CD-16 UTILITY PLAN.pdf

PDF 929 KB Posted

Attached to
B861-26-01 MULTIPRIME - NEW CONSTRUCTION Operations Facility Expansion Project
Solicitation number
US.254234
Issued by
Lancaster County, Pennsylvania

About this file

This is a Utility Plan document prepared for the City of Lancaster Operations Facility Expansion Project located at 150 Pitney Road, Lancaster, Pennsylvania. The plan sheet (CD-16) details the utility infrastructure required for the construction of five new buildings, including water, sewer, gas, electric, communications, and stormwater systems. The project involves coordination with multiple utility providers including the City of Lancaster Water Bureau, PPL Electric, UGI Utilities, and EDEN Manor services. Key utilities addressed include an 8-inch DICL water main previously installed by the City of Lancaster, frost-free hydrants specified as Woodward Y2 or approved equal models installed by Ford Meter Box Company, and roof leader drainage systems. The General Contractor is responsible for all subgrade preparation, earthwork, and trenching coordination with other prime contractors, with minimum vertical clearances required between utilities ranging from 12 to 18 inches depending on utility type. The plan includes five addendums issued between October 6, 2026 and November 2, 2026, with the final version plotted on November 2, 2026.

The document specifies detailed utility installation responsibilities: the General Contractor must coordinate with UGI regarding gas service installation, provide trenching and stone dust materials per UGI specifications, and install concrete pads for gas meters prior to installation; the Electrical Contractor is responsible for primary and secondary duct bank installation with PPL to provide cable pulling and transformer installation; and the contractor must confirm acceptability of specified equipment with the City of Lancaster Water Bureau prior to ordering. All contractors are required to coordinate work with the General Contractor and confirm minimum vertical clearances at all utility crossings. The project timeline references a pre-bid conference on October 7, 2026, at 9:00 AM with mandatory site visits available Monday through Friday from 8:00 AM to 4:00 PM, and bid submission deadline of October 28, 2026, at 11:00 AM.

View the file

Other files

File Type Posted
334100 - STORM UTILITY DRAINAGE PIPING.pdf PDF
C08 - Construction Plan.pdf PDF
2026-10-14 - CD Addendum 2.pdf PDF
B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
C05 - Site Civil Specifications Combined.pdf PDF
ES-LOD-NPDES.dwg DWG drawing
321723 - PAVEMENT MARKINGS.pdf PDF
CD-18 UTILITY PLAN.pdf PDF
C10 - Geotechnical Report.pdf PDF
Layout.dwg DWG drawing
Addendum 03 Arch Front End Specs.pdf PDF
2026-10-06 - Civil Addendum 1.pdf PDF
C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
2026-10-29 - ES Addendum 4.pdf PDF
25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
CD-17 UTILITY PLAN.pdf PDF
Existing.dwg DWG drawing
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
25061 - Addendum 1.pdf PDF
ES.dwg DWG drawing
C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
2026-10-29 - CD Addendum 4.pdf PDF
FINAL QA Report.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
312000 - EARTH MOVING.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
Landscape.dwg DWG drawing
Demolition.dwg DWG drawing
B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
C04 - Operations Facilities Expansion - Bid Specs - Vol II.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 2.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.pdf PDF
EG.dwg DWG drawing
Easements.dwg DWG drawing
Pre-Bid QA Ops Center Expansion 10072026.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Profiles-Utilities.dwg DWG drawing
2026-10-06 - ES Addendum 1.pdf PDF
C09 - Fill Assessment Summary.pdf PDF
329113 - SOIL PREPARATION.pdf PDF
C07 - ES Plan.pdf PDF
B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
Addendum 04 Arch MEP Specs.pdf PDF
C01 - Standard General Conditions of the Contract.pdf PDF
PG.dwg DWG drawing
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALT STORAGE

BUILDING

STORAGE YARD

TRASH AREA

846 SF.

COVERED STORAGE

FROST FREE HYDRANT (TYP.),

WOODWARD Y2 OR APPROVED

EQUAL

INSTALLED FORD METER BOX

COMPANY - BASIS OF DESIGN

PSBH-488-20-60-NL-FP:

CONTRACTOR TO CONFIRM

ACCEPTABILITY WITH CITY OF

LANCASTER WATER BUREAU

PRIOR TO ORDERING

SCM-002

SCM-001

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E

LD

-1

LD

-1

LD-18

SHEET KEY MAP

LD-17

LD-16

8" DICL WATER MAIN PREVIOUSLY

INSTALLED BY CITY OF LANCASTER

"DO NOT EXPLODE"MATCHLINE

LD-17

LD-18

TERMINAL HYDRANT PREVIOUSLY

INSTALLED BY CITY OF LANCASTER

MATERIAL STORAGE

PROPOSED TREE

PROTECTION FENCE (TYP.)

EXTENTS OF EXISTING

VEGETATION TO REMAIN (TYP.)

EX. ELECTRIC / COMMUNICATIONS

UTILITY, IF ADJUSTMENT/REBURIAL

REQUIRED TO PROVIDE REQUIRED

COVER, UTILITY AND OWNER SHALL

RELOCATE AT OWNER'S EXPENSE.

GC IS REQUIRED TO COORDINATE

ACCESS AND INCORPORATE WORK

INTO SCHEDULE

EX. ELECTRIC TO BE REBURIED

PER UTILITY PROVIDER

SPECIFICATIONS, IF

INSUFFICIENT COVER WILL

RESULT FROM ROADWAY

GRADING, CONTRACTOR TO

TEST PIT AND CONFIRM

PROPOSED LIGHT

POST (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

8" ROOF LEADER

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

APPROXIMATE LOCATION OF EX. 6" WATER LINE

PER EDEN MANOR INTERCEPTOR REPLACEMENT &

CONESTOGA PINES TRAIL IMPROVEMENT PLAN,

LAST REVISED 10/11/2022.

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E C

D -1

C D

-1

CD-18

SHEET KEY MAP

CD-17

CD-16

"DO NOT EXPLODE"MATCHLINE

CD-17

CD-18

M -A

M-A5

M -A

M-A3

M-A2

EW-A1

I-A7

I-A10

M-A12

SW-A27

OS-1

M-A29

O S-

M-A28

M-A30

FE

S-

A3

FE

S-

A3

M-A26

OS-3

M-A11 I-A8

G G

S S

S S

S S

S S

S

S S

S S

S S

S

S S

S

C O

-8

C O

-6

C O

-7

C O

-5 C O

-4

CO-9

W W

WW

W

WWWWWW

W

(NOT IN SCOPE)

GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE

PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS

TO COORDINATE WORK WITH GENERAL CONTRACTOR.

(NOT IN SCOPE)

FROST FREE HYDRANT (TYP.),

WOODWARD Y2 OR APPROVED

EQUAL

INSTALLED FORD METER BOX

COMPANY - BASIS OF DESIGN

PSBH-488-20-60-NL-FP:

CONTRACTOR TO CONFIRM

ACCEPTABILITY WITH CITY OF

LANCASTER WATER BUREAU

PRIOR TO ORDERING

UTILITY NOTES:

1.GENERAL UTILITY NOTES:

a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS

REPRESENT THE CENTER OF THE UTILITY LINE OR

TRENCH.

b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL

CLEARANCES ARE PROVIDED AT ALL UTILITY CROSSINGS.

c. VERTICAL CLEARANCES SHALL BE PROVIDED AS FOLLOWS:

i. STORMWATER - MIN. 18" SEPARATION FROM

SANITARY/STORM/WATER

ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER

iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER

iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES

vi. ELECTRIC - PER PPL REQUIREMENTS

2.ELECTRIC NOTES:

a.INSTALLATION OF PRIMARY AND SECONDARY DUCT

BANKS SHALL BE PERFORMED BY THE ELECTRICAL

CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE

GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY

AND SECONDARY ELECTRICAL SERVICE DETAILS.

b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR AND

METERING.

c.ELECTRICAL CONTRACTOR TO COORDINATE AND INSTALL

ALL ONSITE ELECTRICAL CONDUIT FOR

GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP

PLANS.

3.GAS NOTES:

a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR

COORDINATION WITH UGI REGARDING GAS SERVICE

INSTALLATION SCHEDULE.

b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING

FROM THE EXISTING GAS LINE TO THE RISER/METER

LOCATION(S).

c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE DUST

PER UGI SPECIFICATIONS AND HAVE THIS MATERIAL

AVAILABLE FOR UGI'S USE AT THE TIME OF SERVICE LINE

INSTALLATION. TRENCH SPOILS SHALL ALSO BE LOCATED

ADJACENT TO THE TRENCH FOR UGI'S USE WHEN

BACKFILLING.

d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO

AND INCLUDING THE GAS METER SHALL BE INSTALLED BY

UGI UTILITIES.

THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD

FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE

INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.

SCRIPT:

SE

AL

SE

AL

MANAGER:

DATE:

PROJECT NO.:

OF

SHEET NO.:

C or po ra te O ffi ce

W es t J am es S tre et

Su ite

, L an ca st er , P

A

Ph on e:

(7

) 7

-1 w w w .rg sa ss oc ia te s.

co m

R eg io na l O ffi ce s:

Yo rk

, H ar ris bu rg , a nd P ao li

La nd

P la nn in g La nd sc ap e

Ar ch ite ct ur e

C iv il En gi ne er in g

XR

EF

S:

E xi st in g;

Ex is tin g-

G

IS

-S ur ve y;

La yo ut ;E as em en ts

;F lo od pl ai n;

Li gh tin g;

Z- U til ity

;P ro fil es

-U til iti es

PL

O

TT

ED

/2 /2

3:

P M

F

IL

EN

AM

E:

P

:\2

5\

2-

4\ C

AD

D

\C on st ru ct io n\ Pl ot \Z

-C D

-U til ity .d w g

N O

D

AT

E R

EV

IS

IO

N

O

PE

R

AT

IO

N

S

FA

C

IL

IT

Y

EX

PA

N

SI

O N

PI

TN

EY

R

O

AD

C O

N

ST

R U

C

TI

O N

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R

LA

N C

AS

TE

R C

O U

N

TY

, P A

U

TI

LI

TY

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R D

EP

AR

TM

EN

T O

F

PU

BL

IC

W O

R

KS

N O

R

TH

D U

KE

S

TR

EE

T P.

O . B

O X

LA

N

C

AS

TE

R

, P A

(7

) 2

-4

SC

AL

E:

0' 0'

SEPTEMBER 8, 2026

2025992-044

BENJAMIN MORTON, RLA

CD-16 54

/0 6/

AD

D

EN

D

U M

/1 4/

AD

D

EN

D

U M

/2 3/

AD

D

EN

D

U M

/2 9/

AD

D

EN

D

U M

/2 /2

AD

D

EN

D

U M

MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-18 UTILITY PLAN

Sheets and Views
CD-16 UTILITY PLAN