334100 - STORM UTILITY DRAINAGE PIPING.pdf
PDF 127 KB Posted
- Solicitation number
- US.254234
- Issued by
- Lancaster County, Pennsylvania
About this file
This document is a specification section for Storm Utility Drainage Piping (Section 334100) for the Operations Center Expansion Project (RGS 2025992-044) undertaken by the City of Lancaster, Department of Public Works in Pennsylvania. The specification details requirements for 4- through 60-inch N-12 WT IB high-density polyethylene pipe and fittings for gravity-flow land drainage applications, along with trench drains. The work involves installation of underground storm drainage piping with bell and spigot joints, nonpressure transition couplings, and related fittings in compliance with AASHTO and ASTM standards. Installation must follow manufacturer guidelines and include proper grading, alignment, and connection procedures to existing piping systems and underground structures. The project requires coordination with existing storm drainage infrastructure, with service interruptions limited to those approved in writing by the Owner following a minimum two-day advance notice. Field inspections are mandated after approximately 24 inches of backfill placement and upon project completion to identify defects including alignment issues, deflection, damage, infiltration, and exfiltration. All piping systems must be tested for leaks and defects in accordance with authorities having jurisdiction requirements before being enclosed or placed into service.
The specification requires submission of product data and coordination drawings for all storm drainage products prior to installation. Storage of plastic materials must avoid direct sunlight exposure, and all pipes and fittings must be protected from dirt and damage during handling. Minimum pipe cover in trafficked areas ranges from one foot for 4- through 48-inch diameters to two feet for 60-inch diameter applications in single-run installations, with backfill consisting of compacted Class 1, Class 2 (minimum 90 percent Standard Proctor Density), or Class 3 (minimum 95 percent SPD) material. Connections to existing piping require encasement in concrete with a minimum 28-day compressive strength of 3,000 psi, and epoxy-bonding compounds must be used as interfaces between new and existing materials. Warning tape identification—either standard or detectable tape depending on pipe material composition—must be installed directly over piping and at the outside edge of underground structures. The contractor must clean the interior of all piping of dirt and extraneous materials and flush with water prior to final completion.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Operations Center Expansion RGS 2025992-044
City of Lancaster - Department of Public Works
STORM UTILITY DRAINAGE PIPING 334100
SECTION 334100 - STORM UTILITY DRAINAGE PIPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Pipe and fittings.
2. Trench Drain.
ACTION SUBMITTALS
B. Product Data: For each type of product indicated.
1.3 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Shop drawings, cut sheet. Etc for all products related to storm drainage.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Do not store plastic manholes, pipe, and fittings in direct sunlight.
B. Protect pipe, pipe fittings, and seals from dirt and damage.
1.5 PROJECT CONDITIONS
A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated:
1. Notify Owner no fewer than two days in advance of proposed interruption of service.
2. Do not proceed with interruption of service without Owner's written permission.
PART 2 - PRODUCTS
2.1 PIPE AND FITTINGS
A. This specification describes 4- through 60-inch (100 to 1500 mm) N-12 WT IB pipe (per
AASHTO) for use in gravity-flow land drainage applications. Joints made using couplings in first subparagraph below are silt tight.
1. Pipe Requirements
a. N-12 WT IB pipe (per AASHTO) shall have a smooth interior and annular exterior corrugations.
1) 4- through 10-inch (100 to 250 mm) pipe shall meet AASHTO M252, Type
S.
2) 12- through 60-inch (300 to 1500 mm) pipe shall meet AASHTO M294, Type
S or ASTM F2306.
2. Joint Performance
a. Pipe shall be joined using a bell & spigot joint meeting the requirements of
AASHTO M252, AASHTO M294, or ASTM F2306. The joint shall be watertight according to the requirements of ASTM D3212. Gaskets shall meet the requirements of ASTM F477. Gaskets shall be installed by the pipe manufacturer and covered with a removable, protective wrap to ensure the gasket is free from debris. A joint lubricant available from the manufacturer shall be used on the gasket and bell during assembly. 12- through 60-inch (300 to 1500 mm) diameters shall have an exterior bell wrap installed by the manufacturer.
3. Fittings
a. Fittings shall conform to AASHTO M252, AASHTO M294, or ASTM F2306. Bell and spigot connections shall utilize a spun-on or welded bell and valley or saddle gasket meeting the watertight joint performance requirements of AASHTO M252, AASHTO M294, or ASTM F2306.
4. Field Pipe and Joint Performance
a. To assure watertightness, field performance verification may be accomplished by testing in accordance with ASTM F2487. Appropriate safety precautions must be used when field-testing any pipe material. Contact the manufacturer for recommended leakage rates.
5. Material Properties
a. Virgin material for pipe and fitting production shall be high-density polyethylene conforming with the minimum requirements of cell classification 424420C for 4-through 10-inch (100 to 250 mm) diameters, and 435400C for 12- through 60-inch
(300 to 1500 mm) diameters, as defined and described in the latest version of ASTM
D3350, except that carbon black content should not exceed 4%. The 12- through 60-inch (300 to 1500 mm) virgin pipe material shall comply with the notched constant ligament-stress (NCLS) test as specified in Sections 9.5 and 5.1 of AASHTO M294 and ASTM F2306 respectively.
6. Installation
a. Installation shall be in accordance with ASTM D2321 and ADS recommended installation guidelines, with the exception that minimum cover in trafficked areas for 4- through 48-inch (100 to 1200 mm) diameters shall be one foot. (0.3 m) and for 60-inch (1500 mm) diameter the minimum cover shall be 2 ft. (0.6 m) in single run applications. Backfill for minimum cover situations shall consist of Class 1
(compacted), Class 2 (minimum 90% SPD) or Class 3 (minimum 95%) material.
Maximum fill heights depend on embedment material and compaction level; please refer to Technical Note 2.01. Contact your local ADS representative or visit our website at www.ads-pipe.com for a copy of the latest installation guidelines.
2.2 NONPRESSURE TRANSITION COUPLINGS
A. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism on each end.
B. Sleeve Materials:
1. For Concrete Pipes: ASTM C 443 (ASTM C 443M), rubber.
2. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC.
3. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined.
C. Unshielded, Flexible Couplings:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
2. Description: Elastomeric sleeve with stainless-steel shear ring and corrosion-resistant-metal tension band and tightening mechanism on each end.
D. Shielded, Flexible Couplings:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
2. Description: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.
E. Ring-Type, Flexible Couplings:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
2. Description: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring.
2.3 TRENCH DRAINS
A. As specified on plans.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavation, trenching, and backfilling are specified in Section 312000 "Earth Moving."
3.2 PIPING INSTALLATION
A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground storm drainage piping. Location and arrangement of piping layout take into account design considerations. Install piping as indicated, to extent practical. Where specific installation is not indicated, follow piping manufacturer's written instructions.
B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements.
C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch connections unless direct tap into existing sewer is indicated.
D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.
E. When installing pipe under streets or other obstructions that cannot be disturbed, use pipe-jacking process of microtunneling.
3.3 TRENCH DRAIN
A. Install per manufacturer’s instructions.
3.4 CONNECTIONS
A. Make connections to existing piping and underground manholes.
1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch (150-mm) overlap, with not less than 6 inches (150 mm) of concrete with 28-day compressive strength of 3000 psi (20.7 MPa).
2. Make branch connections from side into existing piping, NPS 4 to NPS 20 (DN 100 to
DN 500). Remove section of existing pipe, install wye fitting into existing piping, and encase entire wye with not less than 6 inches (150 mm) of concrete with 28-day compressive strength of 3000 psi (20.7 MPa).
3. Make branch connections from side into existing piping, NPS 21 (DN 525) or larger, or to underground manholes and structures by cutting into existing unit and creating an opening large enough to allow 3 inches (76 mm) of concrete to be packed around entering connection. Cut end of connection pipe passing through pipe or structure wall to conform to shape of and be flush with inside wall unless otherwise indicated. On outside of pipe, manhole, or structure wall, encase entering connection in 6 inches (150 mm) of concrete for minimum length of 12 inches (300 mm) to provide additional support of collar from connection to undisturbed ground.
a. Use concrete that will attain a minimum 28-day compressive strength of 3000 psi
(20.7 MPa) unless otherwise indicated.
b. Use epoxy-bonding compound as interface between new and existing concrete and piping materials.
4. Protect existing piping, manholes, and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate.
B. Pipe couplings, expansion joints, and deflection fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated.
1. Use nonpressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping unless otherwise indicated.
a. Shielded flexible couplings for same or minor difference OD pipes.
b. Unshielded, increaser/reducer-pattern, flexible couplings for pipes with different
OD.
c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation.
2. Use pressure-type pipe couplings for force-main joints.
3.5 IDENTIFICATION
A. Materials and their installation are specified in Section 312000 "Earth Moving." Arrange for installation of green warning tape directly over piping and at outside edge of underground structures.
1. Use warning tape or detectable warning tape over ferrous piping.
2. Use detectable warning tape over nonferrous piping and over edges of underground structures.
3.6 FIELD QUALITY CONTROL
A. Inspect interior of piping to determine whether line displacement or other damage has occurred.
Inspect after approximately 24 inches (610 mm) of backfill is in place, and again at completion of Project.
1. Submit separate reports for each system inspection.
2. Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter.
c. Damage: Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
e. Exfiltration: Water leakage from or around piping.
3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified.
4. Reinspect and repeat procedure until results are satisfactory.
B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.
1. Do not enclose, cover, or put into service before inspection and approval.
2. Test completed piping systems according to requirements of authorities having jurisdiction.
3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice.
4. Submit separate report for each test.
5. Gravity-Flow Storm Drainage Piping: Test according to requirements of authorities having jurisdiction.
C. Replace leaking piping using new materials and repeat testing until leakage is within allowances specified.
3.7 CLEANING
A. Clean interior of piping of dirt and superfluous materials. Flush with water.
END OF SECTION 334100
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| 1. Pipe and fittings. |
| 2. Trench Drain. |
| ACTION SUBMITTALS |
| B. Product Data: For each type of product indicated. |
| 1.3 INFORMATIONAL SUBMITTALS |
| A. Coordination Drawings: Shop drawings, cut sheet. Etc for all products related to storm drainage. |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| A. Do not store plastic manholes, pipe, and fittings in direct sunlight. |
| B. Protect pipe, pipe fittings, and seals from dirt and damage. |
| 1.5 PROJECT CONDITIONS |
| A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements... |
| 1. Notify Owner no fewer than two days in advance of proposed interruption of service. |
| 2. Do not proceed with interruption of service without Owner's written permission. |
| PART 2 - PRODUCTS |
| 2.1 PIPE AND FITTINGS |
| A. This specification describes 4- through 60-inch (100 to 1500 mm) N-12 WT IB pipe (per AASHTO) for use in gravity-flow land drainage applications. Joints made using couplings in first subparagraph below are silt tight. |
| 1. Pipe Requirements |
| a. N-12 WT IB pipe (per AASHTO) shall have a smooth interior and annular exterior corrugations. |
| 1) 4- through 10-inch (100 to 250 mm) pipe shall meet AASHTO M252, Type S. |
| 2) 12- through 60-inch (300 to 1500 mm) pipe shall meet AASHTO M294, Type S or ASTM F2306. |
| 2. Joint Performance |
| a. Pipe shall be joined using a bell & spigot joint meeting the requirements of AASHTO M252, AASHTO M294, or ASTM F2306. The joint shall be watertight according to the requirements of ASTM D3212. Gaskets shall meet the requirements of ASTM F477. Gaske... |
| 3. Fittings |
| a. Fittings shall conform to AASHTO M252, AASHTO M294, or ASTM F2306. Bell and spigot connections shall utilize a spun-on or welded bell and valley or saddle gasket meeting the watertight joint performance requirements of AASHTO M252, AASHTO M294, or ... |
| 4. Field Pipe and Joint Performance |
| a. To assure watertightness, field performance verification may be accomplished by testing in accordance with ASTM F2487. Appropriate safety precautions must be used when field-testing any pipe material. Contact the manufacturer for recommended leakag... |
| 5. Material Properties |
| a. Virgin material for pipe and fitting production shall be high-density polyethylene conforming with the minimum requirements of cell classification 424420C for 4- through 10-inch (100 to 250 mm) diameters, and 435400C for 12- through 60-inch (300 to... |
| 6. Installation |
| a. Installation shall be in accordance with ASTM D2321 and ADS recommended installation guidelines, with the exception that minimum cover in trafficked areas for 4- through 48-inch (100 to 1200 mm) diameters shall be one foot. (0.3 m) and for 60-inch ... |
| 2.2 NONPRESSURE TRANSITION COUPLINGS |
| A. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism o... |
| B. Sleeve Materials: |
| 1. For Concrete Pipes: ASTM C 443 (ASTM C 443M), rubber. |
| 2. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC. |
| 3. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined. |
| C. Unshielded, Flexible Couplings: |
| 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| 2. Description: Elastomeric sleeve with stainless-steel shear ring and corrosion-resistant-metal tension band and tightening mechanism on each end. |
| D. Shielded, Flexible Couplings: |
| 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| 2. Description: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end. |
| E. Ring-Type, Flexible Couplings: |
| 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| 2. Description: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring. |
| 2.3 TRENCH DRAINS |
| A. As specified on plans. |
| PART 3 - EXECUTION |
| 3.1 EARTHWORK |
| A. Excavation, trenching, and backfilling are specified in Section 312000 "Earth Moving." |
| 3.2 PIPING INSTALLATION |
| A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground storm drainage piping. Location and arrangement of piping layout take into account design considerations. Install piping as indic... |
| B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instruct... |
| C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch connections unless direct tap into existing sewer is indicated. |
| D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited. |
| E. When installing pipe under streets or other obstructions that cannot be disturbed, use pipe-jacking process of microtunneling. |
| 3.3 TRENCH DRAIN |
| A. Install per manufacturer’s instructions. |
| 3.4 CONNECTIONS |
| A. Make connections to existing piping and underground manholes. |
| 1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch (150-mm) overlap, with not less than 6 inches (150 mm) o... |
| 2. Make branch connections from side into existing piping, NPS 4 to NPS 20 (DN 100 to DN 500). Remove section of existing pipe, install wye fitting into existing piping, and encase entire wye with not less than 6 inches (150 mm) of concrete with 28-da... |
| 3. Make branch connections from side into existing piping, NPS 21 (DN 525) or larger, or to underground manholes and structures by cutting into existing unit and creating an opening large enough to allow 3 inches (76 mm) of concrete to be packed aroun... |
| a. Use concrete that will attain a minimum 28-day compressive strength of 3000 psi (20.7 MPa) unless otherwise indicated. |
| b. Use epoxy-bonding compound as interface between new and existing concrete and piping materials. |
4. Protect existing piping, manholes, and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate.
| B. Pipe couplings, expansion joints, and deflection fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated. |
| 1. Use nonpressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping unless otherwise indicated. |
| a. Shielded flexible couplings for same or minor difference OD pipes. |
| b. Unshielded, increaser/reducer-pattern, flexible couplings for pipes with different OD. |
| c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation. |
2. Use pressure-type pipe couplings for force-main joints.
| 3.5 IDENTIFICATION |
| A. Materials and their installation are specified in Section 312000 "Earth Moving." Arrange for installation of green warning tape directly over piping and at outside edge of underground structures. |
| 1. Use warning tape or detectable warning tape over ferrous piping. |
| 2. Use detectable warning tape over nonferrous piping and over edges of underground structures. |
| 3.6 FIELD QUALITY CONTROL |
| A. Inspect interior of piping to determine whether line displacement or other damage has occurred. Inspect after approximately 24 inches (610 mm) of backfill is in place, and again at completion of Project. |
| 1. Submit separate reports for each system inspection. |
| 2. Defects requiring correction include the following: |
| a. Alignment: Less than full diameter of inside of pipe is visible between structures. |
| b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter. |
| c. Damage: Crushed, broken, cracked, or otherwise damaged piping. |
| d. Infiltration: Water leakage into piping. |
| e. Exfiltration: Water leakage from or around piping. |
| 3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified. |
| 4. Reinspect and repeat procedure until results are satisfactory. |
| B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects. |
| 1. Do not enclose, cover, or put into service before inspection and approval. |
| 2. Test completed piping systems according to requirements of authorities having jurisdiction. |
| 3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice. |
| 4. Submit separate report for each test. |
| 5. Gravity-Flow Storm Drainage Piping: Test according to requirements of authorities having jurisdiction. |
C. Replace leaking piping using new materials and repeat testing until leakage is within allowances specified.
| 3.7 CLEANING |
| A. Clean interior of piping of dirt and superfluous materials. Flush with water. |
File details come from the government source that posted it. Updated .