B861-26-01 BidTabulationReport.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
B861-26-01 MULTIPRIME - NEW CONSTRUCTION Operations Facility Expansion Project
Solicitation number
US.254234
Issued by
Lancaster County, Pennsylvania

About this file

This is a bid tabulation report for the City of Lancaster, Pennsylvania's B861-26-01 Multiprime Operations Facility Expansion Project, a five-prime contract involving General Construction, Mechanical, Electrical, Plumbing, and Fire Protection trades. The General Construction phase received five bids ranging from $9,311,650.00 (Lobar, Inc., lowest) to $11,814,000.00 (Skepton Construction, Inc., highest), with base bid pricing excluding the salt shed structure ranging from $8,858,250.00 to $10,777,500.00. The project scope includes construction of five new buildings with multiple line items covering base bid work and deduct alternates such as elimination of paving, storage structures, and pallet racking, as well as substitutions for wall panel gauges, column protection systems, and flooring materials. Specialized trades submitted bids as follows: Mechanical (2 bidders: $212,000.00–$256,529.00), Electrical (7 bidders: $669,500.00–$1,320,300.00), Plumbing (4 bidders: $245,000.00–$342,912.00), and Fire Protection (2 bidders: $160,500.00–$209,460.00). Bids were due October 28, 2026, at 11:00 AM, with a non-mandatory pre-bid conference held October 7, 2026, at 9:00 AM at the Water Administration Building, 150 Pitney Road, Lancaster, Pennsylvania, followed by a site tour; pre-bid site visits were required between 8:00 AM and 4:00 PM Monday through Friday.

The tabulation presents unit prices and total costs for each line item and bidder across all five trade categories, with deduct alternates clearly marked as negative values. All pricing is lump sum (LS) for major components, with selective unit pricing for soil remediation and removal work in the General Construction trade. The City indicated it would select the lowest responsible bidder based on submitted bids and noted that successful bidders must comply with applicable discrimination laws, minimum wage requirements, the Steel Products Procurement Act, and other federal and state requirements as specified in Article 27 of the instructions to bidders. Building permits and associated inspections were required through the Bureau of Building Code Administration.

View the file

Other files

File Type Posted
334100 - STORM UTILITY DRAINAGE PIPING.pdf PDF
C08 - Construction Plan.pdf PDF
2026-10-14 - CD Addendum 2.pdf PDF
B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
C05 - Site Civil Specifications Combined.pdf PDF
ES-LOD-NPDES.dwg DWG drawing
321723 - PAVEMENT MARKINGS.pdf PDF
CD-18 UTILITY PLAN.pdf PDF
C10 - Geotechnical Report.pdf PDF
Layout.dwg DWG drawing
Addendum 03 Arch Front End Specs.pdf PDF
2026-10-06 - Civil Addendum 1.pdf PDF
C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
2026-10-29 - ES Addendum 4.pdf PDF
25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
CD-17 UTILITY PLAN.pdf PDF
Existing.dwg DWG drawing
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
25061 - Addendum 1.pdf PDF
ES.dwg DWG drawing
C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
2026-10-29 - CD Addendum 4.pdf PDF
FINAL QA Report.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
312000 - EARTH MOVING.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
Landscape.dwg DWG drawing
Demolition.dwg DWG drawing
B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
C04 - Operations Facilities Expansion - Bid Specs - Vol II.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 2.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.pdf PDF
EG.dwg DWG drawing
Easements.dwg DWG drawing
Pre-Bid QA Ops Center Expansion 10072026.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Profiles-Utilities.dwg DWG drawing
2026-10-06 - ES Addendum 1.pdf PDF
C09 - Fill Assessment Summary.pdf PDF
329113 - SOIL PREPARATION.pdf PDF
C07 - ES Plan.pdf PDF
Addendum 04 Arch MEP Specs.pdf PDF
C01 - Standard General Conditions of the Contract.pdf PDF
CD-16 UTILITY PLAN.pdf PDF
PG.dwg DWG drawing
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

GENERAL CONSTRUCTIONCaldwell, Heckles, and Egan Inc.Lobar, Inc.Skepton Construction, Inc.Uhrig ConstructioneciConstruction LLC
Total Cost$ 9,928,375.00$ 9,311,650.00$ 11,814,000.00$ 9,739,608.00$ 9,513,800.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 11,672,875.00$ 10,441,000.00$ 13,670,000.00$ 11,153,196.00$ 11,184,000.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 10,144,000.00$ 10,144,000.00$ 8,858,250.00$ 8,858,250.00$ 10,777,500.00$ 10,777,500.00$ 9,383,000.00$ 9,383,000.00$ 9,467,475.00$ 9,467,475.00
#1-2Salt Shed StructureLS1$ 1,087,500.00$ 1,087,500.00$ 1,100,000.00$ 1,100,000.00$ 2,395,000.00$ 2,395,000.00$ 1,282,446.00$ 1,282,446.00$ 1,275,000.00$ 1,275,000.00
#1-3Bulk Rock RemovalCY175$ 210.00$ 36,750.00$ 200.00$ 35,000.00$ 250.00$ 43,750.00$ 250.00$ 43,750.00$ 168.00$ 29,400.00
#1-4Trench Rock Removal -CY75$ 275.00$ 20,625.00$ 250.00$ 18,750.00$ 250.00$ 18,750.00$ 200.00$ 15,000.00$ 195.00$ 14,625.00
#1-5Unsatisfactory/Unsuitable Soils - RemediationCY9000$ 7.00$ 63,000.00$ 9.00$ 81,000.00$ 15.00$ 135,000.00$ 9.00$ 81,000.00$ 7.50$ 67,500.00
#1-6Unsatisfactory/Unsuitable Soils - Removal and ReplacementCY6000$ 53.50$ 321,000.00$ 58.00$ 348,000.00$ 50.00$ 300,000.00$ 58.00$ 348,000.00$ 55.00$ 330,000.00
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$ (1,744,500.00)$ (1,129,350.00)$ (1,856,000.00)$ (1,413,588.00)$ (1,670,200.00)
#2-1Eliminate: Paving of the Construction Yard and Construction Yard Structure (Covered Storage), Leaving the Entire Site at the Stone Subgrade LevelLS1$ (275,000.00)$ (275,000.00)$ (286,000.00)$ (286,000.00)$ (190,000.00)$ (190,000.00)$ (235,083.00)$ (235,083.00)$ (227,000.00)$ (227,000.00)
#2-2Eliminate: Construction Yard StructureLS1$ (750,000.00)$ (750,000.00)$ (411,000.00)$ (411,000.00)$ (730,000.00)$ (730,000.00)$ (641,377.00)$ (641,377.00)$ (653,700.00)$ (653,700.00)
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ (78,500.00)$ (78,500.00)$ (84,900.00)$ (84,900.00)$ (68,000.00)$ (68,000.00)$ (84,282.00)$ (84,282.00)$ (76,000.00)$ (76,000.00)
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$ (125,000.00)$ (125,000.00)$ (133,700.00)$ (133,700.00)$ (127,000.00)$ (127,000.00)$ (132,715.00)$ (132,715.00)$ (142,000.00)$ (142,000.00)
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ (12,500.00)$ (12,500.00)$ (10,800.00)$ (10,800.00)$ (73,000.00)$ (73,000.00)$ (29,668.00)$ (29,668.00)$ (18,500.00)$ (18,500.00)
#2-6Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ (5,000.00)$ (5,000.00)$ (10,000.00)$ (10,000.00)$ - 0$ - 0$ (12,500.00)$ (12,500.00)
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ (40,000.00)$ (40,000.00)$ (50,700.00)$ (50,700.00)$ (29,000.00)$ (29,000.00)$ (94,319.00)$ (94,319.00)$ (75,500.00)$ (75,500.00)
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ (30,000.00)$ (30,000.00)$ (15,750.00)$ (15,750.00)$ (20,000.00)$ (20,000.00)$ (44,138.00)$ (44,138.00)$ (44,500.00)$ (44,500.00)
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ (325,000.00)$ (325,000.00)$ (281,500.00)$ (281,500.00)$ (249,000.00)$ (249,000.00)$ (269,380.00)$ (269,380.00)$ (276,000.00)$ (276,000.00)
#2-10Substitute: Pre-Engineered Post-Frame Salt Shed Structure System in lieu of Base Bid Salt Shed StructureLS1$ (97,500.00)$ (97,500.00)$ 158,000.00$ 158,000.00$ (350,000.00)$ (350,000.00)$ 129,813.00$ 129,813.00$ (135,000.00)$ (135,000.00)
#2-11Eliminate: All Lockers in Warehouse BuildingLS1$ (11,000.00)$ (11,000.00)$ (8,000.00)$ (8,000.00)$ (10,000.00)$ (10,000.00)$ (12,439.00)$ (12,439.00)$ (9,500.00)$ (9,500.00)
MECHANICALGarden Spot Mechanical, Inc.Vision Mechanical
Total Cost$ 212,000.00$ 256,529.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$212,000.00$256,529.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$212,000.00$ 212,000.00$256,529.00$256,529.00
#1-2Salt Shed StructureLS1$ - 0$ - 0$ - 0$ - 0
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$0.00$0.00
#2-1Eliminate: Paving of the Construction YardLS1$ - 0$ - 0$ - 0$ - 0
#2-2Eliminate: Construction Yard StructureLS1$ - 0$ - 0$ - 0$ - 0
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ - 0$ - 0$ - 0$ - 0
#2-6Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ - 0$ - 0
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ - 0$ - 0$ - 0$ - 0
ELECTRICALGarden Spot Electric, Inc.Hirneisen Electric, Inc.Lobar, Inc.Manada ElectricMidState Mechanical & Electrical, LLCSchipsi Electric LLCShannon A. Smith, Inc.
Total Cost$ 669,500.00$ 943,230.00$ 973,000.00$ 725,700.00$ 889,450.00$ 779,091.00$ 1,320,300.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 698,600.00$ 949,230.00$ 975,000.00$ 749,000.00$ 912,950.00$ 779,091.00$ 1,320,300.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 682,800.00$ 682,800.00$ 924,230.00$ 924,230.00$ 960,000.00$ 960,000.00$ 735,700.00$ 735,700.00$ 889,700.00$ 889,700.00$ 762,496.00$ 762,496.00$ 1,295,000.00$ 1,295,000.00
#1-2Salt Shed StructureLS1$ 15,800.00$ 15,800.00$ 25,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ 13,300.00$ 13,300.00$ 23,250.00$ 23,250.00$ 16,595.00$ 16,595.00$ 25,300.00$ 25,300.00
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$ (29,100.00)$ (6,000.00)$ (2,000.00)$ (23,300.00)$ (23,500.00)$ - 0$ - 0
#2-1Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-2Eliminate: Pallet Racking in Center of WarehouseLS1$ (29,100.00)$ (29,100.00)$ - 0$ - 0$ - 0$ - 0$ (23,300.00)$ (23,300.00)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-3Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-4Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-5Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-6Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-7Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-8Eliminate: Paving of the Construction YardLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-9Eliminate: Construction Yard StructureLS1$ - 0$ - 0$ (6,000.00)$ (6,000.00)$ (2,000.00)$ (2,000.00)$ - 0$ - 0$ (23,500.00)$ (23,500.00)$ - 0$ - 0$ - 0$ - 0
PLUMBINGGarden Spot Mechanical, Inc.SSM IndustriesVision MechanicalW.C. Eshenaur & Son Inc
Total Cost$ 245,000.00$ 342,912.00$ 287,300.00$ 276,267.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 245,000.00$ 342,912.00$ 287,300.00$ 276,267.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 245,000.00$245,000.00$ 342,912.00$ 342,912.00$ 287,300.00$ 287,300.00$ 276,267.00$ 276,267.00
#1-2Salt Shed StructureLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$0.00$0.00$0.00$0.00
#2-1Eliminate: Paving of the Construction YardLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-2Eliminate: Construction Yard StructureLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-6Substitute: Alternate Column Protection SystemLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
FIRE PROTECTIONAnchor Fire ProtectionTriangle Fire Protection, Inc.
Total Cost$ 160,500.00$ 209,460.00
#ItemsUNITQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 160,500.00$ 209,460.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 160,500.00$ 160,500.00$ 209,460.00$ 209,460.00
#1-2Salt Shed StructureLS1$ - 0$ - 0$ - 0$ - 0
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$ - 0$ - 0
#2-1Eliminate: Paving of the Construction YardLS1$ - 0$ - 0$ - 0$ - 0
#2-2Eliminate: Construction Yard StructureLS1$ - 0$ - 0$ - 0$ - 0
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ - 0$ - 0$ - 0$ - 0
#2-6Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ - 0$ - 0
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .