C10 - Geotechnical Report.pdf
PDF 6 MB Posted
- Solicitation number
- US.254234
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a Geotechnical Engineering Report prepared by Hillis-Carnes Engineering Associates, Inc. (HCEA) for the City of Lancaster Department of Public Works regarding subsurface exploration and geotechnical evaluation for the Operations Center Expansion Project located at 150 Pitney Road, Lancaster, Pennsylvania. The report documents findings from fifteen (15) test borings (B-1 through B-15) conducted on April 14-15, 2026, to characterize subsurface conditions and provide engineering recommendations for foundation systems, floor slabs, and related geotechnical aspects. The proposed project consists of construction of approximately 42,012 square-foot Storage/Office Warehouse with mezzanine, 9,739 square-foot Salt Storage Shed, 14,715 square-foot open-sided Storage Building, and approximately 5,070 square feet of Covered Material Storage Bays, along with associated parking areas. Ground elevations across the site range from approximately 300 to 330 feet, with cut excavations up to 7 feet and fill placement up to 13 feet required to establish design finished grades depending on structure location.
The subsurface exploration revealed generally adaptable conditions for conventional footing foundations and ground-supported slab construction, though several geotechnical issues require mitigation including the presence of soft overburden soils, dissimilar bearing materials at various depths, and potential for sinkhole development associated with underlying Karst geology (Ledger and Conestoga limestone/dolomite formations). Key recommendations include scarification and re-compaction of soft soils to depths of 2-4 feet, proofrolling of all subgrades prior to fill and foundation construction, maximum allowable bearing pressures of 2,000-4,000 psf depending on soil conditions, placement of 4-inch clean granular base course under slabs, and implementation of comprehensive surface water drainage and sinkhole monitoring procedures. No groundwater was encountered during boring operations; however, the report notes that groundwater levels may fluctuate seasonally. The boring samples will be stored at HCEA's Harrisburg office for 30 days from the May 20, 2026 report date, with longer-term storage requiring written authorization.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corporate Headquarters - Annapolis Junction, MD
Maryland Washington, DC Delaware Pennsylvania Virginia Caribbean
May 20, 2026
Mr. Matthew R. Metzler Deputy Director of Public Works City of Lancaster Department of Public Works 225 Riverside Avenue Lancaster, PA 17602
Re: Geotechnical Engineering Study Operations Center Expansion City of Lancaster Public Works 150 Pitney Road Lancaster, PA 17601 HCEA Project No. HAR260051A
Dear Mr. Metzler:
Hillis-Carnes Engineering Associates, Inc. (HCEA) is pleased to submit this report conveying results of the subsurface exploration and subsequent geotechnical evaluation for the proposed project referenced above. Authorization to perform the study was provided through written execution of HCEA Proposal No.
P260073HAR dated March 4, 2026.
We wish to advise you that the boring samples will be stored at our Harrisburg, Pennsylvania office for a period of 30 days from the date of this letter. Should you wish the samples to be stored for a longer period, or to be delivered to you or another party, please advise us in writing prior to the end of the 30-day period. Otherwise, the samples will be discarded at the end of the 30-day storage period.
HCEA appreciates having had the opportunity to provide the geotechnical consultation for this project, and we will remain available for further consultation during the various design stages. Should you have any questions concerning the contents of this report, or require additional consultation, design, inspection, or testing services, please contact our office.
Sincerely, HILLIS-CARNES ENGINEERING ASSOCIATES, INC.
Nathaniel J. Lauver, P.E.
Principal Engineer nlauver@hcea.com
Stephen M. Simonette, P.E.
Principal Engineer ssimonette@hcea.com
6951 Allentown Boulevard, Unit A
Harrisburg, PA 17112
Phone (717) 561-1623
Fax (717) 754-0084 www.hcea.com
Geotechnical Engineering Study Operations Center Expansion City of Lancaster Public Works
150 Pitney Road Lancaster, PA 17601
HCEA Project No. HAR260051A
Prepared For:
Mr. Matthew R. Metzler Deputy Director of Public Works
City of Lancaster Department of Public Works 225 Riverside Avenue Lancaster, PA 17602
Prepared By:
Hillis-Carnes Engineering Associates, Inc.
6951 Allentown Boulevard, Unit A
Harrisburg, PA 17112
Date:
May 20, 2026
Lancaster Operations Center Expansion
HCEA Project No. HAR260051A
HILLIS-CARNES ENGINEERING ASSOCIATES
TABLE OF CONTENTS
LETTER OF TRANSMITTAL………………………………………………………………………...……………….………..i
1.0 PURPOSE AND SCOPE
2.0 PROJECT CHARACTERISTICS
3.0 FIELD EXPLORATION AND LABORATORY TESTING
3.1 Test Borings
3.2 Laboratory Testing
4.0 SUBSURFACE CONDITIONS
4.1 Site Geology and Soil Mapping
4.2 Surface Materials
4.3 FILL/POSSIBLE FILL
4.4 Natural Soils
4.5 Weathered Rock
4.5 Groundwater
5.0 EVALUATIONS AND RECOMMENDATIONS
5.1 Discussion
5.1.1 Overburden Soil Conditions and Dissimilar Bearing Materials
5.1.2 Karst Considerations
5.2 General Site Preparation
5.3 Rock Excavation Considerations
5.4 Fill Selection, Placement and Compaction
5.5 Foundations
5.6 Ground-Supported Slabs
5.7 Groundwater and Drainage
5.8 Earth Pressure Recommendations
5.9 Seismic Design Parameters
5.10 Pavement Design
5.11 Sinkholes and Karst Topography
6.0 RECOMMENDED ADDITIONAL SERVICES
7.0 REMARKS
APPENDIX
HILLIS-CARNES ENGINEERING ASSOCIATES Page 1
1.0 PURPOSE AND SCOPE
The purpose of this study was to characterize the general subsurface conditions at the boring locations and to evaluate those conditions with respect to the concept and design of foundation systems, floor slabs, and related geotechnical aspects for the proposed construction.
The evaluations and recommendations presented in this report were developed from a review of project characteristics and an interpretation of the general subsurface conditions at the site based on the results of the site exploration. The stratification lines indicated on the Records of Subsurface Exploration (boring logs) represent the approximate boundaries between soil types. However, the in-situ transitions may be gradual. Such variations can best be evaluated during construction and any minor design changes can be made at that time, if necessary.
An evaluation of the site with respect to potential construction problems and recommendations dealing with the earthwork and inspection during construction are also included. The inspection is considered necessary to verify the subsurface conditions and to verify that the soils-related construction phases are performed properly. The Appendix of this report contains a summary of the field and laboratory work performed for this study.
2.0 PROJECT CHARACTERISTICS
Based on the provided Beers + Hoffman Architecture drawing titled “Site Massing - City of Lancaster Public Works – 150 Pitney Road” dated January 14, 2026, the RGS Associates, Inc. drawing titled “Grading Plan – Operations Center Expansion, 150 Pitney Road – Preliminary/Final Land Development Plan” dated April 9, 2026, and the RGS Associates, Inc. drawing titled “Layout Plan – Operations Center Expansion, 150 Pitney Road – Preliminary/Final Land Development Plan”, we understand that the proposed project consists of expansion of the City of Lancaster Public Works Operations Center at 150 Pitney Road in the City of Lancaster, Lancaster County, Pennsylvania. The proposed project consists of construction of an approximate 42,012 square-foot (SF) Storage/Office Warehouse, an approximate 9,739 SF Salt Storage Shed, and a storage yard housing an approximate 14,715 SF open-sided Storage Building and an approximate combined 5,070 SF of Covered Material Storage Bays. A proposed parking area is shown adjacent to the east side of the planned Storage/Office Building.
Building construction is anticipated to consist of the following:
- Storage/Office Warehouse with Mezzanine – Pre-Engineered Metal Building, Concrete Slab-on-Grade, and Strip and Spread Footings
- Salt Storage Shed – Cast-in-Place Concrete Walls with Wood Truss Roof, Concrete Slab-on-Grade, and Wall Footings (likely designed as retaining wall foundations due to horizontal loading due salt)
- Open-Sided Storage Building – Open-Sided Pre-Engineered Metal Building, Spread Footings to Support Framing, Open-Bottom with Asphalt Paving
HILLIS-CARNES ENGINEERING ASSOCIATES Page 2
- Covered Material Storage Bays – Cast-in-Place Concrete Walls with Wood Truss Roof, Strip Footings, Open-Bottom with Asphalt Paving
Based on topographic information contained on the provided grading/sketch plan, existing ground elevations decrease to the north and west across the site with existing ground elevations ranging from approximately EL 300 feet to EL 330 feet. The drawing provided indicates a finished floor elevation (FFE) of 327.19 feet for the Storage/Office Warehouse with existing ground elevations within the proposed building footprint ranging from approximately EL 313 feet near the northwest building corner to EL 328 feet near the southeast building corner. Therefore, cut excavations of up to about 2 feet will be required to establish the slab subgrade near the southeast building corner and fill placement of up to about 13 feet will be required to establish the slab subgrade near the northwest building corner.
A finished floor elevation (FFE) of EL 321.61 feet is shown for the Salt Storage Shed while existing ground elevations within the proposed building footprint range from approximately EL 313 near the north building wall line to EL 323 feet near the southeast building corner. Therefore, cut excavation of up to about 3 feet will be required to establish the slab subgrade near the southeast building corner and fill placement of up to about 7.5 feet will be required to establish the slab subgrade near the northern wall line.
Proposed grades within the Storage Yard are shown to range from approximately EL 309 feet at the north to approximately EL 312 feet to the south in the area of the Covered Material Storage Bays and open-sided Storage Building. Existing ground elevations within the proposed footprint of the Storage Building ranged from approximately EL 311 feet near the northwest building corner to EL 319 feet near the southeast building corner. Therefore, cut excavations of up to about 2 to 7 feet will be required to establish finished subgrade. Based on the existing elevations indicated, minimal (less than 3 feet) of grading is anticipated to establish final grades within the footprint area of the Covered Material Storage Bays.
It is anticipated that the Office/Storage Building and Salt Storage Building will be concrete slab-on-grade, while the
Existing ground elevations decrease to the north and west across the proposed site with existing ground elevations ranging from approximately EL 300 feet to EL 330 feet.
Surficial cover for the approximate eastern half of the project consists of trees and some brush, while the approximate western half of the project will overlap an existing gravel covered storage yard/laydown area.
Structural loading information provided by the project structural engineer is summarized as follows.
- Office/Storage Warehouse: DL=32.0 kips, LL=41.0 kips, SL=22.6 kips
- Salt Storage Shed: Foundation Toe Pressure=2,500 psf
- Open-sided Storage Building: DL=1.6 kips, 11.2 kips
- Storage Bay Structure: DLroof=0.75 klf, DLwall=3.15 klf, SL=1.13 klf
HILLIS-CARNES ENGINEERING ASSOCIATES Page 3
For floors, our recommendations are based on loads of up to 250 psf. Our recommendations are based on tolerable settlements of 1-inch total and 1/2-inch differential.
Should any of the project characteristics, construction type, or structural loading conditions differ from those outlined above, then this office should be contacted so revisions of these recommendations can be made.
3.0 FIELD EXPLORATION AND LABORATORY TESTING
3.1 Test Borings
A subsurface exploration program was performed consisting of a total of fifteen (15) borings designated as Borings B-1 through B-15. All borings were extended to auger refusal on the apparent top of bedrock. Approximate boring locations are indicated on Figure 3 included in the Appendix. A brief overall summary of the boring results is presented in tabular form below.
Summary of Boring Data
Boring No.
Drilled Depth (Feet)
Depth to
Apparent Top of Bedrock (Feet)
Groundwater Levels
Depth Upon Completion
(Feet)
24-Hrs. After Completion
(Feet) Covered Material Storage Bays
B-1 4.0 Auger Refusal Obtained at 4.0 feet Dry Borehole Backfilled Upon Completion
B-2 3.5 Auger Refusal Obtained at 3.5 feet Dry Dry
Covered Storage Building
B-3 7.7 Auger Refusal Obtained at 7.7 feet Dry Dry
B-4 6.3 Auger Refusal Obtained at 6.3 feet Dry Borehole Backfilled Upon Completion
B-5 6.0 Auger Refusal Obtained at 6.0 feet Dry Borehole Backfilled Upon Completion
Salt Storage Shed
B-6 12.3 Auger Refusal Obtained at 12.3 feet Dry Borehole Backfilled Upon Completion
B-7 8.1 Auger Refusal Obtained at 8.1 feet Dry Borehole Backfilled Upon Completion
B-8 8.9 Auger Refusal Obtained at 8.9 feet Dry Borehole Backfilled Upon Completion
Storage/Office Building and Mezzanine
B-9 5.6 Auger Refusal Obtained at 8.9 feet Dry Borehole Backfilled Upon Completion
B-10 11.0 Auger Refusal Obtained at 11.0 feet Dry Borehole Backfilled Upon Completion
B-11 4.5 Auger Refusal Obtained at 4.5 feet Dry Borehole Backfilled Upon Completion
B-12 3.1 Auger Refusal Obtained at 3.1 feet Dry Borehole Backfilled Upon Completion
B-13 6.0 Auger Refusal Obtained at 6.0 feet Dry Borehole Backfilled Upon Completion
B-14 6.0 Auger Refusal Obtained at 6.0 feet Dry Dry
B-15 5.6 Auger Refusal Obtained at 5.6 feet Dry Dry
HCEA’s drilling personnel performed the test borings on April 14 and 15, 2026 with an Acker Rebel track-mounted rig equipped with an automatic hammer under the supervision of HCEA geotechnical personnel. The borings were advanced with hollow-stem augers and the subsurface soils were sampled continuously to a depth of 10 feet and at 5-foot sample intervals thereafter until the depths at which the boreholes were terminated obtaining auger refusal on the apparent top of bedrock. Standard
HILLIS-CARNES ENGINEERING ASSOCIATES Page 4
Penetration Testing (SPT) was performed and disturbed samples were obtained by driving a 1-3/8-inch I.D. (2-inch O.D.) split-spoon sampler in general accordance with ASTM D-1586 specifications. The sampler was first seated 6 inches to penetrate any loose cuttings and then was driven an additional one foot with blows of a 140-pound hammer, falling 30 inches. The number of hammer blows required to drive the sampler one foot following the initial 6-inch seating is designated as the "Penetration Resistance" or "N" value. The penetration resistance (N-value) can be used as an indication of the soil strength and compression characteristics.
At completion of the drilling, the boreholes were backfilled with auger cuttings. Upon backfilling of the boreholes, no additional compaction effort or site restoration was performed. Additional settlement and/or softening of the soil replaced in the boreholes may occur, resulting in a depression or hole in the ground surface. Consequently, future maintenance or restoration of the site may be required by others.
All recovered samples were visually classified by HCEA’s geotechnical engineer.
Portions of each SPT sample were placed in glass jars and transported to HCEA's laboratory for additional inspection and select laboratory testing. Visual classification was performed in general accordance with the Unified Soil Classification System (USCS) and ASTM D-2488. The Unified Soil Classification Symbols appear on the boring logs and the system nomenclature is generally described in the Appendix.
3.2 Laboratory Testing
Laboratory testing was performed in HCEA’s laboratory on representative samples obtained from the field exploration for basic engineering properties. Laboratory testing consisted of Particle Size Analysis (ASTM D442), Atterberg Limits (ASTM D4318), and Natural Moisture Content (ASTM D2216). The Unified Soil Classification System (USCS) was used to assign group symbols and group names to the soils tested. The results of the laboratory testing have been included on the Test Boring Logs included in the Appendix of this report. The Particle Size Distribution Reports from the laboratory testing are also included in the Appendix.
4.0 SUBSURFACE CONDITIONS
Details of the subsurface conditions encountered at the site are shown on the Test Boring Logs. Strata divisions shown on the boring logs have been estimated based on visual examinations of the recovered boring samples and the collection intervals. In the field, strata changes could occur gradually and/or at different levels than indicated on the boring logs.
The groundwater conditions indicated on the Test Boring Logs are those observed during the subsurface exploration. Fluctuations in groundwater levels should be expected and are typically influenced by changes in seasons, grading, runoff, infiltration rates, and may be influenced by other factors.
Borings were located via survey instrumentation by others prior to commencement of the drilling. The existing ground elevations discussed in this report and indicated on
HILLIS-CARNES ENGINEERING ASSOCIATES Page 5 the boring logs for those borings are based on the topographic information indicated on the provided drawing titled “Grading Plan” prepared by RGS Associates, Inc. and dated April 9, 2026.
General area geology, USDA soil survey information, and the generalized subsurface conditions and pertinent engineering characteristics of the soils encountered in our borings are discussed below.
4.1 Site Geology and Soil Mapping
Available geologic maps indicate that the project site is mapped near the interpreted geological contact between the Cambrian-aged Ledger Formation (Cl) and the Ordovician and Cambrian-aged Conestoga Formation (OCc). A generalized description of the bedrock of both formations is given below as presented in the Pennsylvania Department of Environmental Resources (DER) Environmental Geological Report 1, “Engineering Characteristics of the Rocks of Pennsylvania”.
The bedrock of the Ledger Formation is described as light gray, locally mottled, coarsely crystalline dolomite. The bedrock is described as moderately well bedded and massive. Most joints have a blocky pattern, range from moderately well to well developed and are moderately abundant with a wide distance between fractures. The fractures are typically open and steeply dipping.
The rock is generally moderately resistant to weathering and slightly to moderately weathered to a shallow depth. Blocky fragments commonly result from the weathering. The bedrock-mantle interface is characterized by pinnacles. Excavation is difficult due to the pinnacles and the drilling rate is classified as moderate.
Foundation stability to good but foundations should be excavated to sound material and should be thoroughly investigated for possible solution cavities.
The bedrock of the Conestoga Formation is described as medium gray, impure limestone having black, graphitic shale partings. The bedrock is described as crudely to poorly bedded, and most bedding is described as thin. Joints have an irregular pattern, are poorly formed, moderately abundant and widely spaced. Many joints are open, but some are filled with quartz and calcite.
The rock is generally moderately resistant to weathering and slightly weathered to a shallow depth. The rock is variably weathered as impure layers weather to a higher relief. Large is, irregular shaped fragments result from the weathering process. The bedrock-mantle interface is characterized by pinnacles in many places. Excavation is difficult due to the pinnacles and quartz veins. The drilling rate is classified as fast, but quartz veins can slow the drilling rate. Foundation stability is stated to be good, but foundations should be excavated to sound material and should be thoroughly investigated for possible solution cavities.
A review of DCNR’s web-mapping application “Pennsylvania Geologic Data Exploration (PaGEODE)” shows no sinkholes (indicated by the orange dots in the below mapping) and/or closed depressions sinkholes (indicated by the green dots in
HCEA Project No. HAR260051A
HILLIS-CARNES ENGINEERING ASSOCIATES Page 6 the below mapping) mapped within the project site. While no Karst features mapped within the direct vicinity of the site, multiple closed depressions and sinkholes are mapped more regionally surrounding and project site and are within the Ledger and Conestoga Formations which underlie the project site. It is suspected that development in the area surrounding the site may have masked the presence of such features.
A custom soil resource report for the site has been obtained from the United States Department of Agriculture (USDA) website, https://websoilsurvey.sc.egov.usda.gov/.
The report indicates the soils within the project area are of the Duffield silt loam, 3 to 8 percent slopes (DbB) and the Pequea silt loam, 8 to 15 percent slopes (PeC) series of soils. The soils of the Duffield silt loam series are stated to consist of residual soils derived from the weathering process of limestone and siltstone bedrock. The soils are listed well drained with depths to restrictive (or limiting) layers being more than 80 inches to lithic bedrock. Depths to the water table are indicated to be greater than 80 inches. Capacities of the most limiting layer to transmit water (Ksat) are indicated to range from moderately high to high with rates ranging from approximately 0.6 to 2 in/hour. The soils of the Duffield silt loam series are stated to consist of residual soils derived from the weathering process of limestone bedrock. The soils are listed well drained with depths to restrictive (or limiting) layers ranging from 40 to 60 inches to lithic bedrock. Depths to the water table are indicated to be greater than 80 inches.
Capacities of the most limiting layer to transmit water (Ksat) are indicated to range from moderately high to high with rates ranging from approximately 0.6 to 6 in/hour.
4.2 Surface Materials
Surficial Topsoil ranging in thickness from approximately 1 to 6 inches of Topsoil was encountered in our borings. It should be stressed that surficial material types and thicknesses may vary between widely spaced boring positions. Please note that this report is not intended to be solely used in estimating surficial material quantities. The site developer should include provisions in their estimates to account for the removal
HILLIS-CARNES ENGINEERING ASSOCIATES Page 7 of any excess topsoil, rootmats, gravel, pavement, or other surficial materials encountered otherwise not expressed herein.
4.3 FILL/POSSIBLE FILL
At Borings B-3, B-6 and B-8, the surficial Topsoil was underlain by materials classified as FILL/POSSIBLE FILL to depths ranging from approximately 2 to 4 feet below the existing surface grades. The FILL is likely the result of original construction of the existing stockyard. The FILL included Poorly graded SAND with Gravel (SP), Poorly graded GRAVEL with Sand (GP), and Sandy LEAN CLAY (CL). Wood fragments were noted in the FILL within Boring B-8.
The SPT N-values in the FILL ranged from approximately 6 to 24 blows per foot (bpf).
However, it should be stressed that the results of the Standard Penetration Tests in man-placed fill may not be reliable indicators of the actual consistency or relative density. The miscellaneous character of the fill could cause erroneous values and, therefore, may not be indicative of the true engineering properties for the fill. The engineering characteristics of this material, such as strength and compressibility, are likely to be extremely variable.
Laboratory tested samples of the samples of FILL exhibited moisture contents ranging from approximately 3 to 28 percent.
4.4 Natural Soils
The surficial Topsoil in all borings except Borings B-3, B-6, and B-8 and the FILL/POSIBLE FILL in Borings B-3, B-6, and B-8 was underlain by natural Residual overburden soils and Decomposed Rock to depths ranging from approximately 2 to
12.3 feet below the existing surface grades. The Residual soils included fine-grained SILT (ML), LEAN CLAY (CL), LEAN CLAY (CL), LEAN CLAY with Sand (CL), Sandy LEAN CLAY (CL), Sandy Lean CLAY with Gravel (CL) and granular Silty SAND (SM), Silty SAND with Gravel (SM), Clayey SAND (SC), and Clayey SAND with Gravel (SC).
The Decomposed Rock encountered included LIMESTONE (classified as Poorly Graded GRAVEL with Sand, GP and Clayey SAND with GRAVEL, SC). The fine-grained residual soils exhibited SPT N-values ranging from approximately 2 to 16 bpf indicating soft to very stiff consistencies, while the granular residual soils exhibited SPT N-values ranging from approximately 6 to 33 bpf, indicating loose to dense relative densities. The SPT N-values in the decomposed rock ranged from approximately 38 to 41 bpf, indicating dense relative densities.
Laboratory tested samples of the natural soils exhibited moisture contents ranging from approximately 15 to 36 percent. The samples from Borings B-6, B-7, and B-14 exhibited non-plastic conditions with a fines contents ranging from approximately 36 to 86 percent. The sample from Boring B-10 was found to contain a fines content of approximately 88 percent with the fines portion of the sample exhibiting a Liquid Limit of 33 and a Plasticity Index of 12.
HILLIS-CARNES ENGINEERING ASSOCIATES Page 8
4.5 Weathered Rock
Below the Residual soils and Decomposed Rock, Weathered Rock consisting of Limestone was encountered in the majority of our borings. Augering was possible in the Weathered Rock for a limited depth, and the limited-size split-spoon samples were classified as Poorly Graded Gravel (GP) and Silty GRAVEL (GM). The SPT N-values ranged from approximately 60 bpf to 50 blows for 1 to 4 inches of sampler penetration, indicating very dense relative densities.
4.5 Groundwater
Infiltrating groundwater was not encountered within the depths explored during drilling and sampling operations. All boreholes were found to be dry upon completion.
Borings drilled during the first day of operations were left open overnight in order to obtain an extended groundwater reading. These borings were also found to be dry.
A more accurate determination of the hydrostatic water table would require the installation of perforated pipes or piezometers which could be monitored over an extended period. The actual level of the hydrostatic water table and the amount and level of perched water should be anticipated to fluctuate throughout the year, depending on variations in precipitation, surface run-off, infiltration, site topography, and drainage. The Contractor should determine the actual groundwater levels at the time of construction to evaluate groundwater impact on the proposed construction procedures.
A more accurate determination of the hydrostatic water table would require the installation of perforated pipes or piezometers which could be monitored over an extended period of time. The actual level of the hydrostatic water table and the amount and level of perched water should be anticipated to fluctuate throughout the year, depending on variations in precipitation, surface run-off, infiltration, site topography, and drainage. The Contractor should determine the actual groundwater levels at the time of construction to evaluate groundwater impact on the proposed construction procedures.
5.0 EVALUATIONS AND RECOMMENDATIONS
5.1 Discussion
Based on the planned new construction and our borings, the site is generally considered adaptable for implementation of conventional footing foundations and ground-supported slab construction.
However, the geotechnical issues for development of this site include the presence of soft overburden soils, dissimilar bearing materials at the slab subgrade and footing bearing levels, and the potential for sinkhole development associated with the Karst geology underlying the site. Further discussion of these issues is presented in Sections
5.1.1 and 5.1.2.
HILLIS-CARNES ENGINEERING ASSOCIATES Page 9
5.1.1 Overburden Soil Conditions and Dissimilar Bearing Materials
The presence of soft soils and dissimilar bearing materials are discussed for each planned building structure as follows.
At the Office/Warehouse Storage Building area, Borings B-9 through B-12, and B- 14 encountered relatively soft soil conditions in the uppermost approximate 2 to 4 feet. Approximately 2 to 11 feet of new fill is anticipated to be required to attain the design finished soil subgrade elevation. At the areas of Borings B-11 and B- 14, the soft soils are anticipated at or in close proximity to the footing bearing levels. If not addressed during the site preparation phase, these soils are anticipated to undergo excessive settlement under the weight of the new fill and the new building structural loads. Following clearing and grubbing, HCEA recommends the uppermost overburden soils be scarified, aerated as needed to attain optimum moisture contents, and then placed and compacted as new fill.
The depths of scarification will need to be determined in the field by the Geotechnical Engineer or their representative. Based on our borings, the scarification depths are anticipated to range from about 2 to 4 feet below the existing surface grades. Provided the scarification/aeration/re-compaction or a removal/replacement program are implemented, conventional footing foundations and a grade supported floor slab may be implemented for this structure.
At the Salt Storage Shed area, Boring B-6 encountered FILL to approximately 4 feet. As these materials are considered to have been placed in an uncontrolled manner, it is difficult to estimate their potential settlement with certainty. Existing FILL may only remain in place if they do not exhibit yielding conditions under thorough proofrolling and and provided the owner accepts the risk of settlement of unremoved FILL. At Boring B-7, the uppermost approximate 4 feet exhibited relatively soft conditions. Similar to the Office/Warehouse Storage Building site, scarification/aeration/re-compaction of these soils is recommended. This process can also be implemented where the existing FILL is present (area of Boring B-6) to provide well-compacted soils for proper support of footings and grade-supported floor slab. Where the existing FILL contains organic matter such as the soils encountered in the uppermost approximate 2 feet at Boring B-8, they should be removed and should not be placed as new fill in areas planned for new building structures.
At the Open-sided Storage Structure area, the existing POSSIBLE FILL soils encountered in Boring B-3 should be thoroughly proofrolled at the design finished subgrade similar to the Salt Storage Structure area as discussed above. The exposed subgrades at the designed finished soil subgrade level should exhibit non-yielding conditions under proofroll equipment loads prior to placement of the final aggregate base course. At Boring B-5, apparent bedrock was encountered at approximately EL 313 feet. This elevation is above the anticipated finished floor level. Therefore, dissimilar bearing materials are anticipated directly below the floor slab level. To minimize the potential for excessive differential settlements, HCEA recommends a minimum of 8 inches of rock be removed below the design finished soil subgrade elevation. The over-excavation should be
HILLIS-CARNES ENGINEERING ASSOCIATES Page 10 backfilled with approved on-site or imported soils. For conventional footings, we recommend the excavations be extended below the overburden soils to the medium dense sand or weathered rock strata as encountered in Borings B-4.
Where the over-excavations extend below the design bearing level, lean concrete (minimum 1,500 psi 28-day compressive strength) should be placed as backfill to attain the design bearing level.
At the Storage Bay structure area, Borings B-1 and B-2 generally indicate that the overburden soil strength conditions should be suitable for a grade-supported floor slab. The exposed soils at the design finished soil subgrade elevation should exhibit non-yielding conditions under proofroll loads prior to the placement of the final aggregate base layer and new concrete. HCEA recommends footings bear on approved weathered rock or lean concrete following over-excavation to the weathered rock. If a mat foundation is planned for the structure, scarification/ aeration/re-compaction of the existing soils is recommended.
Beyond the building structure locations at areas planned for new flexible pavements and/or gravel yards, the soils at the design finished soil subgrade elevations are also anticipated to exhibit soft conditions similar to those discussed above.
Scarification/aeration/re-compaction is recommended to achieve proper subgrade support in these areas. The depths of scarification can be reduced to 2 feet. However, it must be stressed that soft, yielding conditions should be anticipated and may require placement of geo-grid and coarse aggregate such as AASHTO M43 No. 1 and No. 2 materials. Application of lime or cement as a stabilizing or strengthening additive may also be considered. If required, hemical stabilization should be performed by an experience soil improvement contractor.
5.1.2 Karst Considerations
Sinkhole development and subsidence affecting structures is possible at sites underlain by Karst geology. The previous occurrence of a sinkhole or closed depression does not ensure future occurrences of sinkhole activity. Likewise, the absence of such features does not ensure that sinkhole activity will not occur in the future. The probability of sinkhole occurrence cannot be accurately quantified within practical budget restraints.
A detailed geophysical investigation and study are necessary to obtain additional information necessary to evaluate the risk of potential sinkhole development. As a minimum, diligent site grading and maintaining positive drainage and collection of surface water runoff must be performed continuously by the contractor to avoid conditions during construction that could increase the potential for excessive water infiltration and sinkhole development.
The presence of sinkhole/depression susceptible ground and the selection of the foundation system for support of the structure are interrelated. The Owner must understand that there will always be some risk of future sinkhole formation that could adversely impact the proposed structure. Selection of foundation type and acceptance of the varying degrees of risk associated with the foundation alternatives is often dependent on project economics and risk tolerance. In general, with the Owner’s acceptance of greater performance risk comes the benefit of greater construction cost
HILLIS-CARNES ENGINEERING ASSOCIATES Page 11 savings. Adversely, a demand for low performance risk results in both higher cost and greater cost uncertainty.
A conventional shallow foundation system is typically considered to be more cost effective than deep foundations, rigid mat foundations, and/or ground improvement methods. Deep foundations, grade-beam type foundations, rigid mat foundations, and/or ground improvement methods can reduce, but not eliminate, the severity of damage should a sinkhole affect the structure. However, the use of either foundation system would not eliminate the need for remediation should a sinkhole form either within the footprint of the proposed addition or within the general vicinity.
The additional recommendations presented in the following sections have been developed on the basis of the previously described project characteristics and subsurface conditions. If there are any changes to the project characteristics or if different subsurface conditions are encountered during construction, HCEA should be consulted so that the recommendations of this report can be reviewed and revised accordingly.
5.2 General Site Preparation
At the beginning of construction activities, all surficial topsoil including rootmat, trees including root systems and root balls, pavements, utilities to be abandoned/relocated, and all miscellaneous debris should be removed from the planned construction area.
Topsoil may be stockpiled for re-use in future landscape areas. Under no circumstances should topsoil be placed as fill or backfill in areas of future structures.
Excavations resulting from clearing, grubbing, and demolition activities should be backfilled in accordance with the recommendations presented in Section 5.4 of this report.
We suggest that all available information regarding the existing utilities at the site be reviewed prior to construction. Removal should include all underground pipes, utilities, and underground structures that might interfere with the new construction. If abandoned underground utilities are to be removed prior to the initiation of construction, provisions should be made in the construction specifications and budget to restore the subgrade to a stable condition. Restoration should include backfilling and compaction of the excavated areas.
The exposed soils in areas to receive new fill needed to attain the design finished soil subgrade elevations, those at the design finished soil subgrade elevations in planned cut areas, and those at the scarification depths as discussed in Section 5.1.1 above should be proofrolled. Proofrolling should be performed using a tri-axle truck or other similar rubber-tire vehicle having a minimum gross weight of 20 tons. Subgrade soils exhibiting yielding, pumping, and/or rutting conditions should be removed and replaced, scarified/aerated/re-compacted, or chemically stabilized. The Geotechnical Engineer or experienced Soils Technician should witness the proofrolling operations and should determine which areas need further undercutting and/or stabilization as a result of yielding, pumping, or rutting subgrade soils. Based on our borings, and as previously discussed in Section 5.1.1, soft yielding conditions should be anticipated.
HCEA Project No. HAR260051A
HILLIS-CARNES ENGINEERING ASSOCIATES Page 12
It should be noted that the project site is underlain by a carbonate geology (limestone/dolomite bedrock). The proofrolling is an integral part of the foundation design of the project and will allow for a final evaluation of subgrade conditions for indication of soft, raveling, or wet soil conditions that may be indicative of sinkhole activity. In areas of the site where a cut is required to establish the required soil subgrade elevation, proofrolling of the surface should be performed after the proposed subgrade elevation is achieved.
Overall site grading should be designed to provide positive drainage away from the proposed structure. Positive drainage should be maintained throughout construction activities.
5.3 Rock Excavation Considerations
Based on the results of the boring program and review of published geological data, the project site is underlain by Karst geology, and the bedrock surface is likely pinnacled. The irregularity of the rock surface means that the elevation of the rock surface can vary greatly over even a short lateral distance. Therefore, the potential exists for weathered bedrock and bedrock to be encountered at elevations that vary significantly from the elevation in which bedrock was encountered in the boring program.
Based on our borings, the uppermost overburden soils and some of the immediately underlying Weathered Rock should generally be excavatable using conventional excavation equipment. Bedrock should be anticipated to be encountered within the excavation to establish the finished subgrade elevations within the approximate southern half of the open-sided Covered Storage Building (general vicinity of Borings B-4 and B-5) and within the approximate southern half of the Covered Storage Bay structure (general vicinity of Boring B-2). However, it is stressed that potential exists for bedrock to be encountered at elevations that vary significantly from the elevation in which bedrock was encountered in the boring program.
Excavation difficulties in rock are anticipated to increase with increased depth, and over-sized equipment and special excavation techniques may be necessary. Some of the weathered rock above the auger refusal depths may be of limited thickness and very dense conditions (high SPT N-values) should be anticipated. SPT N-values in excess of 50 BPF may require pre-splitting or pre-loosening with specialized rock excavation equipment to achieve excavation. Bulldozer and/or track-hoe equipment equipped with ripper teeth should generally be sufficient for excavation of the uppermost weathered rock; however, top-down excavation through these materials may be difficult. The rippability of the very dense weathered rock and underlying bedrock is expected to be limited and may require impact hammers or limited blasting, depending on design finished grades and bearing levels for foundations and underground utilities.
For the purposes of this report, we recommend the contract documents define rock as those materials in beds, ledges, unstratified masses, conglomerate deposits, and
HCEA Project No. HAR260051A
HILLIS-CARNES ENGINEERING ASSOCIATES Page 13 boulders of rock material ¾ cubic yard or more in volume that exceed a standard penetration resistance of 50 blows for 3 inches of penetration or less according to ASTM D1586. If the project specifications indicated the excavated materials as “unclassified”, we recommend this geotechnical report and the boring logs be included in the contract documents. For “classified” excavated materials, the contract documents should include unit prices for rock excavation and disposal or on-site crushing for re-use.
5.4 Fill Selection, Placement and Compaction
Materials to be used as fill or backfill should be observed, tested, and approved by the Geotechnical Engineer. In general, the on-site soils should be suitable for re-use as fill and backfill. However, overburden soils may require significant aeration or chemical modification prior to re-use, depending on the time of year construction takes place.
Materials suitable for various construction purposes can be identified by an experienced Soils Technician during grading operations. Crushed aggregate meeting the requirements of PennDOT 2A aggregate or approved equivalent could also be utilized as structural fill at locations recommended by the Geotechnical Engineer, and should be considered for localized, relatively deep fills such as foundation undercuts or trenches where utilities are removed.
On-site and imported soils to be used as fill and backfill should exhibit Unified Soil Classifications of CL, ML, CL-ML, SW, SP, SC, SM, GW, GP, GC, or GM, have a Liquid Limit of less than 45 and a Plasticity Index of less than 20, a maximum particle size of 3 inches in their largest dimension, and be free of organic and other deleterious components. Uniformly graded materials, such as AASHTO No. 57 aggregate, should only be utilized as structural fill with the permission of the Geotechnical Engineer.
Care should be exercised during the grading operations. Heavy equipment could create pumping and a general deterioration of site soils if conducted in the presence of water.
Therefore, if at all possible, earthwork should be carried out during a dry season. This should minimize these potential problems, although they may not be eliminated. If such problems arise, the Geotechnical Engineer should be consulted for an evaluation of the conditions.
It is anticipated that it will be difficult to achieve proper compaction and acceptable moisture contents during periods of adverse weather conditions. Moisture conditioning, wetting or drying of the soils, should be anticipated to achieve proper compaction. The moisture conditioning can include scarification, mixing, or other processes of conditioning through chemical means such as lime stabilization, soil cement, etc. The moisture contents of the soils should be controlled properly to avoid extensive construction delays.
New fill and backfill materials should be placed in relatively horizontal 8 inch (maximum) loose lifts and should be compacted to a minimum of 95 percent of the Modified Proctor (ASTM D1557) maximum dry density. Moisture contents should be maintained within 2 percent of the optimum moisture content.
HILLIS-CARNES ENGINEERING ASSOCIATES Page 14
Where new fill is placed on existing sloping terrain, continuous benching of the existing soils should be performed. Benches should be a minimum of 8 feet in width and should not exceed 4 feet in height. Exposed bench soils should be verified to be stable and non-yielding prior to placement of new fill. The initial lift of fill onto benches ended with the exposed bench soils using bulldozer and sheepsfoot equipment. The embankment fills should be slightly overbuilt by at least 3 feet and then back-cut to establish the design finished slope surface grades. Exposed slopes should be covered with topsoil and seeded as soon as possible following completion of fine grading to promote vegetation growth.
Where seeps and/or springs are encountered during site grading, they should be permanently drained through the placement of perforated pipe and gravel drains extended to local stormwater collection systems or new/natural drainage features.
5.5 Foundations
Conventional shallow foundations may be considered for support of the new building structures provided a soil improvement program as discussed in Section 5.1.1 is implemented. Footing foundations bearing in approved soils for the Office/Warehouse Storage Building and Salt Storage structures may be proportioned using a maximum allowable net bearing pressure of 2,000 psf. Footing foundations for the Open-sided Storage and Storage Bay structures bearing in weathered rock or medium dense sand soils, or on lean concrete following over-excavation, may be proportioned using a maximum allowable net bearing pressure of 4,000 psf. If a mat foundation is selected for the Storage Bay structure, a maximum allowable net bearing pressure of 2,000 psf and a subgrade modulus of 120 pci may be used for the design. As previously discussed in Section 5.1.1, if a mat foundation is planned for the Storage Bay structure, scarification/ aeration/re-compaction of the existing overburden soils is recommended.
For the allowable bearing pressures recommended above, total and differential settlements are anticipated to be within tolerable limits of 1-inch and ½-inch, respectively.
Allowable friction coefficients of 0.30 for foundations bearing in soil and 0.42 for foundations bearing on rock, medium dense, and/or lean concrete may be used for sliding resistance design. For uplift resistance design, a density of 120 pcf may be used for properly compacted backfill soils above the footings.
Continuous footing supporting walls and spread footings supporting columns should have minimum widths of 18 inches and 36 inches, respectively, regardless of the calculated bearing pressure. It is recommended that continuous footings be provided with longitudinal reinforcement. Proper longitudinal reinforcement is designed to provide the footings with greater bending capacity that should allow them to span across localized weak bearing zones that may go undetected during construction. Since a net soil pressure is specified, the weights of the footing concrete and backfill need not be added to the structural loads when proportioning the footings.
Perimeter footings and footings in unheated areas should be located at depths of at least 36 inches below the final exterior grades so as to provide adequate protection from frost
HCEA Project No. HAR260051A
HILLIS-CARNES ENGINEERING ASSOCIATES Page 15 heave. Interior footings within heated areas may bear at minimum elevations required for floor slab clearance. Where steps in continuous footings are necessary, the maximum vertical height of each step should be no greater than twice the thickness of the footing and the horizontal overlap should be at least twice the footing thickness.
Prior to foundation construction, exposed soils at the design bearing levels should be compacted with a walk-behind vibratory roller, automatic tamper, or other similar equipment as approved. Foundations should be constructed on firm, dry, non-frozen subgrade. After compaction efforts are completed, footing excavations should be observed by a Geotechnical Engineer or experienced Soils Technician prior to the placement of reinforcement steel and concrete. The purpose of the inspection would be to document that the exposed materials will be capable of supporting the design bearing pressure. If soft or unsuitable soils are encountered in the footing excavations, they should be over-excavated to suitable underlying soil strata and replaced with granular materials meeting the gradation specifications of PennDOT 2A aggregate. Where over-excavation is performed, the excavations should be widened from each footing edge by one-half the over-excavation depth. Where over-excavations are extended to rock, widening of the over-excavations is not required and the over-excavations should be backfilled to the design bearing level with lean concrete (minimum 28-day compressive strength of 1,500 psi).
Foundation excavations should be backfilled as soon as practical following foundation and grade/stem wall construction to limit exposure to atmospheric conditions and surface runoff. Surface water should be diverted away from foundation excavations. Foundation excavations should be free of saturated and otherwise unsuitable material prior to foundation construction.
5.6 Ground-Supported Slabs
Floor slabs should be supported on approved, firm in-situ soils, or on new compacted fill. The slab subgrade should be prepared in accordance with the procedures outlined in Sections 5.1 through 5.4 of this report. In particular, the slab subgrades should be heavily proofrolled to delineate any soft or loose areas requiring undercutting and/or stabilization.
It is recommended that the slab be directly supported on a minimum 4-inch layer of clean granular materials such as AASHTO No. 57 coarse aggregate or approved equivalent. These materials will require acquisition from an off-site source. A suitable moisture/vapor barrier (that is, polyethylene sheeting) should also be provided. These procedures will provide a moisture break that will help to prevent capillary rise and also help to cure the slab concrete. It is also recommended that construction joints on the slab surface and isolation joints between the slab and structural walls be provided (such that the slab would be ground-supported). Subgrade conditions should be modeled for design utilizing a subgrade modulus, Ks, of not more than 120 pci.
On most projects, there is a significant time lag between initial grading and a point when the contractor is ready to pour the slabs-on-grade. Environmental conditions and construction traffic often disturb the subgrade soils. Provisions should be made in the
HILLIS-CARNES ENGINEERING ASSOCIATES Page 16 construction specifications for the restoration of the subgrade soils to a stable condition prior to the placement of the concrete for the floor slabs.
5.7 Groundwater and Drainage
As previously discussed, soils above the soil/bedrock interface were generally found to be moist with no visible free water indicating groundwater at a deeper depth within the bedrock strata. Therefore, it is believed that the groundwater table should be below any construction related activities. However, the boreholes were backfilled upon completion or within 24-hours upon completion for safety reasons and therefore, longer term groundwater measurements were not made. Due to the fine-grained nature of the soils, longer times may have been required to stabilize groundwater levels within the boreholes.
Any water infiltration resulting from precipitation, surface run-off, or a shallow interception of the groundwater table should be able to be controlled by means of sump pits and pumps, or by gravity ditching procedures.
This is the start of the file's text. The full file is on GovTribe.