25061 - Addendum 1.pdf

PDF 377 KB Posted

Attached to
B861-26-01 MULTIPRIME - NEW CONSTRUCTION Operations Facility Expansion Project
Solicitation number
US.254234
Issued by
Lancaster County, Pennsylvania

About this file

Addendum No. 1 Summary

This is an Addendum No. 1 document issued by Beers + Hoffman architects on behalf of the City of Lancaster Department of Public Works for the Operations Facilities Expansion Project (BH Project #25-061). The addendum modifies the original bid documents dated September 8, 2026, and was issued on October 6, 2026, to clarify, amend, and supersede portions of the contract drawings and specifications. The project involves construction of five new buildings: a warehouse, salt shed, covered shed, and material shed, along with associated mechanical, electrical, plumbing, and fire protection systems. The addendum includes revisions to Section 133419 (Pre-Engineered Metal Building Systems), with a specification change to revise the finish to Gray Primer, and updates to 20 drawing sheets that modify details related to roof loading for future solar panels, metal liner panels, column placement, floor slab/paving notes, bar joist specifications, foundation plans, HVAC details, fire protection zoning, electrical one-line diagrams, and emergency generator pad details.

The addendum does not contain information regarding pricing terms, set-asides, incumbents, funding sources, or other financial requirements, as it functions solely as a technical modification to the contract documents. All changes have been incorporated as part of the Contract Documents for the subject project and must be considered by bidders submitting proposals. The addendum applies to the multiprime contract structure consisting of General Construction, Mechanical, Electrical, Plumbing, and Fire Protection trades, with bids due on October 28, 2026, at 11:00 AM through the PennBid website.

View the file

Other files

File Type Posted
334100 - STORM UTILITY DRAINAGE PIPING.pdf PDF
C08 - Construction Plan.pdf PDF
2026-10-14 - CD Addendum 2.pdf PDF
B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
C05 - Site Civil Specifications Combined.pdf PDF
ES-LOD-NPDES.dwg DWG drawing
321723 - PAVEMENT MARKINGS.pdf PDF
CD-18 UTILITY PLAN.pdf PDF
C10 - Geotechnical Report.pdf PDF
Layout.dwg DWG drawing
Addendum 03 Arch Front End Specs.pdf PDF
2026-10-06 - Civil Addendum 1.pdf PDF
C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
2026-10-29 - ES Addendum 4.pdf PDF
25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
CD-17 UTILITY PLAN.pdf PDF
Existing.dwg DWG drawing
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
ES.dwg DWG drawing
C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
2026-10-29 - CD Addendum 4.pdf PDF
FINAL QA Report.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
312000 - EARTH MOVING.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
Landscape.dwg DWG drawing
Demolition.dwg DWG drawing
B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
C04 - Operations Facilities Expansion - Bid Specs - Vol II.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 2.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.pdf PDF
EG.dwg DWG drawing
Easements.dwg DWG drawing
Pre-Bid QA Ops Center Expansion 10072026.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Profiles-Utilities.dwg DWG drawing
2026-10-06 - ES Addendum 1.pdf PDF
C09 - Fill Assessment Summary.pdf PDF
329113 - SOIL PREPARATION.pdf PDF
C07 - ES Plan.pdf PDF
B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
Addendum 04 Arch MEP Specs.pdf PDF
C01 - Standard General Conditions of the Contract.pdf PDF
CD-16 UTILITY PLAN.pdf PDF
PG.dwg DWG drawing
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LITITZ LANCASTER LEBANON

www.BEERSHOFFMAN.com

Beers + Hoffman

Scott L. Shonk, AIA, LEED AP

Peter D. Kerekgyarto, AIA, LEED AP

Robert P. Hoffman, AIA

BH Project #: 25-061

Operations Facilities Expansion

City of Lancaster – Department of Public Works

Addendum No. 1

6 October 2026

Notice to all bidders

This Addendum forms a part of the Contract Documents and modifies the original Bid documents dated

September 8, 2026. The Contract Documents for the above-referenced Project are being modified as set forth in this

Addendum. This addendum is issued to clarify, amend, or supersede the drawings and specifications as applicable and shall become a part of the Contract Documents for the subject project as if fully incorporated and bound therein.

ATTACHMENTS:

• Revised Specifications:

o Section 133419 – PRE-ENGINEERED METAL BUILDING SYSTEMS

• Revised Drawings:

o A100 – OVERALL SITE LAYOUT & ROOF PLANS & SOUTH ELEVATION - PROPOSED o A101 – (W) WAREHOUSE PLAN – FIRST FLOOR - PROPOSED o A102 – (W) WAREHOUSE PLAN – MEZZANINE FLOOR - PROPOSED o A103 – (S) SALT SHED PLAN – PROPOSED, EXTERIOR ELEVATIONS, MISC. INFO.

o A104 – (C) COVERED SHED PLAN – PROPOSED & EXTERIOR ELEVATIONS o A105 – (M) MATERIAL SHED PLAN – PROPOSED & EXTERIOR ELEVATIONS o A111 – (W) WAREHOUSE PLAN – FIRST FLOOR – REFLECTED CEILING & DETAILS o A301 – (W) WAREHOUSE – BUILDING SECTIONS o A302 – (W) WAREHOUSE – BUILDING SECTIONS & WALL SECTIONS o A303 – (S) SALT, (C) COVERED & (M) MATERIAL SHEDS – BUILDING SECTIONS o A514 – (C) COVERED & (M) MATERIAL SHED – WALL SECTIONS & DETAILS o S103 – SALT SHED FOUNDATION AND ROOF FRAMING PLANS o S104 – COVERED SHED FOUNDATION PLAN o S105 – MATERIAL SHED FOUNDATION AND ROOF FRAMING PLAN o H001 – HVAC LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS o FP100 – FIRST FLOOR PLAN – FIRE PROTECTION o E001 – ABBREVIATIONS, NOTES & SCHEDULES o E002 – SCHEDULES AND DETAILS

SPECIFICATION CHANGES:

• Section 133419 – PRE-ENGINEERED METAL BUILDING SYSTEMS: Delete Section in its entirety and replace with revised section.

a. 2.2_D_8. Revise finish to Gray Primer.

DRAWING CHANGES:

• Drawing A100 – OVERALL SITE LAYOUT & ROOF PLANS & SOUTH ELEVATION - PROPOSED

a. (W) Warehouse Roof Plan: added note regarding roof loading for future solar panels

b. (C) Covered Shed Roof Plan: added note regarding roof loading for future solar panels

• Drawing A101 – (W) WAREHOUSE PLAN – FIRST FLOOR - PROPOSED

a. Added notes regarding metal liner panels at exterior walls

b. Added columns and column notes at Archive Shelving Room (W104)

c. Added notes clarifying pallet racking groups for deduct alternate schedule

• Drawing A102 - (W) WAREHOUSE PLAN – MEZZANINE FLOOR - PROPOSED

a. Added notes regarding metal liner panels at exterior walls

• Drawing A103 - (S) SALT SHED PLAN – PROPOSED, EXTERIOR ELEVATIONS, MISC. INFO

a. 1/A103: Modified notes regarding salt shed floor slab/paving.

• Drawing A104 – (C) COVERED SHED PLAN – PROPOSED & EXTERIOR ELEVATIONS

a. 1/A104: Modified notes regarding floor paving

• Drawing A105 - (M) MATERIAL SHED PLAN – PROPOSED & EXTERIOR ELEVATIONS

a. 1/A105: Modified notes regarding floor slab/paving

• Drawing A111 - (W) WAREHOUSE PLAN – FIRST FLOOR – REFLECTED CEILING & DETAILS

a. 2/A111: Modified notes regarding bar joists

• Drawing A301 - (W) WAREHOUSE – BUILDING SECTIONS

a. 2/A301: Modified notes regarding bar joists

• Drawing A302 - (W) WAREHOUSE – BUILDING SECTIONS & WALL SECTIONS

a. 3/A302: Modified notes regarding bar joists

• Drawing A303 - (S) SALT, (C) COVERED & (M) MATERIAL SHEDS – BUILDING SECTIONS

a. 6/A303: Modified note regarding floor slab

• Drawing A514 - (C) COVERED & (M) MATERIAL SHED – WALL SECTIONS & DETAILS

a. 5/A514: Modified note regarding sheathing locations

b. 6/A514: Modified notes regarding floor slab, & stud framing size

• Drawing S103 - SALT SHED FOUNDATION AND ROOF FRAMING PLANS

a. Salt Shed Foundation Plan; Revised note clarifying details for alternate deduct of floor slab.

b. Salt Shed Roof Framing Plan and Plan Notes added to sheet.

• Drawing S104 - COVERED SHED FOUNDATION PLAN

a. Covered Shed Foundation Plan; Revised notes clarifying details for floor/slab material and associated alternate deduct.

• Drawing S105 - MATERIAL SHED FOUNDATION AND ROOF FRAMING PLAN

a. Material Shed Foundation Plan; Revised notes clarifying details for alternate deduct of floor slab.

b. Material Shed Roof Framing Plan; Revised plan note #3 regarding roof deck material

• Drawing H001 - HVAC LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS

a. Concrete Pad-Typical detail added to sheet

• Drawing FP100 - FIRST FLOOR PLAN – FIRE PROTECTION

a. Plan 1/FP100; revised note regarding zone information

• Drawing E001 - ABBREVIATIONS, NOTES & SCHEDULES

a. One-Line Diagram detail added to sheet

• Drawing E002 - ABBREVIATIONS, NOTES & SCHEDULES

a. One-Line Diagram detail removed from sheet and placed on sheet E001

b. Generator - (with main circuit Breaker) Detail added to sheet

c. Emergency Generator Pad Detail added to sheet

End of Addendum No. 1