This specification document details facility natural-gas piping requirements for Project 25-388, a CBI HVAC and Lighting Upgrade, prepared under Section 231123. The specification establishes comprehensive standards for the design, materials, installation, and testing of natural gas piping systems serving the project. The scope includes pipe, pipe fittings, valves, regulators, and all associated connections for natural gas distribution. The specification references multiple ANSI, ASME, ASTM, AWS, ICC-ES, and MSS standards to ensure quality and safety compliance. Submittals required from contractors include product data for all piping materials and components, welder certifications demonstrating compliance with AWS D1.1/D1.1M standards, shop drawings for rooftop supports with design calculations, and project record documents documenting actual valve locations. Contractors must furnish valve repacking kits for each valve type and size for owner maintenance and must maintain temporary protective coatings and end caps on all materials during delivery, storage, and handling until final installation.

The specification establishes distinct material requirements based on piping location: polyethylene pipe (ASTM D2513, SDR 11) for buried piping beyond five feet from the building with socket-type fittings using fusion-welded joints; steel pipe (ASTM A53/A53M, Grade B, Schedule 40) or copper tube (ASTM B88 or B68/B68M) for above-grade applications with threaded or welded joints; and mechanical couplings with grooved and shouldered joints complying with AWWA C606 standards. Approved manufacturers for ball valves include Apollo Valves and Milwaukee Valve Company, and line pressure regulators must comply with ANSI Z21.80/CSA 6.22 standards with maximum inlet operating pressure of 10 psi and output pressure range of 1 to 80 inch wc. Installation requirements mandate minimum two-foot cover for buried piping, support spacing per pipe size (ranging from 6.5 feet for 1/2-1-1/4 inch pipe to 10 feet for larger sizes), dielectric connections where dissimilar metals join, and vent piping from pressure reducing valves terminating in weatherproof hoods. All welding must comply with ASME BPVC-IX standards, and hangers and supports must be fabricated from stainless steel or hot-dip galvanized carbon steel with non-penetrating rooftop supports required to maintain six-inch minimum clearance above roofing membranes.

View the file

Other files

File Type Posted
230923 Alerton Direct Digital Control System for HVAC.pdf PDF
TYPE S1 iO-CoviO-Spec-Sheet.pdf PDF
260553-RIB-Identification for Electrical Systems-12-24-2025.pdf PDF
232113-RIB-Hydronic Piping-12-24-2025.pdf PDF
235100-RIB-Breechings, Chimneys, and Stacks-12-24-2025.pdf PDF
262726-RIB-Wiring Devices-12-24-2025.pdf PDF
260505-RIB-Selective Demolition for Electrical-12-24-2025.pdf PDF
CBI GJ Project Manual_VSS_R2.pdf PDF
TYPE EMX CMB-ISOLITE-Specification.pdf PDF
230523-RIB-General-Duty Valves for HVAC Piping-12-24-2025.pdf PDF
TYPE P2 Metalux-Cruze-Linear-Bay-spec-sheet.pdf PDF
238126.13-RIB-Small-Capacity Split-System Air Conditioners-12-24-2025.pdf PDF
Bid Questions - BCE Response - 05012026.pdf PDF
CBI GJ sign-in.pdf PDF
260519-RIB-Low-Voltage Electrical Power Conductors and Cables-12-24-2025.pdf PDF
230513-RIB-Common Motor Requirements for HVAC Equipment-12-24-2025.pdf PDF
TYPE D3 PrentaLux-CYL6-6-Sustainable-LED-Cylinder-Luminaire-Spec-Sheet.pdf PDF
232123-RIB-Hydronic Pumps-12-24-2025.pdf PDF
235216-RIB-Condensing Boilers-12-24-2025.pdf PDF
265600-RIB-Exterior Lighting-12-24-2025.pdf PDF
TYPE IU Sure-Lites-SLX-Surface-Mount-LED.pdf PDF
221006-RIB-Plumbing Piping Specialties-12-24-2025.pdf PDF
233423-RIB-HVAC Power Ventilators-12-24-2025.pdf PDF
265100-RIB-Interior Lighting-12-24-2025.pdf PDF
230719-RIB-HVAC Piping Insulation-12-24-2025.pdf PDF
230593-RIB-Testing, Adjusting, and Balancing for HVAC-12-24-2025.pdf PDF
232114-RIB-Hydronic Specialties-12-24-2025.pdf PDF
220529-RIB-Hangers and Supports for Plumbing Piping and Equipment-12-24-2025.pdf PDF
260923-RIB-Lighting Control Devices-12-24-2025.pdf PDF
260583-RIB-Wiring Connections-12-24-2025.pdf PDF
230800-RIB-Commissioning of HVAC-12-24-2025.pdf PDF
233100-RIB-HVAC Ducts and Casings-12-24-2025.pdf PDF
230553-RIB-Identification for HVAC Piping and Equipment-12-24-2025.pdf PDF
230913-RIB-Instrumentation and Control Devices for HVAC-12-24-2025.pdf PDF
25388-CBI 100% CD w Add1.pdf PDF
230529-RIB-Hangers and Supports for HVAC Piping and Equipment-12-24-2025.pdf PDF
220553-RIB-Identification for Plumbing Piping and Equipment-12-24-2025.pdf PDF
221005-RIB-Plumbing Piping-12-24-2025.pdf PDF
265140-LUT-Luminaires-12-24-2025.pdf PDF
Answers to Questions_IFB REAA 2027-05.pdf PDF
237413-RIB-Packaged Outdoor Central-Station Air-Handling Units-12-24-2025.pdf PDF
TYPE P1 Corelite-Iridium-i3-Suspended-specification-sheet.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-388 CBI HVAC and Lighting Upgrade 231123 - 1 Facility Natural-Gas Piping

SECTION 231123

FACILITY NATURAL-GAS PIPING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Pipe, pipe fittings, valves, and connections for natural gas piping systems.

1.02 RELATED REQUIREMENTS

A. Section 083100 - Access Doors and Panels.

B. Section 099113 - Exterior Painting.

C. Section 230548 - Vibration and Seismic Controls for HVAC.

D. Section 230553 - Identification for HVAC Piping and Equipment.

E. Section 312316 - Excavation.

F. Section 312323 - Fill.

G. Section 335216 - Gas Hydrocarbon Piping.

1.03 REFERENCE STANDARDS

A. ANSI Z21.18/CSA 6.3 - Gas Appliance Pressure Regulators; 2019.

B. ANSI Z21.80/CSA 6.22 - Line Pressure Regulators; 2019.

C. ASME BPVC-IX - Boiler and Pressure Vessel Code, Section IX - Qualification Standard for

Welding, Brazing, and Fusing Procedures; Welders; Brazers; and Welding, Brazing, and Fusing Operators; 2025.

D. ASME B16.3 - Malleable Iron Threaded Fittings: Classes 150 and 300; 2021.

E. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes; 2024.

F. ASME B31.1 - Power Piping; 2024.

G. ASME B31.9 - Building Services Piping; 2025.

H. ASTM A47/A47M - Standard Specification for Ferritic Malleable Iron Castings; 1999, with

Editorial Revision (2022).

I. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2024.

J. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products; 2024.

K. ASTM A234/A234M - Standard Specification for Piping Fittings of Wrought Carbon Steel and

Alloy Steel for Moderate and High Temperature Service; 2025.

L. ASTM B68/B68M - Standard Specification for Seamless Copper Tube, Bright Annealed; 2025.

M. ASTM B75/B75M - Standard Specification for Seamless Copper Tube; 2020.

N. ASTM B88 - Standard Specification for Seamless Copper Water Tube; 2022.

O. ASTM B88M - Standard Specification for Seamless Copper Water Tube (Metric); 2020.

P. ASTM B813 - Standard Specification for Water Flushable Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube; 2024.

Q. ASTM B828 - Standard Practice for Making Capillary Joints by Soldering of Copper and Copper

Alloy Tube and Fittings; 2023.

R. ASTM D2513 - Standard Specification for Polyethylene (PE) Gas Pressure Pipe, Tubing, and

Fittings; 2025.

S. ASTM D2683 - Standard Specification for Socket-Type Polyethylene Fittings for Outside

Diameter-Controlled Polyethylene Pipe and Tubing; 2020.

Upgrade 231123 - 2 Facility Natural-Gas Piping

T. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers; 2024.

U. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2025.

V. AWWA C606 - Grooved and Shouldered Joints; 2022.

W. ICC-ES AC01 - Acceptance Criteria for Expansion Anchors in Masonry Elements; 2018, with

Editorial Revision (2020).

X. ICC-ES AC106 - Acceptance Criteria for Predrilled Fasteners (Screw Anchors) in Masonry;

2018, with Editorial Revision (2020).

Y. ICC-ES AC193 - Acceptance Criteria for Mechanical Anchors in Concrete Elements; 2017, with

Editorial Revision (2020).

Z. ICC-ES AC308 - Acceptance Criteria for Post-Installed Adhesive Anchors in Concrete

Elements; 2023.

AA. MSS SP-78 - Gray Iron Plug Valves, Flanged and Threaded Ends; 2011.

BB. MSS SP-110 - Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends;

2010, with Errata .

1.04 SUBMITTALS

A. See Section 013000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide data on pipe materials, pipe fittings, valves, and accessories. Provide manufacturers catalog information. Indicate valve data and ratings.

C. Welder Certificate: Include welders certification of compliance with AWS D1.1/D1.1M.

D. Shop Drawings: For non-penetrating rooftop supports, submit detailed layout developed for this project, with design calculations for loadings and spacings.

E. Project Record Documents: Record actual locations of valves.

F. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

1. See Section 016000 - Product Requirements, for additional provisions.

2. Valve Repacking Kits: One for each type and size of valve.

1.05 QUALITY ASSURANCE

A. Perform work in accordance with applicable codes.

B. Valves: Manufacturer's name and pressure rating marked on valve body.

C. Welding Materials and Procedures: Comply with ASME BPVC-IX and applicable state labor regulations.

D. Welder Qualifications: Certified in accordance with ASME BPVC-IX.

E. Identify pipe with marking including size, ASTM material classification, and ASTM specification.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Accept valves on site in shipping containers with labeling in place. Inspect for damage.

B. Provide temporary protective coating on cast iron and steel valves.

C. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.

D. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the work, and isolating parts of completed system.

1.07 FIELD CONDITIONS

A. Do not install underground piping when bedding is wet or frozen.

PART 2 PRODUCTS

2.01 NATURAL GAS PIPING, BURIED BEYOND 5 FEET OF BUILDING

A. Polyethylene Pipe: ASTM D2513, SDR 11.

Upgrade 231123 - 3 Facility Natural-Gas Piping

1. Fittings: ASTM D2683 or ASTM D2513 socket type.

2. Joints: Fusion welded.

2.02 NATURAL GAS PIPING, BURIED WITHIN 5 FEET OF BUILDING

2.03 NATURAL GAS PIPING, ABOVE GRADE

A. Steel Pipe: ASTM A53/A53M, Grade B, Type F, Schedule 40 black.

1. Fittings: ASME B16.3, malleable iron, or ASTM A234/A234M, wrought steel welding type.

2. Joints: Threaded or welded to ASME B31.1.

B. Copper Tube: ASTM B88 (ASTM B88M), Type K (A) or L (B) annealed.

1. Fittings: ASME B16.26, cast bronze.

2. Joints: Flared.

C. Copper Tube: ASTM B68/B68M, O50 or O60 temper; or ASTM B75/B75M, H58 (general purpose) drawn temper.

1. Fittings: ASME B16.26, cast bronze.

2. Joints: Flared.

2.04 FLANGES, UNIONS, AND COUPLINGS

A. Unions for Pipe Sizes 2 inches and Under:

1. Ferrous Pipe: Class 150 malleable iron threaded unions.

2. Copper Tube and Pipe: Class 150 bronze unions with soldered joints.

B. Flanges for Pipe Size Over 1 Inch:

1. Ferrous Pipe: Class 150 malleable iron threaded or forged steel slip-on flanges;

preformed neoprene gaskets.

2. Copper Tube and Pipe: Class 150 slip-on bronze flanges; preformed neoprene gaskets.

C. Mechanical Couplings for Grooved and Shouldered Joints: Two or more curved housing segments with continuous key to engage pipe groove, circular C-profile gasket, and bolts to secure and compress gasket.

1. Dimensions and Testing: In accordance with AWWA C606.

2. Housing Material: Provide ASTM A47/A47M malleable iron or ductile iron, galvanized.

3. Gasket Material: EPDM suitable for operating temperature range from minus 30 degrees

F to 230 degrees F.

4. Bolts and Nuts: Hot dipped galvanized or zinc-electroplated steel.

5. When pipe is field grooved, provide coupling manufacturer's grooving tools.

D. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

2.05 PIPE HANGERS AND SUPPORTS

A. Provide hangers and supports that comply with MSS SP-58.

1. If type of hanger or support for a particular situation is not indicated, select appropriate type using MSS SP-58 recommendations.

2. Overhead Supports: Individual steel rod hangers attached to structure or to trapeze hangers.

3. Trapeze Hangers: Welded steel channel frames attached to structure.

4. Vertical Pipe Support: Steel riser clamp.

5. Floor Supports: Concrete pier or steel pedestal with floor flange; fixture attachment.

6. Rooftop Supports for Low-Slope Roofs: Steel pedestals with bases that rest on top of roofing membrane, not requiring any attachment to the roof structure and not penetrating the roofing assembly, with support fixtures as specified; and as follows:

a. Bases: High density polypropylene.

b. Base Sizes: As required to distribute load sufficiently to prevent indentation of roofing assembly.

c. Steel Components: Stainless steel, or carbon steel hot-dip galvanized after fabrication in accordance with ASTM A123/A123M.

Upgrade 231123 - 4 Facility Natural-Gas Piping

d. Attachment/Support Fixtures: As recommended by manufacturer, same type as indicated for equivalent indoor hangers and supports; corrosion resistant material.

e. Height: Provide minimum clearance of 6 inches under pipe to top of roofing.

B. Hanger Fasteners: Attach hangers to structure using appropriate fasteners, as follows:

1. Concrete Wedge Expansion Anchors: Complying with ICC-ES AC193.

2. Masonry Wedge Expansion Anchors: Complying with ICC-ES AC01.

3. Concrete Screw Type Anchors: Complying with ICC-ES AC193.

4. Masonry Screw Type Anchors: Complying with ICC-ES AC106.

5. Concrete Adhesive Type Anchors: Complying with ICC-ES AC308.

6. Other Types: As required.

2.06 BALL VALVES

A. Manufacturers:

1. Apollo Valves: www.apollovalves.com/#sle.

2. Milwaukee Valve Company: www.milwaukeevalve.com/#sle.

3. Substitutions: See Section 016000 - Product Requirements.

B. Construction, 4 Inches and Smaller: MSS SP-110, Class 150, 400 psi CWP, bronze or ductile iron body, 304 stainless steel or chrome plated brass ball, regular port, Teflon seats and stuffing box ring, blow-out proof stem, lever handle with balancing stops, solder, threaded, or grooved ends with union.

2.07 PLUG VALVES

A. Construction 2-1/2 Inches and Larger: MSS SP-78, 175 psi CWP, cast iron body and plug, pressure lubricated, Teflon or Buna N packing, flanged or grooved ends. Provide lever operator with set screw.

2.08 LINE PRESSURE REGULATORS AND APPLIANCE REGULATORS INDICATORS

A. Manufacturers:

1. Maxitrol Company: www.maxitrol.com/#sle.

2. Substitutions: See Section 016000 - Product Requirements.

B. Compliance Requirements:

1. Appliance Regulator: ANSI Z21.18/CSA 6.3.

2. Line Pressure Regulator: ANSI Z21.80/CSA 6.22.

C. Materials in Contact With Gas:

1. Housing: Aluminum, steel (free of non-ferrous metals).

2. Seals and Diaphragms: NBR-based rubber.

D. Maximum Inlet Operating Pressure: 10 psi.

1. Appliance Regulator: 10 psi.

2. Line Pressure Regulator: 10 psi.

E. Maximum Body Pressure: 10 psi.

F. Output Pressure Range: 1 inch wc to 80 inch wc.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that excavations are to required grade, dry, and not over-excavated.

3.02 PREPARATION

A. Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe.

B. Remove scale and dirt, on inside and outside, before assembly.

C. Prepare piping connections to equipment with flanges or unions.

3.03 INSTALLATION

Upgrade 231123 - 5 Facility Natural-Gas Piping

A. Install in accordance with manufacturer's instructions.

B. Provide non-conducting dielectric connections wherever jointing dissimilar metals.

C. Route piping in orderly manner and maintain gradient. Route parallel and perpendicular to walls.

D. Install piping to maintain headroom, conserve space, and not interfere with use of space.

E. Group piping whenever practical at common elevations.

F. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment.

G. Provide clearance in hangers and from structure and other equipment for installation of insulation and access to valves and fittings.

H. Provide access where valves and fittings are not exposed.

1. Coordinate size and location of access doors with Section 083100.

I. Establish elevations of buried piping outside the building to ensure not less than two ft of cover.

J. Install vent piping penetrating roofed areas to maintain integrity of roof assembly.

K. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welding.

L. Provide support for utility meters in accordance with requirements of utility companies.

M. Prepare exposed, unfinished pipe, fittings, supports, and accessories ready for finish painting.

1. Painting of exterior piping systems and components is specified in Section 099113.

N. Excavate in accordance with Section 312316.

O. Backfill in accordance with Section 312323.

P. Install valves with stems upright or horizontal, not inverted.

Q. Pipe vents from gas pressure reducing valves to outdoors and terminate in weather proof hood.

R. Copper Pipe and Tube: Make soldered joints in accordance with ASTM B828, using specified solder, and flux meeting ASTM B813.

S. Sleeve pipes passing through partitions, walls and floors.

T. Inserts:

1. Provide inserts for placement in concrete formwork.

2. Provide inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams.

3. Provide hooked rod to concrete reinforcement section for inserts carrying pipe over 4 inches.

4. Where concrete slabs form finished ceiling, locate inserts flush with slab surface.

5. Where inserts are omitted, drill through concrete slab from below and provide through-bolt with recessed square steel plate and nut above slab.

U. Pipe Hangers and Supports:

1. Install in accordance with ASME B31.9.

2. Support horizontal piping as indicated.

3. Install hangers to provide minimum 1/2 inch space between finished covering and adjacent work.

4. Place hangers within 12 inches of each horizontal elbow.

5. Use hangers with 1-1/2 inch minimum vertical adjustment. Design hangers for pipe movement without disengagement of supported pipe.

6. Support vertical piping at every other floor. Support riser piping independently of connected horizontal piping.

7. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers.

Upgrade 231123 - 6 Facility Natural-Gas Piping

8. Provide copper plated hangers and supports for copper piping.

9. Prime coat exposed steel hangers and supports. Hangers and supports located in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed.

a. Painting of exterior piping systems and components is specified in Section 099113.

10. Provide hangers adjacent to motor driven equipment with vibration isolation; refer to Section 230548.

3.04 APPLICATION

A. Install unions downstream of valves and at equipment or apparatus connections.

B. Install brass male adapters each side of valves in copper piped system. Solder adapters to pipe.

C. Install ball valves for shut-off and to isolate equipment, part of systems, or vertical risers.

D. Install ball valves for throttling, bypass, or manual flow control services.

E. Provide plug valves in natural gas systems for shut-off service.

3.05 SERVICE CONNECTIONS

A. Provide new gas service complete with gas meter and regulators in accordance with Section

335216. Gas service distribution piping to have initial minimum pressure of 7 inch wg. Provide regulators on each line serving gravity type appliances, sized in accordance with equipment.

B. For medium pressure systems (2-5 psi), provide pressure regulators as shown on the drawings to provide 10" wc delivery pressure. Provide tee upstream and downstream of regulator with capped or plugged tee port for testing.

3.06 SCHEDULES

A. Pipe Hanger Spacing:

1. Metal Piping:

a. Pipe Size: 1/2 inches to 1-1/4 inches:

1) Maximum Hanger Spacing: 6.5 ft.

2) Hanger Rod Diameter: 3/8 inches.

b. Pipe Size: 1-1/2 inches to 2 inches:

1) Maximum Hanger Spacing: 10 ft.

2) Hanger Rod Diameter: 3/8 inch.

c. Pipe Size: 2-1/2 inches to 3 inches:

1) Maximum Hanger Spacing: 10 ft.

2) Hanger Rod Diameter: 1/2 inch.

d. Pipe Size: 4 inches to 6 inches:

1) Maximum Hanger Spacing: 10 ft.

2) Hanger Rod Diameter: 5/8 inch.

END OF SECTION

231123 - Facility Natural-Gas Piping

File details come from the government source that posted it. Updated .