywood sheathing and pressure treated lumber notes
Drawing A514 - COVERED SHED FOUNDATION PLAN
a. Modify plywood sheathing and pressure treated lumber notes
Drawing S001 - MATERIAL SHED FOUNDATION AND ROOF FRAMING PLAN
a. Add foundation notes
Drawing S002 – FOUNDATION DETAILS
a. Add floor slab type
Drawing S101
a. Modifications
Drawing S102 – FRAMING DETAILS
Drawing S104
Drawing S202
Drawing H001
a. Modifcations
Drawing FP100
End of Addendum No. 3