This is a Utility Plan for the Operations Facility Expansion Project prepared by the City of Lancaster Department of Public Works in Lancaster County, Pennsylvania. The document provides comprehensive utility infrastructure details for the construction of five new buildings at 150 Pitney Road, Lancaster, PA. The utility plan addresses water, sewer, gas, electrical, communications, and stormwater systems serving the facility. Key infrastructure components include an 8-inch ductile iron cast lead water main previously installed by the City of Lancaster, proposed domestic and fire suppression 6-inch water lines, a proposed gas line coordinated with UGI Utilities, electrical conduit and duct banks to be installed per PPL specifications, communications conduit extensions, and roof leader drainage systems. The plan specifies minimum vertical clearances between utilities including 18 inches for water, sewer, and stormwater lines and 12 inches for gas and audiovisual/IT lines. The project involves five prime contracts: General Construction, Mechanical, Electrical, Plumbing, and Fire Protection. The bid deadline is October 28, 2026, at 11:00 AM, with a non-mandatory pre-bid conference scheduled for October 7, 2026, at 9:00 AM. Bidders are required to conduct site visits between 8:00 AM and 4:00 PM Monday through Friday, with additional visits available by contacting the Water Distribution Manager.
The utility plan document does not contain pricing information, set-asides, incumbent contractor details, or funding sources. However, the related contract opportunity specifies that the City will award based on the lowest responsible bidder and that successful bidders must comply with applicable discrimination protections, minimum salary and wage requirements, and the Steel Products Procurement Act. Building permits and inspections are required through the Bureau of Building Code Administration. The General Contractor is responsible for all subgrade preparation, earthwork, coordination with utility providers, and installation of trenching for electrical, gas, and other utilities. The electrical contractor handles conduit installation and coordinates with PPL for cable pulling and transformer installation. UGI Utilities is responsible for the gas service connection from the main to and including the gas meter, while the General Contractor must provide the concrete pad for the gas meter and necessary stone dust per UGI specifications.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EAST LAMPETER TOWNSHIP
CITY OF LANCASTER
SALT STORAGE
BUILDING
STORAGE BUILDING
STORAGE YARD
TRASH AREA
846 SF.
COVERED STORAGE
(2) LOADING
DOCKS
PROP. GENERATOR
LOCATION
PROP.
TRANSFORMER
LOCATION
12' GRAVEL PATH
FROST FREE HYDRANT (TYP.),
WOODWARD Y2 OR APPROVED
EQUAL
INSTALLED FORD METER BOX
COMPANY - BASIS OF DESIGN
PSBH-488-20-60-NL-FP:
CONTRACTOR TO CONFIRM
ACCEPTABILITY WITH CITY OF
LANCASTER WATER BUREAU
PRIOR TO ORDERING
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E
LD
-1
LD
-1
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E
LD
-1
LD
-1
LD-18
SHEET KEY MAP
LD-17
LD-16
8" DICL WATER MAIN PREVIOUSLY
INSTALLED BY CITY OF LANCASTER
"DO NOT EXPLODE"MATCHLINE
LD-17
LD-18
TERMINAL HYDRANT PREVIOUSLY
INSTALLED BY CITY OF LANCASTER
PROP. TAPPING
SLEEVE AND VALVE
MATERIAL STORAGE
PROP. GAS LINE, SEE MEP
DRAWINGS AND SPECIFICATION
PROPOSED TREE
PROTECTION FENCE (TYP.)
PROPOSED TREE
PROTECTION FENCE (TYP.)
EXTENTS OF EXISTING
VEGETATION TO REMAIN (TYP.)
EX. ELECTRIC / COMMUNICATIONS
UTILITY, IF ADJUSTMENT/REBURIAL
REQUIRED TO PROVIDE REQUIRED
COVER, UTILITY AND OWNER SHALL
RELOCATE AT OWNER'S EXPENSE.
GC IS REQUIRED TO COORDINATE
ACCESS AND INCORPORATE WORK
INTO SCHEDULE
EX. ELECTRIC TO BE REBURIED
PER UTILITY PROVIDER
SPECIFICATIONS, IF
INSUFFICIENT COVER WILL
RESULT FROM ROADWAY
GRADING, CONTRACTOR TO
TEST PIT AND CONFIRM
TD-A25 TO TIE
INTO PROPOSED
ROOF LEADER
PROP. FIRE
SUPPRESSION
6" LINE
PROP. DOMESTIC
6" WATER LINE
PROPOSED LIGHT
POST (TYP.)
PROPOSED
LIGHT POST
(TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
8" ROOF LEADER
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER 6" ROOF LEADER
TIE-IN (TYP.)
INVERT OUT: 316.90
PROP. GAS
CONNECTION. REFER
TO MECHANICAL
DRAWINGS.
PROP. HYDRANT, SEE DETAIL
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E C
D -1
C D
-1
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E C
D -1
C D
-1
CD-18
SHEET KEY MAP
CD-17
CD-16
"DO NOT EXPLODE"MATCHLINE
CD-17
CD-18
I-A
I- A
I- A
I- A
M -A
M-A5
I-A7
I-A10
M-A16
M-A14
M-A12
M-A15
I-A20
I-A
I- A
M-A11
M -A22
I-A8
TD-A25
W W
W W
W W
W W
G
G G
G G
G G
G G
G G
G S
S S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
W
CO-11
C O
-8
C O
-6
C O
-7
C O
-5
CO-9
CO-12 CO-14
CO-13
U E
U E
U E
U E
W W
W W
W W
W
WW
W
WWWWWW
W
W
(NOT IN SCOPE)
PROP. ELECTRICAL CONDUIT (SHOWN FOR
REFERENCE PURPOSES ONLY) PER PPL
SPECIFICATION, SEE ELECTRIC PLANS FOR
QUANTITY, SIZE AND DEMARCATION POINT.
ELECTRICAL CONTRACTOR IS RESPONSIBLE
FOR CONDUIT. CONDUIT TO RUN FROM CITY
INSTALLED QUAZITE BOX/ DEMARCATION
POINT
(NOT IN SCOPE)
PROP. COMMUNICATIONS
CONDUIT TO BE EXTENDED TO
PROPOSED TERMINATION POINTS
AS SHOWN ON THE ELECTRICAL
DRAWINGS, TO BE INSTALLED BY
CONTRACTOR
COMMUNICATIONS HANDHOLE
INSTALLED BY CITY OF
LANCASTER, TRAFFIC RATED
ELECTRIC HANDHOLE
INSTALLED BY CITY OF
LANCASTER, TRAFFIC RATED
GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE
PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS
TO COORDINATE WORK WITH GENERAL CONTRACTOR.
FROST FREE HYDRANT (TYP.),
WOODWARD Y2 OR APPROVED
EQUAL
INSTALLED FORD METER BOX
COMPANY - BASIS OF DESIGN
PSBH-488-20-60-NL-FP:
CONTRACTOR TO CONFIRM
ACCEPTABILITY WITH CITY OF
LANCASTER WATER BUREAU
PRIOR TO ORDERING
UTILITY NOTES:
1.GENERAL UTILITY NOTES:
a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS REPRESENT THE CENTER OF THE UTILITY LINE OR TRENCH.
b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL CLEARANCES ARE PROVIDED AT ALL UTILITY CROSSINGS.
c. VERTICAL CLEARANCES SHALL BE PROVIDED AS FOLLOWS:
i. STORMWATER - MIN. 18" SEPARATION FROM SANITARY/STORM/WATER
ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER
iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER
iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES
vi. ELECTRIC - PER PPL REQUIREMENTS
2.ELECTRIC NOTES:
a.INSTALLATION OF PRIMARY AND SECONDARY DUCT BANKS SHALL BE PERFORMED BY THE ELECTRICAL CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY AND SECONDARY ELECTRICAL SERVICE DETAILS.
b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR AND METERING.
c.ELECTRICAL CONTRACTOR TO COORDINATE AND INSTALL ALL ONSITE ELECTRICAL CONDUIT FOR GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP
PLANS.
3.GAS NOTES:
a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH UGI REGARDING GAS SERVICE INSTALLATION SCHEDULE.
b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING FROM THE EXISTING GAS LINE TO THE RISER/METER LOCATION(S).
c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE DUST PER UGI SPECIFICATIONS AND HAVE THIS MATERIAL AVAILABLE FOR UGI'S USE AT THE TIME OF SERVICE LINE INSTALLATION. TRENCH SPOILS SHALL ALSO BE LOCATED ADJACENT TO THE TRENCH FOR UGI'S USE WHEN BACKFILLING.
d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO AND INCLUDING THE GAS METER SHALL BE INSTALLED BY UGI UTILITIES.
THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE INSTALLED PRIOR TO THE
INSTALLATION OF THE GAS METER.
SCRIPT:
SE
AL
SE
AL
MANAGER:
DATE:
PROJECT NO.:
OF
SHEET NO.:
C or po ra te O ffi ce
W es t J am es S tre et
Su ite
, L an ca st er , P
A
Ph on e:
(7
) 7
-1 w w w .rg sa ss oc ia te s.
co m
R eg io na l O ffi ce s:
Yo rk
, H ar ris bu rg , a nd P ao li
La nd
P la nn in g La nd sc ap e
Ar ch ite ct ur e
C iv il En gi ne er in g
XR
EF
S:
E xi st in g;
Ex is tin g-
G
IS
-S ur ve y;
La yo ut ;E as em en ts
;F lo od pl ai n;
Li gh tin g;
Z- U til ity
;P ro fil es
-U til iti es
PL
O
TT
ED
/2 /2
3:
P M
F
IL
EN
AM
E:
P
:\2
5\
2-
4\ C
AD
D
\C on st ru ct io n\ Pl ot \Z
-C D
-U til ity .d w g
N O
D
AT
E R
EV
IS
IO
N
O
PE
R
AT
IO
N
S
FA
C
IL
IT
Y
EX
PA
N
SI
O N
PI
TN
EY
R
O
AD
C O
N
ST
R U
C
TI
O N
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R
LA
N C
AS
TE
R C
O U
N
TY
, P A
U
TI
LI
TY
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R D
EP
AR
TM
EN
T O
F
PU
BL
IC
W O
R
KS
N O
R
TH
D U
KE
S
TR
EE
T P.
O . B
O X
LA
N
C
AS
TE
R
, P A
(7
) 2
-4
SC
AL
E:
0' 0'
SEPTEMBER 8, 2026
2025992-044
BENJAMIN MORTON, RLA
CD-17 54
/0 6/
AD
D
EN
D
U M
/1 4/
AD
D
EN
D
U M
/2 3/
AD
D
EN
D
U M
/2 9/
AA
D
EN
D
U M
| Sheets and Views |
| CD-17 UTILITY PLAN |
File details come from the government source that posted it. Updated .