Exhibit_B.pdf

PDF 33 KB Posted

Attached to
HVAC Maintenance services for US Embassy London UK
Solicitation number
19GE5018R0023
Issued by

View the file

Other files

File Type Posted
Exhibit_A.pdf PDF
Exhibit_D.pdf PDF
Exhibit_C.pdf PDF
O&M_Hydronic_Pumps_-_5.pdf PDF
O&M_Hydronic_Pumps_-_2.pdf PDF
O&M_Hydronic_Pumps_-_6.pdf PDF
O&M_Hydronic_Pumps_-_0.1.pdf PDF
Centrifugal_Water_Chiller_O&M.PDF PDF
O&M_Hydronic_Pumps_-_0.pdf PDF
Computer_Room_AC_O&M.PDF PDF
DHR_Modular_Chiller_O&M_-_1_of_2.pdf PDF
Soliciation_19GE5018R0023.pdf PDF
O&M_Hydronic_Pumps_-_4.2.pdf PDF
HX_1&2_O&M.PDF PDF
Cooling_Towers_O&M.PDF PDF
HVAC_Power_Ventilators_O&M.PDF PDF
Heat_Echangers_for_HVAC_Schedule.pdf PDF
HVAC_Ventilators_Schedule.pdf PDF
Hydronic_Pumps_Schedule.pdf PDF
Air_Terminal_Units_(VAV)_-_O&M.PDF PDF
O&M_Hydronic_Pumps_-_3.pdf PDF
DHR_Modular_Chiller_O&M_-_2_of_2.pdf PDF
O&M_Hydronic_Pumps_-_1.pdf PDF
Air_Cooled_Modular_Chiller_O&M.PDF PDF
O&M_Hydronic_Pumps_-_4.1.pdf PDF
Original_Signed_letter_19GE5018R0023.pdf PDF
HX_3&4_O&M.PDF PDF
Central_Station_Air_Handling_Units_O&M.PDF PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American Embassy London UNCLASSIFIED U.S. Department of State

EXHIBIT B

Additional contractors responsibilities applicable to all the HVAC equipment

1. Provide an 80 hours a week, 52 weeks a year service to all the HVAC equipment described within this document.

2. The contractor shall record daily (or as required) measurements and fill the relevant log sheet. This information will be used in identifying operating trends and diagnosing potential system problems.

3. Develop a yearly plan for the whole length of the contract to include the dates, the list of task to be performed by equipment and when each task will be undertaken.

4. Undertake the preventive maintenance activities for all the HVAC equipment and systems in a safely manner and in accordance to the relevant O&M documents.

5. Undertake the reactive maintenance activities as and when required.

6. Ensure that all relevant maintenance documentation is kept up to date and compliant to standards and procedures.

7. Liaise with 3rd party contractors in providing solutions to planned and reactive maintenance activities.

8. Liaise with the Embassy facility maintenance employees including the BAS engineer in providing solutions to planned and reactive maintenance activities.

9. Provide air conditioning and plumbing related maintenance and repair to the relevant systems on site, including relevant drainage / ventilation / extraction systems.

10. Undertake minor electrical checks to all the HVAC equipment as described on the O&M documents.

11. Identify faults and inefficient equipment in a timely manner.

12. Contractor’s employees qualifications: City & Guild qualification (or equivalent) in pipe fitting and general plumbing in commercial systems including domestic water, gas, air, chilled water, drainage systems, extraction systems, ventilation systems etc.

13. Contractor’s employees qualifications: Level 3 NVQ Diploma in Heating and Ventilating Systems and Level 3 NVQ Diploma in Refrigeration and Air Conditioning.

Solicitation 19GE5018R0023

American Embassy London UNCLASSIFIED U.S. Department of State

14. The contractor’s individuals shall have extensive experience on preventive and reactive maintenance of similar size of equipment in a similar size commercial building.

Solicitation 19GE5018R0023