240176_Amendment 1 Drawings.pdf

PDF 3 MB Posted

Attached to
Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Solicitation number
FA813726R0043
Issued by

About this file

This document is a Concept Design drawing set for a federal construction project at Tinker Air Force Base, Oklahoma. The project, identified as WWYK240176, involves the replacement of Industrial Waste Lift Stations 6N and 6S at Building B62501. The design was prepared by TEPA-CSAG with a design date of 24 March 2026 and includes general notes, vicinity maps, demolition and new work plans, plumbing details, and control system schematics.

The project scope requires demolition of existing industrial waste lift stations and construction of new lift station infrastructure to consolidate industrial waste flows. Key technical requirements include: installation of a new 10-foot diameter by 22-foot deep lift station with approximately 5,000-gallon fluid capacity; three submersible pumps rated at 100 GPM and 10 HP each, designed to meet N+1 redundancy criteria with a minimum 2 feet per second outlet velocity; pump systems equipped with guide rails and variable frequency drives for soft start; flow meters on discharge piping; and packaged pump effluent level control systems with multiple alarms including high/high sump level, analog signal loss, pump fault, temperature monitoring, and door open detection. Construction specifications require compliance with UFC 3-420-01 (Plumbing Systems), UFC 3-240-01 (Domestic Wastewater Treatment), and Tinker AFB mechanical standards. The contractor must provide a 20-foot wide concrete driveway from Warehouse Road to the fenced area and a 4-foot wide concrete walkway for maintenance access, with the remaining area finished in gravel. Environmental protocols mandate testing for asbestos-containing materials and lead-based paint, with immediate notification to the Contracting Officer and Contracting Officer's Representative if suspect conditions are encountered. All excavated materials must be stored in lined containers, tested, and disposed of in accordance with the Tinker Hazardous Waste Management Plan. The design includes provisions for continuous operation of the industrial waste system during phased demolition and construction.

View the file

Other files

File Type Posted
240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf PDF
240176_Site Visit Sign In.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
240176_ATT 11_Submittal Register.pdf PDF
240176_Final_ Plan Set.pdf PDF
WWYK143004_CU502.pdf PDF
WWYK143004_CU513.pdf PDF
WWYK143004_CU501.pdf PDF
WWYK143004_CU505.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
690255.pdf PDF
480211.pdf PDF
Combined As-Built Record Dwgs.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
2025 TAFB Mechanical Standard_Signed.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
tinkerafb_INRMP.pdf PDF
afman32-7003.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
017800_Attch1_DD1354.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
007200_Attch9_EMS Awareness Training.pdf PDF
Solicitation - FA813726R0043.pdf PDF
240176_ATT09_SOW.pdf PDF
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_ATT 10_Design Narrative.pdf PDF
Industrial Waste Lines 1969.pdf PDF
WWYK143004_CU507.pdf PDF
WWYK143004_CU503.pdf PDF
WWYK143004_CU500.pdf PDF
WWYK143004_CU504.pdf PDF
Pages from 910139.pdf PDF
20010298.pdf PDF
710237.pdf PDF
430515.pdf PDF
2025 TAFB Electrical Standards - Signed.pdf PDF
01 78 00.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafi21-101.pdf PDF
dafi13-213.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OKWWYK240176

REPLACE INDUSTRIAL WASTE

LIFT STATIONS 6N & 6S, B62501

DISCIPLINE

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

M

AR

TE

PA

-C

SA

G

J.

A

LL

EN

G-101

S

ST

AR

R

J W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S

U

PP

O R

T\ D

R

AW

IN

G

S\ M

O D

EL

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

1 7

C-101 AERIAL IMAGE WITH UTILITIES, 6N & 6S B62501

PLUMBING DEMOLITION AND NEW WORK PLAN LAYOUT

ELECTRICAL DEMOLITION AND NEW WORK PLAN LAYOUT

P-101

E-101

C-102 DEMOLITION AND NEW WORK WASTE LIFT STATION 6N & 6S

5 PLUMBING DETAILSP-501

PLUMBING CONTROLSP-601

GE

NE

RA

L R

EV

IS

IO

N

MA

R2

21402139

62501-6N 62501-6S

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

62501W 62501E

62501-6N 62501-6S

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

PROJECT

LOCATION

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

C-102

DEMOLITION WORK WASTE LIFT STATION 6N & 6S

SCALE: 1/32" = 1'-0"

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

M

AR

TE

PA

-C

SA

G

J.

A

LL

EN

C-102

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

DE

MO

LIT

IO

N

AN

D

NE

W W

OR

K

W

AS

TE

LI

FT

ST

AT

IO

N 6N

6S

3 7

GENERAL NOTES

DURING THE DEMOLITION OF THE INDUSTRIAL WASTE STATION, IT IS PRESUMED

THAT ASBESTOS-CONTAINING MATERIALS (ACM) AND/OR LEAD-BASED PAINT

(LBP) WILL BE PRESENT. THE CONTRACTOR IS REQUIRED TO TEST FOR THESE

MATERIALS ONCE THEY ARE EXPOSED. IF THE CONTRACTOR ENCOUNTERS

ANY SUSPECT ENVIRONMENTAL CONDITIONS AT ANY TIME, THEY MUST

IMMEDIATELY NOTIFY THE CONTRACTING OFFICER (CO) AND THE

CONTRACTING OFFICER'S REPRESENTATIVE (COR).

AN EM SURVEY INDICATES THERE ARE NO ASBESTOS CONTAINING MATERIALS

(ACM), HEAVY METALS (HM, OR LEAD BASED PAINT (LBP) CONCERNS FOR

AREA(S) WHERE WORK IS TO BE PERFORMED. IF AT ANY TIME THE

CONTRACTOR ENCOUNTERS SUSPECT ENVIRONMENTAL CONDITIONS, THEY

SHALL NOTIFY THE CO AND THE COR.

1.ANY DEWATERING NEEDS TO BE PUMPED AND HAULED TO THE IWTP

2.ANY EXCAVATION NEEDS TO BE STORED IN A LINED CONTAINER

TESTED, AND DISPOSED OF, IN

ACCORDANCE WITH SAMPLING RESULTS. (REF. TINKER HAZARDOUS WASTE

MANAGEMENT PLAN).

IF AT ANY TIME THE CONTRACTOR ENCOUNTERS SUSPECT ENVIRONMENTAL

CONDITIONS NOT IDENTIFIED ABOVE, THEY SHALL NOTIFY THE CO AND THE

COR.

THIS DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED

ACCESS FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS FOR ACCURACY.

PROVIDE 20FT WIDE CONCRETE DRIVEWAY FROM WAREHOUSE RD. TO THE

DOUBLE-GATE PROTRUDING 25FT INTO THE FENCED AREA FOR MAINTENANCE

VEHICLE PARKING. PLACE MINIMUM 4FT WIDE CONCRETE WALKWAY FROM THE

PROPOSED DRIVEWAY AT THE EXISTING GATE TO ELECTRICAL PANELS,

INDUSTRIAL WASTE VALVE VAULT AND INDUSTRIAL WASTE LIFT STATION FOR

ACCESS. THE REMAINDER OF THE AREA INSIDE THE FENCED AREA TO BE

GRAVEL. PLACE GRAVEL AT 1INCH BELOW THE TOP OF THE CONCRETE

DRIVEWAY AND CONCRETE WALKWAYS.

REMOVE EXISTING INDUSTRIAL WASTE LIFT STATIONS (6N AND 6S) AND

ASSOCIATED PIPING, VALVES, AND STRUCTURES IN A PHASED SEQUENCE.

BACKFILL AND COMPACT EXCAVATED AREAS IN CONTROLLED LIFTS TO

ACHIEVE REQUIRED DENSITY AND STABILITY.

PROPERLY DISPOSE OF ALL REMOVED MATERIALS IN ACCORDANCE WITH

LOCAL ENVIRONMENTAL REGULATIONS AND TINKER AFB STANDARDS.

REROUTE THE DISCHARGE FROM LIFT STATION 6S TO CONNECT INTO THE LIFT

STATION 6N SYSTEM TO CONSOLIDATE INDUSTRIAL WASTE FLOWS.

DECOMMISSION AND DEMOLISH LIFT STATION 6S ONCE FLOW HAS BEEN

SUCCESSFULLY REDIRECTED.

SEQUENCE ALL WORK TO MAINTAIN CONTINUOUS OPERATION OF THE

INDUSTRIAL WASTE SYSTEM AND MINIMIZE SERVICE DISRUPTIONS.

EXCAVATE AND PREPARE SUBGRADE FOR THE INSTALLATION OF THE NEW LIFT

STATION AND ASSOCIATED VALVE VAULTS.

CONSTRUCT CONCRETE PAD VALVE VAULT AND INSTALL GRAVEL AROUND THE

ENTIRE LIFT STATION AREAS TO SUPPORT LONG-TERM MAINTENANCE.

INSTALL NEW INDUSTRIAL WASTE PIPING AND AN 8" VALVE BOX WITH COVER TO

CONNECT TO THE EXISTING SYSTEM.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

C-102

NEW WORK WASTE LIFT STATION 6N & 6S

SCALE: 1/32" = 1'-0"

14.

GE

NE

RA

L R

EV

IS

IO

N

MA

R2

15.

16.

6S

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

0'

35'

EXISTING

62501-6S

6N

EXISTING

62501-6N

IWVV

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

0'

35'

MV

NEW INDUSTRIAL

WASTE VALVE

VAULT

NEW INDUSTRIAL

WET WELL

IWLS

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

P-101

PLUMBING DEMOLITION AND NEW WORK PLAN LAYOUT

NTS

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

M

AR

TE

PA

-C

SA

G

J.

A

LL

EN

P-101

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

PL

UM

BI

NG

D

EM

OL

IT

IO

N

AN

D

NE

W

W

OR

K

PL

AN

LA

YO

UT

4 7

GENERAL NOTES

THIS DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

INSTALLATION SHALL BE DESIGNED AND CONSTRUCTED IAW UFC 3-420-01

PLUMBING SYSTEMS, UFC 3-240-01 DOMESTIC WASTEWATER TREATMENT, AND THE

TAFB MECHANICAL STANDARD.

PROVIDE SUMP OF APPROXIMATELY 5,000-GALLON FLUID CAPACITY (10' DIAMETER

X 20' DEPTH) TO BE VERIFIED BY THE DOR. REFER TO SHEET DT-101.

PROVIDE THREE (3) SUBMERSIBLE TYPE PUMPS, 100 GPM, 10 HP IN THE NEW IWLS

TO BE VERIFIED BY THE DOR. PUMP FLOW RATE TO MEET A MINIMUM OF 2 FT/S IN

OUTLET PIPING. PUMP SYSTEM TO MEET N+1 CRITERIA TO MAINTAIN TWO

WORKING PUMPS. PUMPS TO MEET CLASS 1, DIVISION 1, GROUP D N.E.C.

REQUIREMENTS. PROVIDE EACH PUMP WITH GUIDE RAIL SYSTEM AND VFD FOR

SOFT START PURPOSES.

PROVIDE FLOW METER ON PUMP DISCHARGE PIPING IN NEW METER VAULT ON

EACH IW PIPE THAT ROUTES TO THE IWTP.

LOCAL CONTROL WILL BE PROVIDED ON ALL NEW SUBMERSIBLE PUMPS. PUMPS

WILL BE CONTROLLED BY PACKAGED PUMP EFFLUENT LEVEL CONTROL SYSTEM.

EXISTING MONACO SYSTEM SHALL REMAIN ACTIVE UNTIL NEW LIFT STATION IS

OPERATIONAL THEN CONNECTED TO THE NEW LIFT STATION EQUIPMENT.

1.

KEYED NOTES

INDUSTRIAL WASTE LIFT STATION, 10' DIA. x 22' DEEP, 5,000 GALLON CAPACITY

TO BE VARIFIED BY THE DOR.

EXISTING IW PEAK FLOW RATES:

B2122: 280GPM

B2136: 30 GPM

CONTROLS TO PROVIDE LEAD/LAG CAPABILITY, ALARMS: FAILED TO RUN,

FAILED TO STOP, NOT IN AUTO: RUNTIME HOURS, ANALOG LEVEL SENSOR,

HIGH SUMP ALARM, LAG PUMP ON, ALL PUMPS OFF, HIGH SUMP LEVEL,

ANALOG SIGNAL LOSS, PUMP FAULT (ALL), LOW PANEL TEMP, HIGH PANEL

TEMP & DOOR OPEN. PROVIDE FOR FLOW METER CONNECTION.

INDUSTRIAL WASTE VALVE VAULT TO CONNECT BOTH OR EITHER FORCED

MAINS FOR USE WITH ANY AND ALL PUMPS.

PROVIDE VAULT FOR FLOW METERS AND CONTROLLERS. LOCATE TO

ACCOMODATE FLOW METER REQUIREMENT FOR UPSTREAM STRAIGHT LINE

OF PIPE.

DEMOLISH EXISTING INDUSTRIAL WASTE LIFT STATION.

2.

3.

4.

5.

6.

GE

NE

RA

L R

EV

IS

IO

N

MA

R2

S.

D

OU

GL

AS

B

LV

D.

W

AR

EH

OU

SE

R

D.

35'-0"

100'-0"

62501-6S

62501-6N

IWVV

IWLS

MV 3

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

DESIGN

W W

YK

RE

PL

AC

E

IN

DU

ST

RI

AL

W

AS

TE

LIF

T

ST

AT

IO

NS

6N

6S , B

M

AR

TE

PA

-C

SA

G

S

SE

XT

O

N

P-601

S

ST

AR

R

J.

W

H

EE

LE

R

En gr

\D es ig n\

\2

4\

\S up po rt\ D ra w in gs

\M od el

PL

UM

BI

NG

CO

NT

RO

LS

6 7

GENERAL NOTES

1. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING UTILITIES AND ALL

SURVEY INFORMATION PRIOR TO CONSTRUCTION.

2. THIS SHEET FOR REFERENCE ONLY AND MAY NOT BE ACCURATE IN

EVERY DETAIL. DOR TO VERIFY ALL POINTS AND SEQUENCES REQUIRED

FOR A COMPLETE AND OPERATIONIAL SYSTEM.

LEGEND:

PROPOSED PANEL WIRING

PROPOSED FIELD WIRING

1. PUMP TO BE PROGRAMMED FOR LEAD / LAG CONTROL. ON EQUAL TIME BASIS FOR ALL

PUMPS.

2. ROTATE LEAD WHEN ALL PUMPS OFF.

3. ROTATE LAG TO LEAD IF LEAD PUMP FAILS.

4. ALARM IN SCADA: FAILED TO RUN, FAILED TO STOP, NOT IN AUTO

5. ACCUMULATE RUNTIME HOURS (RTH) AND DISPLAY ON SCADA.

PUMP CONTROL

1. MEASURE SUMP LEVEL VIA ANALOG LEVEL SENSOR.

2. PROGRAM ADJUSTABLE PUMP ON/OFF SETPOINTS (HIGH TO LOW)

HI HI: HIGH SUMP ALARM

HI: LAG PUMP ON

LO: LEAD PUMP ON

LO LO: ALL PUMPS OFF:

PUMP START / STOP

1. ACTIVE WHEN ALARM ACTIVE.

2. ALARMS: HIGH HIGH SUMP LEVEL

ANALOG SIGNAL LOSS

PUMP FAULT (ALL)

LOW LOW PANEL TEMP

HIGH HIGH PANEL TEMP

DOOR OPEN

ALARM BEACON

BUILDING 62501 SEQUENCE OF OPERATIONS IWLS-6

SCALE: NTS

M-601

RTU

ALARM BEACON

FUNC. DEVICE

PSH100AB10

24VAC

(100VA)

120VAC

SURGE

SUPPRESSOR

120VAC

MS3 AUX

TB-DI

MS2 AUX

24VDC

(100VA)

FIELD

DEVICES

24VAC

(100VA)

FIELD

DEVICES AND

RELAY POWER

EXISTING

120VAC

MS3

480V

MS1

480V

NEW 480V PUMP PANELREMOTE TERMINAL UNIT (RTU) PANEL

LT-AI

24V

TB-DO

DO

TB-AI

24V

DI

24V

DI

24V

DI

24V

DI

COM

DO

COM

DO

COM

DO

DO

AISUMP LEVEL

CR

CR

RUNRUN

RUNRUN

CT

CTDI

HIGH ALARM

PUMP #2 ON

PUMP #1 ON

PUMPS OFF

FILTER

SHROUD

AIR

FAN

SHROUD

AIR

T-STAT120VAC

HEATER120VAC

PANEL TEMP TIT

BUILDING 62501 LIFT STATION DETAIL IWLS-6

SCALE: NTS

M-601

24V+ 24V- B/N+

B/N-FM BACNET +

24V+ 24V- B/N+

B/N-FM BACNET +

BACNET TO EBI

PANEL

SP

P1 P2PT

(LEVEL)

TO IWTP

FLOW

METER

PWRB/N

FLOW

METER

PWRB/N

ALARM HORN

HRN COMBCN

PLACE KEYED HOA SWITCHES ON FRONT OF RTU ENCLOSURE.

COORDINATE WITH ITWP PERSONNEL FOR MANUFACTURER AND KEY

CODE. PROVIDE CONTACT BLOCK TO MONITOR AUTO POSITION.

PLACE CONTROL RELAY AND CT SWITCH IN PUMP START PANEL.

DESIGN PANEL TO BRING ALL AVAILABLE RTU I/O TO FIELD TERMINAL

STRIPS. ALL FIELD DEVICES TO CONNECT TO PANEL THROUGH FIELD

TERMINAL STRIPS.

HYDROSTATIC (PRESSURE) LEVEL SENSOR.

PROVIDE AND INSTALL ONICON F-4300 CLAMP ON FLOW METER AND

TRANSMITTER.

PROVIDE FAN AND VENT FOR AIR FLOW. PROVIDE THERMOSTAT FOR

FAN CONTROL. PROVIDE SHROUDS FOR NEMA 3R.

PROVIDE PANEL 120VAC PANEL HEATER WITH INTEGRAL T-STAT.

PROVIDE SENSOR TO MONITOR PANEL INTERNAL TEMPERATURE.

PROVIDE DOOR SWITCH TO MONITOR DOOR OPEN.

SURGE PROTECTION AND BACNET COMMUNICATION LINES ARE NOT IN

THIS CONTRACT.

PLACE HORN SILENCE SWITCH ON FRONT OF RTU PANEL.

HOAMS3 RUN

HOAMS2 RUN 1

AUTO SW

AUTO SW

HRN SLC

IWW LIFT STATION

VAULT

1. ACTIVE WHEN ALARM ACTIVE.

2. HORN SILENCE SWITCH TO SILENCE HORN FOR 30

MINUTES.

3. ALARMS: HIGH HIGH SUMP LEVEL

ANALOG SIGNAL LOSS

PUMP FAULT (ALL)

LOW LOW PANEL TEMP

HIGH HIGH PANEL TEMP

ALARM HORN

FLOW METER

VAULT

P3

MS2

480V

CR

RUNRUN

CT

HOAMS1 RUN 1

AUTO SW

MS1 AUX

DI

DI

GE

NE

RA

L R

EV

IS

IO

N

MA

R2

KEYED NOTESADD 15A CB AND TERMINALS TO

EXISTING 120V AC SOURCE CLEARLY

LABLE AS POWERING RTU PANEL

AutoCAD SHX Text 15A

Sheets and Views
G101
03-240176-C102-C102.pdf
Sheets and Views
C102
04-240176-P101-M101.pdf
Sheets and Views
M101
06-240176-P601-M601.pdf
Sheets and Views
M601

File details come from the government source that posted it. Updated .