Hydraulic Pumps Schedule

View the file

Other files

File Type Posted
Exhibit_A.pdf PDF
Exhibit_B.pdf PDF
Exhibit_D.pdf PDF
Exhibit_C.pdf PDF
O&M_Hydronic_Pumps_-_5.pdf PDF
O&M_Hydronic_Pumps_-_2.pdf PDF
O&M_Hydronic_Pumps_-_6.pdf PDF
O&M_Hydronic_Pumps_-_0.1.pdf PDF
Centrifugal_Water_Chiller_O&M.PDF PDF
O&M_Hydronic_Pumps_-_0.pdf PDF
Computer_Room_AC_O&M.PDF PDF
DHR_Modular_Chiller_O&M_-_1_of_2.pdf PDF
Soliciation_19GE5018R0023.pdf PDF
O&M_Hydronic_Pumps_-_4.2.pdf PDF
HX_1&2_O&M.PDF PDF
Cooling_Towers_O&M.PDF PDF
HVAC_Power_Ventilators_O&M.PDF PDF
Heat_Echangers_for_HVAC_Schedule.pdf PDF
HVAC_Ventilators_Schedule.pdf PDF
Air_Terminal_Units_(VAV)_-_O&M.PDF PDF
O&M_Hydronic_Pumps_-_3.pdf PDF
DHR_Modular_Chiller_O&M_-_2_of_2.pdf PDF
O&M_Hydronic_Pumps_-_1.pdf PDF
Air_Cooled_Modular_Chiller_O&M.PDF PDF
O&M_Hydronic_Pumps_-_4.1.pdf PDF
Original_Signed_letter_19GE5018R0023.pdf PDF
HX_3&4_O&M.PDF PDF
Central_Station_Air_Handling_Units_O&M.PDF PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUMP SCHEDULE

ITEM

CHWP-1, -2

CHWP-3, -4

SCHWP-1, -2

HHWP-1, -2

HHWP-3, -4

HHWP-5,-6

BCP-1, -2

SHHWP-1, -2

SHHWP-3,- 4

CWP-1, -2

SWP-1, -2

GLP-1, -2

DHWP-1, -2

DIP-1, -2

KP-1, -2

RFP-1, -2

RFP-3, -4

RFP-5, -6

RFP-7, -8

RFP-9, -10

RFP-11, -12

RFP-13, -14

RFP-15, -16

NOTES:

1.

2.

3.

SERVICE

PRIMARY CHW

MODULAR CHILLER CHW

CHILLED BEAMS

PRIMARY HHW

MODULAR CHILLER HHW

CHP HEAT RECOVERY

BOILER INJECTION PUMP

AHU, FCU, CRAC HHW

FTR

FLOODED CHILLER CW

MODULAR CHILLER SW

GROUND LOOP

DHW HEATING LOOP

DISTRICT LOOP INJECTION

WATER-COOLED KITCHEN EQUIPMENT

MAIN ENTRY LOBBY RF

GALLERY E RF

GALLERY W RF

CONSULAR ENTRY LOBBY RF

SERVICE CAC

CONSULAR CAC WEST

CONSULAR CAC EAST

MAIN CAC

PUMPS SCHEDULED IN PARIS ARE DUTY/STANDBY. THE FIRST PUMP LISTED IN EACH PAIR IS THE DUTY PUMP

EXCEPT FOR RFP'S, PROVIDE ALL PUMPS WITH VFD'S AND VFD-RATED MOTORS.

PUMPS SHALL BE RATED FOR 1725 KPA WORKING PRESSURE, MINIMUM.

LOCATION

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, SW MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, NE MER

LOWER LEVEL, SW MER

LEVEL 5 MER

ENTRY LEVEL PAA JC

ENTRY LEVEL GWA JC

ENTRY LEVEL MER

ENTRY LEVEL MER

SERVICE CAC

CONSULAR CAC

CONSULAR CAC

MAIN CAC

MANUFACTURER

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

BELL&GOSSETT

ECOCIRC

ECOCIRC

ECOCIRC

ECOCIRC

ECOCIRC

ECOCIRC

ECOCIRC

ECOCIRC

MODEL

VSX-VSC 8x10x17-1/2A

1510-5BC

1510-6G

VSX-VSC 6x8x10-1/2B

1510-5BC

eSV 66SV-2/1A

1510-5BC

1510-6G 1510-5G

VSX-VSC 8x10x17-1/2A 1510-6G

VSX-VSC 4x6x17-1/2A eSV 33SV-2

1510-5G

SERIES 80-SC

TLCB-25-4

TLCB-25-4

TLCB-25-4

TLCB-25-6L

TLCB-25-4

TLCB-25-3

TLCHB-25-7L

TLCB-25-4

FLOW RATE

(L/S) 8.3

0.38 0.36 0.26 0.49 0.28 0.15 0.73 0.30

HEAD

(KPA)

23.3 27.2 30.5 32.3 20.0 23.6 32.3 23.3

RPM

ELECTRICAL DATA

HP

(W)

7.5 7.5 1.5

(70) (70) (70) (100) (70) (63) (260) (70)

VOLT

PHASE

HZ

STATUS

FOR

ELECTRICAL

DUTY / STANDBY ON EMERGENCY

DUTY / STANDBY ON EMERGENCY

DUTY / STANDBY ON EMERGENCY

DUTY / STANDBY ON EMERGENCY

DUTY / STANDBY ON EMERGENCY

DUTY / STANDBY ON EMERGENCY

DRY

WEIGHT

(KG)

NOTES

15% PROPLYENE GLYCOL

UNITED STATES DEPARTMENT OF STATE

NEW LONDON EMBASSY COMPOUND

(NLE)

LONDON, UNITED KINGDOM

DESIGN ISSUED FOR CONSTRUCTION

KP-1, -2 WATER-COOLED KITCHEN EQUIPMENT SERIES 80-SCLEVEL 5 MER 3

EXCEPT FOR RFP'S, PROVIDE ALL PUMPS WITH VFD'S AND VFD-RATED MOTORS.

PUMPS SHALL BE RATED FOR 1725 KPA WORKING PRESSURE, MINIMUM.

N PARIS A . THE FIRST PUMP LISTED IN EACH PAIR IS THE DUTY PUMP