B861-26-01 BidTabulationReport.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- US.254234
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a bid tabulation report for the City of Lancaster, Pennsylvania's B861-26-01 Multiprime Operations Facility Expansion Project, a five-prime contract involving General Construction, Mechanical, Electrical, Plumbing, and Fire Protection trades. The General Construction phase received five bids ranging from $9,311,650.00 (Lobar, Inc., lowest) to $11,814,000.00 (Skepton Construction, Inc., highest), with base bid pricing excluding the salt shed structure ranging from $8,858,250.00 to $10,777,500.00. The project scope includes construction of five new buildings with multiple line items covering base bid work and deduct alternates such as elimination of paving, storage structures, and pallet racking, as well as substitutions for wall panel gauges, column protection systems, and flooring materials. Specialized trades submitted bids as follows: Mechanical (2 bidders: $212,000.00–$256,529.00), Electrical (7 bidders: $669,500.00–$1,320,300.00), Plumbing (4 bidders: $245,000.00–$342,912.00), and Fire Protection (2 bidders: $160,500.00–$209,460.00). Bids were due October 28, 2026, at 11:00 AM, with a non-mandatory pre-bid conference held October 7, 2026, at 9:00 AM at the Water Administration Building, 150 Pitney Road, Lancaster, Pennsylvania, followed by a site tour; pre-bid site visits were required between 8:00 AM and 4:00 PM Monday through Friday.
The tabulation presents unit prices and total costs for each line item and bidder across all five trade categories, with deduct alternates clearly marked as negative values. All pricing is lump sum (LS) for major components, with selective unit pricing for soil remediation and removal work in the General Construction trade. The City indicated it would select the lowest responsible bidder based on submitted bids and noted that successful bidders must comply with applicable discrimination laws, minimum wage requirements, the Steel Products Procurement Act, and other federal and state requirements as specified in Article 27 of the instructions to bidders. Building permits and associated inspections were required through the Bureau of Building Code Administration.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| GENERAL CONSTRUCTION | Caldwell, Heckles, and Egan Inc. | Lobar, Inc. | Skepton Construction, Inc. | Uhrig Construction | eciConstruction LLC | |||
| Total Cost | $ 9,928,375.00 | $ 9,311,650.00 | $ 11,814,000.00 | $ 9,739,608.00 | $ 9,513,800.00 | |||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 11,672,875.00 | $ 10,441,000.00 | $ 13,670,000.00 | $ 11,153,196.00 | $ 11,184,000.00 | ||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 10,144,000.00 | $ 10,144,000.00 | $ 8,858,250.00 | $ 8,858,250.00 | $ 10,777,500.00 | $ 10,777,500.00 | $ 9,383,000.00 | $ 9,383,000.00 | $ 9,467,475.00 | $ 9,467,475.00 |
| #1-2 | Salt Shed Structure | LS | 1 | $ 1,087,500.00 | $ 1,087,500.00 | $ 1,100,000.00 | $ 1,100,000.00 | $ 2,395,000.00 | $ 2,395,000.00 | $ 1,282,446.00 | $ 1,282,446.00 | $ 1,275,000.00 | $ 1,275,000.00 |
| #1-3 | Bulk Rock Removal | CY | 175 | $ 210.00 | $ 36,750.00 | $ 200.00 | $ 35,000.00 | $ 250.00 | $ 43,750.00 | $ 250.00 | $ 43,750.00 | $ 168.00 | $ 29,400.00 |
| #1-4 | Trench Rock Removal - | CY | 75 | $ 275.00 | $ 20,625.00 | $ 250.00 | $ 18,750.00 | $ 250.00 | $ 18,750.00 | $ 200.00 | $ 15,000.00 | $ 195.00 | $ 14,625.00 |
| #1-5 | Unsatisfactory/Unsuitable Soils - Remediation | CY | 9000 | $ 7.00 | $ 63,000.00 | $ 9.00 | $ 81,000.00 | $ 15.00 | $ 135,000.00 | $ 9.00 | $ 81,000.00 | $ 7.50 | $ 67,500.00 |
| #1-6 | Unsatisfactory/Unsuitable Soils - Removal and Replacement | CY | 6000 | $ 53.50 | $ 321,000.00 | $ 58.00 | $ 348,000.00 | $ 50.00 | $ 300,000.00 | $ 58.00 | $ 348,000.00 | $ 55.00 | $ 330,000.00 |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $ (1,744,500.00) | $ (1,129,350.00) | $ (1,856,000.00) | $ (1,413,588.00) | $ (1,670,200.00) | ||||||||
| #2-1 | Eliminate: Paving of the Construction Yard and Construction Yard Structure (Covered Storage), Leaving the Entire Site at the Stone Subgrade Level | LS | 1 | $ (275,000.00) | $ (275,000.00) | $ (286,000.00) | $ (286,000.00) | $ (190,000.00) | $ (190,000.00) | $ (235,083.00) | $ (235,083.00) | $ (227,000.00) | $ (227,000.00) |
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $ (750,000.00) | $ (750,000.00) | $ (411,000.00) | $ (411,000.00) | $ (730,000.00) | $ (730,000.00) | $ (641,377.00) | $ (641,377.00) | $ (653,700.00) | $ (653,700.00) |
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ (78,500.00) | $ (78,500.00) | $ (84,900.00) | $ (84,900.00) | $ (68,000.00) | $ (68,000.00) | $ (84,282.00) | $ (84,282.00) | $ (76,000.00) | $ (76,000.00) |
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ (125,000.00) | $ (125,000.00) | $ (133,700.00) | $ (133,700.00) | $ (127,000.00) | $ (127,000.00) | $ (132,715.00) | $ (132,715.00) | $ (142,000.00) | $ (142,000.00) |
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ (12,500.00) | $ (12,500.00) | $ (10,800.00) | $ (10,800.00) | $ (73,000.00) | $ (73,000.00) | $ (29,668.00) | $ (29,668.00) | $ (18,500.00) | $ (18,500.00) |
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ (5,000.00) | $ (5,000.00) | $ (10,000.00) | $ (10,000.00) | $ - 0 | $ - 0 | $ (12,500.00) | $ (12,500.00) |
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ (40,000.00) | $ (40,000.00) | $ (50,700.00) | $ (50,700.00) | $ (29,000.00) | $ (29,000.00) | $ (94,319.00) | $ (94,319.00) | $ (75,500.00) | $ (75,500.00) |
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ (30,000.00) | $ (30,000.00) | $ (15,750.00) | $ (15,750.00) | $ (20,000.00) | $ (20,000.00) | $ (44,138.00) | $ (44,138.00) | $ (44,500.00) | $ (44,500.00) |
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ (325,000.00) | $ (325,000.00) | $ (281,500.00) | $ (281,500.00) | $ (249,000.00) | $ (249,000.00) | $ (269,380.00) | $ (269,380.00) | $ (276,000.00) | $ (276,000.00) |
| #2-10 | Substitute: Pre-Engineered Post-Frame Salt Shed Structure System in lieu of Base Bid Salt Shed Structure | LS | 1 | $ (97,500.00) | $ (97,500.00) | $ 158,000.00 | $ 158,000.00 | $ (350,000.00) | $ (350,000.00) | $ 129,813.00 | $ 129,813.00 | $ (135,000.00) | $ (135,000.00) |
| #2-11 | Eliminate: All Lockers in Warehouse Building | LS | 1 | $ (11,000.00) | $ (11,000.00) | $ (8,000.00) | $ (8,000.00) | $ (10,000.00) | $ (10,000.00) | $ (12,439.00) | $ (12,439.00) | $ (9,500.00) | $ (9,500.00) |
| MECHANICAL | Garden Spot Mechanical, Inc. | Vision Mechanical | |||||||||||
| Total Cost | $ 212,000.00 | $ 256,529.00 | |||||||||||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $212,000.00 | $256,529.00 | ||||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $212,000.00 | $ 212,000.00 | $256,529.00 | $256,529.00 | |||||
| #1-2 | Salt Shed Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $0.00 | $0.00 | ||||||||||
| #2-1 | Eliminate: Paving of the Construction Yard | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| ELECTRICAL | Garden Spot Electric, Inc. | Hirneisen Electric, Inc. | Lobar, Inc. | Manada Electric | MidState Mechanical & Electrical, LLC | Schipsi Electric LLC | Shannon A. Smith, Inc. | |||||
| Total Cost | $ 669,500.00 | $ 943,230.00 | $ 973,000.00 | $ 725,700.00 | $ 889,450.00 | $ 779,091.00 | $ 1,320,300.00 | |||||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 698,600.00 | $ 949,230.00 | $ 975,000.00 | $ 749,000.00 | $ 912,950.00 | $ 779,091.00 | $ 1,320,300.00 | ||||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 682,800.00 | $ 682,800.00 | $ 924,230.00 | $ 924,230.00 | $ 960,000.00 | $ 960,000.00 | $ 735,700.00 | $ 735,700.00 | $ 889,700.00 | $ 889,700.00 | $ 762,496.00 | $ 762,496.00 | $ 1,295,000.00 | $ 1,295,000.00 |
| #1-2 | Salt Shed Structure | LS | 1 | $ 15,800.00 | $ 15,800.00 | $ 25,000.00 | $ 25,000.00 | $ 15,000.00 | $ 15,000.00 | $ 13,300.00 | $ 13,300.00 | $ 23,250.00 | $ 23,250.00 | $ 16,595.00 | $ 16,595.00 | $ 25,300.00 | $ 25,300.00 |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $ (29,100.00) | $ (6,000.00) | $ (2,000.00) | $ (23,300.00) | $ (23,500.00) | $ - 0 | $ - 0 | ||||||||||
| #2-1 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-2 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ (29,100.00) | $ (29,100.00) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ (23,300.00) | $ (23,300.00) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-3 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-4 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-5 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-6 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-7 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-8 | Eliminate: Paving of the Construction Yard | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-9 | Eliminate: Construction Yard Structure | LS | 1 | $ - 0 | $ - 0 | $ (6,000.00) | $ (6,000.00) | $ (2,000.00) | $ (2,000.00) | $ - 0 | $ - 0 | $ (23,500.00) | $ (23,500.00) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| PLUMBING | Garden Spot Mechanical, Inc. | SSM Industries | Vision Mechanical | W.C. Eshenaur & Son Inc | |||||||||||||
| Total Cost | $ 245,000.00 | $ 342,912.00 | $ 287,300.00 | $ 276,267.00 | |||||||||||||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 245,000.00 | $ 342,912.00 | $ 287,300.00 | $ 276,267.00 | ||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 245,000.00 | $245,000.00 | $ 342,912.00 | $ 342,912.00 | $ 287,300.00 | $ 287,300.00 | $ 276,267.00 | $ 276,267.00 | |
| #1-2 | Salt Shed Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| #2-1 | Eliminate: Paving of the Construction Yard | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| FIRE PROTECTION | Anchor Fire Protection | Triangle Fire Protection, Inc. | ||||||||||
| Total Cost | $ 160,500.00 | $ 209,460.00 | ||||||||||
| # | Items | UNIT | Quantity | |||||||||
| Required | Unit | |||||||||||
| Price | Total | |||||||||||
| Cost | Unit | |||||||||||
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 160,500.00 | $ 209,460.00 | |||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 160,500.00 | $ 160,500.00 | $ 209,460.00 | $ 209,460.00 |
| #1-2 | Salt Shed Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $ - 0 | $ - 0 | |||||
| #2-1 | Eliminate: Paving of the Construction Yard | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |