These are concept design drawings for a federal construction project at Tinker Air Force Base, Oklahoma, specifically for replacing industrial waste lift stations 6N and 6S in Building B62501. The project, identified as WWYK240176, was designed by TEPA-CSAG and issued on February 5, 2026. The drawings include general notes and vicinity maps, aerial imagery with utility locations, demolition and new work plans for plumbing and electrical systems, and detailed specifications for the new lift station infrastructure.

The project scope involves demolishing existing industrial waste lift stations 6N and 6S and constructing a new consolidated system. The new lift station will feature a 10-foot diameter by 22-foot deep wet well with approximately 5,000-gallon fluid capacity, three submersible pumps (100 GPM, 10 HP each) meeting N+1 redundancy criteria, and new industrial waste valve vaults. Work includes installation of new piping systems, flow meters, control panels with packaged pump effluent level control systems tied to the base SCADA system, and electrical service racks constructed of stainless steel NEMA 4X enclosures. All work must comply with UFC standards for plumbing systems and domestic wastewater treatment. The contractor is responsible for field verification of existing conditions, environmental testing for asbestos-containing materials and lead-based paint during demolition, proper dewatering to the Industrial Waste Treatment Plant, and restoration of disturbed areas with concrete pads and gravel walkways for maintenance access.

View the file

Other files

File Type Posted
240176_ATT03_Amendment 2_Drawings.pdf PDF
240176_ATT01_Design Narrative_Amendment 2.pdf PDF
240176_PRE-BID RFI RESPONSES - COR Signed.pdf PDF
Site Visit Meet-up Point.png PNG image
240176_ATT 9_STATEMENT OF WORK.pdf PDF
920203.pdf PDF
1995_IndWaste.pdf PDF
WWYK143004_CU511.pdf PDF
WWYK143004_CU508.pdf PDF
WWYK143004_CU506.pdf PDF
730155.pdf PDF
710238.pdf PDF
551213.pdf PDF
531005.pdf PDF
FIRE SUPPRESSION TANK FIRE ALARM AS-BUILT SHOP DRAWINGS.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
00 80 00.pdf PDF
01 78 23.pdf PDF
HAZMAT Reporting at Tinker AFB FEB 2025.pdf PDF
ufc_3_535_01_2017_c4.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
afman91-203_oc-alcsup.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
007100_Attch1_Airfield Construction Waiver.pdf PDF
007000_Attch1_TAFB Outage Request Form.pdf PDF
013300_Attch1_TAFBF3000.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
240176_ATT 11_Submittal Register.pdf PDF
WWYK143004_CU502.pdf PDF
WWYK143004_CU513.pdf PDF
WWYK143004_CU501.pdf PDF
WWYK143004_CU505.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
690255.pdf PDF
480211.pdf PDF
Combined As-Built Record Dwgs.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
2025 TAFB Mechanical Standard_Signed.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
tinkerafb_INRMP.pdf PDF
afman32-7003.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OKWWYK240176

REPLACE INDUSTRIAL WASTE

LIFT STATIONS 6N & 6S, B62501

DISCIPLINE

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

J.

A

LL

EN

G-101

S

ST

AR

R

J W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S

U

PP

O R

T\ D

R

AW

IN

G

S\ M

O D

EL

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

1 7

C-101 AERIAL IMAGE WITH UTILITIES, 6N & 6S B62501

PLUMBING DEMOLITION AND NEW WORK PLAN LAYOUT

ELECTRICAL DEMOLITION AND NEW WORK PLAN LAYOUT

P-101

E-101

C-102 DEMOLITION AND NEW WORK WASTE LIFT STATION 6N & 6S

5 PLUMBING DETAILSP-501

PLUMBING CONTROLSP-601

21402139

62501-6N 62501-6S

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

62501W 62501E

62501-6N 62501-6S

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

PROJECT

LOCATION

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

C-101

AERIAL IMAGE WITH UTILITIES

SCALE: 1/32" = 1'-0"

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

J.

A

LL

EN

C-101

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

AE

RI

AL

IM

AG

E

W

IT

H

UT

ILI

TI

ES

, 6

N

6S B

2 7

C-101

AERIAL IMAGE WITH UTILITIES, 6N & 6S B62501

SCALE: 1/16" = 1'-0"

6N

6S

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

MH

0'

35'

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

6N

6S

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

6N

6S

0'

35'

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

C-102

DEMOLITION WORK WASTE LIFT STATION 6N & 6S

SCALE: 1/32" = 1'-0"

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

J.

A

LL

EN

C-102

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

DE

MO

LIT

IO

N

AN

D

NE

W W

OR

K

W

AS

TE

LI

FT

ST

AT

IO

N 6N

6S

3 7

GENERAL NOTES

DURING THE DEMOLITION OF THE INDUSTRIAL WASTE STATION, IT IS

PRESUMED THAT ASBESTOS-CONTAINING MATERIALS (ACM) AND/OR

LEAD-BASED PAINT (LBP) WILL BE PRESENT. THE CONTRACTOR IS REQUIRED

TO TEST FOR THESE MATERIALS ONCE THEY ARE EXPOSED. IF THE

CONTRACTOR ENCOUNTERS ANY SUSPECT ENVIRONMENTAL CONDITIONS AT

ANY TIME, THEY MUST IMMEDIATELY NOTIFY THE CONTRACTING OFFICER (CO)

AND THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).

AN EM SURVEY INDICATES THERE ARE NO ASBESTOS CONTAINING MATERIALS

(ACM), HEAVY METALS (HM, OR LEAD BASED PAINT (LBP) CONCERNS FOR

AREA(S) WHERE WORK IS TO BE PERFORMED. IF AT ANY TIME THE

CONTRACTOR ENCOUNTERS SUSPECT ENVIRONMENTAL CONDITIONS, THEY

SHALL NOTIFY THE CO AND THE COR.

1.ANY DEWATERING NEEDS TO BE PUMPED AND HAULED TO THE IWTP

2.ANY EXCAVATION NEEDS TO BE STORED IN A LINED CONTAINER,

TESTED, AND DISPOSED OF, IN

ACCORDANCE WITH SAMPLING RESULTS. (REF. TINKER HAZARDOUS

WASTE MANAGEMENT PLAN).

IF AT ANY TIME THE CONTRACTOR ENCOUNTERS SUSPECT ENVIRONMENTAL

CONDITIONS NOT IDENTIFIED ABOVE, THEY SHALL NOTIFY THE CO AND THE

COR.

THIS DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED

ACCESS FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS FOR ACCURACY.

PROVIDE CONCRETE PAD FROM EXISTING GATE TO ELECTRICAL PANELS,

INDUSTRIAL WASTE VALVE VAULT AND INDUSTRIAL WASTE LIFT STATION.

THE REMAINDER OF THE AREA INSIDE THE FENCE AREA TO BE GRAVEL.

REMOVE EXISTING INDUSTRIAL WASTE LIFT STATIONS (6N AND 6S) AND

ASSOCIATED PIPING, VALVES, AND STRUCTURES IN A PHASED SEQUENCE.

BACKFILL AND COMPACT EXCAVATED AREAS IN CONTROLLED LIFTS TO

ACHIEVE REQUIRED DENSITY AND STABILITY.

PROPERLY DISPOSE OF ALL REMOVED MATERIALS IN ACCORDANCE WITH

LOCAL ENVIRONMENTAL REGULATIONS AND TINKER AFB STANDARDS.

REROUTE THE DISCHARGE FROM LIFT STATION 6S TO CONNECT INTO THE

LIFT STATION 6N SYSTEM TO CONSOLIDATE INDUSTRIAL WASTE FLOWS.

DECOMMISSION AND DEMOLISH LIFT STATION 6S ONCE FLOW HAS BEEN

SUCCESSFULLY REDIRECTED.

SEQUENCE ALL WORK TO MAINTAIN CONTINUOUS OPERATION OF THE

INDUSTRIAL WASTE SYSTEM AND MINIMIZE SERVICE DISRUPTIONS.

EXCAVATE AND PREPARE SUBGRADE FOR THE INSTALLATION OF THE NEW

LIFT STATION AND ASSOCIATED VALVE VAULTS.

CONSTRUCT CONCRETE PAD VALVE VAULT AND INSTALL GRAVEL WALKWAYS

AROUND LIFT STATION AREAS TO SUPPORT LONG-TERM MAINTENANCE

ACCESS.

INSTALL NEW INDUSTRIAL WASTE PIPING AND AN 8" VALVE BOX WITH COVER

TO CONNECT TO THE EXISTING SYSTEM.

PERFORM FINAL GRADING TO ESTABLISH POSITIVE DRAINAGE AWAY FROM

STRUCTURES AND RESTORE DISTURBED AREAS IN ACCORDANCE WITH

TINKER AFB STANDARDS.

PROVIDE MINIMUM 4 FT WIDE GRAVEL PATHS AROUND CONCRETE PADS AND

ACCESS POINTS FOR PERSONNEL MOBILITY.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

C-102

NEW WORK WASTE LIFT STATION 6N & 6S

SCALE: 1/32" = 1'-0"

14.

15.

16.

6S

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

0'

35'

EXISTING

62501-6S

6N

EXISTING

62501-6N

IWVV

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

0'

35'

MV

NEW INDUSTRIAL

WASTE VALVE

VAULT

NEW INDUSTRIAL

WET WELL

IWLS

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

P-101

PLUMBING DEMOLITION AND NEW WORK PLAN LAYOUT

NTS

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

J.

A

LL

EN

P-101

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

PL

UM

BI

NG

D

EM

OL

IT

IO

N

AN

D

NE

W

W

OR

K

PL

AN

LA

YO

UT

4 7

GENERAL NOTES

THIS DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

INSTALLATION SHALL BE DESIGNED AND CONSTRUCTED IAW UFC 3-420-01

PLUMBING SYSTEMS, UFC 3-240-01 DOMESTIC WASTEWATER TREATMENT, AND THE

TAFB MECHANICAL STANDARD.

PROVIDE SUMP OF APPROXIMATELY 5,000-GALLON FLUID CAPACITY (10' DIAMETER

X 20' DEPTH) TO BE VERIFIED BY THE DOR. REFER TO SHEET DT-101.

PROVIDE THREE (3) SUBMERSIBLE TYPE PUMPS, 100 GPM, 10 HP IN THE NEW IWLS

TO BE VERIFIED BY THE DOR. PUMP FLOW RATE TO MEET A MINIMUM OF 2 FT/S IN

OUTLET PIPING. PUMP SYSTEM TO MEET N+1 CRITERIA TO MAINTAIN TWO

WORKING PUMPS. PUMPS TO MEET CLASS 1, DIVISION 1, GROUP D N.E.C.

REQUIREMENTS. PROVIDE EACH PUMP WITH GUIDE RAIL SYSTEM AND VFD FOR

SOFT START PURPOSES.

PROVIDE FLOW METER ON PUMP DISCHARGE PIPING IN NEW METER VAULT ON

EACH IW PIPE THAT ROUTES TO THE IWTP.

LOCAL CONTROL WILL BE PROVIDED ON ALL NEW SUBMERSIBLE PUMPS. PUMPS

WILL BE CONTROLLED BY PACKAGED PUMP EFFLUENT LEVEL CONTROL SYSTEM.

THE DIRECT DIGITAL CONTROLS WILL BE TIED INTO THE BASE SIDE COINE AND

HONEYWELL EBI DDC SYSTEM LOCATED IN B2136. EBI TO ALLOW MONITORING AND

TROUBLESHOOTING REMOTELY AS WELL AS AT THE FACILITY. NEW GRAPHICS WILL

BE PROVIDED FOR ALL NEW PUMPS AND FLOW METERS.

1.

KEYED NOTES

INDUSTRIAL WASTE LIFT STATION, 10' DIA. x 22' DEEP, 5,000 GALLON CAPACITY

TO BE VARIFIED BY THE DOR.

EXISTING IW PEAK FLOW RATES:

B2122: 280GPM

B2136: 30 GPM

CONTROLS TO PROVIDE LEAD/LAG CAPABILITY, ALARMS: FAILED TO RUN,

FAILED TO STOP, NOT IN AUTO: RUNTIME HOURS, ANALOG LEVEL SENSOR,

HIGH SUMP ALARM, LAG PUMP ON, ALL PUMPS OFF, HIGH SUMP LEVEL,

ANALOG SIGNAL LOSS, PUMP FAULT (ALL), LOW PANEL TEMP, HIGH PANEL

TEMP & DOOR OPEN. PROVIDE FOR FLOW METER CONNECTION.

INDUSTRIAL WASTE VALVE VAULT TO CONNECT BOTH OR EITHER FORCED

MAINS FOR USE WITH ANY AND ALL PUMPS.

PROVIDE VAULT FOR FLOW METERS AND CONTROLLERS. LOCATE TO

ACCOMODATE FLOW METER REQUIREMENT FOR UPSTREAM STRAIGHT LINE

OF PIPE.

DEMOLISH EXISTING INDUSTRIAL WASTE LIFT STATION.

2.

3.

4.

5.

6.

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

35'-0"

100'-0"

62501-6S

62501-6N

IWVV

IWLS

MV 3

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

S.

S

EX

TO

N

P-501

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

PL

UM

BI

NG

D

ET

AI

LS

5 7

A

DT-101

NEW INDUSTRIAL WASTE LIFT STATION

NOT TO SCALE

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. THIS DETAIL PROVIDED FOR REFERENCE ONLY. ANY DIMENSIONS, ELEVATIONS,

ETC SHALL NOT BE TAKEN AS APPLICABLE TO THIS PROJECT.

B

DT-101

FLOW METER VAULT

NOT TO SCALE

ALUMINUM

ACCESS

HATCH

GROUND LEVEL

HWL ALARM ON

PUMP OFF

LOW WATER ALARM

VALVE VAULT

GROUND LEVEL

4" PLUG

VALVE

PS-1

TEE

PS-1

DIP HDPE

SST FASTENERS GROUND LEVEL

FLAP

VALVE

PUMP ON

WET WELL

CCV

CCV

PVCCV

PV

PVMJ

MJ

MJ

MJ

MJ DJ

DJ

DJMJ

PLAN VIEW

RIM ELEV.

CONCRETE FILLET EL

SET POINT

WET WELL VALVE VAULT

PV

PV

PS-1

3" ANTI-FLOTATION FLANGE

(VERIFY SIZE WITH

MANUFACTURER)

REDUCER

PS-2

DIP DISCHARGE PIPE

(3) GUIDE RAILS,

SCHEDULE 40 SST,

ONE FOR EACH PUMP

WET WELL

4" DRAIN

PIPE

CONDUIT STUB

(ROTATED FOR

CLARITY)

(3) LIFT-OUT CHAIN WITH

1/4" SST LIFTING BAIL,

ONE FOR EACH PUMP AIR RELIEF VALVE

PLUG VALVE (PV)

BLIND FLANGE

TAP FOR 4" SPOOL

4" DIA FLG x FLG SPOOL

1" GATE VALVE

CHECK

VALVE (CV)

ALUMINUM ACCESS

HATCH

4" CAM LOK FITTING WITH

DUST CAP

ALUMINUM ACCESS

HATCH

DISMANTLING

JOINT (DJ)

FLOW

FLOW

8" DI DISCHARGE FLANGE

4" DRAIN

PIPE

TOP MOUNT 4"

VENT PIPE

3 SUBMERSIBLE PUMPS

FRP WET WELL

CAR WASH

WASTE

INDUSTRIAL WASTE

FLOW

FLO

W

TEE WITH E-CONNECTION

POINT

3" ANTI-FLOATATION FLANGE

(VERIFY SIZE WITH MANUFACTURER)

A

DT-101

LOCATION FOR REFERENCE ONLYCAR WASH WASTE

INDUSTRIAL WASTE

ALUMINUM ACCESS HATCH

CONCRETE FILLET CONCRETE FILLET

ALUMINUM ACCESS

HATCH

DEBRIS BASKET WITH GRATING FOR 2" SPHERES

PROVIDE RAIL SYSTEM WITH PROPER ACCESS

4"

1'

2'

1/2" - 1" ROCK BASE WRAPPED IN

SILT SCREEN MATERIAL

3" DRAIN OPENING WITH

SCREEN PLATE

FLOW METER. SEE INSTRUMENTATION

PLANS FOR ADDITIONAL

INFORMATION.

CAULK AND SEAL OPENING AFTER

INSTRUMENTATION WIRE(S) ARE

PASSED THROUGH

WIRE TO INSTRUMENTATION CONTROL PANEL.

SEE INSTRUMENTATION PLANS FOR

ADDITIONAL INFORMATION

RUBBER BOOT, (TYP.). FERNCO FLEXIBLE

COUPLING OR APPROVED EQUIVALENT

EXISTING GRADE

EXISTING SANITARY SEWER LINE. SIZE

VARIES, SEE DETAILS THIS SHEET

NOTES:

1. CONTRACTOR SHALL SUBMIT PLANS FROM STRUCTURAL ENGINEER

REGISTERED IN STATE OF OKLAHOMA PRIOR TO VAULT ACCEPTANCE

FOR CONSTRUCTION.

DE

PT

H

VA

RI

ES

SE

E

DE

TA

ILS

T

HI

S

SH

EE

T

8" (TYP.)

8" (T

YP

PROPOSED 4" DRAIN LINE BACK TO

WET WELL

TOP ACCESS

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

S

SE

XT

O

N

P-601

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

PL

UM

BI

NG

CO

NT

RO

LS

6 7

GENERAL NOTES:

1. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING UTILITIES AND ALL

SURVEY INFORMATION PRIOR TO CONSTRUCTION.

2. THIS SHEET FOR REFERENCE ONLY AND MAY NOT BE ACCURATE IN

EVERY DETAIL. DOR TO VERIFY ALL POINTS AND SEQUENCES REQUIRED

FOR A COMPLETE AND OPERATIONIAL SYSTEM.

KEY NOTES:

LEGEND:

PROPOSED PANEL WIRING

PROPOSED FIELD WIRING

1. PUMP TO BE PROGRAMMED FOR LEAD / LAG CONTROL. ON EQUAL TIME BASIS FOR ALL

PUMPS.

2. ROTATE LEAD WHEN ALL PUMPS OFF.

3. ROTATE LAG TO LEAD IF LEAD PUMP FAILS.

4. ALARM IN SCADA: FAILED TO RUN, FAILED TO STOP, NOT IN AUTO

5. ACCUMULATE RUNTIME HOURS (RTH) AND DISPLAY ON SCADA.

PUMP CONTROL

1. MEASURE SUMP LEVEL VIA ANALOG LEVEL SENSOR.

2. PROGRAM ADJUSTABLE PUMP ON/OFF SETPOINTS (HIGH TO LOW)

HI HI: HIGH SUMP ALARM

HI: LAG PUMP ON

LO: LEAD PUMP ON

LO LO: ALL PUMPS OFF:

PUMP START / STOP

1. ACTIVE WHEN ALARM ACTIVE.

2. ALARMS: HIGH HIGH SUMP LEVEL

ANALOG SIGNAL LOSS

PUMP FAULT (ALL)

LOW LOW PANEL TEMP

HIGH HIGH PANEL TEMP

DOOR OPEN

ALARM BEACON

BUILDING 62501 SEQUENCE OF OPERATIONS IWLS-6

SCALE: NTS

M-601

RTU

ALARM BEACON

FUNC. DEVICE

PSH100AB10

24VAC

(100VA)

120VAC

SURGE

SUPPRESSOR

120VAC

MS3 AUX

TB-DI

MS2 AUX

24VDC

(100VA)

FIELD

DEVICES

24VAC

(100VA)

FIELD

DEVICES AND

RELAY POWER

EXISTING

120VAC ADD 15A CB AND TERMINALS TO

EXISTING 120VAC SOURCE

CLEARLY LABEL AS POWERING

RTU PANEL

MS3

480V

MS1

480V

NEW 480V PUMP PANELREMOTE TERMINAL UNIT (RTU) PANEL

LT-AI

24V

TB-DO

DO

TB-AI

24V

DI

24V

DI

24V

DI

24V

DI

COM

DO

COM

DO

COM

DO

DO

AISUMP LEVEL

CR

CR

RUNRUN

RUNRUN

CT

CTDI

HIGH ALARM

PUMP #2 ON

PUMP #1 ON

PUMPS OFF

FILTER

SHROUD

AIR

FAN

SHROUD

AIR

T-STAT120VAC

HEATER120VAC

PANEL TEMP TIT

BUILDING 62501 LIFT STATION DETAIL IWLS-6

SCALE: NTS

M-601

24V+ 24V- B/N+

B/N-FM BACNET +

24V+ 24V- B/N+

B/N-FM BACNET +

BACNET TO EBI

PANEL

SP

P1 P2PT

(LEVEL)

TO IWTP

FLOW

METER

PWRB/N

FLOW

METER

PWRB/N

ALARM HORN

HRN COMBCN

PLACE KEYED HOA SWITCHES ON FRONT OF RTU ENCLOSURE.

COORDINATE WITH ITWP PERSONNEL FOR MANUFACTURER AND KEY

CODE. PROVIDE CONTACT BLOCK TO MONITOR AUTO POSITION.

PLACE CONTROL RELAY AND CT SWITCH IN PUMP START PANEL.

DESIGN PANEL TO BRING ALL AVAILABLE RTU I/O TO FIELD TERMINAL

STRIPS. ALL FIELD DEVICES TO CONNECT TO PANEL THROUGH FIELD

TERMINAL STRIPS.

HYDROSTATIC (PRESSURE) LEVEL SENSOR.

PROVIDE AND INSTALL ONICON F-4300 CLAMP ON FLOW METER AND

TRANSMITTER.

PROVIDE FAN AND VENT FOR AIR FLOW. PROVIDE THERMOSTAT FOR

FAN CONTROL. PROVIDE SHROUDS FOR NEMA 3R.

PROVIDE PANEL 120VAC PANEL HEATER WITH INTEGRAL T-STAT.

PROVIDE SENSOR TO MONITOR PANEL INTERNAL TEMPERATURE.

PROVIDE DOOR SWITCH TO MONITOR DOOR OPEN.

PROVIDE SURGE PROTECTION FOR BACNET COMMUNICATION LINES

BETWEEN RTU AND EBI PANEL.

PLACE HORN SILENCE SWITCH ON FRONT OF RTU PANEL.

HOAMS3 RUN

HOAMS2 RUN 1

AUTO SW

AUTO SW

HRN SLC

IWW LIFT STATION

VAULT

1. ACTIVE WHEN ALARM ACTIVE.

2. HORN SILENCE SWITCH TO SILENCE HORN FOR 30

MINUTES.

3. ALARMS: HIGH HIGH SUMP LEVEL

ANALOG SIGNAL LOSS

PUMP FAULT (ALL)

LOW LOW PANEL TEMP

HIGH HIGH PANEL TEMP

ALARM HORN

FLOW METER

VAULT

P3

MS2

480V

CR

RUNRUN

CT

HOAMS1 RUN 1

AUTO SW

MS1 AUX

DI

DI

AutoCAD SHX Text 15A

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

E-101

ELECTRICAL DEMOLITION AND NEW WORK PLAN LAYOUT

NTS

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

F

EB

TE

PA

-C

SA

G

D P

ER

R

Y

E-101

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

EL

EC

TR

IC

AL

D

EM

OL

IT

IO

N

AN

D

NE

W W

OR

K

PL

AN

LA

YO

UT

7 7

GENERAL NOTES

1. THIS DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED

ACCESS FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS FOR ACCURACY.

2. COORDINATION THE PROJECT SEQUENCE WITH OTHER TRADES:THIS LIFT

STATION CONTROL PANEL(S) MUST REMAIN IN SERVICE DURING ALL

CONSTRUCTION PHASING.

3. EXISTING ELECTRICAL SERVICE THIS LIFT STATION 6N & 6S (FACILITY

B62502) IF FED FROM PANEL MDP 2119-PNL-6, WHICH IS A 480/277 VOLT, 3

PHASE, 100 AMP SERVICE (CKT 1, 3, 5) IN (FACILITY 2119). THIS PANEL IS ON

EMERGENCY GENERATOR.

4. VALIDATE THE EXISTING ELECTRICAL SERVICE CAN SUPPORT THE NEW

LIFT STATION DESIGN FOR THE SELECTED NUMBER OF AND SIZE OF

PUMPS.

5. PERFORM MOTOR STARTING ANALYSIS AND MAXIMUM SHORT CIRCUIT

CALCULATIONS. LIST MAXIMUM SHORT CIRCUIT AMPERAGE IAW TINKER

AFB STANDARDS.

6. ELECTRICAL WORK SHALL BE IN A HAZARDOUS AREA: EQUIPMENT,

MATERIALS, AND INSTALLATION IN THIS AREA IS DESIGNATED AS

HAZARDOUS AND SHALL COMPLY WITH NEC ARTICLES 500, 501, 502, AND

503. HAZARDOUS AREAS AS DEFINED BY NEC AS CLASS I, DIVISION I,

EXPLOSION PROOF.

7. THE WET WELL AND THE AREA EXTENDING UP TO 12” ABOVE THE WET

WELL SHALL BE CLASSIFIED AS A CLASS 1 DIVISION 1, GROUP D

HAZARDOUS LOCATION PER THE NATIONAL ELECTRICAL CODE.

8. COORDINATE FINAL ELECTRICAL CLEARANCES FOR UNIMPEDED

MAINTENANCE OPERATIONS FOR THE AREA SURROUNDING THE

ELECTRICAL COMPONENTS INCLUDING, BUT NOT LIMITED TO, THE WET

WELL, PUMPS AND MOTOR SLABS, AND VALVE SLABS.

9. PROVIDE AN ELECTRICAL SERVICE RACK & SWITCH RACK THEY SHALL BE

CONSTRUCTED WITH METAL SUPPORT POLES AND CROSS BRACES.

COORDINATE FINAL ELECTRICAL CLEARANCES FOR UNIMPEDED

MAINTENANCE OPERATIONS FOR THE AREA SURROUNDING THE IWLS AND

IWVV COMPONENTS INCLUDING, BUT NOT LIMITED TO, THE WET WELL,

PUMP AND MOTOR SLABS, AND VALVE SLABS. RACKS SHALL BE PAINTED

WITH ENAMEL GRAY PAINT.

10. ENCLOSURES SHALL BE STAINLESS STEEL NEMA 4X, DOORS PROVIDED

WITH RUBBER-GASKET WITH CONTINUOUS HINGE WITH STAINLESS

STEEL LOCKABLE QUICK-RELEASE CLAMPS WITH ENCLOSURE LOCKABLE

HANDLE ON THE OUTSIDE OF EACH DOOR. COORDINATE ENCLOSURE

SIZE WITH HONEYWELL EBI TO ALLOW ACCESS AROUND ALL

COMPONENTS FOR EASE OF OPERATION AND MAINTENANCE. DETERMINE

THE NEED TO PROTECT OF ENCLOSURE COMPONENTS FROM

OVERHEATING.

11. THREE-PHASE POWER SHALL BE PROVIDED FOR THREE (3) PUMPS: NO

PHASE CONVERTERS OR SINGLE-PHASE POWER SHALL BE ALLOWED

12. LOCATE THE MOTOR CONTROL CENTER OUTSIDE THE WET WELL

IMMEDIATE SPACE, READILY ACCESSIBLE AND PROTECTED BY CONDUIT

SEALS, TO MEET THE REQUIREMENTS OF THE NFPA NATIONAL

ELECTRICAL CODE TO PREVENT THE ATMOSPHERE OF THE WET WELL TO

ENTER THE CONTROL CENTER.

13. ALL CONDUIT RUNS SHALL BE BURIED UNDER OR WITHIN THE SLAB. NO

CONDUIT RUNS OR JUNCTION BOXES ARE TO BE INSTALLED INSIDE OR ON

TOP OF WET WELL. SPLICING OF CABLES INSIDE THE WET WELL SHALL

NOT BE PERMITTED

14. TRANSIENT PROTECTION: ALL POWER ELEMENTS AND CONTROLS SHALL

BE PROTECTED AGAINST DAMAGE DUE TO ELECTRICAL TRANSIENTS

INDUCED OR INTERCONNECTING, LINES BY LIGHTNING. PER NFPA 789 &

UFC 2-575-0. AS A MINIMUM, PROVIDE SURGE SUPPRESSORS AT THE

FOLLOWING: ANY CONNECTIONS TO AC CONTROL PANEL AND ANY

COMMUNICATION SUPPORT (SPECIFICS TO BE DETERMINED DURING THE

DESIGN COORDINATE WITH HONEYWELL EBI FOR ELECTRICAL APPARATUS

FOR COMMUNICATION AND POWER.)

15. PROVIDE A 120V GFCI CONVENIENCE OUTLET ON THE ELECTRIC SERVICE

RACK. THIS RECEPTACLE IS FOR THE OPERATORS AND MAINTENANCE

STAFF.

16. PROVIDE LEDS FOR GENERAL ILLUMINATION. DESIGN LIGHTING LEVEL

EQUAL TO 1.0 FOOT-CANDLE FOR THE LIFT STATION EQUIPMENT AND

CONTROL PANEL AREA. USE LED FOR GENERAL ILLUMINATION. SITE

LIGHTING SHALL NOT INTERFERE WITH SURROUNDING AREA. TYPE OF

LIGHTING CONTROL TO BE DETERMINED.

NEW WORK KEYED NOTES

INDUSTRIAL WASTE LIFT STATION, 10' DIA. x 20' DEEP, 5,000 GALLON

CAPACITY TO BE VARIFIED BY THE DOR.

EXISTING IW PEAK FLOW RATES:

B2122: 280GPM

B2280: 200 GPM

B3225: 120 GPM

B3228: 120 GPM

B3705: 100 GPM

INDUSTRIAL WASTE VALVE VAULT TO CONNECT BOTH OR EITHER FORCED

MAINS FOR USE WITH ANY AND ALL PUMPS.

DEMOLISH EXISTING INDUSTRIAL WASTE LIFT STATION.

DEMOLITION WORK KEYED NOTES

DEMOLISH EXISTING INDUSTRIAL WASTE LIFT STATION 6N AND 6S.A

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

62501-6S

62501-6N

IWVV

IWLS

A

A

35'-0"

0'- 0"

Sheets and Views
G101
02-240176-C101-C101.pdf
Sheets and Views
C101
03-240176-C102-C102.pdf
Sheets and Views
C102
04-240176-P101-M101.pdf
Sheets and Views
M101
05-240176-P501-M501.pdf
Sheets and Views
M501
06-240176-P601-M601.pdf
Sheets and Views
M601
07-240176-E101-E101.pdf
Sheets and Views
E101

File details come from the government source that posted it. Updated .