329113 - SOIL PREPARATION.pdf

PDF 199 KB Posted

Attached to
B861-26-01 MULTIPRIME - NEW CONSTRUCTION Operations Facility Expansion Project
Solicitation number
US.254234
Issued by
Lancaster County, Pennsylvania

About this file

This is a Soil Preparation specification document (Section 329113) for the Operations Center Expansion project (RGS 2025992-044) administered by the City of Lancaster Department of Public Works in Pennsylvania. The specification establishes requirements for planting soils and layered soil assemblies, including lawn medium and planting medium, to support landscaping activities associated with the facility expansion. The project requires soil preparation work including topsoil stripping and stockpiling, turf and grass placement, plant installations, and tree transplanting. Contractors must conduct preconstruction soil testing through qualified laboratories, with samples collected by certified soil scientists. Minimum three representative soil samples from varied locations must be tested for particle size distribution, organic matter content, soluble salts, and other parameters through Pennsylvania State University's Agricultural Analytical Services Laboratory. The specification references related work sections and the City of Lancaster Tree Manual for compliance with topsoil specifications at street tree plantings.

The specification establishes detailed product requirements for topsoil, inorganic soil amendments (lime, sulfur, iron sulfate, perlite, agricultural gypsum, and sand), and organic soil amendments (compost). Topsoil must contain between 5.0 and 8.0 percent organic matter and conform to specified grain size distribution requirements, with a maximum two-inch particle size and no more than 20 percent retained on a number 10 sieve by weight. Compost products must bear the U.S. Composting Council's "Seal of Testing Assurance" and meet standards for pH (5.5 to 8), moisture content (35 to 55 percent), organic matter content (greater than 40 percent dry weight), and bulk density (less than 1,000 pounds per cubic yard). All packaged materials must be delivered in original, unopened containers with certified analysis and manufacturer information, while bulk materials require certificates of compliance accompanying each delivery.

View the file

Other files

File Type Posted
334100 - STORM UTILITY DRAINAGE PIPING.pdf PDF
C08 - Construction Plan.pdf PDF
2026-10-14 - CD Addendum 2.pdf PDF
B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
C05 - Site Civil Specifications Combined.pdf PDF
ES-LOD-NPDES.dwg DWG drawing
321723 - PAVEMENT MARKINGS.pdf PDF
CD-18 UTILITY PLAN.pdf PDF
C10 - Geotechnical Report.pdf PDF
Layout.dwg DWG drawing
Addendum 03 Arch Front End Specs.pdf PDF
2026-10-06 - Civil Addendum 1.pdf PDF
C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
2026-10-29 - ES Addendum 4.pdf PDF
25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
CD-17 UTILITY PLAN.pdf PDF
Existing.dwg DWG drawing
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
25061 - Addendum 1.pdf PDF
ES.dwg DWG drawing
C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
2026-10-29 - CD Addendum 4.pdf PDF
FINAL QA Report.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
312000 - EARTH MOVING.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
Landscape.dwg DWG drawing
Demolition.dwg DWG drawing
B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
C04 - Operations Facilities Expansion - Bid Specs - Vol II.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 2.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.pdf PDF
EG.dwg DWG drawing
Easements.dwg DWG drawing
Pre-Bid QA Ops Center Expansion 10072026.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Profiles-Utilities.dwg DWG drawing
2026-10-06 - ES Addendum 1.pdf PDF
C09 - Fill Assessment Summary.pdf PDF
C07 - ES Plan.pdf PDF
B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
Addendum 04 Arch MEP Specs.pdf PDF
C01 - Standard General Conditions of the Contract.pdf PDF
CD-16 UTILITY PLAN.pdf PDF
PG.dwg DWG drawing
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operations Center Expansion RGS 2025992-044

City of Lancaster - Department of Public Works

SOIL PREPARATION 329113

SECTION 329113 – SOIL PREPARATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

B. City of Lancaster Tree Manual for topsoil specifications to be used at street tree plantings only.

1.2 SUMMARY

A. Section includes planting soils and layered soil assemblies including:

1. Lawn Medium

2. Planting Medium

B. Related Requirements:

1. Section 311000 "Site Clearing" for topsoil stripping and stockpiling.

2. Section 329200 "Turf and Grasses" for placing planting soil for turf and grasses.

3. Section 329300 "Plants" for placing planting soil for plantings.

4. Section 329600 “Transplanting” for placing planting soil in tree planting pits

1.3 ALLOWANCES

A. Preconstruction and field quality-control testing are part of testing and inspecting allowance.

1.4 DEFINITIONS

A. AAPFCO: Association of American Plant Food Control Officials.

B. Backfill: The earth used to replace or the act of replacing earth in an excavation. This can be amended or unamended soil as indicated.

C. CEC: Cation exchange capacity.

D. Compost: The product resulting from the controlled biological decomposition of organic material that has been sanitized through the generation of heat and stabilized to the point that it is beneficial to plant growth.

E. Duff Layer: A surface layer of soil, typical of forested areas, that is composed of mostly decayed leaves, twigs, and detritus.

F. Imported Soil: Soil that is transported to Project site for use.

G. Layered Soil Assembly: A designed series of planting soils, layered on each other, that together produce an environment for plant growth.

H. Manufactured Soil: Soil produced by blending soils, sand, stabilized organic soil amendments, and other materials to produce planting soil.

I. NAPT: North American Proficiency Testing Program. An SSSA program to assist soil-, plant-, and water-testing laboratories through interlaboratory sample exchanges and statistical evaluation of analytical data.

J. Organic Matter: The total of organic materials in soil exclusive of undecayed plant and animal tissues, their partial decomposition products, and the soil biomass; also called "humus" or "soil organic matter."

K. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified as specified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

L. RCRA Metals: Hazardous metals identified by the EPA under the Resource Conservation and

Recovery Act.

M. SSSA: Soil Science Society of America.

N. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.

O. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

P. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil"; but in disturbed areas such as urban environments, the surface soil can be subsoil.

Q. USCC: U.S. Composting Council.

1.5 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.6 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include recommendations for application and use.

2. Include test data substantiating that products comply with requirements.

3. Include sieve analyses for aggregate materials.

4. Material Certificates: For each type of imported soil, soil amendment and fertilizer before delivery to the site, according to the following:

a. Manufacturer's qualified testing agency's certified analysis of standard products.

b. Analysis of fertilizers, by a qualified testing agency, made according to AAPFCO methods for testing and labeling and according to AAPFCO's SUIP #25.

c. Analysis of nonstandard materials, by a qualified testing agency, made according to

SSSA methods, where applicable.

1.7 INFORMATIONAL SUBMITTALS

A. Qualification Data: For each testing agency.

B. Preconstruction Test Reports: For preconstruction soil analyses specified in "Preconstruction

Testing" Article.

C. Field quality-control reports.

1.8 QUALITY ASSURANCE

A. Testing Agency Qualifications: An independent, state-operated, or university-operated laboratory; experienced in soil science, soil testing, and plant nutrition; with the experience and capability to conduct the testing indicated; and that specializes in types of tests to be performed.

1. Laboratories: Subject to compliance with requirements, provide testing by a laboratory such as but not limited to:

a. Pennsylvania State University’s Agricultural Analytical Services Laboratory.

2. Multiple Laboratories: At Contractor's option, work may be divided among qualified testing laboratories specializing in physical testing, chemical testing, and fertility testing.

1.9 SOIL-SAMPLING REQUIREMENTS

A. General: Extract soil samples according to requirements in this article.

B. Sample Collection and Labeling: Have samples taken and labeled by soil scientist (CPSS) certified by SSSA, soil classifier (CPSC) certified by SSSA, soil scientist (RPSS) registered by the National Society of Consulting Soil Scientists or state-certified, -licensed, or -registered soil scientist under the direction of the testing agency.

1. Number and Location of Samples: Minimum of three (3) representative soil samples from varied locations for each soil to be used or amended for landscaping purposes.

2. Procedures and Depth of Samples: According to USDA-NRCS's "Field Book for

Describing and Sampling Soils.”

3. Division of Samples: Split each sample into two, equal parts. Send half to the testing agency and half to Owner for its records.

4. Labeling: Label each sample with the date, location keyed to a site plan or other location system, visible soil condition, and sampling depth.

1.10 TESTING REQUIREMENTS

A. General: Perform tests on soil samples according to requirements in this article.

B. The following test shall be obtained via Penn State College of Agricultural Sciences –

Agricultural Analytical Services Lab:

1. Partial Size Test

2. Standard Multiple Soil Test Kit

3. Organic Matter

4. Soluble Salts

C. Recommendations: Based on the test results, state recommendations for soil treatments and soil amendments to be incorporated to produce satisfactory planting soil suitable for healthy, viable plants indicated. Include, at a minimum, recommendations for nitrogen, phosphorous, and potassium fertilization, and for micronutrients.

1. Fertilizers and Soil Amendment Rates: State recommendations in weight per 1000 sq. ft.

for 6-inch depth of soil.

2. Soil Reaction: State the recommended liming rates for raising pH or sulfur for lowering pH according to the buffered acidity or buffered alkalinity in weight per 1000 sq. ft. for 6-inch depth of soil.

1.11 DELIVERY, STORAGE, AND HANDLING

A. Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and compliance with state and

Federal laws if applicable.

B. Bulk Materials:

1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants.

2. Provide erosion-control measures to prevent erosion or displacement of bulk materials, discharge of soil-bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways.

3. Do not move or handle materials when they are wet or frozen.

4. Accompany each delivery of bulk fertilizers and soil amendments with appropriate certificates.

PART 2 - PRODUCTS

2.1 TOPSOIL

A. Topsoil shall be existing topsoil stripped and stockpiled at the site or shall be imported. Stripped topsoil shall be sampled and tested for grain size distribution and organic content according to tests as specified. Test results shall be reported to the Landscape Architect who may make minor adjustments to specified approximate mixing ratios and mix requirements for each mix type.

1. Stripped topsoil which has been contaminated by incorporation of subsoil shall not be acceptable for use and shall be replaced with imported topsoil meeting specification requirements at no cost to be owner.

B. Base Loam as required for the work shall be free of subsoil, large stones, earth clods, sticks, stumps, clay lumps, roots or other objectionable, extraneous matter or debris. Base Loam shall also be free of quack-grass rhizomes, Agropyron Repens, and the nut-like tubers of nutgrass, Cyperus Esculentus, and all other primary noxious weeds. Base Loam shall not be delivered or used for planting while in a frozen or muddy condition. Base Loam for mixing shall conform to the following grain size distribution for material passing the #10 sieve:

C. The ratio of the particle size for 80% passing (D80) to the particle size for 30% passing (D30) shall be 8 or less. (D80/D30 < 8).

D. Maximum size shall be two-inch largest dimension. The maximum retained on the #10 sieve shall be 20% by weight of the total sample.

E. The organic content shall be between 5.0 and 8.0 percent.

2.2 INORGANIC SOIL AMENDMENTS

A. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows:

1. Class: T, with a minimum of 99 percent passing through a No. 8 (2.36-mm) sieve and a minimum of 75 percent passing through a No. 60 (0.25-mm) sieve.

2. Class: O, with a minimum of 95 percent passing through a No. 8 (2.36-mm) sieve and a minimum of 55 percent passing through a No. 60 (0.25-mm) sieve.

3. Form: Provide lime in form of ground dolomitic limestone, calcitic limestone or mollusk shells.

B. Sulfur: Granular, biodegradable, and containing a minimum of 90 percent elemental sulfur, with a minimum of 99 percent passing through a No. 6 (3.35-mm) sieve and a maximum of 10 percent passing through a No. 40 (0.425-mm) sieve.

C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

Percent Passing

U.S. Sieve Size Number Minimum Maximum

10 --- 100 18 85 100 35 70 95 60 50 85 140 36 53 270 32 42 0.002mm 3 6

D. Perlite: Horticultural perlite, soil amendment grade.

E. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through a No. 50 (0.30-mm) sieve.

F. Sand: Clean, washed, natural or manufactured, free of toxic materials, and according to

ASTM C 33/C 33M.

2.3 ORGANIC SOIL AMENDMENTS

A. Compost: Well-composted, stable, and weed-free organic matter produced by composting feedstock, and bearing USCC's "Seal of Testing Assurance," and as follows:

1. Reaction: pH of 5.5 to 8

2. Soluble-Salt Concentration: Less than 4 mmhos (dS).

3. Moisture Content: 35 to 55 percent by weight.

4. Organic-Matter Content: greater than 40% of dry weight.

5. Particle Size: Minimum of 98 percent passing through a 1-inch sieve.

6. C:N Ratio: 50-30:1

7. Bulk Density: Less than 1,000 lbs/cy

8. Foreign Matter: <1% BU weight

9. Organic Matter (Compost) for amending planting medium: stable, humus-like material produced from the aerobic decomposition of organic residues consisting of Leaf or Yard

Waste Compost which shall be composted for a minimum of one year (12 months).

Compost shall be free of debris such as plastics, metal, concrete or other debris and stones larger than 1/2", larger branches and roots and wood chips over 1/2" in length or diameter.

Compost shall be a dark brown to black color and be capable of supporting plant growth with appropriate management practices in conjunction with addition of fertilizer and other amendments as applicable, with no visible free water or dust, with no unpleasant odor, and meeting the following criteria as reported by laboratory tests.

10. Feedstock: limited to leaves

B. Milorganite or approved equal

2.4 FERTILIZERS

A. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified testing agency.

2. Composition: 1 lb/1000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

B. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified testing agency.

2. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

2.5 LAWN MEDIUM

A. Topsoil, compost and other amendments above shall be combined as recommended by the results of required testing to support lawn growth.

B. Gradation for Material Passing the Number 10 Sieve:

1. Maximum size shall be one inch largest dimension. The maximum retained on the #10 sieve shall be 20% by weight of the total sample.

2. Ratio of the particle size for 80% passing (D80) to the particle size for 30% passing (D30) shall be 5.5 or less. (D80/D30 <5.5)

3. Saturated hydraulic conductivity of the mix: not less than 3 inches per hour according to

ASTM D5856-95 (2000) when compacted to a minimum of 88% Standard Proctor, ASTM

698.

4. Organic content: between 4 and 5.5 percent by weight

2.6 PLANTING MEDIUM

A. Topsoil, compost and other amendments each as specified above shall be combined as recommended by the results of required testing to support landscape plant growth (herbaceous perennials, shrubs and trees).

B. When soil testing indicates that the existing or imported topsoil will not meet the gradation requirements of 2.1.B, Sand, Compost, and/or alternate Topsoil, each as specified above, shall be combined at a ratio to achieve the requirement in 2.5.C.

Percent Passing

U.S. Sieve Size Number Minimum Maximum

10 100 --- 18 70 90 35 45 72 60 26 40 140 15 22 270 11 14 0.002mm 2 5

C. Gradation for Material Passing the Number 10 Sieve:

1. Maximum size shall be one inch largest dimension. The maximum retained on the #10 sieve shall be 20% by weight of the total sample.

2. Ratio of the particle size for 80% passing (D80) to the particle size for 30% passing (D30) shall be 6.5 or less. (D80/D30 <6.5)

3. Saturated hydraulic conductivity of the mix: not less than 2 inches per hour according to

ASTM D5856-95 (2000) when compacted to a minimum of 86% Standard Proctor, ASTM

698.

4. Organic content: between 5.0 and 8.0 percent by weight.

PART 3 - EXECUTION

3.1 GENERAL

A. Place planting soil and fertilizers according to requirements in other Specification Sections.

B. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in planting soil.

C. Proceed with placement only after unsatisfactory conditions have been corrected.

D. Proceed with placement only after all utility work in surrounding area has been completed.

3.2 PREPARATION OF UNAMENDED, ON-SITE SOIL BEFORE AMENDING

A. Excavation: Excavate soil from designated area(s) to a depth of 6 inches (150 mm and stockpile until amended.

B. Unacceptable Materials: Clean soil of concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials that are harmful to plant growth.

C. Unsuitable Materials: Clean soil to contain a maximum of 8 percent by dry weight of stones, roots, plants, sod, clay lumps, and pockets of coarse sand.

U.S. Sieve Size Number Minimum Maximum

10 100 - 18 73 90 35 54 74 60 33 53 140 22 34 270 18 26 0.002mm 2.5 6

3.3 PLACING AND MIXING PLANTING SOIL OVER EXPOSED SUBGRADE

A. General: Apply and mix unamended soil with amendments on-site to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches. Remove stones larger than

1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Apply, add soil amendments, and mix approximately half the thickness of unamended soil over prepared, loosened subgrade according to "Mixing" Paragraph below. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil.

C. Mixing: Spread unamended soil to total depth as indicated but not less than required to meet finish grades after mixing with amendments and natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.

1. Amendments: Apply soil amendments, and fertilizer, if required, evenly on surface, and thoroughly blend them with unamended soil to produce planting soil.

a. Mix lime and sulfur with dry soil before mixing fertilizer.

b. Mix fertilizer with planting soil no more than seven days before planting.

2. Lifts: Apply and mix unamended soil and amendments in lifts not exceeding 8 inches in loose depth for material compacted by compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

D. Compaction: Compact each blended lift of planting soil to 75 to 82 percent of maximum Standard

Proctor density according to ASTM D 698 and tested in-place, except where a different compaction value is indicated on Drawings.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.4 PLACING MANUFACTURED PLANTING SOIL OVER EXPOSED SUBGRADE

A. General: Apply manufactured soil on-site in its final, blended condition. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches. Remove stones larger than

1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Apply approximately half the thickness of planting soil over prepared, loosened subgrade.

Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil.

C. Application: Spread planting soil to total depth as indicated on Drawings, but not less than required to meet finish grades after natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.

1. Lifts: Apply planting soil in lifts not exceeding 8 inches loose depth for material compacted by compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

D. Compaction: Compact each lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 except where a different compaction value is indicated on

Drawings.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.5 BLENDING PLANTING SOIL IN PLACE

A. General: Mix amendments with in-place, unamended soil to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Preparation: Till unamended, existing soil in planting areas to a minimum depth as indicated on

Drawings. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

C. Mixing: Apply soil amendments, and fertilizer, if required, evenly on surface, and thoroughly blend them into full depth of unamended, in-place soil to produce planting soil.

1. Mix lime and sulfur with dry soil before mixing fertilizer.

2. Mix fertilizer with planting soil no more than seven days before planting.

D. Compaction: Compact blended planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 except where a different compaction value is indicated on

Drawings.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.6 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

B. Perform the following tests and inspections:

1. Compaction: Test planting-soil compaction after placing each lift and at completion using a densitometer or soil-compaction meter calibrated to a reference test value based on laboratory testing according to ASTM D 698. Space tests at no less than one for each 1000

sq. ft. of in-place soil or part thereof.

C. Soil will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

E. Label each sample and test report with the date, location keyed to a site plan or other location system, visible conditions when and where sample was taken, and sampling depth.

3.7 PROTECTION

A. Protect areas of in-place soil from additional compaction, disturbance, and contamination.

Prohibit the following practices within these areas except as required to perform planting operations:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Vehicle traffic.

4. Foot traffic.

5. Erection of sheds or structures.

6. Impoundment of water.

7. Excavation or other digging unless otherwise indicated.

B. If planting soil or subgrade is overcompacted, disturbed, or contaminated by foreign or deleterious materials or liquids, remove the planting soil and contamination; restore the subgrade as directed by Landscape Architect/Engineer and replace contaminated planting soil with new planting soil.

3.8 CLEANING

A. Protect areas adjacent to planting-soil preparation and placement areas from contamination. Keep adjacent paving and construction clean and work area in an orderly condition.

B. Remove surplus soil and waste material including excess subsoil, unsuitable materials, trash, and debris and legally dispose of them off Owner's property unless otherwise indicated.

END OF SECTION

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
B. City of Lancaster Tree Manual for topsoil specifications to be used at street tree plantings only.
1.2 SUMMARY
A. Section includes planting soils and layered soil assemblies including:
1. Lawn Medium
2. Planting Medium
B. Related Requirements:
1. Section 311000 "Site Clearing" for topsoil stripping and stockpiling.
2. Section 329200 "Turf and Grasses" for placing planting soil for turf and grasses.
3. Section 329300 "Plants" for placing planting soil for plantings.
4. Section 329600 “Transplanting” for placing planting soil in tree planting pits
1.3 ALLOWANCES
A. Preconstruction and field quality-control testing are part of testing and inspecting allowance.
1.4 DEFINITIONS
A. AAPFCO: Association of American Plant Food Control Officials.
B. Backfill: The earth used to replace or the act of replacing earth in an excavation. This can be amended or unamended soil as indicated.
C. CEC: Cation exchange capacity.
D. Compost: The product resulting from the controlled biological decomposition of organic material that has been sanitized through the generation of heat and stabilized to the point that it is beneficial to plant growth.
E. Duff Layer: A surface layer of soil, typical of forested areas, that is composed of mostly decayed leaves, twigs, and detritus.
F. Imported Soil: Soil that is transported to Project site for use.
G. Layered Soil Assembly: A designed series of planting soils, layered on each other, that together produce an environment for plant growth.
H. Manufactured Soil: Soil produced by blending soils, sand, stabilized organic soil amendments, and other materials to produce planting soil.
I. NAPT: North American Proficiency Testing Program. An SSSA program to assist soil-, plant-, and water-testing laboratories through interlaboratory sample exchanges and statistical evaluation of analytical data.
J. Organic Matter: The total of organic materials in soil exclusive of undecayed plant and animal tissues, their partial decomposition products, and the soil biomass; also called "humus" or "soil organic matter."
K. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified as specified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.
L. RCRA Metals: Hazardous metals identified by the EPA under the Resource Conservation and Recovery Act.
M. SSSA: Soil Science Society of America.
N. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.
O. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.
P. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil"; but in disturbed areas such as urban environments, the surface soil can be subsoil.
Q. USCC: U.S. Composting Council.
1.5 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include recommendations for application and use.
2. Include test data substantiating that products comply with requirements.
3. Include sieve analyses for aggregate materials.
4. Material Certificates: For each type of imported soil, soil amendment and fertilizer before delivery to the site, according to the following:
a. Manufacturer's qualified testing agency's certified analysis of standard products.
b. Analysis of fertilizers, by a qualified testing agency, made according to AAPFCO methods for testing and labeling and according to AAPFCO's SUIP #25.
c. Analysis of nonstandard materials, by a qualified testing agency, made according to SSSA methods, where applicable.
1.7 INFORMATIONAL SUBMITTALS
A. Qualification Data: For each testing agency.
B. Preconstruction Test Reports: For preconstruction soil analyses specified in "Preconstruction Testing" Article.
C. Field quality-control reports.
1.8 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent, state-operated, or university-operated laboratory; experienced in soil science, soil testing, and plant nutrition; with the experience and capability to conduct the testing indicated; and that speciali...
1. Laboratories: Subject to compliance with requirements, provide testing by a laboratory such as but not limited to:
a. Pennsylvania State University’s Agricultural Analytical Services Laboratory.

2. Multiple Laboratories: At Contractor's option, work may be divided among qualified testing laboratories specializing in physical testing, chemical testing, and fertility testing.

1.9 SOIL-SAMPLING REQUIREMENTS
A. General: Extract soil samples according to requirements in this article.
B. Sample Collection and Labeling: Have samples taken and labeled by soil scientist (CPSS) certified by SSSA, soil classifier (CPSC) certified by SSSA, soil scientist (RPSS) registered by the National Society of Consulting Soil Scientists or state-cer...
1. Number and Location of Samples: Minimum of three (3) representative soil samples from varied locations for each soil to be used or amended for landscaping purposes.
2. Procedures and Depth of Samples: According to USDA-NRCS's "Field Book for Describing and Sampling Soils.”
3. Division of Samples: Split each sample into two, equal parts. Send half to the testing agency and half to Owner for its records.
4. Labeling: Label each sample with the date, location keyed to a site plan or other location system, visible soil condition, and sampling depth.
1.10 TESTING REQUIREMENTS
A. General: Perform tests on soil samples according to requirements in this article.
B. The following test shall be obtained via Penn State College of Agricultural Sciences – Agricultural Analytical Services Lab:
1. Partial Size Test
2. Standard Multiple Soil Test Kit
3. Organic Matter
4. Soluble Salts
C. Recommendations: Based on the test results, state recommendations for soil treatments and soil amendments to be incorporated to produce satisfactory planting soil suitable for healthy, viable plants indicated. Include, at a minimum, recommendations...
1. Fertilizers and Soil Amendment Rates: State recommendations in weight per 1000 sq. ft. for 6-inch depth of soil.
2. Soil Reaction: State the recommended liming rates for raising pH or sulfur for lowering pH according to the buffered acidity or buffered alkalinity in weight per 1000 sq. ft. for 6-inch depth of soil.
1.11 DELIVERY, STORAGE, AND HANDLING
A. Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and compliance with state and Federal laws if applicable.
B. Bulk Materials:
1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants.
2. Provide erosion-control measures to prevent erosion or displacement of bulk materials, discharge of soil-bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways.
3. Do not move or handle materials when they are wet or frozen.
4. Accompany each delivery of bulk fertilizers and soil amendments with appropriate certificates.
PART 2 - PRODUCTS
2.1 TOPSOIL
A. Topsoil shall be existing topsoil stripped and stockpiled at the site or shall be imported. Stripped topsoil shall be sampled and tested for grain size distribution and organic content according to tests as specified. Test results shall be report...
1. Stripped topsoil which has been contaminated by incorporation of subsoil shall not be acceptable for use and shall be replaced with imported topsoil meeting specification requirements at no cost to be owner.
B. Base Loam as required for the work shall be free of subsoil, large stones, earth clods, sticks, stumps, clay lumps, roots or other objectionable, extraneous matter or debris. Base Loam shall also be free of quack-grass rhizomes, Agropyron Repens, a...
C. The ratio of the particle size for 80% passing (D80) to the particle size for 30% passing (D30) shall be 8 or less. (D80/D30 < 8).
D. Maximum size shall be two-inch largest dimension. The maximum retained on the #10 sieve shall be 20% by weight of the total sample.
E. The organic content shall be between 5.0 and 8.0 percent.
2.2 INORGANIC SOIL AMENDMENTS
A. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows:
1. Class: T, with a minimum of 99 percent passing through a No. 8 (2.36-mm) sieve and a minimum of 75 percent passing through a No. 60 (0.25-mm) sieve.
2. Class: O, with a minimum of 95 percent passing through a No. 8 (2.36-mm) sieve and a minimum of 55 percent passing through a No. 60 (0.25-mm) sieve.
3. Form: Provide lime in form of ground dolomitic limestone, calcitic limestone or mollusk shells.
B. Sulfur: Granular, biodegradable, and containing a minimum of 90 percent elemental sulfur, with a minimum of 99 percent passing through a No. 6 (3.35-mm) sieve and a maximum of 10 percent passing through a No. 40 (0.425-mm) sieve.
C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.
D. Perlite: Horticultural perlite, soil amendment grade.
E. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through a No. 50 (0.30-mm) sieve.
F. Sand: Clean, washed, natural or manufactured, free of toxic materials, and according to ASTM C 33/C 33M.
2.3 ORGANIC SOIL AMENDMENTS
A. Compost: Well-composted, stable, and weed-free organic matter produced by composting feedstock, and bearing USCC's "Seal of Testing Assurance," and as follows:
1. Reaction: pH of 5.5 to 8
2. Soluble-Salt Concentration: Less than 4 mmhos (dS).
3. Moisture Content: 35 to 55 percent by weight.
4. Organic-Matter Content: greater than 40% of dry weight.
5. Particle Size: Minimum of 98 percent passing through a 1-inch sieve.
6. C:N Ratio: 50-30:1
7. Bulk Density: Less than 1,000 lbs/cy
8. Foreign Matter: <1% BU weight
9. Organic Matter (Compost) for amending planting medium: stable, humus-like material produced from the aerobic decomposition of organic residues consisting of Leaf or Yard Waste Compost which shall be composted for a minimum of one year (12 months)....
10. Feedstock: limited to leaves

B. Milorganite or approved equal

2.4 FERTILIZERS
A. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following compo...
1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified testing agency.
2. Composition: 1 lb/1000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.
B. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:
1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified testing agency.
2. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.
2.5 LAWN MEDIUM
A. Topsoil, compost and other amendments above shall be combined as recommended by the results of required testing to support lawn growth.
B. Gradation for Material Passing the Number 10 Sieve:
1. Maximum size shall be one inch largest dimension. The maximum retained on the #10 sieve shall be 20% by weight of the total sample.
2. Ratio of the particle size for 80% passing (D80) to the particle size for 30% passing (D30) shall be 5.5 or less. (D80/D30 <5.5)
3. Saturated hydraulic conductivity of the mix: not less than 3 inches per hour according to ASTM D5856-95 (2000) when compacted to a minimum of 88% Standard Proctor, ASTM 698.
4. Organic content: between 4 and 5.5 percent by weight
2.6 PLANTING MEDIUM
A. Topsoil, compost and other amendments each as specified above shall be combined as recommended by the results of required testing to support landscape plant growth (herbaceous perennials, shrubs and trees).
B. When soil testing indicates that the existing or imported topsoil will not meet the gradation requirements of 2.1.B, Sand, Compost, and/or alternate Topsoil, each as specified above, shall be combined at a ratio to achieve the requirement in 2.5.C.
C. Gradation for Material Passing the Number 10 Sieve:
1. Maximum size shall be one inch largest dimension. The maximum retained on the #10 sieve shall be 20% by weight of the total sample.
2. Ratio of the particle size for 80% passing (D80) to the particle size for 30% passing (D30) shall be 6.5 or less. (D80/D30 <6.5)
3. Saturated hydraulic conductivity of the mix: not less than 2 inches per hour according to ASTM D5856-95 (2000) when compacted to a minimum of 86% Standard Proctor, ASTM 698.
4. Organic content: between 5.0 and 8.0 percent by weight.
PART 3 - EXECUTION
3.1 GENERAL
A. Place planting soil and fertilizers according to requirements in other Specification Sections.
B. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been depo...
C. Proceed with placement only after unsatisfactory conditions have been corrected.
D. Proceed with placement only after all utility work in surrounding area has been completed.
3.2 PREPARATION OF UNAMENDED, ON-SITE SOIL BEFORE AMENDING
A. Excavation: Excavate soil from designated area(s) to a depth of 6 inches (150 mm and stockpile until amended.
B. Unacceptable Materials: Clean soil of concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials that are harmful...
C. Unsuitable Materials: Clean soil to contain a maximum of 8 percent by dry weight of stones, roots, plants, sod, clay lumps, and pockets of coarse sand.
3.3 PLACING AND MIXING PLANTING SOIL OVER EXPOSED SUBGRADE
A. General: Apply and mix unamended soil with amendments on-site to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.
B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.
1. Apply, add soil amendments, and mix approximately half the thickness of unamended soil over prepared, loosened subgrade according to "Mixing" Paragraph below. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil.
C. Mixing: Spread unamended soil to total depth as indicated but not less than required to meet finish grades after mixing with amendments and natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.
1. Amendments: Apply soil amendments, and fertilizer, if required, evenly on surface, and thoroughly blend them with unamended soil to produce planting soil.
a. Mix lime and sulfur with dry soil before mixing fertilizer.
b. Mix fertilizer with planting soil no more than seven days before planting.

2. Lifts: Apply and mix unamended soil and amendments in lifts not exceeding 8 inches in loose depth for material compacted by compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

D. Compaction: Compact each blended lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 and tested in-place, except where a different compaction value is indicated on Drawings.
E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.
3.4 PLACING MANUFACTURED PLANTING SOIL OVER EXPOSED SUBGRADE
A. General: Apply manufactured soil on-site in its final, blended condition. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.
B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.
1. Apply approximately half the thickness of planting soil over prepared, loosened subgrade. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil.
C. Application: Spread planting soil to total depth as indicated on Drawings, but not less than required to meet finish grades after natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.
1. Lifts: Apply planting soil in lifts not exceeding 8 inches loose depth for material compacted by compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.
D. Compaction: Compact each lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 except where a different compaction value is indicated on Drawings.
E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.
3.5 BLENDING PLANTING SOIL IN PLACE
A. General: Mix amendments with in-place, unamended soil to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.
B. Preparation: Till unamended, existing soil in planting areas to a minimum depth as indicated on Drawings. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them of...
C. Mixing: Apply soil amendments, and fertilizer, if required, evenly on surface, and thoroughly blend them into full depth of unamended, in-place soil to produce planting soil.
1. Mix lime and sulfur with dry soil before mixing fertilizer.
2. Mix fertilizer with planting soil no more than seven days before planting.
D. Compaction: Compact blended planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 except where a different compaction value is indicated on Drawings.
E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.
3.6 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B. Perform the following tests and inspections:
1. Compaction: Test planting-soil compaction after placing each lift and at completion using a densitometer or soil-compaction meter calibrated to a reference test value based on laboratory testing according to ASTM D 698. Space tests at no less than ...
C. Soil will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports.
E. Label each sample and test report with the date, location keyed to a site plan or other location system, visible conditions when and where sample was taken, and sampling depth.
3.7 PROTECTION
A. Protect areas of in-place soil from additional compaction, disturbance, and contamination. Prohibit the following practices within these areas except as required to perform planting operations:
1. Storage of construction materials, debris, or excavated material.
2. Parking vehicles or equipment.
3. Vehicle traffic.
4. Foot traffic.
5. Erection of sheds or structures.
6. Impoundment of water.
7. Excavation or other digging unless otherwise indicated.

B. If planting soil or subgrade is overcompacted, disturbed, or contaminated by foreign or deleterious materials or liquids, remove the planting soil and contamination; restore the subgrade as directed by Landscape Architect/Engineer and replace conta...

3.8 CLEANING
A. Protect areas adjacent to planting-soil preparation and placement areas from contamination. Keep adjacent paving and construction clean and work area in an orderly condition.
B. Remove surplus soil and waste material including excess subsoil, unsuitable materials, trash, and debris and legally dispose of them off Owner's property unless otherwise indicated.