ITEM SERVICE FLOW RATE (L/S) HEAD (KPA)
CHWP‐1, ‐2 PRIMARY CHW 122 333
CHWP‐3, ‐4 MODULAR CHILLER CHW 28 121
SCHWP‐1, ‐2 CHILLED BEAMS 109 258
HHWP‐1, ‐2 PRIMARY HHW 116 136
HHWP‐3, ‐4 MODULAR CHILLER HHW 54 121
HHWP‐5,‐6 CHP HEAT RECOVERY 16 364
BCP‐1, ‐2 BOILER INJECTION PUMP 38 106
SHHWP‐1, ‐2 AHU, FCU, CRAC HHW 102 273
SHHWP‐3,‐ 4 FTR 36 258
CWP‐1, ‐2 FLOODED CHILLER CW 126 333
SWP‐1, ‐2 MODULAR CHILLER SW 60 212
GLP‐1, ‐2 GROUND LOOP 61 515
DHWP‐1, ‐2 DHW HEATING LOOP 8.3 470
DIP‐1, ‐2 DISTRICT LOOP INJECTION 56 288
KP‐1, ‐2 WATER‐COOLED KITCHEN EQUIPMENT 3 115
RFP‐1, ‐2 MAIN ENTRY LOBBY RF 0.38 23.3
RFP‐3, ‐4 GALLERY E RF 0.36 27.2
RFP‐5, ‐6 GALLERY W RF 0.26 30.5
RFP‐7, ‐8 CONSULAR ENTRY LOBBY RF 0.49 32.3
RFP‐9, ‐10 SERVICE CAC 0.28 20
RFP‐11, ‐12 CONSULAR CAC WEST 0.15 23.6
RFP‐13, ‐14 CONSULAR CAC EAST 0.73 32.3
RFP‐15, ‐16 MAIN CAC 0.3 23.3