This is a Utility Plan document prepared for the City of Lancaster Operations Facility Expansion Project located at 150 Pitney Road, Lancaster, Pennsylvania. The plan sheet (CD-16) details the utility infrastructure required for the construction of five new buildings, including water, sewer, gas, electric, communications, and stormwater systems. The project involves coordination with multiple utility providers including the City of Lancaster Water Bureau, PPL Electric, UGI Utilities, and EDEN Manor services. Key utilities addressed include an 8-inch DICL water main previously installed by the City of Lancaster, frost-free hydrants specified as Woodward Y2 or approved equal models installed by Ford Meter Box Company, and roof leader drainage systems. The General Contractor is responsible for all subgrade preparation, earthwork, and trenching coordination with other prime contractors, with minimum vertical clearances required between utilities ranging from 12 to 18 inches depending on utility type. The plan includes five addendums issued between October 6, 2026 and November 2, 2026, with the final version plotted on November 2, 2026.
The document specifies detailed utility installation responsibilities: the General Contractor must coordinate with UGI regarding gas service installation, provide trenching and stone dust materials per UGI specifications, and install concrete pads for gas meters prior to installation; the Electrical Contractor is responsible for primary and secondary duct bank installation with PPL to provide cable pulling and transformer installation; and the contractor must confirm acceptability of specified equipment with the City of Lancaster Water Bureau prior to ordering. All contractors are required to coordinate work with the General Contractor and confirm minimum vertical clearances at all utility crossings. The project timeline references a pre-bid conference on October 7, 2026, at 9:00 AM with mandatory site visits available Monday through Friday from 8:00 AM to 4:00 PM, and bid submission deadline of October 28, 2026, at 11:00 AM.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALT STORAGE
BUILDING
STORAGE YARD
TRASH AREA
846 SF.
COVERED STORAGE
FROST FREE HYDRANT (TYP.),
WOODWARD Y2 OR APPROVED
EQUAL
INSTALLED FORD METER BOX
COMPANY - BASIS OF DESIGN
PSBH-488-20-60-NL-FP:
CONTRACTOR TO CONFIRM
ACCEPTABILITY WITH CITY OF
LANCASTER WATER BUREAU
PRIOR TO ORDERING
SCM-002
SCM-001
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E
LD
-1
LD
-1
LD-18
SHEET KEY MAP
LD-17
LD-16
8" DICL WATER MAIN PREVIOUSLY
INSTALLED BY CITY OF LANCASTER
"DO NOT EXPLODE"MATCHLINE
LD-17
LD-18
TERMINAL HYDRANT PREVIOUSLY
INSTALLED BY CITY OF LANCASTER
MATERIAL STORAGE
PROPOSED TREE
PROTECTION FENCE (TYP.)
EXTENTS OF EXISTING
VEGETATION TO REMAIN (TYP.)
EX. ELECTRIC / COMMUNICATIONS
UTILITY, IF ADJUSTMENT/REBURIAL
REQUIRED TO PROVIDE REQUIRED
COVER, UTILITY AND OWNER SHALL
RELOCATE AT OWNER'S EXPENSE.
GC IS REQUIRED TO COORDINATE
ACCESS AND INCORPORATE WORK
INTO SCHEDULE
EX. ELECTRIC TO BE REBURIED
PER UTILITY PROVIDER
SPECIFICATIONS, IF
INSUFFICIENT COVER WILL
RESULT FROM ROADWAY
GRADING, CONTRACTOR TO
TEST PIT AND CONFIRM
PROPOSED LIGHT
POST (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
8" ROOF LEADER
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
APPROXIMATE LOCATION OF EX. 6" WATER LINE
PER EDEN MANOR INTERCEPTOR REPLACEMENT &
CONESTOGA PINES TRAIL IMPROVEMENT PLAN,
LAST REVISED 10/11/2022.
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E C
D -1
C D
-1
CD-18
SHEET KEY MAP
CD-17
CD-16
"DO NOT EXPLODE"MATCHLINE
CD-17
CD-18
M -A
M-A5
M -A
M-A3
M-A2
EW-A1
I-A7
I-A10
M-A12
SW-A27
OS-1
M-A29
O S-
M-A28
M-A30
FE
S-
A3
FE
S-
A3
M-A26
OS-3
M-A11 I-A8
G G
S S
S S
S S
S S
S
S S
S S
S S
S
S S
S
C O
-8
C O
-6
C O
-7
C O
-5 C O
-4
CO-9
W W
WW
W
WWWWWW
W
(NOT IN SCOPE)
GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE
PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS
TO COORDINATE WORK WITH GENERAL CONTRACTOR.
(NOT IN SCOPE)
FROST FREE HYDRANT (TYP.),
WOODWARD Y2 OR APPROVED
EQUAL
INSTALLED FORD METER BOX
COMPANY - BASIS OF DESIGN
PSBH-488-20-60-NL-FP:
CONTRACTOR TO CONFIRM
ACCEPTABILITY WITH CITY OF
LANCASTER WATER BUREAU
PRIOR TO ORDERING
UTILITY NOTES:
1.GENERAL UTILITY NOTES:
a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS
REPRESENT THE CENTER OF THE UTILITY LINE OR
TRENCH.
b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL
CLEARANCES ARE PROVIDED AT ALL UTILITY CROSSINGS.
c. VERTICAL CLEARANCES SHALL BE PROVIDED AS FOLLOWS:
i. STORMWATER - MIN. 18" SEPARATION FROM
SANITARY/STORM/WATER
ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER
iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER
iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES
vi. ELECTRIC - PER PPL REQUIREMENTS
2.ELECTRIC NOTES:
a.INSTALLATION OF PRIMARY AND SECONDARY DUCT
BANKS SHALL BE PERFORMED BY THE ELECTRICAL
CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE
GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY
AND SECONDARY ELECTRICAL SERVICE DETAILS.
b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR AND
METERING.
c.ELECTRICAL CONTRACTOR TO COORDINATE AND INSTALL
ALL ONSITE ELECTRICAL CONDUIT FOR
GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP
PLANS.
3.GAS NOTES:
a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
COORDINATION WITH UGI REGARDING GAS SERVICE
INSTALLATION SCHEDULE.
b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING
FROM THE EXISTING GAS LINE TO THE RISER/METER
LOCATION(S).
c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE DUST
PER UGI SPECIFICATIONS AND HAVE THIS MATERIAL
AVAILABLE FOR UGI'S USE AT THE TIME OF SERVICE LINE
INSTALLATION. TRENCH SPOILS SHALL ALSO BE LOCATED
ADJACENT TO THE TRENCH FOR UGI'S USE WHEN
BACKFILLING.
d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO
AND INCLUDING THE GAS METER SHALL BE INSTALLED BY
UGI UTILITIES.
THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD
FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE
INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.
SCRIPT:
SE
AL
SE
AL
MANAGER:
DATE:
PROJECT NO.:
OF
SHEET NO.:
C or po ra te O ffi ce
W es t J am es S tre et
Su ite
, L an ca st er , P
A
Ph on e:
(7
) 7
-1 w w w .rg sa ss oc ia te s.
co m
R eg io na l O ffi ce s:
Yo rk
, H ar ris bu rg , a nd P ao li
La nd
P la nn in g La nd sc ap e
Ar ch ite ct ur e
C iv il En gi ne er in g
XR
EF
S:
E xi st in g;
Ex is tin g-
G
IS
-S ur ve y;
La yo ut ;E as em en ts
;F lo od pl ai n;
Li gh tin g;
Z- U til ity
;P ro fil es
-U til iti es
PL
O
TT
ED
/2 /2
3:
P M
F
IL
EN
AM
E:
P
:\2
5\
2-
4\ C
AD
D
\C on st ru ct io n\ Pl ot \Z
-C D
-U til ity .d w g
N O
D
AT
E R
EV
IS
IO
N
O
PE
R
AT
IO
N
S
FA
C
IL
IT
Y
EX
PA
N
SI
O N
PI
TN
EY
R
O
AD
C O
N
ST
R U
C
TI
O N
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R
LA
N C
AS
TE
R C
O U
N
TY
, P A
U
TI
LI
TY
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R D
EP
AR
TM
EN
T O
F
PU
BL
IC
W O
R
KS
N O
R
TH
D U
KE
S
TR
EE
T P.
O . B
O X
LA
N
C
AS
TE
R
, P A
(7
) 2
-4
SC
AL
E:
0' 0'
SEPTEMBER 8, 2026
2025992-044
BENJAMIN MORTON, RLA
CD-16 54
/0 6/
AD
D
EN
D
U M
/1 4/
AD
D
EN
D
U M
/2 3/
AD
D
EN
D
U M
/2 9/
AD
D
EN
D
U M
/2 /2
AD
D
EN
D
U M
MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-18 UTILITY PLAN