O&M_Hydronic_Pumps_-_0.pdf
PDF 99 KB Posted
- Solicitation number
- 19GE5018R0023
About this file
O and M Hydrolic Pumps 0
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2905 PACIFIC DRIVE, NORCROSS, GA 30071
P. 770.447.4443 F.770.448.6120
OPERATION AND MAINTENANCE INSTRUCTIONS
FOR
NEW LONDON EMBASSY,
CHILLED WATER STATION
LONDON, UNITED KINGDOM
PRODUCTION NO. 20133707
SALES ORDER NO. 332202
SHIP DATE: 12/22/2014
TABLE OF CONTENTS
SECTION 1 – PARTICULARS
ISO 9001:2008
UL AUTHORIZATION
ETL COMPLIANCE
CERTIFICATE OF INSURANCE
WARRANTY
MUNICIPAL SYSTEM OPERATION AND MAINTENANCE
DATA SHEETS
TEST REPORTS
SECTION 2 – PUMP & MOTOR DATA
CHWP 1&2 PUMP DATA
SCHWP 1&2 PUMP DATA
CHWP 3&4 PUMP DATA
CHWP 1&2 MOTOR DATA
SCHWP 1&2 MOTOR DATA
CHWP 3&4 MOTOR DATA
CHWP 1&2 PUMP MANUAL
SCHWP 1&2 PUMP MANUAL
CHWP 3&4 PUMP MANUAL
CHWP 1&2 MOTOR MANUAL
SCHWP 1&2 MOTOR MANUAL
CHWP 3&4 MOTOR MANUAL
SECTION 3 – MECHANICAL DATA
PRESSURE GAUGE
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING BUTTERFLY
AUTOMATIC AIR RELEASE
SUCTION DIFFUSER
WYE STRAINER
BACKFLOW PREVENTER
FLEX CONNECTOR
VIBRATION ISOLATOR
FILTER FEEDER
EXPANSION TANK
AIR SEPARATOR
SECTION 4 – ELECTRICAL DATA
CHWP 1&2 VFD’S
CHWP 3&4 VFD’S
SCHWP 1&2 VFD’S
SECTION 5 – DRAWINGS & SCHEMATICS
FRONT VIEW
PLAN VIEW
ISO VIEW
CHWP 1-2
SCHWP 1-2
CHWP 3-4
File details come from the government source that posted it.