Addendum No. 4 Summary

This document is an addendum to the contract documents for the Operations Facilities Expansion Project issued by the City of Lancaster, Pennsylvania Department of Public Works, prepared by Beers + Hoffman architecture firm. Addendum No. 4, dated October 29, 2026, modifies the original bid documents dated September 8, 2026, and three prior addenda issued on October 6, 16, and 23, 2026. The addendum revises multiple specifications and construction drawings for the warehouse facility expansion project. Specification revisions include complete replacements of Sections 102800 (Toilet, Bath, and Laundry Accessories), 220719 (Plumbing Piping Insulation), 230713 (Duct Insulation), and 233100 (HVAC Ducts and Casings). Drawing revisions affect eleven sheets across architectural, structural, HVAC, and plumbing disciplines, with modifications including parging notes on exterior elevations, dimension changes for shower alcoves and wall sections, ceramic wall tile height revisions, slab edge insulation notes, window sill height adjustments, and updates to various schedules and details.

The addendum constitutes modifications to the contract documents that bidders must incorporate into their proposals. Notable drawing changes include the addition of new details to Sheet A401 and modifications to foundation, wall section, door and window, finish, and utility legend sheets. The specification changes and drawing revisions address construction detailing and material specifications across multiple building systems. This addendum was issued to clarify, amend, and supersede portions of the original drawings and specifications and becomes part of the binding contract documents upon issuance.

View the file

Other files

File Type Posted
334100 - STORM UTILITY DRAINAGE PIPING.pdf PDF
C08 - Construction Plan.pdf PDF
2026-10-14 - CD Addendum 2.pdf PDF
B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
C05 - Site Civil Specifications Combined.pdf PDF
ES-LOD-NPDES.dwg DWG drawing
321723 - PAVEMENT MARKINGS.pdf PDF
CD-18 UTILITY PLAN.pdf PDF
C10 - Geotechnical Report.pdf PDF
Layout.dwg DWG drawing
Addendum 03 Arch Front End Specs.pdf PDF
2026-10-06 - Civil Addendum 1.pdf PDF
C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
2026-10-29 - ES Addendum 4.pdf PDF
CD-17 UTILITY PLAN.pdf PDF
Existing.dwg DWG drawing
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
25061 - Addendum 1.pdf PDF
ES.dwg DWG drawing
C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
2026-10-29 - CD Addendum 4.pdf PDF
FINAL QA Report.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
312000 - EARTH MOVING.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
Landscape.dwg DWG drawing
Demolition.dwg DWG drawing
B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
C04 - Operations Facilities Expansion - Bid Specs - Vol II.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 2.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.pdf PDF
EG.dwg DWG drawing
Easements.dwg DWG drawing
Pre-Bid QA Ops Center Expansion 10072026.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Profiles-Utilities.dwg DWG drawing
2026-10-06 - ES Addendum 1.pdf PDF
C09 - Fill Assessment Summary.pdf PDF
329113 - SOIL PREPARATION.pdf PDF
C07 - ES Plan.pdf PDF
B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
Addendum 04 Arch MEP Specs.pdf PDF
C01 - Standard General Conditions of the Contract.pdf PDF
CD-16 UTILITY PLAN.pdf PDF
PG.dwg DWG drawing
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LITITZ LANCASTER LEBANON

www.BEERSHOFFMAN.com

Beers + Hoffman

Scott L. Shonk, AIA, LEED AP

Peter D. Kerekgyarto, AIA, LEED AP

Robert P. Hoffman, AIA

BH Project #: 25-061

Operations Facilities Expansion City of Lancaster – Department of Public Works

Addendum No. 4

29 October 2026

Notice to all bidders

This Addendum forms a part of the Contract Documents and modifies the original Bid documents dated September 8, 2026; Addendum No. 1, dated October 6, 2026; and Addendum No. 2, dated October 16, 2026 and Addendum No. 3 dated October 23, 2026. The Contract Documents for the above-referenced Project are being modified as set forth in this Addendum. This addendum is issued to clarify, amend, or supersede the drawings and specifications as applicable and shall become a part of the Contract Documents for the subject project as if fully incorporated and bound therein.

ATTACHMENTS:

Revised Specifications:

o Section 102800 – TOILET, BATH, AND LAUNDRY ACCESSORIES o Section 220719 – PLUMBING PIPING INSULATION o Section 230713 – DUCT INSULATION o Section 233100 – HVAC DUCTS AND CASINGS

Revised Drawings:

o A000 – COVER SHEET o A201 – (W) WAREHOUSE - EXTERIOR ELEVATIONS & MISC. INFO..

o A202 – (W) WAREHOUSE - EXTERIOR ELEVATIONS & MISC. INFO.

o A401 – ENLARGED PLANS AND INTERIOR ELEVATIONS o A511 – (W) WAREHOUSE - WALL SECTIONS & DETAILS o A512 - (W) WAREHOUSE- WALL SECTIONS & DETAILS o A601 – DOOR AND WINDOW SCHEDULE & DETAILS o A801 – FINISH PLANS, SCHEDULES & DETAILS o S101 – WAREHOUSE FOUNDATION PLAN o H001 – HVAC LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS o P001– PLUMBING LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS

SPECIFICATION CHANGES:

Section 102800 – TOILET, BATH, AND LAUNDRY ACCESSORIES Delete Section in its entirety and replace with revised section.

a. Add grab bar ‘GB-30’

Section 220719 – PLUMBING PIPING INSULATION: Delete Section in its entirety and replace with revised section.

a. Delete and replace entire section

Section 230713 – DUCT INSULATION: Delete Section in its entirety and replace with revised section.

Section 233100 – HVAC DUCTS AND CASINGS: Delete Section in its entirety and replace with revised section.

DRAWING CHANGES: Replace all sheets listed with new sheets.

Drawing A000

a. Modify – sheet list to include A901 that was issued an Addendum 2

Drawing A201

a. Modify – notes added to elevations to indicate parging

Drawing A202

a. Modify – notes added to elevations to indicate parging

Drawing A401

a. Modify detail # 2– dimension changes for walls at shower alcoves, shower seat illustrated, ceramic wall tile height revision at shower alcoves

b. Modify detail # 4– ceramic wall tile height revision at shower alcoves

c. Add – details #7, #8, and #9 added to sheet

d. Modify – accessories schedule modified to clarify shower grab bars

Drawing A511

a. Modify details # 1 & #2 – parging notes revised, slab edge insulation note revision

Drawing A512

a. Modify detail #3 - slab edge and foundation details

b. Modify detail #6 – foundation wall revisions, window sill height revision

Drawing A601

a. Modify detail #1 – window sill height revision

Drawing A801

a. Modify detail #5 – shower cove base dimension revision

Drawing S101

a. Modify – section cut tag revisions

Drawing H001

a. Modify – General notes revision

Drawing P001

a. Modify – Plumbing fixture schedule revision

End of Addendum No. 4