CD-18 UTILITY PLAN.pdf
PDF 834 KB Posted
- Solicitation number
- US.254234
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a utility plan for the Operations Facility Expansion Project being managed by the City of Lancaster, Pennsylvania Department of Public Works. The project is a multiprime construction undertaking consisting of five new buildings at 150 Pitney Road in Lancaster County, PA, with five separate prime contracts covering General Construction, Mechanical, Electrical, Plumbing, and Fire Protection work. The utility plan (Sheet CD-18) details the coordination and installation requirements for water, sewer, gas, electric, communications, and stormwater systems serving the facility. Bids for the project were due on October 28, 2026, at 11:00 AM, with a non-mandatory pre-bid conference held on October 7, 2026, at 9:00 AM at the Water Administration Building. Bidders were required to conduct site visits between 8:00 AM and 4:00 PM, Monday through Friday, with additional visits available by contacting Mike Belfino, Water Distribution Manager, at (717) 989-3695 or mbelfino@cityoflancasterpa.gov.
The utility plan document establishes minimum vertical clearance requirements for utility line crossings, including 18-inch separations for stormwater, sanitary, and water lines from each other; 12-inch separation for gas and audiovisual/information technology lines; and compliance with PPL requirements for electric lines. Responsibility for utility installation is clearly delineated: the General Contractor manages all subgrade preparation, earthwork, and trenching; the Electrical Contractor installs primary and secondary duct banks and onsite conduit; PPL handles cable pulling, transformer installation, and metering; and UGI Utilities coordinates gas service installation. The City of Lancaster will award contracts based on the lowest responsible bidder. All work is subject to compliance with applicable federal and state laws, including prevailing wage requirements, the Steel Products Procurement Act, and building permit requirements through the Bureau of Building Code Administration.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROP.
TRANSFORMER
LOCATION
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E
LD
-1
LD
-1
LD-18
SHEET KEY MAP
LD-17
LD-16
PROP. TAPPING
SLEEVE AND VALVE
PROPOSED TREE
PROTECTION FENCE (TYP.)
8" DICL
PROPOSED
LIGHT POST
(TYP.)
"DO NOT EXPLODE"
MATCHLINE
A
B
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E C
D -1
C D
-1
CD-18
SHEET KEY MAP
CD-17
CD-16
"DO NOT EXPLODE"
MATCHLINE
A
B
I- A
I- A
M-A16
W
W
W
W
W
W W
W W
W W
W W
U E
U E
U E
U E
PROP. COMMUNICATIONS
CONDUIT TO BE EXTENDED TO
PROPOSED TERMINATION POINTS
AS SHOWN ON THE ELECTRICAL
DRAWINGS, TO BE INSTALLED BY
CONTRACTOR
COMMUNICATIONS HANDHOLE
INSTALLED BY CITY OF
LANCASTER, TRAFFIC RATED
ELECTRIC HANDHOLE
INSTALLED BY CITY OF
LANCASTER, TRAFFIC RATED
GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE
PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS
TO COORDINATE WORK WITH GENERAL CONTRACTOR.
UTILITY NOTES:
1.GENERAL UTILITY NOTES:
a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS
REPRESENT THE CENTER OF THE UTILITY LINE OR
TRENCH.
b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL
CLEARANCES ARE PROVIDED AT ALL UTILITY
CROSSINGS.
c. VERTICAL CLEARANCES SHALL BE PROVIDED AS
FOLLOWS:
i. STORMWATER - MIN. 18" SEPARATION FROM
SANITARY/STORM/WATER
ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER
iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER
iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES
vi. ELECTRIC - PER PPL REQUIREMENTS
2.ELECTRIC NOTES:
a.INSTALLATION OF PRIMARY AND SECONDARY DUCT
BANKS SHALL BE PERFORMED BY THE ELECTRICAL
CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE
GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY
AND SECONDARY ELECTRICAL SERVICE DETAILS.
b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR
AND METERING.
c.ELECTRICAL CONTRACTOR TO COORDINATE AND
INSTALL ALL ONSITE ELECTRICAL CONDUIT FOR
GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP
PLANS.
3.GAS NOTES:
a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
COORDINATION WITH UGI REGARDING GAS SERVICE
INSTALLATION SCHEDULE.
b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING
FROM THE EXISTING GAS LINE TO THE RISER/METER
LOCATION(S).
c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE
DUST PER UGI SPECIFICATIONS AND HAVE THIS
MATERIAL AVAILABLE FOR UGI'S USE AT THE TIME OF
SERVICE LINE INSTALLATION. TRENCH SPOILS SHALL
ALSO BE LOCATED ADJACENT TO THE TRENCH FOR UGI'S
USE WHEN BACKFILLING.
d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO
AND INCLUDING THE GAS METER SHALL BE INSTALLED
BY UGI UTILITIES.
THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD
FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE
INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.
EXTENTS OF EXISTING
VEGETATION TO REMAIN (TYP.)
"DO NOT EXPLODE"
MATCHLINE
A
B
"DO NOT EXPLODE"
MATCHLINE
A
B
"DO NOT EXPLODE"MATCHLINE
LD-17
LD-18
PROP. TIE-IN TO EXISTING
SANITARY MAIN
"DO NOT EXPLODE"MATCHLINE
CD-17
CD-18
S S
S S
S S
S S
S S
S S
S
C O
-3 C O
-2 C O
-1 C O
-5 C O
-4
SCRIPT:
SE
AL
SE
AL
MANAGER:
DATE:
PROJECT NO.:
OF
SHEET NO.:
C or po ra te O ffi ce
W es t J am es S tre et
Su ite
, L an ca st er , P
A
Ph on e:
(7
) 7
-1 w w w .rg sa ss oc ia te s.
co m
R eg io na l O ffi ce s:
Yo rk
, H ar ris bu rg , a nd P ao li
La nd
P la nn in g La nd sc ap e
Ar ch ite ct ur e
C iv il En gi ne er in g
XR
EF
S:
E xi st in g;
Ex is tin g-
G
IS
-S ur ve y;
La yo ut ;E as em en ts
;F lo od pl ai n;
Li gh tin g;
Z- U til ity
;P ro fil es
-U til iti es
PL
O
TT
ED
/2 /2
3:
P M
F
IL
EN
AM
E:
P
:\2
5\
2-
4\ C
AD
D
\C on st ru ct io n\ Pl ot \Z
-C D
-U til ity .d w g
N O
D
AT
E R
EV
IS
IO
N
O
PE
R
AT
IO
N
S
FA
C
IL
IT
Y
EX
PA
N
SI
O N
PI
TN
EY
R
O
AD
C O
N
ST
R U
C
TI
O N
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R
LA
N C
AS
TE
R C
O U
N
TY
, P A
U
TI
LI
TY
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R D
EP
AR
TM
EN
T O
F
PU
BL
IC
W O
R
KS
N O
R
TH
D U
KE
S
TR
EE
T P.
O . B
O X
LA
N
C
AS
TE
R
, P A
(7
) 2
-4
SC
AL
E:
0' 0'
SEPTEMBER 8, 2026
2025992-044
BENJAMIN MORTON, RLA
CD-18 54
/0 6/
AD
D
EN
D
U M
/1 4/
AD
D
EN
D
U M
/2 3/
AD
D
EN
D
U M
/2 9/
AD
D
EN
D
U M
/2 /2
AD
D
EN
D U
M
MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-16 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-16 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN
| Sheets and Views |
| CD-18 UTILITY PLAN |
File details come from the government source that posted it. Updated .