25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf
PDF 4 MB Posted
- Solicitation number
- US.254234
- Issued by
- Lancaster County, Pennsylvania
About this file
This document is Addendum 4 to the architectural and structural drawings for the City of Lancaster Operations Facility Expansion Project, a multi-building construction initiative in Lancaster, Pennsylvania. The project encompasses the design and construction of five new buildings: a warehouse with storage mezzanine, a salt shed, a covered shed, and a material shed, along with associated site work. The addendum, issued October 29, 2026, updates and clarifies the architectural, structural, mechanical, plumbing, and electrical specifications originally issued for bidding on September 8, 2026. The construction contract documents include general construction notes requiring contractors to verify all dimensions and existing conditions, comply with applicable laws and codes, coordinate work across trades, protect adjacent construction, and follow manufacturer installation requirements. The pre-bid conference was held October 7, 2026, with site visits available by appointment, and bids were due October 28, 2026, at 11:00 AM through PennBid's online portal.
The project is structured as five separate prime contracts covering general construction, mechanical, electrical, plumbing, and fire protection work. Detailed specifications address building materials, finishes, and systems, including pre-engineered metal building components with semi-corrugated panels, galvanized steel trim, metal roofing and siding, and interior finishes such as epoxy flooring, carpet tile, and ceramic wall tile in wet areas. The project requires compliance with ADA accessibility standards, NFPA fire-stopping requirements, and building code regulations. Mechanical systems include gas-fired furnaces, heat pumps, unit heaters, and HVAC equipment; plumbing includes fixtures such as ADA-compliant water closets, lavatories, and emergency safety equipment. Funding source and final contract award details are determined by the City of Lancaster based on the lowest responsible bidder evaluation.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
FD
FD
FD FDFD
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
EXISTING CONDITIONS PRIOR TO START OF WORK.
2. CONTRACTOR SHALL COMPLY WITH AND PERFORM
WORK IN ACCORDANCE WITH ALL APPLICABLE LAWS,
STATUTES, ORDINANCES, LAWFUL ORDERS AND
REGULATIONS. IF THE CONTRACTOR RECOGNIZES
THAT PORTIONS OF THE CONTRACT DOCUMENTS DO
NOT CONFORM WITH APPLICABLE STANDARDS, THE
CONTRACTOR SHALL PROMPTLY NOTIFY THE
ARCHITECT, THE CONSTRUCTION MANAGER (IF
APPLICABLE) AND THE OWNER, IN WRITING, BEFORE
PROCEEDING WITH THE WORK.
3. THE CONTRACTOR SHALL NOT SCALE DRAWINGS.
DIMENSIONS ARE LABELED ON DRAWINGS. IN THE
EVENT OF OMISSION OR DISCREPANCY OF
NECESSARY DIMENSIONS OR INFORMATION, NOTIFY
THE ARCHITECT IN WRITING.
4. EACH CONTRACTOR SHALL COORDINATE ITS
WORK WITH OTHER TRADES. EACH CONTRACTOR
WHO FAILS TO COORDINATE ITS WORK WITH OTHER
TRADES SHALL BEAR ALL COSTS OF EACH TRADE
TO REMEDY THE RELATED CONDITION, INCLUDING
DISCONNECTION, REMOVAL, PATCHING, AND RE-
INSTALLATION OF AFFECTED ELEMENTS.
5. EACH CONTRACTOR SHALL PROTECT ALL
ADJACENT CONSTRUCTION AND SYSTEMS FROM
DAMAGE BY ITS WORK. EACH CONTRACTOR WHO
FAILS TO SUFFICIENTLY PROTECT ADJACENT
CONSTRUCTION SHALL BEAR ALL COSTS OF REPAIR
OR REPLACEMENT OF ADJACENT CONSTRUCTION OR
SYSTEMS. DAMAGE TO ELEMENTS TO REMAIN SHALL
BE PATCHED AND REPAIRED.
6. CONTRACTOR SHALL COORDINATE ALL
INSPECTIONS AND TESTING WITH OWNER'S
INDEPENDENT TESTING AGENCY AND LOCAL CODE
OFFICIALS.
7. PLAN DIMENSIONS ARE TO FACE OF STUD, FACE
OF MASONRY OR CENTERLINE OF COLUMN, UNLESS
NOTED OTHERWISE.
8. ALL DIMENSIONS LISTED AS 'CLEAR', 'HOLD', 'MIN.'
OR 'MAX.' ARE ABSOLUTE AND NOT SUBJECT TO
CONSTRUCTION TOLERANCES.
9. EXISTING CONSTRUCTION IS SHOWN FOR
REFERENCE ONLY AND IS ASSUMED. FOR ANY
EXISTING CONSTRUCTION AFFECTED BY NEW WORK,
INCLUDING DEMOLITION, VERIFY IN FIELD.
10. CIVIL, STRUCTURAL, ELECTRICAL, PLUMBING, HVAC
AND FOOD SERVICE INFORMATION SHOWN ON THE
ARCHITECTURAL DRAWINGS ARE FOR REFERENCE
ONLY. REFER TO EACH DISCIPLINE'S DRAWINGS FOR
SPECIFIC INFORMATION.
11. FOR ALL INSTALLED EQUIPMENT, PLUMBING
FIXTURES, DOORS, WINDOWS, ETC., VERIFY ALL
ROUGH OPENING DIMENSIONS WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
12. PROVIDE CONCEALED, IN-WALL BLOCKING,
SUFFICIENT TO SUPPORT ALL CASEWORK, PLUMBING
FIXTURES, TOILET ACCESSORIES, SPECIALTY EQUIPMENT
AND MISCELLANEOUS ITEMS.
13. ALL CODE REQUIRED SIGNAGE SHALL BE INCLUDED
IN CONTRACT. QUANTITY, TYPE AND LOCATIONS TO BE
APPROVED BY CODE OFFICIAL.
14. CONTRACTOR SHALL FOLLOW THE
MANUFACTURER'S RECOMMENDATIONS FOR
INSTALLATION OF ALL MATERIALS, FIXTURES, AND
EQUIPMENT. CONTRACTOR SHALL ADHERE TO
MANUFACTURER'S REQUIREMENTS TO OBTAIN
WARRANTY.
15. CONTRACTOR SHALL PROVIDE CONTROL JOINTS
AS PER INDUSTRY RECOMMENDED STANDARDS OR
MANUFACTURER REQUIREMENTS, WHICHEVER IS MORE
LIMITING, IN ALL MATERIALS, INCLUDING BUT NOT
LIMITED TO CONCRETE, MASONRY, FINISHES AND
GYPSUM BOARD.
16. EACH CONTRACTOR SHALL PREPARE ALL
SUBSTRATES AS REQUIRED FOR INSTALLATION OF
THEIR PORTION OF WORK.
17. FOR ANY PENETRATION THROUGH RATED
CONSTRUCTION, PROVIDE DAMPERS, COLLARS,
SLEEVES, SEALANT OR OTHER FIRESTOPPING
ASSEMBLY AS REQUIRED TO MAINTAIN RATING OF
PENETRATED CONSTRUCTION AND PREVENT THE
SPREAD OF SMOKE AND FIRE AS PER NFPA. THE
FIRESTOPPING ASSEMBLY FOR EACH PENETRATION
SHALL BE BY THE CONTRACTOR MAKING THE
PENETRATION, UNLESS NOTED OTHERWISE.
18. PROVIDE PATCHING AND LEVELING COMPOUNDS AS
REQUIRED FOR INSTALLATION OF ALL FLOOR FINISHES.
19. ALL EXTERIOR STEEL SHALL BE HOT DIPPED
GALVANIZED, PRIMED AND PAINTED, TYP, UNO.
20. SLOPE ALL CONCRETE AND GRADE AWAY FROM
BUILDING AT 1/4" PER FOOT, TYP, UNO.
21. ALL EXTERIOR WOOD FRAMING AND BLOCKING
SHALL BE PRESSURE TREATED.
22. ALL ALUMINUM WRAPPED PRESSURE TREATED
WOOD SHALL HAVE SLIP SHEET BETWEEN ALUMINUM
AND WOOD TO PREVENT GALVANIC ACTION.
23. PROVIDE FASTENERS TO PREVENT GALVANIC
ACTION AT ALL PRESSURE TREATED WOOD
LOCATIONS.
24. GRAB BARS, ACCESSORIES AND ANCHORAGE
SHALL HAVE SUFFICIENT STRENGTH TO SUSTAIN A
WEIGHT OF 250 POUNDS FOR 5 MINUTES.
GENERAL CONSTRUCTION NOTES
Room Name
00 SF/PP
F-5
0000 SF100
0000 MAX
-- ACT
ROOM NAME
150 SF
A A
WIDTH
CAP
LOAD
IN/OCC
00"
100A
.00"
CW01
N
PROJECT
NORTH
A###
Sim
S im
Sim
S im
A101
1 SIM
P1.2
1i
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
CENTERLINE FACE OF
ROOM NAME
ROOM NUMBER
ROOM AREA/DIMS
ROOM
NUMBER ROOM AREA
MAX # OF
OCCUPANTS
ACTUAL # OF
OCCUPANTS
AREA
CLASSIFICATION
DOOR NUMBER
OPENING WIDTH
MAX # OF OCCUPANTS
ACTUAL # OF OCCUPANTS
ALLOWED INCHES PER
OCCUPANT
100A
A101
Sim
VIEW NUMBER
SHEET NUMBER
CALLOUTS
REVISION CLOUD
SECTION MARK
ELEVATION MARKS
EXTERIOR INTERIOR
ROOM TAGS
DOOR TAGS
COLUMN GRID TAGS
CENTERLINE
WALL TAG
WINDOW TAG
ALUMNINUM
FRAME TAG
W40
1i cL
NORTH ARROWS
DEMOLITION
TAG
A101
Sim
SPECIALTY
EQUIPMENT TAG
PLUMBING
FIXTURE TAG
SYMBOL LEGEND
signage tags material tags
MAX # OF OCCUPANTS
@ AT
# / LB NUMBER OR POUND / POUND
ABV ABOVE
ACOUST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
A/C AIR CONDITIONING
ADA AMERICANS w/ DISABILITIES ACT
ADD ADDENDUM / ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE / ADJACENT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE of ARCHITECTS
ALT ALTERNATE
ALUM ALUMINUM
ANCH ANCHOR / ANCHORAGE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
ATTN ATTENTION
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BOD BOTTOM OF DECK
BOS BOTTOM OF STEEL
BOW BOTTOM OF WALL
BSMT BASEMENT
BTWN BETWEEN
BU BUILT UP
BULL BULLETIN
BRG BEARING
CAB CABINET
CER CERAMIC
CI CONTINUOUS INSULATION
CIP CAST IN-PLACE
CJ CONTROL JOINT
CLK CAULK
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMP COMPONENT(S)
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CTOP COUNTERTOP
CT CERAMIC TILE
CW CURTAIN WALL
D DRYER
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DISP DISPENSER
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
E EAST
EA EACH
EIFS EXTERIOR INSULATION & FINISH SYSTEM
ELEC ELECTRIC / ELECTRICAL
EL ELEVATION (HEIGHT)
ELEV ELEVATION (VIEW)
ELVR ELEVATOR
ENG ENGINEER
EPS EXTRUDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE(D)
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EX EXAMPLE
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISHED FLOOR ELEVATION
FIN FINISH / FINISHED
FL FLUSHED
FLR(G) FLOOR(ING)
FR FIRE RATED
FRT FIRE RETARDANT TREATED
FND FOUNDATION
FO FACE OF
FOB FURNISHED BY OTHERS
FOF FACE OF FINISH
FOW FACE OF WALL
FS FIRE STOP
FT FEET / FOOT
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GWB GYPSUM WALL BOARD
GC GENERAL CONTRACTOR
GL GLASS / GLAZING
GYP GYPSUM
H HIGH
HC HANDICAPPED
HCWD HOLLOW CORE WOOD DOOR
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HR HANDRAIL
HWD HARDWARE
HVAC HEATING, VENTILATING, AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER / INTERIOR DESIGN
IN INCHES
INC INCORPORATED
INCL INCLUD(ED)(ING)
INSUL INSULATED / INSULATION
INT INTERIOR
JC JANITOR'S CLOSET
JT JOINT
L LENGTH
LAM(D) LAMINATE(D)
LAV LAVATORY
LTD LIMITED
LVL LAMINATED VENEER LUMBER
LVP LUXURY VINYL PLANK
LVT LUXURY VINYL TILE
LVR LOUVER
MANUF MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MIN MINIMUM
MIR MIRROR(ED)
MISC MISCELLANEOUS
MLDG MOULDING
MO MASONRY OPENING
MNTD MOUNT(ED)
MR MOISTURE RESISTANT
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OCC OCCUPANT(S)
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
P PLASTIC
PERF PERFORATED
PERIM PERIMETER
PF PRE-FINISHED
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PLWD PLYWOOD
PMF PRE-MOLDED FILLER
PNT(D) PAINT(ED)
POB POINT OF BEARING
PRE-FAB PREFABRICATED
PROJ PROJECT / PROJECTION
PSF POUNDS PER SQUARE FOOR
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLY VINYL CHLORIDE
QT QUARRY TILE
QTY QUANTITY
R RISER
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFRIGERATOR
REFL'D REFLECTED
REINF REINFORCED
REQD REQUIRED
REV(S) REVISION(S)
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
RWC RAIN WATER CONDUCTOR
S SOUTH
SCHED SCHEDULE
SCWD SOLID CORE WOOD DOOR
SEC SECRETARY
SECT SECTION
SF SQUARE FOOT(AGE)
SHT SHEET
SHTNG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SOG SLAB ON GRADE
SPEC(S) SPECIFY / SPECIFICATION(S)
SPT SPOUT
SQ SQUARE
SS STAINLESS STEEL
SSF SOLID SURFACE
ST/STOR STORAGE
STC SOUND TRANSMISSION COEFFICIENT
STD STUD
STND STANDARD
STN(D) STAIN(ED)
STL STEEL
STRUCT STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM(S)
T TREAD
T&G TONGUE & GROOVE
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPORARY / TEMPERED
THK THICK
THRESH THRESHOLD
TLT TOILET
TO TOP OF
TOB TOP OF BEAM / BEARING
TOC TOP OF CONCRETE
TOF TOP OF FRAME
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TV TELEVISION
TYP TYPICAL
UC UNDER CABINET/COUNTER
UCL UNDER CABINET LIGHT
UL UNDERWRITERS LABORATORIES
UNEX UNEXCAVATED
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
UV UNIT VENTILATOR
VAPB VAPOR BARRIER
VAPR VAPOR RETARDER
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VNL VINYL
W WEST / WIDE
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WIN WINDOW
w/ WITH w/o WITHOUT
WWF WELDED WIRE FABRIC
XPS EXPANDED POLYSTYRENE
YR YEAR
ABBREVIATIONS
CD-1 COVER SHEET
CD-2 GENERAL NOTES
CD-3 OVERALL EXISTING CONDITIONS PLAN
CD-4 EXISTING CONDITIONS AND DEMOLITION PLAN
CD-5 EXISTING CONDITIONS AND DEMOLITION PLAN
CD-6 EXISTING CONDITIONS AND DEMOLITION PLAN
CD-7 OVERALL SITE PLAN
CD-8 LAYOUT PLAN
CD-9 LAYOUT PLAN
CD-10 LAYOUT PLAN
CD-11 OVERALL GRADING PLAN
CD-12 GRADING PLAN
CD-13 GRADING PLAN
CD-14 GRADING PLAN
CD-15 OVERALL UTILITY PLAN
CD-16 UTILITY PLAN
CD-17 UTILITY PLAN
CD-18 UTILITY PLAN
CD-19 SEWER PROFILES
CD-20 WATER PROFILES
CD-21 SITE DETAILS
CD-22 SITE DETAILS
CD-23 SEWER DETAILS
CD-24 WATER DETAILS
SW-25 COVER SHEET
SW-26 GENERAL NOTES
SW-27 GENERAL NOTES
SW-28 EXISTING CONDITIONS PLAN
SW-29 SCM LOCATION MAP
SW-30 GRADING PLAN
SW-31 GRADING PLAN
SW-32 GRADING PLAN
SW-33 LANDSCAPE NOTES AND DETAILS
SW-34 LANDSCAPE NOTES AND DETAILS
SW-35 OVERALL LANDSCAPE PLAN
SW-36 LANDSCAPE PLAN
SW-37 LANDSCAPE PLAN
SW-38 LANDSCAPE PLAN
SW-39 STORM PROFILES
SW-40 STORM PROFILES
SW-41 STORM PROFILES
SW-42 PCSM DETAILS
SW-43 PCSM DETAILS
SW-44 MATERIAL SPECIFICATIONS
SW-45 OPERATION AND MAINTENANCE NOTES
SW-46 GEOLOGY TESTING
SW-47 GEOLOGY TESTING
SW-48 SCM-001 FACILITY PLAN AND DETAILS
SW-49 SCM-002 FACILITY PLAN AND DETAILS
SW-50 OFFSITE ANALYSIS
SW-51 PRE-DEVELOPMENT DRAINAGE AREA MAP
SW-52 POST-DEVELOPMENT DRAINAGE AREA MAP
SW-53 POST-DEVELOPMENT SUB-DRAINAGE AREA MAP
SW-54 POST-DEVELOPMENT SUB-DRAINAGE AREA MAP
ES-1 COVER SHEET
ES-2 GENERAL NOTES
ES-3 OVERALL EXISTING CONDITIONS PLAN
ES-4 EXISTING CONDITIONS AND DEMOLITION PLAN
ES-5 EXISTING CONDITIONS AND DEMOLITION PLAN
ES-6 EXISTING CONDITIONS AND DEMOLITION PLAN
ES-7 OVERALL E&S CONTROL PLAN
ES-8 E&S CONTROL PLAN
ES-9 E&S CONTROL PLAN
ES-10 E&S CONTROL PLAN
ES-11 E&S DETAILS
ES-12 E&S DETAILS
ES-13 E&S DETAILS
ES-14 E&S DETAILS
CIVIL DRAWING LIST
N
PROJECT
NORTH
(W) WAREHOUSE /
STORAGE BUILDING(S) SALT SHED /
SALT STORAGE BUILDING
(C) COVERED SHED /
COVERED STORAGE /
CONSTRUCTION YARD STRUCTURE
(M) MATERIAL SHED /
MATERIAL STORAGE
SHEET TITLE
ARCHITECTURAL
A000 COVER SHEET
A011 (W) WAREHOUSE PLAN - FIRST FLOOR - CODE
A012 (W) WAREHOUSE PLAN - MEZZANINE FLOOR - CODE, MISC. INFO. &
DETAILS
A021 TYPICAL ANSI A117.1-2017 STANDARDS (NEW BUILDINGS)
A100 OVERALL SITE LAYOUT & ROOF PLANS & SOUTH ELEVATION -
PROPOSED
A101 (W) WAREHOUSE PLAN - FIRST FLOOR - PROPOSED
A102 (W) WAREHOUSE PLAN - MEZZANINE FLOOR - PROPOSED
A103 (S) SALT SHED PLAN - PROPOSED, EXTERIOR ELEVATIONS, MISC. INFO.
A104 (C) COVERED SHED PLAN - PROPOSED & EXTERIOR ELEVATIONS
A105 (M) MATERIAL SHED PLAN - PROPOSED & EXTERIOR ELEVATIONS
A111 (W) WAREHOUSE PLAN - FIRST FLOOR - REFLECTED CEILING & DETAILS
A112 (W) WAREHOUSE PLAN - MEZZANINE FLOOR - REFLECTED CEILING
A201 (W) WAREHOUSE - EXTERIOR ELEVATIONS & MISC. INFO.
A202 (W) WAREHOUSE - EXTERIOR ELEVATIONS & MISC. INFO.
A301 (W) WAREHOUSE - BUILDING SECTIONS
A302 (W) WAREHOUSE - BUILDING & WALL SECTIONS
A303 (S) SALT, (C) COVERED & (M) MATERIAL SHEDS - BUILDING SECTIONS
A401 ENLARGED PLANS AND INTERIOR ELEVATIONS
A501 MISC. PLAN DETAILS
A511 (W) WAREHOUSE - WALL SECTIONS & DETAILS
A512 (W) WAREHOUSE- WALL SECTIONS & DETAILS
A513 (S) SALT SHED - WALL SECTIONS & DETAILS
A514 (C) COVERED & (M) MATERIAL SHED - WALL SECTIONS & DETAILS
A601 DOOR AND WINDOW SCHEDULE & DETAILS
A701 VERTICAL CIRCULATION SECTIONS & DETAILS
A702 VERTICAL CIRCULATION SECTIONS & DETAILS
A801 FINISH PLANS, SCHEDULES & DETAILS
A901 SALT SHED ALTERNATE PRE-ENGINEERED POST FRAME BUILDING
SYSTEM
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES
S002 GENERAL STRUCTURAL NOTES & SCHEDULES
S101 WAREHOUSE FOUNDATION PLAN
S102 WAREHOUSE MEZZANINE FRAMING PLAN
S103 SALT SHED FOUNDATION PLAN
S104 COVERED SHED FOUNDATION PLAN
S105 MATERIAL SHED FOUNDATION PLAN
S201 FOUNDATION DETAILS
S202 FOUNDATION SECTIONS
S301 FRAMING DETAILS
MECHANICAL
H001 HVAC LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS
H100 FLOOR PLAN - HVAC - 1ST FLOOR
H101 FLOOR PLAN - HVAC - 2ND FLOOR
PLUMBING
P001 PLUMBING LEGENDS, SCHEDULES, NOTES & ABBREVIATIONS
P100 FLOOR PLAN - SANITARY & VENT - 1ST FLOOR
P200 FLOOR PLAN - DOMESTIC WATER & GAS - 1ST FLOOR
P201 FLOOR PLAN - DOMESTIC WATER & GAS - 2ND FLOOR
FIRE PROTECTION
FP100 FIRST FLOOR PLAN - FIRE PROTECTION
FP101 SECOND FLOOR PLAN - FIRE PROTECTION
ELECTRICAL
E001 ABBREVIATIONS, NOTES & SCHEDULES
E002 SCHEDULES AND DETAILS
E101 FIRST FLOOR PLAN - LIGHTING
E201 FIRST FLOOR PLAN - POWER
E300 SECOND FLOOR PLAN - LIGHTING AND POWER
E301 OUTBUILDINGS FLOOR PLAN - ELECTRICAL
E400 SITE PLAN - ELECTRICAL
BH JOB NO.
Sheet Number:
ARCHITECTURE
PROJECT DIRECTORY
SITE LOCATION MAP
DRAWING LIST
Project Issue Date:
THESE DRAWINGS, AS AN INSTRUMENT OF SERVICE,
ARE PROPERTY OF THE ARCHITECT, AND MAY NOT BE
REPRODUCED WITHOUT HIS/HER PERMISSION AND
UNLESS THE REPRODUCTION CARRIES HIS/HER NAME
AS ARCHITECT.
1:
:0 A
M
25-061
A000
-0
N
E W
F A C
IL
IT
IE
S F
O
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
City of Lancaster Operations Facility Expansion
NEW FACILITIES FOR:
Beers & Hoffman Architecture 250 Harrisburg Ave Phone:717-625-4200
ARCHITECT
PROVIDENCE ENGINEERING
10 EISENHOWER BLVD, LANCASTER
Phone: 717-509-7000
STRUCTURAL ENGINEER
PARAGON ENGINEEERING SERVICES
1620 S QUEEN ST. YORK
Phone: 717-854-7374
MEP ENGINEER
RGS ASSOCIATES
53 W JAMES ST, LANCASTER
Phone: 717-715-1396
CIVIL ENGINEER
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
N E W
F A C
IL
IT
IE
S F
O R
ISSUED FOR
BIDDING - NOT
FOR
CONSTRUCTION
©2024 BEERS & HOFFMAN, LTD. ARCHITECTS
09.08.26
150 Pitney Road Lancaster, PA. 17603, Lancaster City Lancaster County Pa.
T R
UE
N
O R
T H
NO DATE RELEASE
A 09.08.26 ISSUED FOR
BIDDING
3 10.23.26 ADDENDUM 3
4 10.29.26 ADDENDUM 4
1" = 40'-0"
OVERALL BUILDINGS KEY PLAN
DESCRIPTION / MODEL / SIZE COLOR REMARKS
BASIS OF DESIGN - SEE SPECS. - COORDINATE SUBSTITUTIONS WITH ARCHITECT
COMPONENT MATERIAL MANUFACTURER
EXTERIOR FINISH SCHEDULE
SEMI-CORRUGATED PANELS / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)SIDING METAL SEE SPECS. (*) = FROM MFR. STANDARD COLOR LINE
SEMI-CORRUGATED PANELS / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)ROOFING METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
RIDGE CAP, FASCIA, TRIMS, ETC. / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)TRIM (ROOFING & SIDING) METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
5"X5" BOX / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)GUTTER(S) METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
4"X6" REC. / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)DOWNSPOUT(S) METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
NOTE: ROOF & WALL INSULATION TO BE BY THE PRE-ENGINEERED METAL BUILDING MANUFACTURER
NO.
#1
#2
#3
#4
#5
BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)SNOW-GUARD(S) / RAIL(S) METAL (*) = FROM MFR. STANDARD COLOR LINE
# & SPACING AS RECOMMENDED BY MFR.
SEE SPECS.#6
(W) - FIRST FLOOR
327.19
(W) - FIRST FLOOR
327.19
(W) - MEZZANINE FLOOR
339.19
A302
A302
A302
A302
A302
A302
W.2W.3W.4W.5W.6W.7W.8W.9W.10
A301
A301
11 3/4"
25'-8" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 26'-7 3/4"
ROOF EDGE TO ROOF EDGE
36'-0"
2" O.H.
9 3/4"
35'-6"35'-6"28'-0"28'-4"28'-0"35'-6"35'-6"
9 3/4"
2" O.H.
DS #5
SIDING #1
FASCIA & EDGE TRIM #3
APPROX. FIN. FLR./GRD.
- SEE CIVIL DWGS.
ROOFING #2
GUTTER #4
RIDGE CAP #3
BOOT (TYPICAL)
(BY SITE CONTRACTOR)
DS #5
SIDING #1
FASCIA & TRIM #3
ROOFING#2
GUTTER #4
APPROX. FIN. FLR./GRD.
- SEE CIVIL DWGS.
DS #5
'-0
'-2
COLUMN & WALL FTGS.
- SEE STRUCT. DWGS.
'-2
B .F
.G
TY
P.
3' -0
M
IN
DWGS. TYP.
SEE
STRUCT.
TY
P.
S.
S.
D . S.S.D.
DS #5DS #5DS #5 DS #5DS #5 DS #5
CAP TRIM #3
EDGE TRIM #3
EDGE TRIM #3
EDGE TRIM #3
CORNER TRIM #3CORNER TRIM #3
CORNER TRIM #3
BASE TRIM #3
W.0.5 W.0
SNOW-GUARDS #6
SNOW-GUARDS #6
15'-6"21'-2" 2
D W
G S.
SE
E
SI
TE
STEP FTG. -
SEE STRUCT. DWGS.
W.1
2"1 3/4"36'-8" COL. TO COL. C.L.
PARGING FIN. ON ALL
EXPOSED FOUNDATION WALLS
AND SLAB EDGES AT
WAREHOUSE BUILDING (TYP.)
PARGING FIN. ON ALL
EXPOSED FOUNDATION
WALLS AND SLAB EDGES AT
WAREHOUSE BUILDING (TYP.)
(W) - FIRST FLOOR
327.19
(W) - FIRST FLOOR
327.19
(W) - MEZZANINE FLOOR
339.19
A302
A302
A302
A302
A302
A302
W.2 W.3 W.4 W.5 W.6 W.7 W.8 W.9 W.10
A301
A301
R .F
.O
5' -0
WO1 WO1
W118W124b
W101a
W101b
W101d
W102b W102a
W101c
W124a
W101e
BENT STL. PLT.
JAMBS & HEAD (PNT.)
(TYP. @ ALL O.H. DRS.)
6"⌀ CONC. FILLED STL. BOLLARD.
3'-0" A.F.F. & 3'-0" B.F.F. (PNT.)
(SEE CIVIL DWGS.)
(TYP. ALL BOLLARDS)
2" O.H.
9 3/4"
35'-6" 35'-6" 28'-0" 28'-4" 28'-0" 35'-6" 36'-3 3/4" 2" O.H.
APPROX. FIN. FLR./GRD.
- SEE CIVIL DWGS.
BOOT (TYPICAL)
(BY SITE CONTRACTOR)
SIDING #1
FASCIA & CAP TRIM #3
APPROX. FIN. FLR./GRD.
- SEE CIVIL DWGS.
COLUMN & WALL FTGS.
- SEE STRUCT. DWGS.
2" O.H.
4' -6
/8
'-2
D W
G S.
SE
E
SI
TE
DWGS. TYP.
SEE STRUCT.
S.S.D.
ROOF EDGE TO ROOF EDGE
36'-0" 26'-7 3/4" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-8"
11 3/4"
2"
'-0
HI
G H
TY
P.2"
'-0
HI
G H
TY
P.
SI
TE
D W
G S.
4'
-0
SE
E
B .F
.G
3' -0
M
IN
1/
2" G
LA
SS
4' -7
1/
2"
2 1/2"
EQ.
(TYP.)
2 1/2"
EQ.
(TYP.)2 1/2"
R.F.O.
6'-0" TYPICAL "W01"
WDW. DIMS.
DS #5
SIDING #1
FASCIA & EDGE TRIM #3
ROOFING #2
GUTTER #4
RIDGE CAP #3
DS #5DS #5 DS #5 DS #5DS #5 DS #5DS #5
EDGE TRIM #3
EDGE TRIM #3
CORNER TRIM #3 CORNER TRIM #3CORNER TRIM #3
BASE TRIM #3
FROST WALL
CONC. PAD
FRST. WALL
CONC. PAD
FROAT WALL
CONC. PAD
2"
W/ MODIFIED HILIFT TRACK
14'-0" WIDE2"
2"
W/ HI-LIFT TRACK
12'-0" WIDE2"2"
W/ HI-LIFT TRACK
12'-0" WIDE2"
W/ MODIFIED HI-LIFT TRACK
12'-0" WIDE
W/ MODIFIED HI-LIFT TRACK
12'-0" WIDE
W/ MODIFIED HI-LIFT TRACK
12'-0" WIDE
W.0.5W.0
SNOW-GUARDS #6
15'-6" 21'-2"
D W
G S.
SE
E
SI
TE
D W
G S.
SE
E
SI
TE
B .F
.G
3' -0
" M
IN
DOCK BUMPERS
STEP FTG. -
SEE STRUCT. DWGS.
PARGING FIN. ON ALL
EXPOSED FOUNDATION WALLS AND SLAB
EDGES AT WAREHOUSE BUILDING (TYP.)
W.1
2" 1 3/4" 36'-8" COL. TO COL. C.L.
APPROXIMATE GRADE WHERE ABOVE
FLOOR FINISH. SEE DETAIL 6/A512 FOR
ARCHITECTURAL WALL CONDITION
WHERE THIS OCCURS. SEE STRUCTURAL
DRAWINGS FOR CMU WALL HEIGHTS
ABOVE FLOOR LEVEL. SEE CIVIL
DRAWINGS FOR GRADING.
BH JOB NO.
Sheet Number:
Project Issue Date:
Drawn By:
Checked By:
T H
IS
D R
A W
IN
G
A S A
N I N S T R
UM
E N T O
F S E R
V
IC
E
IS
P R
O P E R
T Y O
F T
H
A
C H
IT
E C
T A N D
M A Y N
O T B
P R
O D
UC
E D
W
IT
H O
UT
H
IS
P
E R
M
IS
S
IO
N A N D
U N L E S S T
H E R
E P R
O D
UC
T
IO
R
R
IE
S
IS
N A M
E A
S A
R C
H
IT
E C
T
D
UE
T O
D
IS
T O
R T
IO
N F
R O
M
P R
O D
UC
T
IO
N P
R O
C E D
UR
E S
D
IM
E N S
IO
N S S
H A L L N
O T B
E S
C A L
D
F
O M
T H E D
R A W
IN
G
S O
N L Y
IM
E N S
IO
N S A
S S
H O
W N A
R E V
A L
ID
C
O N T R
A C
T O
R S S
H A L L V
E R
IF
Y A
E N S
IO
N S A
N D
C O
N D
IT
IO
N S A
T T
IT
E B
E F O
R E P
R O
C E E D
IN
G
W
IT
H T
W
R K w w w .b e e r s h o ff m a n .c o m
Sheet Issue Date:
1:
:0 A
M
25-061
A201
-0
W
F A C
IL
IT
IE
S F
O y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
(W) WAREHOUSE
- EXTERIOR
ELEVATIONS &
MISC. INFO.
JZ / PK
RB
09.08.26
N E W
F A C
IL
IT
IE
S F
O R
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
ISSUED FOR BIDDING - NOT FOR CONSTRUCTION
IS
S U E D
F O
R B
ID
D
IN
G
N O
T F O
R C
O N S T R
U C T
IO
N
B
E E R
S
H O
F F M
A N L T D
A R
C H
IT
E C T S
09.08.26
P it n e y
R o a d
L a n c a s te r P A
L a n c a s te r C it y, L a n c a s te r C o u n ty
P a
1/8" = 1'-0"
WAREHOUSE - NORTH ELEVATION
1/8" = 1'-0"
WAREHOUSE - SOUTH ELEVATION
NO DATE RELEASE
A 09.08.26 ISSUED FOR
BIDDING
2 10.14.26 ADDENDUM 2
4 10.29.26 ADDENDUM 4
(W) - FIRST FLOOR
327.19
(W) - MEZZANINE FLOOR
339.19
A301
A301
A301
A301
W.AW.D W.BW.CW.F W.EW.G
A301
A301
R .F
.O
5' -0
WO1WO1WO1WO1WO1WO1
W106a
2"
12"
2"
12"
W104
9 3/4"
29'-8" 29'-8" 29'-8" 29'-8" 29'-8" 29'-8"
9 3/4"
2" O.H. 2" O.H.
SIDING #1
FASCIA & EDGE TRIM #3
APPROX. FIN. FLR./GRD.
- SEE CIVIL DWGS.
COLUMN & WALL FTGS.
- SEE STRUCT. DWGS.
RIDGE CAP #3
'-2
'-0
DS #5
CONC. PAD FROST WALL
- SEE CIVIL DWGS.
GUTTER #4
BOOT (TYPICAL)
(BY SITE CONTRACTOR) BOOT (TYPICAL)
(BY SITE CONTRACTOR)
6"⌀ CONC. FILLED STL. BOLLARD.
3'-0" A.F.F. & 3'-0" (PNT.)
(SEE CIVIL DWGS.)
(TYP. ALL BOLLARDS)
B .F
.G
TY
P.
3' -0
M
IN
V .I.
F.
B .F
.G
TY
P.
3' -0
M
IN
DWGS. TYP.
SEE
STRUCT.
TY
P.
S.
S.
D
S.S.D.
R.F.O.
6'-0"
2 1/2"
EQ.
(TYP.)
2 1/2"
EQ.
(TYP.) 2 1/2"
1/
2"
G
LA
SS
4' -7
1/ 2"
TYPICAL "W01"
WDW. DIMS.
CORNER TRIM #3
DS #5
GUTTER #4
CORNER TRIM #3
BASE TRIM #3
FROST WALL
CONC. PAD
FROST WALL
CONC. PAD
SNOW-GUARDS #6 SNOW-GUARDS #6 22
APPROXIMATE GRADE WHERE ABOVE
FLOOR FINISH. SEE DETAIL 6/A512 FOR
ARCHITECTURAL WALL CONDITION
WHERE THIS OCCURS. SEE STRUCTURAL
DRAWINGS FOR CMU WALL HEIGHTS
ABOVE FLOOR LEVEL. SEE CIVIL
DRAWINGS FOR GRADING.
(W) - FIRST FLOOR
327.19
A301
A301
A301
A301
W.A W.DW.B W.C W.FW.E W.G
A301
A301
2"
12"
2"
12"
2"
12"
2" O.H.2" O.H.
APPROX. FIN. FLR./GRD.
- SEE CIVIL DWGS.
COLUMN & WALL FTGS.
- SEE STRUCT. DWGS.
2" O.H.
DS #5
GUTTER #4
BOOT (TYPICAL)
(BY SITE CONTRACTOR)
BOOT (TYPICAL)
(BY SITE CONTRACTOR)
'-2
DWGS. TYP.
SEE STRUCT.
TY
P.
S.
S.
D . S.S.D.
9 3/4"
29'-8" 29'-8" 29'-8" 29'-8" 29'-8" 29'-8"
9 3/4"
'-8
/8
2" O.H.
4' -6
/8
SIDING #1
FASCIA & EDGE TRIM #3
RIDGE CAP #3
DS #5
GUTTER #4
CORNER TRIM #3
DS #5
GUTTER #4
CORNER TRIM #3
BASE TRIM #3
CORNER TRIM #3
BOOT (TYPICAL)
(BY SITE CONTRACTOR)
W.C.1 W.C.9
SNOW-GUARDS #6SNOW-GUARDS #6
2'-8" 25'-4" 1'-8"
SNOW-GUARDS #6
PARGING FIN. ON ALL
EXPOSED FOUNDATION WALLS
AND SLAB EDGES AT WAREHOUSE
BUILDING (TYP.)
B .F
.G
TY
P.
3' -0
M
IN
. SI
TE
D
W G
S.
4'
-0
SE
E
D W
G S.
SE
E
SI
TE
D W
G S.
SE
E
SI
TE
3' -1
B .F
.G
TY
P.
3' -0
M
IN
DESCRIPTION / MODEL / SIZE COLOR REMARKS
BASIS OF DESIGN - SEE SPECS. - COORDINATE SUBSTITUTIONS WITH ARCHITECT
COMPONENT MATERIAL MANUFACTURER
EXTERIOR FINISH SCHEDULE
SEMI-CORRUGATED PANELS / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)SIDING METAL SEE SPECS. (*) = FROM MFR. STANDARD COLOR LINE
SEMI-CORRUGATED PANELS / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)ROOFING METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
RIDGE CAP, FASCIA, TRIMS, ETC. / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)TRIM (ROOFING & SIDING) METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
5"X5" BOX / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)GUTTER(S) METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
4"X6" REC. / BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)DOWNSPOUT(S) METAL (*) = FROM MFR. STANDARD COLOR LINESEE SPECS.
NOTE: ROOF & WALL INSULATION TO BE BY THE PRE-ENGINEERED METAL BUILDING MANUFACTURER
NO.
#1
#2
#3
#4
#5
BY P.E.M.B. MFR. / SEE SPECS. T.B.D. (*)SNOW-GUARD(S) / RAIL(S) METAL (*) = FROM MFR. STANDARD COLOR LINE
# & SPACING AS RECOMMENDED BY MFR.
SEE SPECS.#6
BH JOB NO.
Sheet Number:
Project Issue Date:
Drawn By:
Checked By:
T H
IS
D R
A W
IN
G
A S A
N I N S T R
UM
E N T O
F S E R
V
IC
E
IS
P R
O P E R
T Y O
F T
C H
IT
E C
T A N D
M A Y N
O T
P R
O D
UC
E D
W
IT
H O
UT
H
IS
P
E R
M
IS
S
IO
N A N D
U N L E S S T
H E R
E P R
O D
UC
T
R
R
N A M
E A
S A
R C
H
IT
E C
T
D
UE
T O
D
IS
T O
R T
IO
N F
R
P R
O D
UC
T
IO
N P
R O
C E D
UR
E S
D
IM
E N S
IO
N S S
H A L L N
O T B
E S
C A L
O M
T H E D
R A W
IN
G
S O
N
E N S
IO
N S A
S S
H O
W N A
R E V
A L
ID
C
O N T R
A C
T O
R S S
H A L L V
E R
IF
Y A
E N S
IO
N S A
N D
C O
N D
IT
IO
N S A
T T
E B
E F O
R E P
R O
C E E D
IN
G
W
IT
H T
R K w w w .b e e r s h o ff m a n .c o m
Sheet Issue Date:
1:
:0 A
M
25-061
A202
-0
W
F A C
IL
IT
IE
S F
O y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
(W) WAREHOUSE
- EXTERIOR
ELEVATIONS &
MISC. INFO.
JZ / PK
RB
09.08.26
N E W
F A C
IL
IT
IE
S F
O R
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
ISSUED FOR BIDDING - NOT FOR CONSTRUCTION
IS
S U E D
F O
R B
ID
D
IN
G
N O
T F O
R C
O N S T R
U C T
IO
N
B
E E R
S
H O
F F M
A N L T D
A R
C H
IT
E C T S
09.08.26
P it n e y
R o a d
L a n c a s te r P A
L a n c a s te r C it y, L a n c a s te r C o u n ty
P a
1/8" = 1'-0"
WAREHOUSE - EAST ELEVATION
1/8" = 1'-0"
WAREHOUSE - WEST ELEVATION
NO DATE RELEASE
A 09.08.26 ISSUED FOR
BIDDING
2 10.14.26 ADDENDUM 2
1. CONTINUE WALL FINISHES 6" ABOVE CEILING
2. PROVIDE BLOCKING CONCEALED IN WALL AT ALL
GRAB BAR LOCATIONS
3. GRAB BARS, ACCESSORIES AND ANCHORAGE SHALL
HAVE SUFFICIENT STRENGTH TO SUSTAIN A WEIGHT OF
250 POUNDS FOR 5 MINUTES.
4. PROVIDE MOISTURE RESISTANT GYPSUM BOARD FOR
ALL GYPSUM BOARD CONSTRUCTION IN WET AREAS,
SUCH AS, BUT NOT LIMITED TO, TOILET & BATHING
ROOMS, JANITOR'S CLOSETS W/ MOP SINK, LAUNDRY
AREAS.
GENERAL TOILET NOTES24" MIN. 12" MIN.
36" MIN.
M
IN
42" MIN.
1"
A .F
.F
M
IN
INSUL. EXPOSED
PIPES
SURFACE MOUNTED
MIRROR
SURFACE MOUNTED
TOILET PAPER
DISPENSER
SURFACE MOUNTED
SOAP DISPENSER
SURFACE MOUNTED PAPER
TOWEL DISPENSER
ADA HGT. W.C. REFER TO
PLUMBING DWGS. FOR TYPE
GRAB
BARS
(TYP.)
SURFACE
MOUNTED
TOILET PAPER
DISPENSER
LOCATION
BABY CHANGING
STATION
TO
W
O R
K S
UR
F A C
E
M
IN
M A X
PROVIDE ADEQUATE
WD. BLKG. IN WALL
FOR GRAB BAR (TYP.)
ADA HGT. LAV. REFER TO
PLUMBING DRWGS. FOR TYPE
39" - 41"
EDGE OF SINK SHALL NOT
ENCROACH ON TLT. CLR. FLOOR SPACE
FLOOR FLOOR(W
H
EE
L C
H A
IR
H G
T.
M A X
TO
S P O
UT
(S
TA
N D
A R
D H
G T.
TO
S
P O
UT
DRINKING FOUNTAINS
A .F
.F
54" MIN.
12" MAX.
1/
24" MIN.
48" MAX.
7" - 9"33
A .F
.F
M
IN
O F R
EF
LE
C
TI
V E
S
UR
F A C
E
M
A X
TO
B O
TT
O
M E
D G
E
18" MIN.
TO
T
.O R
IM
A .F
.F M
A X
7"
M
IN
C
LR
M
IN
9"
15" MIN.
O F D
IS
P
EN
S
IN
G
M A X
P O
IN
T
O F D
IS
P
EN
S
IN
G
M A X
P O
IN
T
M
IN
18" MIN.
TO
C
EN
TE
R
M
IN
M A X
HOOK
EDGE OF URINAL SHALL
NOT ENCROACH ON
TOILET CLEAR
FLOOR SPACE
15" MIN.
NOTE: ALL GRAB BARS, SHOWER SEATS
AND DRESSING BENCHES SHALL BE
DESIGNED TO RESIST A SINGLE
CONCENTRATED LOAD OF 250 # APPLIED
IN ANY DIRECTION AT ANY POINT AND
TRANSFER THE LOAD TO THE STRUCTURE.
FLOOR SPACE
60" MIN. CLEAR
M A X
FLOOR
SURFACE MOUNTED SANITARY
NAPKIN
DISPOSAL
M
IN
TOILET & LOCKER ROOM FIXTURES & ACCESSORIES SCHEDULE
SYMBOL DESCRIPTION MANF MODEL NO MOUNT REMARKS
TOILET
ACCESSIBLE TOILET
URINAL
SINK
FAUCET
GRAB BAR
GRAB BAR
GRAB BAR
TOILET TISSUE DISPENSER
HAND DRYER
SANITARY NAPKIN DISPOSAL
SOAP DISPENSER
FRAMED MIRROR
CLOTHES HOOK
BY PLUMBING CONTRACTOR
BY PLUMBING CONTRACTOR
BY PLUMBING CONTRACTOR
BY PLUMBING CONTRACTOR
BY PLUMBING CONTRACTOR
FLOOR
FLOOR
WALL
WALL
SINK
BOBRICK
BOBRICK
BOBRICK
BY OWNER
EXCEL
BY OWNER
BOBRICK
BOBRICK
BOBRICK
WALL /
PARTITION
WALL
WALL
WALL
B-6806X42"
B-6806X36"
B-6806X18"
HORIZONTAL (1) PER TOILET + (1) PER SHOWER
HORIZONTAL (1) PER TOILET
VERTICAL (1) PER TOILET + (1) PER SHOWER
TA-SB
B-2012
B-290 24"W X 36"H (1) PER MOP OR HAND SINK
B-211
ALL ACCESSORIES TO BE MOUNTED PER ICC/ANSI 117.1-2017 REQUIREMENTS
GENERAL NOTES:
1. GENERAL CONTRACTOR TO PROVIDE REQUIRED BLOCKING FOR ALL TOILET ROOM FIXTURES AND ACCESSORIES.
2. (*) LOCATION TO BE DETERMINED BY OWNER.
TYPICAL TOILET ROOM - FLOOR 1
GB-42
GB-36
GB-18
TA-1
TA-2
TA-3
TA-4
TA-5
TA-6
WALL /
PARTITION
WALL /
PARTITION
WALL /
PARTITION
WALL /
PARTITION
WALL /
PARTITION
SHOWER CURTAIN ROD
FOLDING SHOWER SEAT
BOBRICK
BOBRICK
WALLB-6047
B-5181
TA-7
TA-8 WALL
MOP & BROOM HOLDER BOBRICK B-239TA-9 WALL
(1) PER TOILET
(1) PER MOP OR HAND SINK (*)
(1) PER TOILET
(1) PER MOP OR HAND SINK (*)
(2) PER SHWR. (*) & (1) PER TOILET (ON DR.)
(1) PER SHOWER
(1) PER SHOWER
(1) PER MOP SINK (*)
GRAB BAR BOBRICK B-6806X30" HORIZONTAL (1) PER SHOWERGB-30
WALL /
PARTITION
W.E
W.G
UTILITY / STR.
W123
W. LOCKER
W116
W
M. LOCKER
W115
W
CORR
W119
TLT.
W121
TLT.
W120
LAUNDRY
W117
W
W
W
OFFICE
W111
W
STR.
W114
IT
W113
W123
CORR.
W118
OFFICE
W110
O P E N O
F F
IC
E W
B R
E A K R
M W
W113
W
W b
ICE MACH.
W
D
R
EC
ES
S
F
EC
-A (4
R
EC
ES
S
F E C -A
(5
DF-1
M O
P S
IN
K
MOP
SINK
6'-0" L.
BENCH
R
EC
ES
S
F
EC
-A (6
3 5/8" (14'-2 3/4"' CLR.)
14'-10"
3 5/8"
(6"CMU)
5 5/8"
2 3/8" SPC.
7 13/16"
3 13/16"
A301
A301
'-1
" C O
UN
TE
R
SP
AC
E
2' -1
C
NT
R
2' -1
4' -0
V
AR
IE
S
5/
8" 5/
8"
1"
2' -0
2'
-6
1'-
3'
-0
2' -6
2'
-1
2'
-0 " 1"
A401
8"
5/
8" (9
'-5
/8
C
LR
9' -6
/8
5/
8"
8' -1
1"
8' -9
/4
C
LR
5/
8"
4" 3'
-4
1'-
1'-6"1'-6"
(6'-6 3/4" CLR.)
7'-2" 6 1/8"
(7'-0 3/4" CLR.)
7'-2"
8"
5/
8" (1
8' -7
/4
C
LR
'-9
5/
8"
EQ. EQ.
TYP.
1'-10"
TYP.
1'-9 7/8"
(9'-0" CLR.)
9'-5 3/8" 3 5/8"
(5'-6" CLR.)
5'-7 1/4" 3 5/8"
(6'-3 1/4" CLR.)
6'-4 1/2" 3 5/8"
A L
IG
N W
A
LL
S
5/
8"
4' -6
5'
-0
/4 C
LR
5/
8" (8
'-2
/4 C
LR
8' -4
5/
8" (5
'-1
/4
" C
LR
6' -0
5/
8"
1'-10"
TY
P.
1'-
5/
8" (9
'-8
/4 C
LR
9' -9
/2
5/
8" (4
'-1
3/ 4"
C
LR
5' -1
5/
8" (8
-7
/8 C
LR
8' -9
/8
5/
8" (4
'-1
" C
LR
4' -1
1/
4"
5/
8"
5' -9
5/
8" (4
'-3
/8
4' -2
/8
5/
8" (1
5' -3
" C
LR
'-4
/4
5/
8"
2' -8
G B
5/ 8"
BENCH
3'-6" L. 2'-4 7/8"
3" SLP.
2'-8" 2'-8"
HC
HC
B
EN
C H
1'- 8"
W
R O
D B
Y G
.C
C
UR
T.
B
Y O
W N E R
SLP. FLR. FOR
POSITIVE DRAIN'G.
TO FLOOR DRAIN. 1/4" PER FOOT MAX.
SLP. FLR. FOR
POSITIVE DRAIN'G.
TO FLOOR DRAIN. 1/4" PER FOOT MAX
2' -1
/4
2' -8
ROD BY G.C. &
CURT. BY OWNER
EQ
EQ
GB
5/8"
1'-3 3/8"
3 5/8"
(4'-8 3/4" CLR.)
4'-9"3 5/
8" 6'
-3
/2
5/
8"
GB
5/8"
3 5/8"
10'-8 3/8"
3 5/8"
CLR.
3'-6"
GB
5/8"
(5'-10 3/8" CLR.)
5'-11 5/8" 3 5/8" 4'-5 1/4" 3 5/8" 5'-9" 3 5/8"
C
LR
3' -3
/8
G B
5/ 8"
3' -1
/4
6'-10 3/8"
3 5/8"
1'-3" 3'-6"
2' -0
/8
1'-11 1/8"
1'-
/8
/8
135°
3'-1"
3 5/8"
5'-0" (5'-1 3/4" CLR.)
3 5/8"
2'-3 3/4"
EQ
UA
L
1/
2" W
. B
EN
C H
EQ
UA
L
EQ
EQ
cL 2'-7"
ALIGN WALLS
EQ
EQ
TY
P.
1'-
7/ 8"
FD
FD
FD
FD
FD
18"W.x21"D.x78"H.
SINGLE TIER MTL.
LOCKER(S) (12)
18"W.x21"D.x78"H.
SINGLE TIER MTL.
LOCKER(S) (3)
WASHER & DRYER SUPPLIED
BY THE OWNER. INSTALLED
BY E.C. & P.C. COORDINATE
POWER & PLUMBING
REQUIREMENTS W/ OWNER.
2'- 3/
4"
BENCH
1'-8" W.
B
EN
C H
3' -6
" L
ICE MACHINE SUPPLIED BY
THE OWNER. INSTALLED BY
E.C. & P.C. COORD. POWER
& PLUMBING REQUIREMENTS
W/ OWNER
A401
1'- 7"
5/
8"
EQ. EQ.
CNTR.
2'-1"
REFRID. SUPPLIED BY THE
OWNER. INSTALLED
BY E.C. & P.C. COORD.
POWER & PLUMBING
REQUIREMENTS W/ OWNER.
BASE
2'-0"
WALL
1'-2"
A401
A401
2' -8
/8
FACE OF MTL. STUD TO BE
TIGHT TO COL. FLANGE.
N
PROJECT
NORTH
2' -8
/8
2'
-8
/8
3'-4" CLR.
FD
FD
S L P . ¼
SLP. ¼"/12"
VOID
PHENOLIC BENCH
PHENOLIC
BENCH
0"
P.E.M.B. COL.
P.E.M.B.
COL.
P.E.M.B. GIRT P.E.M.B. GIRT
8"
11 5/8" (12"CMU)
1 1/2" M.S.
5/8" GB 4'-11 1/4" CLR.
2" S
PC
4' -8
(6 "C
M U)
5/
8"
STL. BRACE ANGLES
- SEE STRUCT. DWGS.
CMU TO BE SCRIBED
TO MATCH THE
STL. COL. ANGLE
7 13/16" 5 15/16"
11 5/8" (12"CMU)
1 1/2" M.S.
5/8" GB
A302
A302
W111
W
(1 3'
-1
/4 " C
LR
'-0
(12'-2 1/8" CLR.)
12'-3 3/8"
4' -4
7' -8
4"
W d
4"
7 5/8" (8"CMU)
1 1/2" M.S.
5/8" GB
DS
9'-10"
FINISHED FLOOR ELEVATION = 327.19'
(4" CONCRETE FLOOR W/ 4" STONE BASE
@ OFFICE AREAS)
(- SEE STRUCT. DWGS.)
DASHED LINE INDICATES
CERAMIC WALL TILE FINISH
-TO EXTEND FROM EPOXY
COVE BASE TO 7'-4" A.F.F.
-ORIENT WALL TILE
HORIZONTALLY
DASHED LINE INDICATES CERAMIC
WALL TILE FINISH
-TO EXTEND FROM EPOXY COVE
BASE TO 7'-4" A.F.F.
-ORIENT WALL TILE HORIZONTALLY
SHOWER
SEAT
SHOWER
SEAT
5 5 5
5 5
A401
4 4
A401
7 8
(W) - FIRST FLOOR
327.19
W.G
6"
1'- 8"
3' -6
1'-
6" 2'
-1
FILL.
1" BASE
2'-0" W.
1D./1DR.
BASE
2'-6 W.
2 D./2 DR.
BASE
1'-0" 4 D.
BASE
3'-0" W.
SINK
BASE
2'-6 W.
2 D./2 DR.
SPC.
2'-10" W.
REF.
BASE
2'-0"
4 DRW.
FILL.
1"
TO TOP OF CNTR. SURFACE
OR IS A DROP IN SINK TO
TOP OF SINK RIM.
2' -6
1'-
1'- 6"
2' -0
1"
2'-0" 2'-6" 1'-0" 3'-0" 2'-6" 2'-10" 2'-0"
1"
'-0
C .H
7' -1
" G
B B
UL
K
HE
AD
8' -0
C .H
B
EY
O
ND
OPEN OFFICE
W112
9' -6
C .H
SIDG.
8"
3 5/8"
5/8"
'-0
'-6
(W) - FIRST FLOOR
327.19
HC
18"W.x21"D.x78"H.
SINGLE TIER MTL.
LOCKER(S) (TYP.)
PHENOLIC BENCH
1'-
6" SHWR.
2'-8"
DRYING
2'-8"3"
ROD BY G.C. &
CURT. BY OWNER
6' -4
" SEE BELOW
FOR GRAB
BAR INFO.
SEE ENLARGED
PLAN ON THIS
SHT. FOR FLR.
SLOPE INFO.
8' -0
C .H
C
ER
AM
IC
W
AL
L
TI
LE
H
EI
G
HT
, T
YP
7' -4
CERAMIC WALL
TILE AT SHOWER
(W) - FIRST FLOOR
327.19
C .H
.1'-10" 3'-4"
REFER TO ADA MOUNTING HGT. BELOW
8'-10" CLEAR
(W) - FIRST FLOOR
327.19
C .H
1'-6"
7'-0 1/2" CLEAR
REFER TO ADA MOUNTING HGT. BELOW
FOLDING SEAT
TO
F
LO
O
R F
IN
IS
H 1'-
6" T
O P
O F
SE
AT
4"
W
AL
L
TI
LE
S
EE
D
ET
AI
LS
O N
SH
EE
T A8
7' -0
EPOXY COVE BASE, SEE
DETAILS ON SHEET A801
WALL TILE
ORIENTED
HORIZONTALLY
SEE PLUMBING
DRAWINGS FOR
SHOWER FIXTURE
INFORMATION
SEE PLAN FOR
EXTENT OF
WALL TILE
2'-6"
MAX
6"
B
AR
A B
O V
E
FL
O O
R F
IN
IS
H
2' -1
TO
T O
P O
F G
R
AB
1'- 6"
5"
2'-8"
EPOXY COVE BASE, SEE
DETAILS ON SHEET A801
W
AL
L
TI
LE
S
EE
D
ET
AI
LS
O N
SH
EE
T A8
7' -0
4"
GRAB
BARS
WALL TILE
ORIENTED
HORIZONTALLY
SEE PLAN FOR
EXTENT OF
WALL TILE
6" MAX
3'-6"
WALL FINISH TO SEAT
2 1/2" MAX
ALIGN CENTER OF
GRAB BAR END WITH
EDGE OF SEAT
B
AR
S
AB
O V
E
FL
O O
R F
IN
IS
H 2'
-1
TO
T O
P O
F G
R
AB
PROVIDE CONCEALED
WALL BLOCKING AS
REQUIRED
FOLDING SEAT
M
IN
A B
O V
E
FL
O O
R F
IN
IS
H
3' -2
M
AX
A B
O V
E
FL
O O
R F
IN
IS
H
4' -0
WALL FINISH
1'-4" MIN TO
MAX TO WALL FINISH
2'-3"
LOCATION OF SHOWER
CONTROL AND HAND
SHOWER WITHIN THIS AREA
-SEE PLUMBING DRAWINGS
FOR SHOWER FIXTURE
INFORMATION
4"
W
AL
L
TI
LE
S
EE
D
ET
AI
LS
O N
SH
EE
T A8
7' -0
EPOXY COVE BASE, SEE
DETAILS ON SHEET A801
GRAB
BAR
AB
O
V E
FL
O
O R
F
IN
IS
H
1'- 6"
T O
P O
F
SE
AT
WALL TILE ORIENTED
HORIZONTALLY
BH JOB NO.
Sheet Number:
Project Issue Date:
Drawn By:
Checked By:
T H
IS
D R
A W
IN
G
A S A
N I N S T R
UM
E N T O
F S E R
V
IC
E
IS
P R
O P E R
T Y O
F T
C H
IT
E C
T A N D
M A Y N
O T
P R
O D
UC
E D
W
IT
H O
UT
H
IS
P
E R
M
IS
S
IO
N A N D
U N L E S S T
H E R
E P R
O D
UC
T
R
R
N A M
E A
S A
R C
H
IT
E C
T
D
UE
T O
D
IS
T O
R T
IO
N F
R
P R
O D
UC
T
IO
N P
R O
C E D
UR
E S
D
IM
E N S
IO
N S S
H A L L N
O T B
E S
C A L
O M
T H E D
R A W
IN
G
S O
N
E N S
IO
N S A
S S
H O
W N A
R E V
A L
ID
C
O N T R
A C
T O
R S S
H A L L V
E R
IF
Y A
E N S
IO
N S A
N D
C O
N D
IT
IO
N S A
T T
E B
E F O
R E P
R O
C E E D
IN
G
W
IT
H T
R K w w w .b e e r s h o ff m a n .c o m
Sheet Issue Date:
1:
:0 A
M
25-061
A401
-0
W
F A C
IL
IT
IE
S F
O y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
ENLARGED
PLANS AND
INTERIOR
ELEVATIONS
JZ / PK
RB
09.08.26
N E W
F A C
IL
IT
IE
S F
O R
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
ISSUED FOR BIDDING - NOT FOR CONSTRUCTION
IS
S U E D
F O
R B
ID
D
IN
G
N O
T F O
R C
O N S T R
U C T
IO
N
B
E E R
S
H O
F F M
A N L T D
A R
C H
IT
E C T S
09.08.26
P it n e y
R o a d
L a n c a s te r P A
L a n c a s te r C it y, L a n c a s te r C o u n ty
P a
3/8" = 1'-0"
TYPICAL ADA MOUNTING HEIGHTS
1/4" = 1'-0"
ENLARGED FIRST FLOOR WAREHOUSE PLAN (PARTIAL)
1/4" = 1'-0"
INTERIOR ELEV. - BREAK ROOM #W122
1/4" = 1'-0"
INTERIOR ELEV. - M. LOCKER #W115
1/4" = 1'-0"
INTERIOR (EAST) ELEV. - T. #W120
1/4" = 1'-0"
INTERIOR (SOUTH) ELEV. - T. #W120
NO DATE RELEASE
A 09.08.26 ISSUED FOR
BIDDING
2 10.14.26 ADDENDUM 2
4 10.29.26 ADDENDUM 4
ALL WALL TYPE INDICATIONS.
REFER TO SHEET A102 FOR WALL TYPES
1/2" = 1'-0"
SHOWER
ELEVATION -
FACING SEAT
SIDE WALL
1/2" = 1'-0"
SHOWER
ELEVATION -
FACING SIDE
WALL
1/2" = 1'-0"
SHOWER ELEVATION - FACING
BACK WALL
EQUAL
SEE STRUCTURAL
CMU EQUAL
ST
O
NE
6"
SL
AB
8" C
O
NC
C
IV
IL
D
W G
S.
FI
N.
G R
D
V
AR
IE
S
SE
E 3'
-0 " M
IN
. B
EL
O
W F
IN
. G
R D
T
YP
S.
S.
D
SEE STRUCT. DWGS. (S.S.D.)
REINF. CONC. FTG.
(SEE STRUCT. DWGS.)
ASSURE ADEQUATE
BRG. CAPACITY
(SEE STRUCT. DWGS.)
COMPACTED BACKFILL
COMPACTED BACKFILL
FULLY GROUTED VERT. REINF.
C.M.U. (SEE STRUCT. DWGS.)
2" RI
2'-0"
R I
2"
½" P.M.F.
PARGING FIN. ON ALL
EXPOSED FOUNDATION
WALLS AND SLAB EDGES
AT WAREHOUSE BUILDING
(TYP.)
1"
METAL SIDING
(BY P.E.M.B. MFR.)
SPRAY OR LIQUID
ROLLED APPLIED
DAMPPROOFING
(CONT. OVER FTG.)
VAPOR BARRIER
SIDING
STUDS
8" MTL.
5 1/2"
WALL INSULATION
(BY P.E.M.B. MFR.)
FOAM SLIP SHEET
BELOW BASE TRACK
8" MTL. STUD BASE TRACK
R-15, MIN XPS RIGID PERIMETER RIGID INSUL.
2'-0" HORIZ. & FULL HGT. VERT.
TYPICAL FLOOR
CONSTRUCTION:
* 8" REINF. POURED IN
PLACE CONC. SLAB ON GRD.
* VAPOR BARRIER
* 6" COMP. STONE BASE
(SEE STRUCT. DWGS.)
METAL BASE TRIM /
FLASHING W/ DRIP EDGE
(BY P.E.M.B. MFR.)
FULLY GROUTED 8" C.M.U.
TOP COURSE (SEE STRUCT. DWGS.)
HORIZ. JNT. REINF. @
16" O.C. VERTICALLY
HORIZ. JNT. REINF. @
16" O.C. VERTICALLY
(1st CRS. BELOW
FLR. LINE)
SEE STRUCTURAL DRAWINGS
FOR ALL STRUCTURAL
INFORMATION
SEE STRUCTURAL
DRAWINGS
(W) - FIRST FLOOR
327.19
1/ 2"
L
IP
1/ 2"
S
LP
1/
2" L
IP
B
AS
E
ST
O
NE
M
AC
. B
AS
E
C R
S.
M
AC
. F
IN
. C R
S.
INSULATED MTL.
OVERHEAD DR. #W102b -
SEE DOOR SCHEDULE
1/4" THICK STL. BENT PLATE JAMB
(BEYOND) (PNT.)
½" RADIUSED EDGE
REFER TO FTG. DTL. #5 FOR ADDITIONAL
TYPICAL NOTES & DIMENSIONS
CONC. HAUNCH @ O.H. DR.
MTL. SIDING
(BY P.E.M.B. MFR.)
CONT. #4 NOSING REBAR.
2" CLEAR EACH WAY.
8"
DOCK BUMPER(S)
4'
-0 " S
EE
S
IT
E
D W
G S.
3' -0
" M
IN
. B
EL
O W
F
IN
. G R
D
S
EE
S
IT
E D
W G
S.
POURED CONCRETE WALL
-SEE STRUCTURAL DRAWINGS
PARGING FIN. ON ALL
EXPOSED FOUNDATION WALLS AND SLAB
EDGES AT WAREHOUSE BUILDING (TYP.)
2"
12"
25'-4" A.F.F.
TO OPENING
(BEYOND)
MTL. ROOFING
(BY P.E.M.B. MFR.)
ROOF INSULATION
(BY P.E.M.B. MFR.)
MTL. SIDING
(BY P.E.M.B. MFR.)
MTL. FASCIA
(BY P.E.M.B. MFR.)
EDGE TRIM
(BY P.E.M.B. MFR.)
MTL. SIDING CAP TRIM
(BY P.E.M.B. MFR.)
PRE-ENGINEERED
METAL BUILDING
(P.E.M.B.) FRAMING
DEFLECTION & TOP TRACK
(BY P.E.M.B. MFR.)
WALL INSULATION
(BY P.E.M.B. MFR.)
SEALANT & BAKER ROD
OVERHEAD DOOR
& MECHANISUM
2"8"
1 3/4"
2"
12"
MTL. ROOFING
(BY P.E.M.B. MFR.)
ROOF INSULATION
(BY P.E.M.B. MFR.)
MTL. SIDING
(BY P.E.M.B. MFR.)
MTL. FASCIA
(BY P.E.M.B. MFR.)
EDGE TRIM
(BY P.E.M.B. MFR.)
MTL. SIDING CAP TRIM
(BY P.E.M.B. MFR.)
PRE-ENGINEERED
METAL BUILDING
(P.E.M.B.) FRAMING
DEFLECTION & TOP TRACK
(BY P.E.M.B. MFR.)
25'-4" A.F.F.
TO OPENING
(BEYOND)
WALL INSULATION
(BY P.E.M.B. MFR.)
SEALANT & BAKER ROD
5"X5" MTL. BOX GUTTER
(BY P.E.M.B. MFR.)
2"
1 3/4"
8"
MTL. ROOFING
(BY P.E.M.B. MFR.)
ROOF INSULATION
(BY P.E.M.B. MFR.)
MTL. SIDING
(BY P.E.M.B. MFR.)
PRE-ENGINEERED
METAL BUILDING
(P.E.M.B.) FRAMING
DEFLECTION & TOP TRACK
(BY P.E.M.B. MFR.)
MTL. FASCIA
(BY P.E.M.B. MFR.)
EDGE TRIM
(BY P.E.M.B. MFR.)
MTL. SIDING CAP TRIM
(BY P.E.M.B. MFR.)
EAVES (BEYOND)
SEALANT & BAKER ROD
FOAM BARRIER
(BY P.E.M.B. MFR.)
MTL. ROOFING
(BY P.E.M.B. MFR.)
ROOF INSULATION
(BY P.E.M.B. MFR.)
FOAM BARRIER
(BY P.E.M.B. MFR.)
PRE-ENGINEERED
METAL BUILDING
(P.E.M.B.) FRAMING
WALL INSULATION
(BY P.E.M.B. MFR.)
OPENING HEADER -
SEE STRUCT. DWGS.
MTL. SIDING BASE TO
WALL TRIM
(BY P.E.M.B. MFR.)
2" ROOF O.H.
SIDING
MFR.)
8" GIRT
(BY P.E.M.B.
W.1
W.0
MTL. ROOFING
(BY P.E.M.B. MFR.)
ROOF INSULATION
(BY P.E.M.B. MFR.)
STDS.
8" MTL.2"
P.E.M.B. MFR.)
MTL.
SIDING (BY
MTL. SIDING
(BY P.E.M.B. MFR.)
MTL. FASCIA
(BY P.E.M.B. MFR.)
EDGE TRIM
(BY P.E.M.B. MFR.)
MTL. SIDING CAP TRIM
(BY P.E.M.B. MFR.)
PRE-ENGINEERED
METAL BUILDING
(P.E.M.B.) FRAMING
DEFLECTION & TOP TRACK
(BY P.E.M.B. MFR.)
27'-2" A.F.F.
TO SOFFIT
(BEYOND)
WALL INSULATION
(BY P.E.M.B. MFR.)
EAVES (BEYOND)
SEALANT & BAKER ROD
FOAM BARRIER
(BY P.E.M.B. MFR.)
W.0
BH JOB NO.
Sheet Number:
Project Issue Date:
Drawn By:
Checked By:
T H
IS
D R
A W
IN
G
A S A
N I N S T R
UM
E N T O
F S E R
V
IC
E
IS
P R
O P E R
T Y O
F T
C H
IT
E C
T A N D
M A Y N
O T
P R
O D
UC
E D
W
IT
H O
UT
H
IS
P
E R
M
IS
S
IO
N A N D
U N L E S S T
H E R
E P R
O D
UC
T
R
R
N A M
E A
S A
R C
H
IT
E C
T
D
UE
T O
D
IS
T O
R T
IO
N F
R
P R
O D
UC
T
IO
N P
R O
C E D
UR
E S
D
IM
E N S
IO
N S S
H A L L N
O T B
E S
C A L
O M
T H E D
R A W
IN
G
S O
N
E N S
IO
N S A
S S
H O
W N A
R E V
A L
ID
C
O N T R
A C
T O
R S S
H A L L V
E R
IF
Y A
E N S
IO
N S A
N D
C O
N D
IT
IO
N S A
T T
E B
E F O
R E P
R O
C E E D
IN
G
W
IT
H T
R K w w w .b e e r s h o ff m a n .c o m
Sheet Issue Date:
1:
:1 A
M
25-061
A511
-0
W
F A C
IL
IT
IE
S F
O y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
(W) WAREHOUSE
- WALL
SECTIONS &
DETAILS
JZ / PK
RB
09.08.26
N E W
F A C
IL
IT
IE
S F
O R
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
ISSUED FOR BIDDING - NOT FOR CONSTRUCTION
IS
S U E D
F O
R B
ID
D
IN
G
N O
T F O
R C
O N S T R
U C T
IO
N
B
E E R
S
H O
F F M
A N L T D
A R
C H
IT
E C T S
09.08.26
P it n e y
R o a d
L a n c a s te r P A
L a n c a s te r C it y, L a n c a s te r C o u n ty
P a
1" = 1'-0"
WAREHOUSE WALL SECTION
1" = 1'-0"
WAREHOUSE WALL SECTION
1" = 1'-0"
WAREHOUSE WALL SECTION
1" = 1'-0"
WAREHOUSE WALL SECTION
1" = 1'-0"
WAREHUSE WALL SECTION
1" = 1'-0"
WAREHOUSE WALL SECTION
NO DATE RELEASE
A 09.08.26 ISSUED FOR
BIDDING
2 10.14.26 ADDENDUM 2
3 10.23.26 ADDENDUM 3
W.8
ARCHIVE SHELVING
W104
C O
N C
S
TN
" 1'-
S .S
.D
EQUAL
(8" CMU)
7 5/8" EQUAL
SEE STRCT. DWGS.
5/8" GB
& R.I.
1 1/2" MTL.
"Z" STDS.
(8" CMU)
7 5/8"
½" P.M.F.
VAPOR BARRIER
FLOOR CONSTRUCTION:
* 8" REINF. POURED IN
PLACE CONC. SLAB ON GRD.
* VAPOR BARRIER
* 6" COMP. STONE BASE
(SEE STRUCT. DWGS.)
8" C.M.U. W/ VERT.
& HORIZ. REINF. -
SEE STRUCT. DWGS.
COMPACTED
STONE FILLER
ASSURE ADEQUATE BRG.
CAPACITY OF THE SUB-
SOIL. SEE STRUCT. DWGS.
C O
N C
S
TN
REINF. CONC. FTG.
SEE STRUCT. DWGS.
FLOOR CONSTRUCTION:
* 6" REINF. POURED IN
PLACE CONC. SLAB ON GRD.
* VAPOR BARRIER
* 6" COMP. STONE BASE
(SEE STRUCT. DWGS.)
½" P.M.F.
VAPOR BARRIER
ALL CMU WALLS ENCLOSING
ARCHIVE ROOM W104 TO HAVE
(1) HOUR MINIMUM FIRE RATING
PER UL 905 ASSEMBLY
G
B 1/
2" G
AP
1½" R.I.
(W) - MEZZANINE FLOOR
339.19
W.8
3' -6
1/
EQ
UA
L
1/
EQ
UA
L
1/
(M A X
STORAGE MEZZANINE
W201
D
EC
K M
TL
ARCHIVE SHELVING
W104
2"
1 1/2"
5/8" GB
& R.I.
1 1/2" MTL.
"Z" STDS.
(8" CMU)
7 5/8"
3 13/16" 3 13/16"
ALL CMU WALLS ENCLOSING
ARCHIVE ROOM W104 TO HAVE
(1) HOUR MINIMUM FIRE RATING
PER UL 905 ASSEMBLY
LAY-IN A.T.C. W/ R-19
F.G. BATT INSUL. ON TOP
8" REINF. C.M.U. BOND BM.
- SEE STRUCT. DWGS.
8" C.M.U. W/ VERT.
& HORIZ. REINF. -
SEE STRUCT. DWGS.
POST BASES TO BE WELDED
TO POUR STOP. PROVIDE
SEALANT AROUND
POUR STOP EMBEDDED INTO
GROUTED TOP CRS. -
SEE STRUCT. DWGS.
6"
1½" R.I.
SHELVING
W103
RECESS.
FEC-A(14)
(W) - FIRST FLOOR
327.19
W.G
WASH BAY
W124
4'-8" 8"
MFR.)
SIDING
(BY P.E.M.B.
V A R
IE
S
3-
M
IN
B
EO
W
F
IN
G
R D
M
AC
. I
NF
O
SE
E
C
IV
IL
D
W G
S.
FO
R
1/ 2"
L
IP
1/ 2"
S
LP
1/ 2"
L
IP
COMP. BACKFILL
REINF. CONC. FTG.
(SEE STRUCT. DWGS.)
ASSURE ADEQUATE BRG. CAPACITY
(SEE STRUCT. DWGS.)
COMPACTED BACKFILL COMPACTED BACKFILL
FULLY GROUTED VERT. REINF. C.M.U.
(SEE STRUCT. DWGS.)
HORIZ. JNT. REINF.
(SEE STRUCT. DWGS.)
SPRAY OR LIQUID
ROLLED APPLIED
DAMPPROOFING
(CONT. OVER FTG.)
R-15 MIN XPS RIGID PERIMETER RIGID INSUL.
2'-0" HORIZ. & FULL HGT. VERT.
TYPICAL FLOOR
CONSTRUCTION:
* 8" REINF. POURED IN
PLACE CONC. SLAB ON GRD.
* VAPOR BARRIER
* 6" COMP. STONE BASE
(SEE STRUCT. DWGS.)
6" 2"
6"
6"⌀ CONC. FILLED STL. BOLLARD.
3'-0" A.F.F. & 3'-0" B.F.F. (PAINTED)
(TYP. ALL BOLLARDS)
INSULATED MTL.
OVERHEAD DOOR -
SEE DOOR SCHEDULE
S.
S.
D
SEE STRUCT. DWGS.
EQ.
SEE STRUCTURAL DWGS
CMU EQ.
2"
2'-0"
CONT. #4 NOSING REBAR.
2" CLEAR EACH WAY
½" RADIUSED EDGE
1/4" THICK STL. BENT PLATE JAMB
(BEYOND) (PNT.)
CONC. HAUNCH @ O.H. DR.
W.G
2"
12"
MTL. ROOFING
(BY P.E.M.B. MFR.)
ROOF INSULATION
(BY P.E.M.B. MFR.)
P.E.M.B. EAVE
HGT. @ 28'-0"
A.F.F.
REFER TO WALL SECTION #4/A511
FOR ADDITIONAL INFORMATION
ALUM. BASE TRIM W/
HEMMED DRIP EDGE
BY MTL. SIDING MFR.
OPENING HEADER
- SEE STRUCT. DWGS.
1/4" THICK BENT STL.
JAMB & HEAD PLATE (PNT.)
- SEE STRUCT. DWGS.
INSULATED MTL.
OVERHEAD DOOR,
TRACK & MECHANISM -
SEE DOOR SCHEDULE
MODIFIED HI-LIFT
TRACK. FOLLOW
ROOF SLOPE
2X FRT WD BLOCKING
CLAD WITH ALUM
(W) - FIRST FLOOR
327.19
W.G
STORAGE
W101
PRE-ENGINEERED METAL BUILDING
STEEL BASE GIRT ANCHORED TO SLAB
- SEE STRUCT. DWGS.
PRE-ENGINEERED METAL BUILDING
STEEL GIRT
WALL INSULATION
(BY P.E.M.B. MFR.)
MTL. SIDING
(BY P.E.M.B. MFR.)
REFER TO WALL SECTION #3/A512
FOR ADDITIONAL INFORMATION
8" GIRT
MFR.)
SIDING
(BY P.E.M.B.
V
ER
IE
S
3' -0
" M
IN
. B
EL
O W
F
IN
G R
D
1"
CONT. FOAM SLIP SHEET BELOW
(BY P.E.M.B. MFR.) BELOW BASE GIRT
BASE DRAINAGE TRIM W/ DRIP EDGE
(BY P.E.M.B. MFR.)
VAPOR BARRIER
SEE STRUCTURAL DRAWINGS
PRE-ENGINEERED METAL BUILDING
STEEL COL. / BENT.
(W) - FIRST FLOOR
327.19
(W) - MEZZANINE FLOOR
339.19
W.G
1'-
9'
-6
C .H
T.
O
.W
BREAK RM
W122
REFER TO WALL SECTION #3 & #5/A512
FOR ADDITIONAL INFORMATION
5/8" GB
M.S.
3 5/8"
W01
WDW.
5" 1"
LAY-IN A.T.C. W/ R-19
F.G. BATT INSUL. ON TOP
LAY-IN A.T.C. SUSP.
WIRES ATTACHED
TO P.E.M.B. (ABV.) 2
SEE
STRUCTURAL
DRAWINGS
1" INSUL. GLASS
THERALLY BROKEN
ALUM. WDW. FRM.
CORNER BEAD
GB HEAD & JAMBS
"J" BEAD & CAULK
CAULK
P-LAM. SILL
FLASHING TRIM BY PEMB
MANUF
SILLFLASHING
TRIM BY PEMB
MANUF
1'-
" M
IN
SPRAY OR LIQUID
ROLLED APPLIED
DAMPPROOFING
(CONT. OVER FTG.)
R-13 MIN FIBERGLASS BATT INSULATION
WITH FACING (FACING ON INTERIOR SIDE)
TO BE PROVIDED AT ALL LOCATIONS
WHERE CMU FOUNDATION WALL EXTENDS
ABOVE FLOOR FINISH. INSULATION TO
EXTEND 1'-0" MINIMUM ABOVE TOP OF
MASONRY, TYPICAL. SEE STRUCTURAL
DRAWINGS FOR ALL LOCATIONS OF CMU
WALL ABOVE FLOOR FINISH. REFER TO
CIVIL DRAWINGS FOR GRADE ELEVATIONS.
SEE STRUCTURAL DRAWINGS
FOR ALL LOCATIONS AND
HEIGHT OF CMU WALL ABOVE
FLOOR FINISH
5' -0
" R .F
.O
3' -0
" S .H
(W) - FIRST FLOOR
327.19
(W) - MEZZANINE FLOOR
339.19
W.A
ARCHIVE SHELVING
W104
STORAGE MEZZANINE
W201
REFER TO WALL SECTION #3 & #5/A512
FOR ADDITIONAL INFORMATION
'-0
FLOOR CONSTR.:
* 4" REINF. POURED IN
PLACE CONC.
* MTL. DECKING
* BAR JOISTS
(BY P.E.M.B. MFR.)
- SEE STRUCT. DWGS.
6" 9'
-2 " C
.H
SEE
STRUCTURAL
DRAWINGS
R
AC
K
IN
G H
EI
G
HT
'-0
5' -0
5'
-0
5' -0
5'
-0
BEAM LEVEL 1
BEAM LEVEL 2
BEAM LEVEL 3
BEAM LEVEL 4
CONFIGURATION SHOWN IS TYPICAL FOR ALL RACKING IN WAREHOUSE
BH JOB NO.
Sheet Number:
Project Issue Date:
Drawn By:
Checked By:
T H
IS
D R
A W
IN
G
A S A
N I N S T R
UM
E N T O
F S E R
V
IC
E
IS
P R
O P E R
T Y O
F T
C H
IT
E C
T A N D
M A Y N
O T
P R
O D
UC
E D
W
IT
H O
UT
H
IS
P
E R
M
IS
S
IO
N A N D
U N L E S S T
H E R
E P R
O D
UC
T
R
R
N A M
E A
S A
R C
H
IT
E C
T
D
UE
T O
D
IS
T O
R T
IO
N F
R
P R
O D
UC
T
IO
N P
R O
C E D
UR
E S
D
IM
E N S
IO
N S S
H A L L N
O T B
E S
C A L
O M
T H E D
R A W
IN
G
S O
N
E N S
IO
N S A
S S
H O
W N A
R E V
A L
ID
C
O N T R
A C
T O
R S S
H A L L V
E R
IF
Y A
E N S
IO
N S A
N D
C O
N D
IT
IO
N S A
T T
E B
E F O
R E P
R O
C E E D
IN
G
W
IT
H T
R K w w w .b e e r s h o ff m a n .c o m
Sheet Issue Date:
1:
:1
A M
25-061
A512
-0
W
F A C
IL
IT
IE
S F
O y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
(W) WAREHOUSE-
WALL SECTIONS
& DETAILS
JZ / PK
RB
09.08.26
N E W
F A C
IL
IT
IE
S F
O R
C it y o f
L a n c a s te r O p e r a ti o n s F a c il it y
E x p a n s io n
ISSUED FOR BIDDING - NOT FOR CONSTRUCTION
IS
S U E D
F O
R B
ID
D
IN
G
N O
T F O
R C
O N S T R
U C T
IO
N
B
E E R
S
H O
F F M
A N L T D
A R
C H
IT
E C T S
09.08.26
P it n e y
R o a d
L a n c a s te r P A
L a n c a s te r C it y, L a n c a s te r C o u n ty
P a
3/4" = 1'-0"
WAREHOUSE WALL SECTION
3/4" = 1'-0"
WAREHOUSE WALL SECTION
3/4" = 1'-0"
WAREHOUSE WALL SECTION
3/4" = 1'-0"
WAREHOUSE WALL SECTION
3/4" = 1'-0"
WAREHOUSE WALL SECTION
3/4" = 1'-0"
WAREHOUSE WALL SECTION
3/4" = 1'-0"
WAREHOUSE WALL SECTION
NO DATE RELEASE
A 09.08.26 ISSUED FOR
BIDDING
2 10.14.26 ADDENDUM 2
3 10.23.26 ADDENDUM 3
4 10.29.26 ADDENDUM 4
1/4" = 1'-0"
WAREHOUSE RACKING SECTION - TYPICAL
1. ALL HARDWARE SHALL BE BRUSHED ALUM. FINISH OR AS OTHERWISE SELECTED BY OWNER.
2. ALL RATED DOORS SHALL HAVE RATED FRAME AND HARDWARE ASSEMBLIES.
GENERAL DOOR NOTES
GENERAL WINDOW NOTES
1. ALL EXTERIOR ALUMINUM FRAMES SHALL
BE THERMALLY BROKEN.
H
EI
G H T
S E E
S C
H
ED
UL
E
SEE SCHED.
WIDTH
HM1 HM2
FINISHED
FLOOR
H
EI
G H T
S E E
S C
H
ED
UL
E
SEE SCHED.
WIDTH 2" 2"2"2"
DOOR FRAME TYPES
EPOXY / SEALERCARPET
EXPOSED CONCRETE
SLAB - SLOPE AWAY
FROM BLDG
DOOR
(SEE SCHEDULE)
1/2" EXP JT
EPOXY/SEALER
CONCRETE SLAB GRADE
THERMALLY BROKEN
THRESHOLD DRIP
DOOR
(SEE SCHED)
RUBBER
REDUCER
STRIP
T2T1
DOOR THRESHOLDS
HOLLOW METAL FRAMES ARE TO BE 5-3/4" DEEP UNLESS NOTED OTHERWISE.
ALUMINUM FRAMES ARE TO BE 4-1/2" DEEP UNLESS NOTED OTHERWISE.
WOOD FRAMES ARE TO BE 5" DEEP UNLESS NOTED OTHERWISE.
STEEL FRAMES ARE TO BE C12 x 20.7 CHANNELS UNLESS NOTED OTHERWISE.
TYPICAL FRAME DEPTHS:
DIMENSIONAL:
DOORS ARE 1-3/4” THICK UNLESS NOTED OTHERWISE.
DOORS TO HAVE A 3/4” UNDERCUT UNLESS NOTED OTHERWISE.
BOTTOM 10” OF PUSH SIDE OF DOOR TO BE A SMOOTH SINGLE PLANE.
BOTTOM EDGE OF VISION LITES TO BE NO HIGHER THAN 43" ABOVE FINISHED FLOOR.
HOLLOW METAL FRAMES TO HAVE A 2" FACE UNLESS NOTED OTHERWISE.
CONSTRUCTION:
HOLLOW METAL DOORS TO HAVE HEADS CAPPED FLUSH WITH TOP EDGE.
HOLLOW METAL DOOR FACES TO BE SEAMLESS 18 GA. STRETCHER LEVEL STEEL.
HOLLOW METAL FRAME IN DRYWALL OPENINGS - KNOCK DOWN FRAMES UNLESS NOTED OTHERWISE HOLLOW METAL FRAME IN MASONRY OPENINGS - CORNERS TO BE WELDED UNLESS NOTED OTHERWISE.
HOLLOW METAL FRAMES TO BE 16 GA. WITH 9 GA. REINFORCEMENT.
HOLLOW METAL FRAMES TO HAVE THREE ANCHORS PER JAMB. ANCHORS TO MEET LABEL REQUIREMENTS.
ALL EXTERIOR METAL DOORS AND FRAMES TO BE GALVANIZED UNLESS NOTED OTHERWISE.
HOLLOW METAL FRAMES ARE TO BE DOUBLE RABBET UNLESS NOTED AS:
SINGLE RABBET, DOUBLE EGRESS, DOUBLE ACTING/CASED
INSTALLATION:
DOOR SWINGS TO MATCH INDICATION ON PLANS.
PROVIDE A MINIMUM OF 4" FROM PERPENDICULAR PARTITION TO FACE OF BACKBEND.
PROVIDE A MINIMUM OF 18" FROM PERPENDICULAR PARTITION TO DOOR EDGE, PULL SIDE.
PROVIDE A MINIMUM OF 12" CLEAR TO LATCH FROM PERPENDICULAR PARTITION TO DOOR EDGE, PUSH SIDE.
PLAN DIMENSIONS ARE LOCATING THE OUTSIDE OF THE FRAME.
HARDWARE:
ALL EXTERIOR DOORS TO BE WEATHER-STRIPPED.
ALL RATED DOORS TO HAVE SMOKE SEALS.
DOOR HANDLES SHALL BE THE LEVER TYPE AND MEET ANSI 404.2.6.
HARDWARE LOCATIONS AND REINFORCEMENT TO BE PER SDI.
GENERAL NOTES - DOORS:
RATINGS:
20 20 MINUTES
45 45 MINUTES
60 60 MINUTES
90 90 MINUTES
GLASS:
FS FIRE RATED SAFETY GLAZING
IS INSULATED SAFETY GLAZING
SS SINGLE SAFETY GLAZING
IV INSULATED VISION GLAZING
SV SINGLE VISION GLAZING
SP INSULATED SPANDREL PANEL
S SPECIAL GLAZING
FINISHES:
SF1 SITE APPLIED PAINT OVER FACTORY PRIME
SF2 SITE APPLIED PAINT OVER FACTORY GALVANIZED
SF3 SITE APPLIED STAIN
FF1 FACTORY STAIN
FF2 FACTORY PAINT
FF3 GALVANIZED
FF4 ANODIZED COATING
FF5 FRP
DOOR MATERIAL:
HM HOLLOW METAL
IM INSULATED METAL
AL ALUMINUM
ST STEEL
WD STAIN-GRADE WOOD
EX EXISTING
WM WOOD GRAIN METAL
PWD PAINT-GRADE WOOD
FRP FIBERGLASS
FRP-I FIBERGLASS - INSULATED
PL PLASTIC LAMINATE
SS STAINLESS STEEL
FB FABRIC
FRAME MATERIAL:
HM HOLLOW METAL
IM INSULATED METAL
AL ALUMINUM
ST STEEL
EX EXISTING
WD STAIN-GRADE WOOD
PWD PAINT-GRADE WOOD
LUM LUMBER
ABBREVIATIONS LEGEND:
DOOR NOTES AND ABBREVIATIONS
M A X
M
IN
6" 8"
TO
G
L A S S
3' -7
M
A X
F
FLUSH
N
NARROW
LITE
8"
TO
G
L A S S
3' -7
M
A X
G
HALF
GLASS
8"
OHS OVERHEAD SECTIONAL DOOR
DOOR TYPES
3" 8"
TO
G
L A S S
3' -7
M
A X
N3
NARROW
LITE
100 SQ. IN MAX
@ RATED DOOR
ROUGH OPENING
6'-0"
R O
UG
H
O
PE
NI
NG
5' -0
FLOOR FINISH
3' -0
TYPICAL
2".
WO1
TYPICAL FIXED ALUM
STOREFRONT WINDOW TYPE -
PROVIDE WINDOW SHADE FOR
EACH W01 LOCATION
A512
Sim
A512
Sim
SEE WALL TYPE CONSTRUCTION
METAL HEADER TRACK
NEW HM DOOR FRAME
(PAINTED)
DOOR - SEE SCHEDULE
CAULK EACH SIDE
4 7/8"
2"
CAULK EACH SIDE
DBL STUD @ JAMB
NEW HM DOOR FRAME
W/ (3) ANCHORS PER JAMB
2"
7/
8"
DOOR - SEE SCHEDULE
SEE WALL TYPE CONSTRUCTION
W203 AND W204
7 1/4" AT DOORS
W
AN
D W
1/
4" A
T D
O O
R S
JAMB DETAIL
HEAD DETAIL
DJ6
DH6
SEE WALL TYPE
CONSTRUCTION
(3) MASONRY
ANCHORS PER JAMB
H.M. DOOR FRAME
-GROUT SOLID
CAULK E.S.
DOOR
-SEE SCHEDULE
V A R
IE
S
7/
/4
BULLNOSE EDGE
GROUT SOLID
2"
SEE WALL TYPE
CONSTRUCTION
H.M. DOOR FRAME
CAULK E.S.
DOOR
-SEE SCHEDULE
LINTEL (PRECAST @ RATED)
(SEE STRUCT. DWGS.)
1/2"
5 3/4"
CMU INFILL
JAMB DETAIL
HEAD DETAIL
DJ7
DH7
SEE WALL TYPE
CONSTRUCTION
(3) MASONRY
ANCHORS PER JAMB
H.M. DOOR FRAME
-GROUT SOLID
CAULK E.S.
2"
DOOR
-SEE SCHEDULE
WHERE TILE WALL FINISH IS
INDICATED, BUTT TILE FINISH
AGAINST H.M. FRAME
BACKBEND RETURN
1/
1/
V A R
IE
S
GROUT SOLID
SEE WALL TYPE
CONSTRUCTION
H.M. DOOR FRAME
CAULK E.S.
DOOR
-SEE SCHEDULE
LINTEL (PRECAST @ RATED)
(SEE STRUCT. DWGS.)
NOTE: WHERE RATED WALL OCCURS -
VERIFY STRUCT. LINTEL
1/2" 1/2"
CMU INFILL
JAMB DETAIL
HEAD DETAIL
DJ5
DH5
CMU,
GROUT SOLID AT JAMB
TRACK, SEE DOOR SCHEDULE
OVERHEAD DOOR, SEE
SCHEDULE
WEATHER STRIPPING
BULLNOSE CORNER
EACH SIDE
LINTEL (SEE STRUCT. DWGS.)
(PAINT EXPOSED SURFACES)
OVERHEAD DOOR
TRACK BEYOND, SEE DOOR
SCHEDULE FOR TRACK TYPE
C.M.U. INFILL
OVERHEAD DOOR, SEE
SCHEDULE
C.M.U.
WEATHER STRIPPING
S E E P
L A N
V A R
IE
S
VARIES
MANUF.
PER
M A N
UF
P E R
JAMB DETAIL
HEAD DETAIL
DJ1
DH1
FRAMING BY PEMB MANUF
JAMB AND HEAD TRIM PER
PEMB MANUF
METAL LINER PANEL
METAL WALL PANEL
2"
CAULK EACH SIDE
HM DOOR FRAME
W/ (3) ANCHORS PER JAMB
DOOR - SEE SCHEDULE
3/
4"
METAL LINER JAMB/HEAD TRIM PER PEMB MANUF
FRAMING BY PEMB MANUF
JAMB AND HEAD TRIM PER
PEMB MANUF
3-5/8" METAL STUD FURRING
METAL WALL PANEL
CAULK EACH SIDE
HM DOOR FRAME
W/ (3) ANCHORS PER JAMB
DOOR - SEE SCHEDULE
3/
4"
5/8" GWB, RETURN TO FRAME
2"
SEE WALL TYPE
CONSTRUCTION
(3) MASONRY
ANCHORS PER JAMB
H.M. DOOR FRAME
-GROUT SOLID
CAULK E.S.
DOOR
-SEE SCHEDULE
/4
1/
V A R
IE
S
GROUT SOLID AT JAMB
SEE WALL TYPE
CONSTRUCTION
H.M. DOOR FRAME
CAULK E.S.
DOOR
-SEE SCHEDULE
LINTEL (PRECAST @ RATED)
(SEE STRUCT. DWGS.)
NOTE: WHERE RATED WALL OCCURS -
VERIFY STRUCT. LINTEL
1/2"
CMU INFILL
ADHERE GWB
TO CMU
1-1/2" METAL FURRING
5/8" GWB
RIGID INSULATION
3/
4"
5 3/4"
ADHERE GWB
TO CMU/STEEL
1-1/2" METAL FURRING
5/8" GWB
RIGID INSULATION
JAMB DETAIL
HEAD DETAIL
DJ4
DH4
BH JOB NO.
Sheet Number:
Project Issue Date:
Drawn By:
Checked By:
T H
IS
D R
A W
IN
G
A S A
N I N S T R
UM
E N T O
F S E R
V
IC
E
IS
P R
O P E R
T Y O
F T
C H
IT
E C
T A N D
M A Y N
O T
P R
O D
UC
E D
W
IT
H O
UT
H
IS
P
E R
M
IS
S
IO
N A N D
U N L E S S T
H E R
E P R
O D
UC
T
R
R
N A M
E A
S A
R C
H
IT
E C
T
D
UE
T O
D
IS
T O
R T
IO
N F
R
P R
O D
UC
T
IO
N P
R O
C E D
UR
E S
D
IM
E N S
IO
N S S
H A L L N
O T B
E S
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .