O&M Library London, United Kingdom NEC
Tab D
Manufacturer Product & Technical Data
Table of Contents Section Page
Multistack Service Manual
Variable Flow Application Product Data
Multistack IOM Manual
Virtual Moveable End Cap for Heat Pumps Installation Supplement pCO3 Controller User Manual
Dedicated Heat Recovery Chiller Product Data
Brass Socket Guages Product Data
Actuator Valves Product Data
Building Automation Site Survey
Multistack Preventative Maintenance
Multistack Heat Exchanger Cleaning Procedures
Multistack Customer Witness Test Report
Information for Spec Section
Tab D
SERVICE MANUAL
for
1065 Maple Avenue PO Box 510
Sparta, WI 54656 Phone: (608)366-2400
Fax: (608)366-2450 www.multistack.com
12-827-82 - VME
202-N030
(5) MS070XC5E2H2AAC-410A,
(2) MS050XC5E2H2AAC-410A,
(7) VME2E8A5 Valve modules
400 Volt
Specification 236422 - Page 1 of 159
Date: December 12, 2013
From: Brad Snodgrass / Mike Orlikowski Multistack
To: Juan Bazan BL Harbert International
Subj: Responses to Submittal Review Comments for 236422, Dedicated Heat Recovery Chillers (GSHP)
Dear Juan, Please see below for our responses to the submittal review comments:
Comment: For record, provide certification indicating compliance with ASHRAE 15 and ANSI/ASHRAE Guideline 147. (Refer to Section 1.6-B.)
Response: Please see page 6 of 89 for ASHRAE 15 and 147 certification letter.
Comment: For record, confirm that the submitted evaporators and condensers comply with the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1. Provide an ASME label on each evaporator and condenser. (Refer to Section 1.6-C.)
Response: The brazed plate heat exchangers are rated and stamped in accordance with UL 1995.
Comment: Provide interface for full BMS integration with the heat pumps’ controllers. Coordinate BMS protocol with the approved BMS shop drawings.
Response: Please provide the completed BMS protocol survey (page 89 of 89).
Comment: Coordinate all VME II controller inputs, outputs, and sequences with the controls contractor in order to satisfy the intent of the control sequences listed in the design documents. Refer to the controls drawings, and in particular, NOB MC9.1.2, MC9.1.3, NOB MC9.1.4, NOB MC9.2.3, and NOB MC9.2.4 for details.
Response:
• NOB MC9.1.2
o MIV03, MIV04, & FCV01 are provided by others, but operated by the Multistack Water to Water Heat Pump. All other points and devices on the 9.1.2 list on sheet NOB MC9.1.2 are by the BAS Contractor.
• NOB MC9.1.3
o MIV03, MIV04, & FCV01 are provided by others, but operated by the Multistack Water to Water Heat Pump. All other points and devices on the 9.1.2 list on sheet NOB MC9.1.2 are by the BAS Contractor.
Specification 236422 - Page 2 of 159
• NOB MC9.1.4
o In order to provide the points list, we will need the completed BMS protocol survey.
Please provide the completed BMS protocol survey (page 89 of 89)
• NOB MC9.2.3
o In order to provide the points list, we will need the completed BMS protocol survey.
Please provide the completed BMS protocol survey (page 89 of 89)
• NOB MC9.2.4
o In order to provide the points list, we will need the completed BMS protocol survey.
Please provide the completed BMS protocol survey (page 89 of 89)
Comment: The bypass valves at the heat pump CHW, HHW, and source water loop hook-ups (refer to “VMEII Piping Schematic,” page 8 of submittal) are by others but shall be controlled by Multistack.
Response: Multistack concurs with this comment.
Comment: Coordinate heat pump dimensions with all other trades. Heat pumps shall be accessible for maintenance and inspection. Coordinate installation of submitted heat pumps with heat pump manufacturer’s recommended service clearances.
Response: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Coordinate all control valves, control wiring, and sensors with the design drawings and the controls contractor.
Response: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Coordinate all power wiring with the design drawings and the electrical contractor.
Response: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Coordinate all piping hook-ups with the design drawings and the chiller manufacturer’s recommendations.
Response: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Coordinate refrigerant leak detector and alarm with design drawings and the mechanical and controls contractors.
Response: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Coordinate all balance-of-system components (pumps, strainers, isolation valves, etc.) with the design drawings and the mechanical contractor.
Responses: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Provide factory-witness test per the mechanical specifications. Coordinate with Owner and CM at time of test.
Response: Multistack will provide notification of the witness test date within 14 days of the test (we will make every effort to give additional notice).
Comment: Coordinate housekeeping pad requirements with the design drawings and the mechanical contractor.
Specification 236422 - Page 3 of 159
Response: Please let us know what additional information is needed to assist in this coordination effort.
Comment: Base isolation is not required. Direct, non-isolated base mounting is acceptable from an acoustic and vibration transmission standpoint.
Response: Multistack is not providing this item – to be coordinated by others.
Comment: Provide startup service, training, toolkit, and O&M data per the specification.
Response:
• We will provide start up services as outlined in specification 236422 Paragraph 3.6.A
• Training will be provided during the onsite start up visit as required by 3.6.A
• Specification 236422 Paragraph 2.9.C requires any special tools that are not readily available.
Our chiller does not require any non-standard tools.
• O&M data will be provided at the time of shipment.
Specification 236422 - Page 4 of 159
Please see below for exceptions – clarifications related to the review of the specification.
Modular Water to Water Heat Pump
• Comments on Schedule Notes o Note 1: Housekeeping Pad by Others – Powder Coated Lifting Frame Included
• Specification 236422 Notes o Seismic & Vibration Isolation (Neoprene & Springs) by Others o Table 2.2-1
Pumps not included in this submittal o 3.3.D & E Evaporator and Condenser Connections by Others o 3.3.F Clarification: Circuit Charge likely below level that requires venting o 3.7.A Occupancy Adjustments, Not Included - Available on a T&M basis
Common Items Included:
• Freight from our Factory in Sparta, Wisconsin to First Destination Contiguous United States
• Warranties as Required in Specifications.
• Factory Witness Tests.
• A single 10 Day Job Site Visit by our TS Cleared Technician for Start Up, Commissioning, and Owner Training is included for both this chiller and the two Water Cooled Chillers presented in a separate submittal. Additional Visits to satisfy construction schedule requirements are available on a T&M basis, $15,000 per 5 day trip.
Common Items Excluded:
• Seismic Isolators
• Pumps and Auxiliary Items (e.g. Expansion Tanks, 30 Mesh Dual Basket Strainers, etc.)
Notes:
• Chilled Water and Hot Water Plant Building Automation System Interfaces with the Master Controllers for the items proposed above via either Bacnet MSTP, Bacnet IP, or Modbus RTU are included.
Specification 236422 - Page 5 of 159
MULTISTACK
1065 Maple Ave, Sparta, WI 54656
PHONE: (608) 366-2400 ▌▌▌FAX: (608) 366-2450
Subject: Compliance with ASHRAE Standard 15
The signature below certifies that Multistack, LLC is compliant with the manufacturer requirements of ASHRAE 15 “Safety Code for Mechanical Refrigeration” and manufacturer requirements of ANSI/ASHRAE Guideline 147 “Reducing Release of Halogenated Refrigerants from Refrigeration and Air-Conditioning Equipment and Systems” for refrigerant leaks, recovery, and handling and storage requirements.
Signed:
Michael S. Orlikowski Multistack Key Accounts Manager
Specification 236422 - Page 6 of 159
P.O. Box 510 - Sparta, WI 54656 - (608)366-2400 / Fax (608)366-2450 www.multistack.com - www.airstack.com
Specification 236422 - Page 7 of 159 http://www.multistack.com/� http://www.airstack.com/�
III MULTISTACK Submittal Information
JOB NAME: ENGINEER: Arup -- Dow Irons
LOCATION: ARCHITECT:
CUSTOMER: CONTRACTORB.L. Harbert
Multistack Order Number: Submitted by:
Customer P.O. Number: Quote #: QMO05242013-11
Sales Representative: Approved by: Date:
GENERAL INFORMATION WATER-COOLED CHILLER FEATURES
Chiller I.D. (5) MS070XC5E2H2AAC-410A & (2) MS050XC5E2H2AAC-410A
Other (7) VME2E8A5 Valve Modules • Stainless steel evaporator and condenser
• Lead compressor sequencing every 24 hours
Length: • Automatic internal rescheduling if fault occurs
Width: • Multiple, independent refrigeration systems
Height: • Automatic logging of any fault conditions
• Electronic chilled water control
CHILLED WATER DESIGN • Modules fit through single width doors and into
Entering Temperature: 57.2 °F passenger elevators
Leaving Temperature: 44.0 °F • Filters in condenser and evaporator supply headers
Evaporator Flow Rate: 360.9 GPM • Stainless steel evaporator & condenser inlet headers
Evaporator Pressure Drop: 10.4 Feet • Quick interconnect modular design
• R-410A Refrigerant
HEATING WATER DESIGN • Warranty: Compressor Parts (5 Year)
Entering Temperature: 130.0 °F • Dedicated Heat Recovery Controls
Leaving Temperature: 140.0 °F • VMEII Controls
Condenser Flow Rate: 687.0 GPM • Total Access Design w/ Var. Flow (Evap. & Cond.) C-Steel Valves (2"-up to 30, 2.5"-50&70)
Condenser Pressure Drop: 10.3 Feet • 8" Headers on Evaporator and Condenser
• Acoustical Cabinet Insulation
VMEII HEAT PUMP PERF. (AT FULL SIMULTANEOUS LOAD) • Refrigerant Pressure Gauges
Cooling Capacity: 699.2 KW • Two Point Power( Each with Disc Sw & PPM)
Power Input: 309 KW • Interoperability Web Portal (BACnet or Modbus)
HEATING CAPACITY: 1007 KW Heating COP: 3.3 • 6" Conduit Passage Incorporated in Module Frame
Cooling COP: 2.3 Heating & Cooling COP: 5.5 • Extra Materials: Control Circuit Board & PPM
Performance Based on 1-50 & 4-70 ton module(s) operating • Extra Materials: 2 Circuit Breakers
• NEMA 4X Variable Flow Actuators
• Factory Witness Test
• Lifting Frame
ELECTRICAL DATA CHILLER BUSBAR SCHEMATIC
MAIN POWER SUPPLY 400 / 50 / 3 - LOCATION OF JUNCTION BOX(S) = J
- ROUTING OF BUSBARS: _ _ _
ELECTRICAL CIRCUIT(S) CAPACITY
LEFT RIGHT
CIRCUIT CIRCUIT V 1 V 2 V 3 V 4 V 5 V 6 7 V
Minimum Circuit Ampacity (amps) 477 351 M 50 M 70 M 70 M 70 M 70 M 70 50 M
Maximum Over Current Protection (MOP) 600 450 J E E E E E E E J
PLAN VIEW
IMPORTANT: To assure full equipment design performance, life and reliability, the MULTISTACK chiller must be piped in accordance with Installation Manual unless specifically authorized otherwise by MULTISTACK in writing.
See Drawing
See Drawing
DESIGN NOTE: All loops (heating, cooling and source/sink) must be designed for the same fluid solution and loop pressure.
202-N030
ALS-15-0067
Brad Snodgrass
See Drawing
Tuesday, February 11, 2014
12-827-82 (VME)-- MWHP-1 (PEAK SIMULTANEOUS)
12-827-82
DoS
Specification 236422 - Page 8 of 159
LOCATION: ARCHITECT:
CUSTOMER: CONTRACTOR:B.L. Harbert
Multistack Order Number: Submitted by:
Customer P.O. Number: Quote #: QMO05242013-11
Sales Representative: Approved by: Date:
GENERAL INFORMATION WATER-COOLED CHILLER FEATURES
Chiller I.D. (5) MS070XC5E2H2AAC-410A & (2) MS050XC5E2H2AAC-410A
Other (7) VME2E8A5 Valve Modules • Stainless steel evaporator and condenser
• Lead compressor sequencing every 24 hours
Length: • Automatic internal rescheduling if fault occurs
Width: • Multiple, independent refrigeration systems
Height: • Automatic logging of any fault conditions
• Electronic chilled water control
SOURCE/SINK WATER DESIGN • Modules fit through single width doors and into
Entering Temperature: 46.0 °F passenger elevators
Leaving Temperature: 40.0 °F • Filters in condenser and evaporator supply headers
Evaporator Flow Rate: 954.5 GPM • Stainless steel evaporator & condenser inlet headers
Evaporator Pressure Drop: 18.6 Feet • Quick interconnect modular design
• R-410A Refrigerant
HEATING WATER DESIGN • Warranty: Compressor Parts (5 Year)
Entering Temperature: 130.0 °F • Dedicated Heat Recovery Controls
Leaving Temperature: 140.0 °F • VMEII Controls
Condenser Flow Rate: 860.4 GPM • Total Access Design w/ Var. Flow (Evap. & Cond.) C-Steel Valves (2"-up to 30, 2.5"-50&70)
Condenser Pressure Drop: 10.3 Feet • 8" Headers on Evaporator and Condenser
• Acoustical Cabinet Insulation
VMEII HEAT PUMP PERF. (AT FULL HEATING LOAD) • Refrigerant Pressure Gauges
Heat Extracted: 840.6 KW • Two Point Power( Each with Disc Sw & PPM)
Power Input: 421.9 KW • Interoperability Web Portal (BACnet or Modbus)
HEATING CAPACITY: 1261.1 KW Heating COP: 3.0 • 6" Conduit Passage Incorporated in Module Frame
Cooling EER: 6.8 Heating & Cooling COP: 5.0 • Extra Materials: Control Circuit Board & PPM
Performance Based on 2-50 & 5-70 ton module(s) operating • Extra Materials: 2 Circuit Breakers
• NEMA 4X Variable Flow Actuators
• Factory Witness Test
• Lifting Frame
ELECTRICAL DATA CHILLER BUSBAR SCHEMATIC
MAIN POWER SUPPLY 400 / 50 / 3 - LOCATION OF JUNCTION BOX(S) = J
- ROUTING OF BUSBARS: _ _ _
ELECTRICAL CIRCUIT(S) CAPACITY
LEFT RIGHT
CIRCUIT CIRCUIT V 1 V 2 V 3 V 4 V 5 V 6 7 V
Minimum Circuit Ampacity (amps) 477 351 M 50 M 70 M 70 M 70 M 70 M 70 50 M
Maximum Over Current Protection (MOP) 600 450 J E E E E E E E J
PLAN VIEW
IMPORTANT: To assure full equipment design performance, life and reliability, the MULTISTACK chiller must be piped in accordance with Installation Manual unless specifically authorized otherwise by MULTISTACK in writing.
See Drawing
See Drawing
DESIGN NOTE: All loops (heating, cooling and source/sink) must be designed for the same fluid solution and loop pressure.
202-N030
ALS-15-0067
Brad Snodgrass
See Drawing
Tuesday, February 11, 2014
12-827-82 (VME) -- MWHP-1 (PEAK HEATING)LSW
12-827-82
DoS
Specification 236422 - Page 9 of 159
LOCATION: ARCHITECT:
CUSTOMER: CONTRACTORB.L. Harbert
Multistack Order Number: Submitted by:
Customer P.O. Number: Quote #: QMO05242013-11
Sales Representative: Approved by: Date:
GENERAL INFORMATION WATER-COOLED CHILLER FEATURES
Chiller I.D. (5) MS070XC5E2H2AAC-410A & (2) MS050XC5E2H2AAC-410A
Other (7) VME2E8A5 Valve Modules • Stainless steel evaporator and condenser
• Lead compressor sequencing every 24 hours
Length: • Automatic internal rescheduling if fault occurs
Width: • Multiple, independent refrigeration systems
Height: • Automatic logging of any fault conditions
• Electronic chilled water control
CHILLED WATER DESIGN • Modules fit through single width doors and into
Entering Temperature: 57.2 °F passenger elevators
Leaving Temperature: 44.0 °F • Filters in condenser and evaporator supply headers
Evaporator Flow Rate: 450.6 GPM • Stainless steel evaporator & condenser inlet headers
Evaporator Pressure Drop: 10.4 Feet • Quick interconnect modular design
• R-410A Refrigerant
SOURCE/SINK WATER DESIGN • Warranty: Compressor Parts (5 Year)
Entering Temperature: 62.0 °F • Dedicated Heat Recovery Controls
Leaving Temperature: 71.0 °F • VMEII Controls
Condenser Flow Rate: 753.1 GPM • Total Access Design w/ Var. Flow (Evap. & Cond.) C-Steel Valves (2"-up to 30, 2.5"-5
Condenser Pressure Drop: 18.6 Feet • 8" Headers on Evaporator and Condenser
• Acoustical Cabinet Insulation
VMEII HEAT PUMP PERF. (AT FULL COOLING LOAD) • Refrigerant Pressure Gauges
Cooling Capacity: 873 KW • Two Point Power( Each with Disc Sw & PPM)
Power Input: 121.8 KW • Interoperability Web Portal (BACnet or Modbus)
Total Heat of Rejection: 993.6 KW Heating COP: 8.2 • 6" Conduit Passage Incorporated in Module Frame
Cooling COP: 7.1 Heating & Cooling COP: 15.3 • Extra Materials: Control Circuit Board & PPM
Performance Based on 1-50 & 3-70 ton module(s) operating • Extra Materials: 2 Spare Circuit Breakers
• NEMA 4X Variable Flow Actuators
• Factory Witness Test
• Lifting Frame
ELECTRICAL DATA CHILLER BUSBAR SCHEMATIC
MAIN POWER SUPPLY 400 / 50 / 3 - LOCATION OF JUNCTION BOX(S) = J
- ROUTING OF BUSBARS: _ _ _
ELECTRICAL CIRCUIT(S) CAPACITY
LEFT RIGHT
CIRCUIT CIRCUIT V 1 V 2 V 3 V 4 V 5 V 6 7 V
Minimum Circuit Ampacity (amps) 477 351 M 50 M 70 M 70 M 70 M 70 M 70 50 M
Maximum Over Current Protection (MOP) 600 450 J E E E E E E E J
PLAN VIEW
202-N030
ALS-15-0067
Brad Snodgrass
See Drawing
Tuesday, February 11, 2014
12-827-82 (VME) -- MWHP-1 (PEAK COOLING)
12-827-82
DoS
IMPORTANT: To assure full equipment design performance, life and reliability, the MULTISTACK chiller must be piped in accordance with Installation Manual unless specifically authorized otherwise by MULTISTACK in writing.
See Drawing
See Drawing
DESIGN NOTE: All loops (heating, cooling and source/sink) must be designed for the same fluid solution and loop pressure.
Specification 236422 - Page 10 of 159
Specification 236422 - Page 11 of 159
MULTISTACK
12-827-82 202-N030
Wiring 202-N030.E01 202-N030.E02 202-N030.E03 202-N030.E04 202-N030.E05 202-N030.E06 202-N030.E07 202-N030.E08 202-N030.E09 202-N030.E10 202-N030.E11 202-N030.E12
III MULTISTACK
1065 Maple Ave.
Phone #: (608) 366-2400 Fax #: (608) 366-2450 E-mail: info@multistack.com
Web Site: www.multistack.com
Specification 236422 - Page 12 of 159
Specification 236422 - Page 13 of 159
Specification 236422 - Page 14 of 159
Specification 236422 - Page 15 of 159
Specification 236422 - Page 16 of 159
Specification 236422 - Page 17 of 159
Specification 236422 - Page 18 of 159
Specification 236422 - Page 19 of 159
Specification 236422 - Page 20 of 159
Specification 236422 - Page 21 of 159
Specification 236422 - Page 22 of 159
Specification 236422 - Page 23 of 159
Specification 236422 - Page 24 of 159
T
T
VME II Piping Schematic
T
T
T T
Temperature sensors provided by Multistack, installed by others.
DP Transmitters for VFD control supplied and installed by others.
Bypass valves supplied and installed by others.
Minimum 30 mesh strainers required on load and source inlets, supplied and installed by others.
T
DP
Specification 236422 - Page 25 of 159
SYST
The V Dedic wate alway will m need than
The V main way v the C sourc exch
A var Wate Modu prope
The M modu plus
1065 Mapl
M
TEM VARIAB
HUSP = HEA
HLSP = HEA
HVSP = HEA
CUSP = COO
CLSP = COO
CVSP =COO
VME II modu cated Heat R r (geotherma ys determine maximize the ded. This allo using two he
VME II contro taining both b valves (one in
COMBINED S
ce/sink water anger on both
1. Optimum
2. And, head riable flow pu er). The Varia ular Chiller (s er turn down
Master Contro ules will be de VME II modu
V1C
V1H e Avenue
MULTISTAC
BLES:
ATING UPPE
ATING LOWE
ATING VARIA
OLING UPPE
OLING LOWE
OLING VARIA
lar chiller is d Recovery Chill l field, tower, the larger of simultaneous ows for a sing at pumps, on ols will monito building hot a n the supply h
SYSTEM VAR
. Additionally h the evapora temperature d pressure co mping system able Flow Pum ee Multistack in flow charac oller program etermined by les on both s
V
V
Sparta, Wi
S
CK GEOTH
R SET POINT
R SET POINT
ABLE SET PO
ER SET POIN
ER SET POIN
ABLE SET PO
esigned to su ers (DHRCTM boiler) as nee the cooling a s section of th le compressio e to cool and or building hot nd chilled wa header and o
RIABLES to de y, a modulatin ator and cond control at par ontrol on the s m is required mping System k Engineering cteristics as t m will be capab the size of th ides of all sim
V2C
V2H isconsin 54
EQUENCE
HERMAL C
(A Patent Pe
T T
OINT
T
NT
OINT
upply HEATIN M) for all simul eded after the and heating lo he chiller and on cycle to pr one to heat, t water and ch ater load. The ne in the retu etermine whic ng two-way m denser sides o rt load conditi source/sink si for all three w m should be c Guide for Va he chiller load ble of operati he simultaneo multaneous he
V3C
V3H
4656 - Pho
E OF OPER
CHILLER W
ending Tech
NG and COOL ltaneous load e simultaneou oad. When a only utilize th rovide both ch thus minimiz hilled water d e VME II valve rn header). T ch modules a otorized valve of the DHRC ons on the bu de.
water systems controlled to th ariable Primar ds and unload ng up to 14 m ous load. VME eating/cooling one (608)36
RATIONS
WITH VMETM
hnology)
LING load wa d requirement us loads are s simultaneous he source/sink hilled and hot zing the energ demand and s e modules uti
The control of are running as e will be insta Modules for:
uilding load s s (Heating Wa he pressure d ry Flow Syste ds.
mechanical m E II modules g modules.
66-2400 - F
M II TECHN
ater (building ts and then in satisfied. Th s load is prese k for the large t water for all gy required by stage compre ilize two indep f the VME II v s DHRC and w alled between ide ater, Cooling differential ac em Control). T odules. The are required
Fax (608)36
NOLOGY
side) by first ncorporating s he VME II Con ent the on bo er of the two l simultaneous y the Geother ssors as requ pendent moto alve modules which will util n the header a
Water and So cross the VME This will facilit number of VM at both ends
66-2450 utilizing source/sink ntrols will oard controls oads as s loads rather rmal System.
uired orized two-s is based on ize the and heat ource/Sink
E II DHRC
tate the
ME II
of the array
VGC
VGH
r
Specification 236422 - Page 26 of 159
The V desig
V V V V
Auto
1) A
2) Co
3) O
While as a
1) Co a b c d
2) C
3) O
To m simu
VME II Modu gnation for the
1C, V2C, V3C 1H, V2H, V3H GC = Valve G GH = Valve G omatic Chang At initiation of t
a) All hea
b) Geo he
c) V1C (co
d) V2C, V ompressors w Open/Close V1 e in Heating M function of sy ooling domina
a) All cooling
b) Geo cooli
c) V1H (hea
d) V2H, V3H
Compressors w Open/Close V1 maximize syste ltaneous mod lar Chiller sha e VME II valv
C, = Valve O H, = Valve O Geo-Field Coo Geo-Field Hea geover of Co the system, th ting control va eating valve is ooling contro
V3C…etc. and will cycle base 1C, V2C….et
Mode, if at an ystem variable ate g control valve ng valve is cl ting control va
H..etc. and VG will cycle base 1H, V2H….et em efficiency dules as poss all be equippe es:
One Cooling, V One Heating, V oling (geo coo ating (geo he ontrol:
he DHRC VM alves are ope s closed (VGH l valve 1) is c d VGC are op ed on system
c. to satisfy c y time the sys es the inverse es are open ( osed (VGC) alve 1) is clos
GH are open ed on system
c. to satisfy h
, an economi sible.
1065 Map Phone ed with a micr
Valve Two Co Valve Two He oling control v ating control
ME II shall star en (V1H, V2H H) losed pen variables to m cooling set po stem senses e of 1-3 above
(V1C, V2C…e sed m variables to heating set po c benefit to th ple Avenue (608)366-2 www.m roprocessor b ooling, Valve T eating, Valve valve) valve) rt in Heating M H etc.)
maintain HEA int that the cooli e will occur.
etc.)
maintain CO oint he owner, the e Sparta, W 2400 Fax ( multistack.c based master
Three Cooling Three Heatin
Mode. (heati
ATING SET P
ing side of the
OLING SET P
e Master Cont
Wisconsin (608)366-2 com r controller wit g, Etc. (cooli ng, Etc. (heat ng dominate)
POINT
e load is grea
POINT
troller will ope
54656 th the followin ng control va ting control va ater than the h erate as many ng alves) alves) heating side y
Specification 236422 - Page 27 of 159
Variable Flow Application Engineering Bulletin sm
For:
Multistack Modular Scroll Only Applications
Specification 236422 - Page 28 of 159
Variable Flow Application Engineering Bulletin Product Information
MultIStAck MOdulAr chIllErS Or hEAt PuMPS And VArIABlE PrIMAry FlOw PuMPIng SyStEMS The Multistack Modular Chiller and Heat Pump design offers some unique advantages when used in a variable primary flow system. These advantages include precise temperature control while providing infinite flow modulation with minimum flows significantly lower than traditional chillers. The Multistack Modular Chiller, however, has some subtle differences from a conventional system. These differences must be understood to properly design a variable primary flow system. This document will outline the basic requirements for a variable primary flow application utilizing the Multistack Modular System. The following three factors must be considered:
1. Pump VFD Control
2. System Bypass Sizing and Control (Minimum flow requirement at full load)
3. Minimum Chiller Flow – (Minimum flow requirement at low load)
PuMP VFd cOntrOl The application of the Multistack Chiller or Heat Pump in a variable flow system requires a different control approach when compared to conventional systems. In place of a single machine with one heat exchanger, the Multistack system incorporates multiple heat exchangers, each with its own motorized, fully modulating isolation valve. The internal header system of a Multistack Modular Chiller manifolds all modules’ evaporators and condensers in a parallel flow arrangement and provides proper flow distribution to each active heat exchanger. As a result the differential pressure across the MULTISTACK MODULAR CHILLER or HEAT PUMP can be directly correlated to the flow across all active heat exchangers.
Proper water flow to each operating heat exchanger must be maintained at all load conditions. This can be accomplished one of two ways:
1. The variable speed drive of the pump is controlled directly by a differential pressure transmitter installed at the inlet and outlet of the Multistack Modular System. The pump will modulate to maintain the required pressure differential across the Multistack Modular System. (Drawing 1).
2. The variable speed drive of the pump is controlled directly to a pressure transmitter installed in the building piping. The pump will modulate to control system pressure at the point of measurement (Drawing 2).
Design Note: To maintain acceptable temperature variance and avoid nuisance faults Multistack incorporates fast acting modulating valves with a stroke times less than 30 seconds. As a result it is critical that there is no delay associated with the Pump VFD control or the System bypass valve. The system bypass valve must be a pressure dependent valve with a similar stroke time to the Multistack onboard valve.
MInIMuM FlOw rEQuIrEMEnt At Full lOAd and SyStEM ByPASS SIZIng and cOntrOl One reality of a variable primary flow system, regardless of which of the above pump control methods is utilized (based on the chiller ΔP or the system pressure), is that there will be some control lag between the load seen by the chilled water distribution system and the Multistack chiller or heat pump.
Because of this, it is possible for the chiller to temporarily have a different flow requirement than the air handler (or other terminal device) . To avoid potential operational issues due to this phenomenon the system must incorporate a bypass valve. One example of how this operational issue could occur is:
The chiller is operating at full load (perhaps in a pull down situation). The air handlers gain control of their load and all simultaneously drive their chilled water control valves closed (this can happen quite abruptly in some variable primary flow systems). At this point the system has a very low water flow requirement to the air handlers. Simultaneously, the chiller (whose capacity is being controlled by chilled water temperature) has not yet seen a drop in required capacity at its system sensors due to the system water volume (which creates a time lag between a change in leaving temperature at the air handlers and a change in entering temperature at the Multistack Chiller). As a result of this lag, the MULTISTACK MODULAR CHILLER or HEAT PUMP would require more flow than the rest of the system until the chiller controls can unload the chiller/heater to match the system load condition. Without a system bypass valve in place the result of this condition would be to either provide too much flow to the air handlers or not enough flow to the MULTISTACK MODULAR CHILLER or HEAT PUMP.
When controlled properly the system bypass valve ensures each system component receives the proper flow at all times (including the potential lag period).
There are two control methods for the system bypass valve (which directly correlate to the control of the pump as described above):
1. When using the first pump control method (differential pressure drop across the chiller controlling the pump speed) the system bypass valve is controlled directly to a differential pressure transmitter installed in the building piping. The system bypass valve will modulate to control pressure differential as shown in (Drawing 1).
2. When using the second pump control method (system pressure controlling the pump speed) the system bypass valve is controlled directly to a differential pressure transmitter installed at the inlet and outlet of the Multistack Modular System. The system bypass will modulate to maintain the required differential pressure across the MULTISTACK MODULAR CHILLER or HEAT PUMP.(Drawing 2)
When sizing the system bypass all load conditions must be taken into account. For this reason the system bypass is not sized to the minimum system flow, rather it is sized to provide minimum flow at full load of the chiller. Contact your local Multistack sales representative for proper bypass sizing.
Design Note: The minimum flow bypass should be located on the load side of the piping system and is typically accomplished by installing the valve as an end-of-loop bypass. Some systems may not allow for an end-of-loop bypass. In these situations the valve may be installed closer to the chiller, however, a minimum system volume equaling a minimum of a 2-minute loop time must be maintained to ensure proper operation.
Specification 236422 - Page 29 of 159
Product Information
MInIMuM chIllEr FlOw (MInIMuM FlOw rEQuIrEMEnt At lIght lOAd) The Multistack control system together with the modulating valves at each evaporator and or condenser allows for maximum flow turndown. The MULTISTACK MODULAR CHILLER or HEAT PUMP can have a minimum flow at light load equivalent to the flow required for one circuit. Often the pumping system has a higher flow requirment than the Multistack Chiller. Additionally, by keeping the lead circuit’s modulating valve open (which is rotated each day to follow the lead circuit) the pumping system will not be “dead‐headed” by the chiller under a no‐load condition. If the pumps minimum turndown is more than one circuit of flow, the MULTISTACK MODULAR CHILLER or HEAT PUMP can be programmed to set the number of open valves to satisfy the minimum flow of the pump, eliminating the need for an external chiller bypass.
Design Note: This is the minimum operating point for MULTISTACK MODULAR CHILLER or HEAT PUMP only. It does not determine the system’s minimum flow requirement or the system bypass valve sizing.
In summary, the Multistack Variable Flow Chiller or Heat Pump can offer significant control and turn‐down advantages in variable primary flow pumping systems that will improve the energy profile of the system. Please contact us with any questions or concerns that you may have. We will listen, and do our best to support you in making your system the best it can be.
Specification 236422 - Page 30 of 159 drawing 1
D P
A H
U -4
A H
U -3
A H
U -2
A H
U -1
D P
Tr an sm itt er xx xx xx x
M ul tis ta ck C hi lle r
M ul tis ta ck R ec om m en de d
Va ria bl e
Fl ow
C hi lle r S ch em at ic en d of lo op b yp as s m ay b e co nt ro lle d di re ct ly b y en d of lo op p re ss ur e w ith a pr es su re tr an sm itt er
D ra w in g O ne
M ul ti st ac k re co m m en de d Va ri ab le F lo w c hi lle r S ch em at ic
En d of l oo p
Sy st em B yp as s w it h ch ill er d iff er en ti al P re ss ur e co nt ro l
*L es s th an se co nd s tr ok e tim e re qu ire d.
M ai nt ai n m in ut e lo op ti m e at a ll lo ad c on di tio ns
Specification 236422 - Page 31 of 159 drawing 2
D P
A H
U -4
A H
U -3
A H
U -2
A H
U -1
D P
Tr an sm itt er xx xx xx x
M ul tis ta ck C hi lle r
M ul tis ta ck R ec om m en de d
Va ria bl e
Fl ow
C hi lle r S ch em at ic en d of lo op b yp as s m ay b e co nt ro lle d di re ct ly b y en d of lo op p re ss ur e w ith a pr es su re tr an sm itt er
D ra w in g O ne
D P
P
D ra w in g Tw o
M ul ti st ac k
V ar ia bl e Fl ow c hi lle r S ch em at ic
*L es s th an se co nd s tr ok e tim e re qu ire d.
M ai nt ai n m in ut e lo op ti m e at a ll lo ad c on di tio ns
Specification 236422 - Page 32 of 159
F168_0812
Originators… Multistack invented the modular water chiller. It started with a radically simple idea: chiller modules that could be brought into the equipment room one at a time, through standard doorways and down elevators, to form a fully integrated chiller system. The idea launched a revolution and transformed Multistack into a leader in the commercial water-chiller industry.
Innovators… Multistack perfected the modular chiller and leads the industry in innovative and environmentally friendly modular solutions. Since founding in the late 1980s, Multistack has engineered, manufactured, and distributed an impressive array of modular air conditioning firsts: the first on-board strainer, the first modular automatic blow-down device, the first modular chiller for variable flow, the first modular chiller-heater (heat pump), the first modular heat-recovery chiller, the first modular air-to-water heat pump, the first modular chiller to utilize MagLev™ compressor technology, and the first modular chiller to utilize R-134a.
Never the Imitators… Multistack sets the standard in the industry for superior customer service, fast and on time shipment, superior product quality, and new product development. Our pioneering leadership in environmental issues is well documented. If you want the best, be sure to specify the original – Multistack®.
sm
1065 Maple Avenue P.O. Box 510 Sparta, WI 54656 Phone 608-366-2400 • Fax 608-366-2450 www.multistack.com
Specification 236422 - Page 33 of 159
Dedicated Heat Recovery Chiller® Installation, Operation, and Maintenance Manual
Specification 236422 - Page 34 of 159
Specification 236422 - Page 35 of 159
Safety Information
Model Number Nomenclature
INSTALLATION
Shipping Information
Chiller Location, Dimensions and Clearances
Installation Site Preparation
Recommended Water Piping Arrangement
Water Piping System Flushing Procedure
Chilled Water, Condenser Water Connections
System Water Volume
Water Treatment
Condenser Water Temperature Control
Pressure Relief Piping and Refrigerant Monitoring
Variable Flow and Power Actuated Butterfly Valves
Isolation Valves (Optional)
Hot Gas Bypass (Optional)
Module Mounting Base and Chiller Assembly
Chiller Assembly
Multiflush System Assembly
Water System Connections
Leak Testing
Flow Protection
Frame and Panel Installation
Buss Bar Installation
Electric Junction Box Installation
Field Electrical Connections
Field Electrical Connections
Optional Single Module Field Connection
Master Control Panel
Module Control Boards and Low Voltage Panel
High Voltage Panel
Compressors, Sensors, Switches
Controls Setup
Start-Up Data Log
OPERATIONS
Pressure Readings
Compressor Oil Level
Daily Log Sheet
Water Treatment
Dedicated Heat Recovery Chiller
MAINTENANCE
Multistack Water Guidelines
Strainer, Heat Exchanger Cleaning
Condenser Strainer Cleaning
Refrigerant Charge, System Evacuation
Filter Driers
Superheat/Subcooling
Pressure Relief Valve
Annual Maintenance
Maintenance Checks
Electrical Components
Refrigeration Circuits
Chilled and Condenser Water System
Cabinet and Related Hardware
Compressors
Heat Exchangers
Leak Testing a Condenser or Evaporator Heat Exchanger .. 40
Condenser or Evaporator Heat Exchanger Replacement ... 40
Troubleshooting DHRC Modules
Chiller Daily Log Sheet
Contents
Specification 236422 - Page 36 of 159
Multistack Dedicated Heat Recovery Chillers™
• Multistack Dedicated Heat Recovery Chillers (DHRC) give owners simultaneous, variable heating and cooling from a single system.
Available in 140, 160 and 180-degree modules while producing cold water for cooling. Ideal for concurrent heating and cooling load applications.
• DHRC units provide significant cost savings by capturing heat already available plus the heat generated in the cooling process.
• Heating COPs of 3.0 and combined heating and cooling COPs of more than 7.0. Typically three times more efficient than gas boilers.
Compatible with high-temp hot water systems.
• Like Multistack modular chillers, DHRC units use the latest in direct digital controls technology for efficient, precise temperature and humidity control with easy interface to BAS systems.
• Compact size requires minimal installation space freeing valuable floor space for core business operations.
This manual will assist in the proper installation, operation and maintenance of Multistack Dedicated Heat Recovery Chillers (DHRC). Review this manual carefully before installing, starting and operating th e DHRC chiller.
The information and illustrations contained in this manual are generalized. Each chiller installation may be customized to an extent that consultation with a Multistack representative may be necessary to cover details not included in this manual.
Be sure to read and follow the safety information found on Pages __ and __ throughout this manual. Good electrical and piping practices must be followed as described in this manual and in accordance with all applicable national and local codes. Do not install this equipment near an open flame per local codes and ASHRAE specifications.
Personnel servicing Multistack DHRC chillers must have a minimum Class II EPA certification.
Questions regarding the content of this manual and the installation, operation and maintenance of DHRC chillers should be directed to an authorized Multistack representative or to the Multistack Service Department at (608) 366-2400 or FAX (608) 366-2450.
Specification 236422 - Page 37 of 159
Safety Information
This manual includes warnings, cautions and notes.
DANGER conveys serious hazards for injury or death.
WARNING indicates risk of injury or death.
CAUTION warns of possible injury or damage.
NOTE calls out work practices that can result in optimal operations.
Warnings, cautions and notes include:
DANGER: To avoid the risk of electrical shock, personal injury or death, disconnect all electrical power to the unit before performing any maintenance or service. The unit may have more than one electrical power supply. Assume all electrical wires are live, energized wires. Use lockout/tag outs.
DANGER: Use extreme caution when working around electrical components, wiring and connections to avoid injury or death by electric shock.
DANGER: Never remove a lockout from equipment unless you placed it there. Each person shall place his/her own lock/tag when required to isolate an energy source. Do not start any adjustment, service or repair without verifying that the tag/lock out switch or control cannot be by-passed or over-ridden. Verify that the locked-out switch or control cannot be overridden. Test the equipment to be certain that the locked-out switch is de-energized and not simply malfunctioning. Press all start buttons to confirm that the equipment WILL NOT start.
Confirm that the system being serviced or repaired is the system that has been locked out. Before restarting equipment, verify all tools and other items have been removed, all machine guards are in place, all electric systems are reconnected, and personnel are clear of equipment.
DANGER: During installation, testing, servicing and troubleshooting this product, it may be necessary to work with live electrical components. Only qualified licensed electricians or other properly trained persons may perform these tasks. Failure to follow all electrical safety precautions can result in death or serious injury. All HVAC equipment must be installed per the National Electric Code (NEC) and/or all applicable state/local codes.
DANGER: Incorrect handling of HVAC equipment can result in explosions, electrical shock or fire, causing property damage, injury and/or fatality.
DANGER: HVAC liquids and chemicals can be dangerous if used incorrectly or if spills or accidents occur. Handle detergents and solvents with care to avoid spills and burns.
DANGER: Danger of explosion. Refrigerant cylinders can explode causing serious injury and/or death if not handled and stored properly.
WARNING: Only qualified, licensed electricians with proper personal protection equipment should wire Multistack chillers. Injury or death my result if not properly wired due to electric shock hazard
WARNING: Danger of electrical shock. Many types of HVAC equipment have switches and regulators with electrical current on even when other parts of the equipment appear to be turned off. Main circuit breakers must be turned off before servicing equipment to avoid injury, fatality.
WARNING: Be sure to use lifting slings with lifting capacity to safely handle unit weight. Consult the unit’s as-built submittal drawings for unit weight data.
WARNING: If welding on chiller water connections, use proper electrical grounding to avoid damaging the compressors or chiller controls.
Never weld directly on the heat exchanger shells. Only an authorized ASME-certified repair agency may weld directly on ASME-certified shells. After welding, an “R” stamp is required.
CAUTION: Working with HVAC (heating, ventilating and air conditioning) equipment can be hazardous due to electricity, moving parts, chemicals, combustion and other hazards. Use safe work habits including proper tools and personal protective equipment. Understand and heed all safety information, installation guidelines and operation and maintenance procedures.
CAUTION: Pressurized application of cleaning substances or refrigerants must be done with the correct procedures to ensure the safety of technicians and others, and avoid property damage.
NOTE: Use correct tools for HVAC equipment installation, maintenance and adjustment. Use the correct tools to make tight connections without stripping threads or breaking screws and bolts. Use accurate refrigerant and electrical meters to properly maintain and diagnose HVAC equipment.
NOTE: Use proper personal protective equipment when working with HVAC equipment. For example, shoes and boots that protect ankles and feet, safety glasses for eye protection, and gloves to protect hands are common protective items for HVAC technicians. Injuries and accidents can be prevented or minimized by using appropriate protective equipment.
NOTE: Understand and pay attention to all safety information including all equipment manufacturer safety instructions, labels and signs.
Always follow original equipment manufacturer’s instructions, and local building codes and ordinances.
NOTE: Do not begin work until barricades, warning signs or other protective devices have been installed to isolate the work area from local traffic.
Specification 236422 - Page 38 of 159
Chiller Identification
Nameplate
Module nameplates are located on module high voltage panel door. Nameplates include model and serial number, refrigerant type and charge, electrical data and Multistack contact information for service parts and technical support.
Model Number Nomenclature
MS 050 X C or N 1 H 1 W 0 A A C -410A
Series1
Module Nominal Capacity (10 - 165 tons)
Compressor Type2
AHRI Certified (C - certified, N - Not certified)
Configuration3
Voltage (see voltage codes)
Module Number ( 1 - single, 2 - multiple)
Application4
AHRI Version - if applicable
Evaporator5
Condenser6
Refrigerant (410A, 134a, 407c)
Controller Option7
1 MS - Multistack (non - reversing valve), MR - Multistack Heat pump (w/ reversing valve) 2A - Copeland Scroll (ZR), B - Bristol, C: Trane Cornerstone, D-Copeland Digital Scroll, H - Hanbell screw, N - none, R - Bitzer Screw, S - Trane Scroll, T - Danfoss Turbocor, Z - Copeland scroll (old elec), X - Copeland Scroll (ZP) 3 1- Standard, 2- Total access, 3 - Evap extended headers, 4 - Cond extended headers, 5 - Both extended headers, 6-Outdoor, V - others 4 A - Air Cooled split, C - Single module temp controller, D - Cond unit, F - Fluid cooler (high temp),H - Heat recovery, R - Heat pump, W - Water cooled 5 A - Brazed SS, B - Brazed SMO, C- S&T copper, D - S&T cu-Ni, O - remote by others, R - remote by MS, V - Other 6 A - Brazed SS, B - Brazed SMO, C- S&T copper, D - S&T cu-Ni, E - Double wall brazed, O - remote by others, R - remote by MS, V - Other 7 F - FlexSys base, G - FlexSys with options, C - Carel, V - Other
C 575/3/60
E 380 - 415/3/50
F 380/3/60
H 460/3/60
V OTHER
A 70
B 80
C 90
D 100
E 110
F 125
G 150
H 175
I 200
J 225
K 250
L 300
M 350
N 400
O 450
P 500
Q 600
R 700
S 800
T 350/500
U 400/500
V 450/500
W 450/600
X 500/600
Amperage Codes/MOP Voltage Codes
Specification 236422 - Page 39 of 159
Typical Multistack chiller module shown with optional removable wheels and standard strainers installed.
Pallet #1 (Optional Cabinetry-not standard)
1. Top Front Panel
2. Bottom Front Panel
3. Rear Panel/End Panel
4. Side End Panel
5. Master Controller Top Panel
6. Frame Pieces
7. Frame Connectors, Fasteners, Clips & Magnetic Tape
Pallet #2 (Buss Connections)
8. Buss bar
9. Buss bar insulation
10. Ground strap
11. Junction Box leg
Installation
For best performance, reliability and chiller life, follow these installation instructions and guidelines. Be sure to observe all safety warnings and recommendations.
Shipping Information
NOTE: Before accepting delivery of the Multistack DHRC chiller modules, check for any visible damage including broken copper lines, oil leaks, damaged controls and/or electrical component housing, or any major component torn loose from its mounting.
If the DHRC chiller is damaged during transportation or handling by the transportation company or its agent, the installing contractor must promptly file a claim with the transportation company and advise Multistack. Any discrepancies must be noted on the bill of lading.
Specification 236422 - Page 40 of 159
Moving the Chiller Modules
Caution: Unit Top Heavy
Module on forklift. On pallet jack. On removable wheels.
WARNING: If lifting modules with a hoist, be sure to use lifting slings with lifting capacity to safely handle unit weight. Consult the unit’s as-built submittal drawings for unit weight data.
25 26
30 31
39 40
Pallet #3 (Piping & Electrical)
18. Master Control (*a)
19. Junction Box
20. Junction Box Cover
21. Sensors / Cables
22. Junction Box Connector (Throat)
23. Power Phase Monitor
24. Buss bar Connector
25. Power Phase Monitor Wire
26. Buss bar Insulation Overlap
27. Phase Monitor Wire
28. Buss bar End Caps
29. Drain Valves & Fittings
30. Module Joining Bolts
31. End Cap for DDRS-210A (upper)
32. End Caps (evaporator)
33. Couplings
34. DDRS-210A
35. Auto Solenoid for DDRS
36. Pipe Stubs
37. End Cap DDRS (lower)
38. Filter Stops
39. Pet Cock Valves
40. Drain Valves & Fittings
41. Sensor Wells
42. 30 Mesh Filter Strainer *a. Maybe shipped separately to sales office or job site.
*b. Shipped inside #19 - Junction Box
Specification 236422 - Page 41 of 159
Chiller Location, Dimensions and Clearances
Recommended clearance values for the modular chiller.
NOTE: There must be a minimum of six inches of clearance over the top ofchiller which includes the top of the master controller if installed on top of the chiller.
Determine piping location before chiller modules are set in place.
Specification 236422 - Page 42 of 159 susanw Rectangle
Installation Site Preparation
Recommended Water Piping Arrangement
All piping must be properly and adequately supported at coupling connections and other suitable intervals along the piping runs. Hanger design must provide for the weight of fluids in the piping system when the chiller is in operation.
MULTISTACK modules are equipped with brazed plate heat exchangers made of 316 stainless steel. MULTISTACK recommends a 1/8-inch basket “Y” type or similar system strainer. MULTISTACK supplies a serviceable 30 mesh strainer in each condenser and evaporator inlet header.
It is the contractor’s responsibility to make sure water systems are flushed and strainers are clean and clear of debris before starting the chiller.
Flushing should be done separately and not through the chiller.
Water Piping System Flushing Procedure
Before connecting the chiller to the condenser and chilled water loop, piping loops shall be flushed with detergent and hot water (110- 130 degrees F) mixture to remove previously accumulated dirt and organic residue. After removing residue, continue flushing with a dilute phosphoric, sulfamic or citric acid and water mixture to remove scale in the pipe. Cleaning chemicals such as Nu-Calgon “Imperial Grade” Scale Remover (Part no. 4360-84) or equivalent suitable for both organic residue and scale removal may be substituted. Otherwise detergents and acids shall not be combined unless approved by the chemical manufacturers.) Only chemicals compatible with 316 stainless steel, copper and carbon steel shall be used. Any concentrations of hydrochloric or sulfuric acid or chloride containing chemicals shall not be allowed to come in contact with copper brazed 316 stainless steel heat exchangers.
During flushing, 30 mesh (max.) Y-strainers (or acceptable equivalent) shall be in place in the system piping and examined periodically as needed to remove residue. The flushing process will require at least six hours or until the strainers are clean. Old water systems with heavy encrustation need to be flushed for at least 24 hours and may require as much as 48 hours before the filters run clean. Detergent and acid concentrations must be in strict accordance with the respective manufacturer’s instructions. After flushing with detergent and/or dilute acid concentrations, the water system must be purged with clean water for at least one hour to ensure that all residual cleaning chemicals are flushed out.
Before supplying water to the chiller, consult the Water Treatment Specifications on Page __ for water quality requirements during chiller operation.
Chilled Water, Condenser Water Connections
Chilled and condenser water connections are standard six-inch grooved fittings. On the evaporator side, the upper header is entering chilled water to the module; the bottom header is chilled water leaving the module. The condenser side is the opposite: Water enters at the bottom and exits on top.