CD-17 UTILITY PLAN.pdf

PDF 795 KB Posted

Attached to
B861-26-01 MULTIPRIME - NEW CONSTRUCTION Operations Facility Expansion Project
Solicitation number
US.254234
Issued by
Lancaster County, Pennsylvania

About this file

This is a Utility Plan for the Operations Facility Expansion Project prepared by the City of Lancaster Department of Public Works in Lancaster County, Pennsylvania. The document provides comprehensive utility infrastructure details for the construction of five new buildings at 150 Pitney Road, Lancaster, PA. The utility plan addresses water, sewer, gas, electrical, communications, and stormwater systems serving the facility. Key infrastructure components include an 8-inch ductile iron cast lead water main previously installed by the City of Lancaster, proposed domestic and fire suppression 6-inch water lines, a proposed gas line coordinated with UGI Utilities, electrical conduit and duct banks to be installed per PPL specifications, communications conduit extensions, and roof leader drainage systems. The plan specifies minimum vertical clearances between utilities including 18 inches for water, sewer, and stormwater lines and 12 inches for gas and audiovisual/IT lines. The project involves five prime contracts: General Construction, Mechanical, Electrical, Plumbing, and Fire Protection. The bid deadline is October 28, 2026, at 11:00 AM, with a non-mandatory pre-bid conference scheduled for October 7, 2026, at 9:00 AM. Bidders are required to conduct site visits between 8:00 AM and 4:00 PM Monday through Friday, with additional visits available by contacting the Water Distribution Manager.

The utility plan document does not contain pricing information, set-asides, incumbent contractor details, or funding sources. However, the related contract opportunity specifies that the City will award based on the lowest responsible bidder and that successful bidders must comply with applicable discrimination protections, minimum salary and wage requirements, and the Steel Products Procurement Act. Building permits and inspections are required through the Bureau of Building Code Administration. The General Contractor is responsible for all subgrade preparation, earthwork, coordination with utility providers, and installation of trenching for electrical, gas, and other utilities. The electrical contractor handles conduit installation and coordinates with PPL for cable pulling and transformer installation. UGI Utilities is responsible for the gas service connection from the main to and including the gas meter, while the General Contractor must provide the concrete pad for the gas meter and necessary stone dust per UGI specifications.

View the file

Other files

File Type Posted
334100 - STORM UTILITY DRAINAGE PIPING.pdf PDF
C08 - Construction Plan.pdf PDF
2026-10-14 - CD Addendum 2.pdf PDF
B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
C05 - Site Civil Specifications Combined.pdf PDF
ES-LOD-NPDES.dwg DWG drawing
321723 - PAVEMENT MARKINGS.pdf PDF
CD-18 UTILITY PLAN.pdf PDF
C10 - Geotechnical Report.pdf PDF
Layout.dwg DWG drawing
Addendum 03 Arch Front End Specs.pdf PDF
2026-10-06 - Civil Addendum 1.pdf PDF
C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
2026-10-29 - ES Addendum 4.pdf PDF
25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
Existing.dwg DWG drawing
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
25061 - Addendum 1.pdf PDF
ES.dwg DWG drawing
C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
2026-10-29 - CD Addendum 4.pdf PDF
FINAL QA Report.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
312000 - EARTH MOVING.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
Landscape.dwg DWG drawing
Demolition.dwg DWG drawing
B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
C04 - Operations Facilities Expansion - Bid Specs - Vol II.pdf PDF
25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 2.pdf PDF
323113 - CHAIN LINK FENCES AND GATES.pdf PDF
EG.dwg DWG drawing
Easements.dwg DWG drawing
Pre-Bid QA Ops Center Expansion 10072026.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Profiles-Utilities.dwg DWG drawing
2026-10-06 - ES Addendum 1.pdf PDF
C09 - Fill Assessment Summary.pdf PDF
329113 - SOIL PREPARATION.pdf PDF
C07 - ES Plan.pdf PDF
B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
Addendum 04 Arch MEP Specs.pdf PDF
C01 - Standard General Conditions of the Contract.pdf PDF
CD-16 UTILITY PLAN.pdf PDF
PG.dwg DWG drawing
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAST LAMPETER TOWNSHIP

CITY OF LANCASTER

SALT STORAGE

BUILDING

STORAGE BUILDING

STORAGE YARD

TRASH AREA

846 SF.

COVERED STORAGE

(2) LOADING

DOCKS

PROP. GENERATOR

LOCATION

PROP.

TRANSFORMER

LOCATION

12' GRAVEL PATH

FROST FREE HYDRANT (TYP.),

WOODWARD Y2 OR APPROVED

EQUAL

INSTALLED FORD METER BOX

COMPANY - BASIS OF DESIGN

PSBH-488-20-60-NL-FP:

CONTRACTOR TO CONFIRM

ACCEPTABILITY WITH CITY OF

LANCASTER WATER BUREAU

PRIOR TO ORDERING

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E

LD

-1

LD

-1

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E

LD

-1

LD

-1

LD-18

SHEET KEY MAP

LD-17

LD-16

8" DICL WATER MAIN PREVIOUSLY

INSTALLED BY CITY OF LANCASTER

"DO NOT EXPLODE"MATCHLINE

LD-17

LD-18

TERMINAL HYDRANT PREVIOUSLY

INSTALLED BY CITY OF LANCASTER

PROP. TAPPING

SLEEVE AND VALVE

MATERIAL STORAGE

PROP. GAS LINE, SEE MEP

DRAWINGS AND SPECIFICATION

PROPOSED TREE

PROTECTION FENCE (TYP.)

PROPOSED TREE

PROTECTION FENCE (TYP.)

EXTENTS OF EXISTING

VEGETATION TO REMAIN (TYP.)

EX. ELECTRIC / COMMUNICATIONS

UTILITY, IF ADJUSTMENT/REBURIAL

REQUIRED TO PROVIDE REQUIRED

COVER, UTILITY AND OWNER SHALL

RELOCATE AT OWNER'S EXPENSE.

GC IS REQUIRED TO COORDINATE

ACCESS AND INCORPORATE WORK

INTO SCHEDULE

EX. ELECTRIC TO BE REBURIED

PER UTILITY PROVIDER

SPECIFICATIONS, IF

INSUFFICIENT COVER WILL

RESULT FROM ROADWAY

GRADING, CONTRACTOR TO

TEST PIT AND CONFIRM

TD-A25 TO TIE

INTO PROPOSED

ROOF LEADER

PROP. FIRE

SUPPRESSION

6" LINE

PROP. DOMESTIC

6" WATER LINE

PROPOSED LIGHT

POST (TYP.)

PROPOSED

LIGHT POST

(TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

8" ROOF LEADER

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER 6" ROOF LEADER

TIE-IN (TYP.)

INVERT OUT: 316.90

PROP. GAS

CONNECTION. REFER

TO MECHANICAL

DRAWINGS.

PROP. HYDRANT, SEE DETAIL

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E C

D -1

C D

-1

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E C

D -1

C D

-1

CD-18

SHEET KEY MAP

CD-17

CD-16

"DO NOT EXPLODE"MATCHLINE

CD-17

CD-18

I-A

I- A

I- A

I- A

M -A

M-A5

I-A7

I-A10

M-A16

M-A14

M-A12

M-A15

I-A20

I-A

I- A

M-A11

M -A22

I-A8

TD-A25

W W

W W

W W

W W

G

G G

G G

G G

G G

G G

G S

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

W

CO-11

C O

-8

C O

-6

C O

-7

C O

-5

CO-9

CO-12 CO-14

CO-13

U E

U E

U E

U E

W W

W W

W W

W

WW

W

WWWWWW

W

W

(NOT IN SCOPE)

PROP. ELECTRICAL CONDUIT (SHOWN FOR

REFERENCE PURPOSES ONLY) PER PPL

SPECIFICATION, SEE ELECTRIC PLANS FOR

QUANTITY, SIZE AND DEMARCATION POINT.

ELECTRICAL CONTRACTOR IS RESPONSIBLE

FOR CONDUIT. CONDUIT TO RUN FROM CITY

INSTALLED QUAZITE BOX/ DEMARCATION

POINT

(NOT IN SCOPE)

PROP. COMMUNICATIONS

CONDUIT TO BE EXTENDED TO

PROPOSED TERMINATION POINTS

AS SHOWN ON THE ELECTRICAL

DRAWINGS, TO BE INSTALLED BY

CONTRACTOR

COMMUNICATIONS HANDHOLE

INSTALLED BY CITY OF

LANCASTER, TRAFFIC RATED

ELECTRIC HANDHOLE

INSTALLED BY CITY OF

LANCASTER, TRAFFIC RATED

GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE

PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS

TO COORDINATE WORK WITH GENERAL CONTRACTOR.

FROST FREE HYDRANT (TYP.),

WOODWARD Y2 OR APPROVED

EQUAL

INSTALLED FORD METER BOX

COMPANY - BASIS OF DESIGN

PSBH-488-20-60-NL-FP:

CONTRACTOR TO CONFIRM

ACCEPTABILITY WITH CITY OF

LANCASTER WATER BUREAU

PRIOR TO ORDERING

UTILITY NOTES:

1.GENERAL UTILITY NOTES:

a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS REPRESENT THE CENTER OF THE UTILITY LINE OR TRENCH.

b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL CLEARANCES ARE PROVIDED AT ALL UTILITY CROSSINGS.

c. VERTICAL CLEARANCES SHALL BE PROVIDED AS FOLLOWS:

i. STORMWATER - MIN. 18" SEPARATION FROM SANITARY/STORM/WATER

ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER

iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER

iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES

vi. ELECTRIC - PER PPL REQUIREMENTS

2.ELECTRIC NOTES:

a.INSTALLATION OF PRIMARY AND SECONDARY DUCT BANKS SHALL BE PERFORMED BY THE ELECTRICAL CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY AND SECONDARY ELECTRICAL SERVICE DETAILS.

b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR AND METERING.

c.ELECTRICAL CONTRACTOR TO COORDINATE AND INSTALL ALL ONSITE ELECTRICAL CONDUIT FOR GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP

PLANS.

3.GAS NOTES:

a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH UGI REGARDING GAS SERVICE INSTALLATION SCHEDULE.

b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING FROM THE EXISTING GAS LINE TO THE RISER/METER LOCATION(S).

c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE DUST PER UGI SPECIFICATIONS AND HAVE THIS MATERIAL AVAILABLE FOR UGI'S USE AT THE TIME OF SERVICE LINE INSTALLATION. TRENCH SPOILS SHALL ALSO BE LOCATED ADJACENT TO THE TRENCH FOR UGI'S USE WHEN BACKFILLING.

d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO AND INCLUDING THE GAS METER SHALL BE INSTALLED BY UGI UTILITIES.

THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE INSTALLED PRIOR TO THE

INSTALLATION OF THE GAS METER.

SCRIPT:

SE

AL

SE

AL

MANAGER:

DATE:

PROJECT NO.:

OF

SHEET NO.:

C or po ra te O ffi ce

W es t J am es S tre et

Su ite

, L an ca st er , P

A

Ph on e:

(7

) 7

-1 w w w .rg sa ss oc ia te s.

co m

R eg io na l O ffi ce s:

Yo rk

, H ar ris bu rg , a nd P ao li

La nd

P la nn in g La nd sc ap e

Ar ch ite ct ur e

C iv il En gi ne er in g

XR

EF

S:

E xi st in g;

Ex is tin g-

G

IS

-S ur ve y;

La yo ut ;E as em en ts

;F lo od pl ai n;

Li gh tin g;

Z- U til ity

;P ro fil es

-U til iti es

PL

O

TT

ED

/2 /2

3:

P M

F

IL

EN

AM

E:

P

:\2

5\

2-

4\ C

AD

D

\C on st ru ct io n\ Pl ot \Z

-C D

-U til ity .d w g

N O

D

AT

E R

EV

IS

IO

N

O

PE

R

AT

IO

N

S

FA

C

IL

IT

Y

EX

PA

N

SI

O N

PI

TN

EY

R

O

AD

C O

N

ST

R U

C

TI

O N

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R

LA

N C

AS

TE

R C

O U

N

TY

, P A

U

TI

LI

TY

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R D

EP

AR

TM

EN

T O

F

PU

BL

IC

W O

R

KS

N O

R

TH

D U

KE

S

TR

EE

T P.

O . B

O X

LA

N

C

AS

TE

R

, P A

(7

) 2

-4

SC

AL

E:

0' 0'

SEPTEMBER 8, 2026

2025992-044

BENJAMIN MORTON, RLA

CD-17 54

/0 6/

AD

D

EN

D

U M

/1 4/

AD

D

EN

D

U M

/2 3/

AD

D

EN

D

U M

/2 9/

AA

D

EN

D

U M

Sheets and Views
CD-17 UTILITY PLAN

File details come from the government source that posted it. Updated .