1614696Amend0001dwg 1of4.pdf

PDF 14 MB Posted

Attached to
P-095 Pier 3 Recap Naval Station Norfolk, VA
Solicitation number
N4008521R0219
Issued by

About this file

This document provides details for a federal solicitation regarding pier recapitalization work at Naval Station Norfolk, Virginia. The solicitation number is N4008521R0219 and is being issued by the Department of the Navy Naval Facilities Engineering Command for pier recapitalization services at Pier 3. Bids are due by the date specified in the solicitation. The work includes recapitalization of Pier 3 to rehabilitate and modernize the structures and systems. This is a firm fixed-price contract and the selected contractor will be responsible for all aspects of the pier recapitalization in accordance with the specifications outlined in the solicitation documentation.

View the file

Other files

File Type Posted
Amendment 0010 and 0011.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
MIL-STD-767 REV G.pdf PDF
Amendment 0007.pdf PDF
1614696Amend0006dwg 1of1.pdf PDF
Attachment K- PIEE Vendor Access Instructions.pdf PDF
1614696Amend0006spc 1of1.pdf PDF
Amendment 0006.pdf PDF
Pier 3 Contractor Laydown Map.pdf PDF
Attachment H - Price Proposal Form Revised 3.docx DOCX document
Amendment 0005.pdf PDF
Attachment G - Small Business Subcontracting Plan Template Revised.pdf PDF
Amendment 0004.pdf PDF
1614696Amend0004dwg 1of1.pdf PDF
Composite Camel Reference Drawings.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment H - Price Proposal Form Revised 2.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
P095 Site Visit Log.pdf PDF
Attachment H-Price Proposal Form Revised.docx DOCX document
Amendment 0001.pdf PDF
1614696dwg15of22_ARCH-BUILD.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
1614696spc05of19_APP-A4.pdf PDF
1614696Amend0001dwg 2of4.pdf PDF
1614696dwg11of22_STRUCT-PIER.pdf PDF
1614696spc11of19_APP-B3.pdf PDF
1614696dwg20of22_ELEC-BUILD.pdf PDF
1614696spc10of19_APP-B2.pdf PDF
1614696spc17of19_APP-E.pdf PDF
Attachment A - PPI Log.doc DOC document
1614696dwg04of22_GEOTECH.pdf PDF
Attachment G - Small Business Subcontracting Plan Template.doc DOC document
1614696dwg13of22_MECH-PIER.pdf PDF
1614696dwg06of22_CIVIL-SITE.pdf PDF
1614696spc16of19_APP-D.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1614696spc02of19_APP-A1.pdf PDF
Attachment I - ODP Badge Access Request.xls XLS spreadsheet
1614696dwg22of22_CAT_PROTECT.pdf PDF
1614696spc15of19_APP-C.pdf PDF
1614696dwg14of22_ELEC-PIER.pdf PDF
1614696Amend0001dwg 4of4.pdf PDF
1614696dwg10of22_STRUCT-PIER.pdf PDF
1614696spc06of19_APP-A5.pdf PDF
1614696spc01of19.pdf PDF
Attachment B - SECNAV 5512.pdf PDF
1614696dwg12of22_FIRE-PIER.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

GENERAL

1 G-001 TITLE SHEET 12828955

2 G-002 INDEX OF DRAWINGS - SHEET 1 OF 3 12828956

3 G-003 INDEX OF DRAWINGS - SHEET 2 OF 3 12828957

4 G-004 INDEX OF DRAWINGS - SHEET 3 OF 3 12828958

5 G-005 GENERAL NOTES 12828959

6 G-101 GENERAL SITE PLAN 12828960

7 G-111 BERTHING PLAN (SUBMARINES BOW-OUT) 12828961

8 G-112 BERTHING PLAN (SUBMARINES BOW-IN) 12828962

9 G-121 PHASING PLAN - PHASE 1 12828963

10 G-122 PHASING PLAN - PHASE 2 12828964

11 G-123 PHASING PLAN - PHASE 3 12828965

12 G-124 PHASING PLAN - PHASE 4 12828966

13 G-125 PHASING PLAN - PHASE 5 12828967

14 G-126 PHASING PLAN - PHASE 6 12828968

15 G-127 PHASING PLAN - PHASE 7 12828969

16 G-128 PHASING PLAN - PHASE 8 12828970

17 G-401 ENLARGED BERTHING PLAN (BOW-OUT) 12828971

18 G-402 ENLARGED BERTHING PLAN (BOW-IN) 12828972

19 G-403 HEAVY WEATHER MOORING LAYOUT 12828973

20 GI001 GUARD BOOTH - LIFE SAFETY CODE ANALYSIS AND PLAN 12828974

21 GI002 GATEHOUSE - LIFE SAFETY CODE ANALYSIS AND PLAN 12828975

22 GI003 USB - LIFE SAFETY CODE ANALYSIS 12828976

23 GI111 USB - LIFE SAFETY PLAN 12828977

24 GI120 FIRE PROTECTION SITE PLAN 12828978

GEOTECHNICAL

25 B-101 GEOTECHNICAL INVESTIGATIONS PLAN 12828980

26 B-601 BORING LOGS - SHEET 1 OF 17 12828981

27 B-602 BORING LOGS - SHEET 2 OF 17 12828982

28 B-603 BORING LOGS - SHEET 3 OF 17 12828983

29 B-604 BORING LOGS - SHEET 4 OF 17 12828984

30 B-605 BORING LOGS - SHEET 5 OF 17 12828985

31 B-606 BORING LOGS - SHEET 6 OF 17 12828986

32 B-607 BORING LOGS - SHEET 7 OF 17 12828987

33 B-608 BORING LOGS - SHEET 8 OF 17 12828988

34 B-609 BORING LOGS - SHEET 9 OF 17 12828989

35 B-610 BORING LOGS - SHEET 10 OF 17 12828990

36 B-611 BORING LOGS - SHEET 11 OF 17 12828991

37 B-612 BORING LOGS - SHEET 12 OF 17 12828992

38 B-613 BORING LOGS - SHEET 13 OF 17 12828993

39 B-614 BORING LOGS - SHEET 14 OF 17 12828994

40 B-615 BORING LOGS - SHEET 15 OF 17 12828995

41 B-616 BORING LOGS - SHEET 16 OF 17 12828996

42 B-617 BORING LOGS - SHEET 17 OF 17 12828997

43 B-618 CPT LOGS - SHEET 1 OF 3 12828998

44 B-619 CPT LOGS - SHEET 2 OF 3 12828999

45 B-620 CPT LOGS - SHEET 3 OF 3 12829000

46 B-621 GEOTECHNICAL INFORMATION 12829001

SURVEY

47 V-001 SURVEY NOTES, ABBREVIATIONS, AND LEGEND 12829002

48 V-002 SURVEY SCHEDULES - SHEET 1 OF 2 12829003

49 V-003 SURVEY SCHEDULES - SHEET 2 OF 2 12829004

50 V-100 EXISTING CONDITIONS OVERALL KEY PLAN 12829005

51 V-101 EXISTING CONDITIONS PLAN - AREA 101 12829006

52 V-102 EXISTING CONDITIONS PLAN - AREA 102 12829007

53 V-103 EXISTING CONDITIONS PLAN - AREA 103 12829008

54 V-104 EXISTING CONDITIONS PLAN - AREA 104 12829009

55 V-105 EXISTING CONDITIONS PLAN - AREA 105 12829010

56 V-106 EXISTING CONDITIONS PLAN - AREA 106 12829011

57 V-107 EXISTING CONDITIONS PLAN - AREA 107 12829012

58 V-108 EXISTING CONDITIONS PLAN - AREA 108 12829013

59 V-109 EXISTING CONDITIONS PLAN - AREA 109 12829014

60 V-110 EXISTING CONDITIONS PLAN - AREA 110 & AREA 114 12829015

61 V-111 EXISTING CONDITIONS PLAN - AREA 111 12829016

62 V-112 EXISTING CONDITIONS PLAN - AREA 112 12829017

63 V-113 EXISTING CONDITIONS PLAN - AREA 113 12829018

CIVIL - SITE

64 C-001 CIVIL LEGENDS AND ABREVIATIONS 12829019

65 C-002 CIVIL GENERAL NOTES 12829020

66 C-003 EROSION CONTROL NOTES 12829021

67 CD100 CIVIL DEMOLITION & EROSION CONTROL OVERALL KEY PLAN 12829022

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

68 CD102 CIVIL DEMOLITION & EROSION CONTROL - AREA 102 12829023

69 CD103 CIVIL DEMOLITION & EROSION CONTROL - AREA 103 12829024

70 CD104 CIVIL DEMOLITION & EROSION CONTROL - AREA 104 12829025

71 CD108 CIVIL DEMOLITION & EROSION CONTROL - AREA 108 12829026

72A CD109A CIVIL DEMOLITION & EROSION CONTROL - AREA 109 12829027

72B CD109B CIVIL DEMOLITION & EROSION CONTROL - AREA 109 (BID OPTION) 12828979

73 CD110 CIVIL DEMOLITION & EROSION CONTROL - AREA 110 & AREA 114 12829028

74A CD111A CIVIL DEMOLITION & EROSION CONTROL - AREA 111 12829029

74B CD111B CIVIL DEMOLITION & EROSION CONTROL - AREA 111 (BID OPTION) 12829070

75 CD112 CIVIL DEMOLITION & EROSION CONTROL - AREA 112 12829030

76 CD113 CIVIL DEMOLITION & EROSION CONTROL - AREA 113 12829031

77 CD501 CIVIL DEMOLITION & EROSION CONTROL - DETAILS - SHEET 1 OF 2 12829032

78 CD502 CIVIL DEMOLITION & EROSION CONTROL - DETAILS - SHEET 2 OF 2 12829033

79A CD601A CIVIL DEMOLITION CONTROL TABLES 12829034

79B CD601B CIVIL DEMOLITION CONTROL TABLES (BID OPTION) 12829071

80 CS100 CIVIL SITE OVERALL KEY PLAN 12829035

81 CS102 CIVIL SITE PLAN - AREA 102 12829036

82 CS103 CIVIL SITE PLAN - AREA 103 12829037

83 CS104 CIVIL SITE PLAN - AREA 104 12829038

84 CS108 CIVIL SITE PLAN - AREA 108 12829039

85A CS109A CIVIL SITE PLAN - AREA 109 12829040

85B CS109B CIVIL SITE PLAN - AREA 109 (BID OPTION) 12829085

86 CS110 CIVIL SITE PLAN - AREA 110 & AREA 114 12829041

87A CS111A CIVIL SITE PLAN - AREA 111 12829042

87B CS111B CIVIL SITE PLAN - AREA 111 (BID OPTION) 12829101

88 CS112 CIVIL SITE PLAN - AREA 112 12829043

89 CS113 CIVIL SITE PLAN - AREA 113 12829044

90 CS201 RAMPS & ROADS PROFILES 12829045

91 CS202 DRAINAGE PROFILES - SHEET 1 OF 2 12829046

92 CS203 DRAINAGE PROFILES - SHEET 2 OF 2 12829047

93 CS301 TYPICAL SECTIONS 12829048

94 CS501 CIVIL SITE DETAILS - SHEET 1 OF 17 12829049

95 CS502 CIVIL SITE DETAILS - SHEET 2 OF 17 12829050

96 CS503 CIVIL SITE DETAILS - SHEET 3 OF 17 12829051

97 CS504 CIVIL SITE DETAILS - SHEET 4 OF 17 12829052

98 CS505 CIVIL SITE DETAILS - SHEET 5 OF 17 12829053

99 CS506 CIVIL SITE DETAILS - SHEET 6 OF 17 12829054

100 CS507 CIVIL SITE DETAILS - SHEET 7 OF 17 12829055

101 CS508 CIVIL SITE DETAILS - SHEET 8 OF 17 12829056

102 CS509 CIVIL SITE DETAILS - SHEET 9 OF 17 12829057

103 CS510 CIVIL SITE DETAILS - SHEET 10 OF 17 12829058

104 CS511 CIVIL SITE DETAILS - SHEET 11 OF 17 12829059

105 CS512 CIVIL SITE DETAILS - SHEET 12 OF 17 12829060

106 CS513 CIVIL SITE DETAILS - SHEET 13 OF 17 12829061

107 CS514 CIVIL SITE DETAILS - SHEET 14 OF 17 12829062

108 CS515 CIVIL SITE DETAILS - SHEET 15 OF 17 12829063

109 CS516 CIVIL SITE DETAILS - SHEET 16 OF 17 12829064

110 CS517 CIVIL SITE DETAILS - SHEET 17 OF 17 12829065

111 CS520 DUMPSTER ENCLOSURE DETAILS 12829066

112 CS601 CIVIL SITE CONTROL TABLES - SHEET 1 OF 3 12829067

113 CS602 CIVIL SITE CONTROL TABLES - SHEET 2 OF 3 12829068

114 CS603 CIVIL SITE CONTROL TABLES - SHEET 3 OF 3 12829069

CIVIL - UTILITIES

115 CU100 OVERALL UTILITY PLAN 12829072

116 CU103 UTILITY PLAN - AREA 103 12829073

117 CU104 UTILITY PLAN - AREA 104 12829074

118 CU109 UTILITY PLAN - AREA 109 12829075

119 CU111 UTILITY PLAN - AREA 111 12829076

120 CU112 UTILITY PLAN - AREA 112 12829077

121 CU113 UTILITY PLAN - AREA 113 12829078

122 CU401 UTILITY PROFILES 12829079

123 CU402 UTILITY PROFILES 12829080

124 CU403 UTILITY PROFILES 12829081

125 CU501 UTILITY DETAILS 12829082

126 CU502 UTILITY DETAILS 12829083

127 CU503 UTILITY DETAILS 12829084

CIVIL - ATFP

128 CX400 OVERALL ENLARGED ATFP PLAN 12829086

129 CX401 ENLARGED ATFP PLAN - AREA 401 12829087

130 CX402 ENLARGED ATFP PLAN - AREA 402 12829088

131 CX403 ENLARGED ATFP PLAN - AREA 403 12829089

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

132 CX404 ENLARGED ATFP PLAN - AREA 404 12829090

133 CX405 ENLARGED ATFP PLAN - AREA 405 12829091

134 CX406 ENLARGED ATFP PLAN - AREA 406 12829092

135 CX501 ATFP DETAILS 12829093

136 CX502 ATFP DETAILS 12829094

137 CX503 ATFP DETAILS 12829095

138 CX504 ATFP DETAILS 12829096

139 CX505 ATFP DETAILS 12829097

140 CX506 ATFP DETAILS 12829098

141 CX507 ATFP DETAILS 12829099

142 CX508 ATFP DETAILS 12829100

CIVIL - DREDGING

143 CN001 DREDGE MATERIAL DISPOSAL AREA MAP 12829102

144A CN101A DREDGING PLAN 12829103

144B CN101B DREDGING PLAN (BID OPTION) 12829105

145 CN301 DREDGE TYPICAL SECTIONS 12829104

STRUCTURAL - PIER

146 S-001 PIER STRUCTURAL NOTES - SHEET 1 OF 2 12829106

147 S-002 PIER STRUCTURAL NOTES - SHEET 2 OF 2 12829107

148 SD100 STRUCTURAL DEMOLITION OVERALL KEY PLAN 12829108

149 SD101 STRUCTURAL DEMOLITION PLAN - AREA 101 12829109

150 SD102 STRUCTURAL DEMOLITION PLAN - AREA 102 12829110

151 SD103 STRUCTURAL DEMOLITION PLAN - AREA 103 12829111

152 SD104 STRUCTURAL DEMOLITION PLAN - AREA 104 12829112

153 SD105 STRUCTURAL DEMOLITION PLAN - AREA 105 12829113

154 SD106 STRUCTURAL DEMOLITION PLAN - AREA 106 12829114

155 SD107 STRUCTURAL DEMOLITION PLAN - AREA 107 12829115

156 SD109 STRUCTURAL DEMOLITION PLAN - AREA 109 12829116

157 SD111 STRUCTURAL DEMOLITION PLAN - AREA 111 12829117

158 SD161 STRUCTURAL DEMOLITION PLAN - AREA 161 12829118

159 SD162 STRUCTURAL DEMOLITION PLAN - AREA 162 12829119

160 SD163 STRUCTURAL DEMOLITION PLAN - AREA 163 12829120

161 SD301 DEMOLITION SECTION - PIER 3 12829121

162 SD302 DEMOLITION SECTION - CEP-176 BULKHEAD 12829122

163 SD303 DEMOLITION SECTION - CEP-102 BULKHEAD 12829123

164 SD304 DEMOLITION SECTION - PIER 3T 12829124

165 SD501 PIER 3T DEMOLITION DETAILS 12829125

166 SD502 PIER 4 DEMOLITION PLAN & SECTION 12829126

167 SD503 CEP-102 DEMOLTION DETAILS 12829127

168 SD601 PIER 3T DEMOLITION PHOTOS - SHEET 1 OF 2 12829128

169 SD602 PIER 3T DEMOLITION PHOTOS - SHEET 2 OF 2 12829129

170 SD603 CEP-176 DEMOLITION PHOTOS - SHEET 1 OF 2 12829130

171 SD604 CEP-176 DEMOLITION PHOTOS - SHEET 2 OF 2 12829131

172 SD605 PIER 3 DEMOLITION PHOTOS - SHEET 1 OF 2 12829132

173 SD606 PIER 3 DEMOLITION PHOTOS - SHEET 2 OF 2 12829133

174 SD607 CEP-102 DEMOLITION PHOTOS 12829134

175 SD608 PIER 4 DEMOLITION PHOTOS 12829135

176 SS100 STRUCTURAL OVERALL KEY PLAN 12829136

177 SS103 PILE PLAN - AREA 103 12829137

178 SS104 PILE PLAN - AREA 104 12829138

179 SS105 PILE PLAN - AREA 105 12829139

180 SS106 PILE PLAN - AREA 106 12829140

181 SS107 PILE PLAN - AREA 107 12829141

182A SS109A PILE PLAN - AREA 109 12829142

182B SS109B PILE PLAN - AREA 109 (BID OPTION) 12829223

183A SS111A PILE PLAN - AREA 111 12829143

183B SS111B PILE PLAN - AREA 111 (BID OPTION) 12829224

184 SS123 DECK PLAN - AREA 103 12829144

185 SS124 DECK PLAN - AREA 104 12829145

186 SS125 DECK PLAN - AREA 105 12829146

187 SS126 DECK PLAN - AREA 106 12829147

188 SS127 DECK PLAN - AREA 107 12829148

189A SS129A DECK PLAN - AREA 109 12829149

189B SS129B DECK PLAN - AREA 109 (BID OPTION) 12829225

190A SS131A DECK PLAN - AREA 111 12829150

190B SS131B DECK PLAN - AREA 111 (BID OPTION) 12829236

191 SS144 FENDER PILE PLAN - AREA 104 12829151

192 SS145 FENDER PILE PLAN - AREA 105 12829152

193 SS146 FENDER PILE PLAN - AREA 106 12829153

194 SS147 FENDER PILE PLAN - AREA 107 12829154

195A SS149A FENDER PILE PLAN - AREA 109 12829155

FI

LE

N

AM

E:

Q

:\N O

R\

0-

\c ad d\

_A ct ive

Pi er

\P

IE

RP

5-

6-

G -0

A.

dw g

L

AY

O

UT

N

AM

E:

IN

DE

X

O F

DR

AW

IN

G

S

- S

HE

ET

O

F

P

LO

TT

ED

: F rid ay , S ep te m be r 1 0,

- 1

0:

am U

SE

R:

w ta fe l

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 12 APRIL 2018

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

N

A V

A L

S

TA

TI

O

N N

O R

FO

LK

N O

R

FO

LK

, V

IR

G

IN

IA

1614696

WMS/IAS

EJA

DSN

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

-A

TL

AN

TI

C C

I C O

R E

H

A M

P

TO

N R

O A

D S

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

, V

A

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

03/05/2021

JAMES E. DONAHUE, R.A.

SRETNIW.EELEKI

M

ENO

RTH CAROL I NA

ENG I NEER

FORP LA

NOISS

SEAL

026433

NC FIRM LICENSE NO. F-0105

IN

DE

X

OF

D

RA

W

IN

GS

SH

EE

T

OF

BA/AC WBT MCM

AS NOTED

12828956

G-002

NBJ

BI

D

OP

TI

ON

S 9/

/2

M

EW

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

195B SS149B FENDER PILE PLAN - AREA 109 (BID OPTION) 12829295

196A SS151A FENDER PILE PLAN - AREA 111 12829156

196B SS151B FENDER PILE PLAN - AREA 111 (BID OPTION) 12829296

197 SS161 FENDER SYSTEM PLAN - AREA 161 12829157

198 SS162 FENDER SYSTEM PLAN - AREA 162 12829158

199 SS163 FENDER SYSTEM PLAN - AREA 163 12829159

200 SS201 NORTH ELEVATION - SHEET 1 OF 3 12829160

201 SS202 NORTH ELEVATION - SHEET 2 OF 3 12829161

202 SS203 NORTH ELEVATION - SHEET 3 OF 3 12829162

203 SS204 WEST ELEVATION - SHEET 1 OF 2 12829163

204 SS205 WEST ELEVATION - SHEET 2 OF 2 12829164

205 SS301 CEP-176 SECTIONS - SHEET 1 OF 2 12829165

206 SS302 CEP-176 SECTIONS - SHEET 2 OF 2 12829166

207 SS303 PIER 3 SECTIONS - SHEET 1 OF 2 12829167

208 SS304 PIER 3 SECTIONS - SHEET 2 OF 2 12829168

209 SS305 CEP-102 SECTION 12829169

210 SS307 RAMP SECTIONS 12829170

211 SS401 ENLARGED PARTIAL PLAN 12829171

212 SS402 PIER 3T ENLARGED STRUCTURAL PLAN & SECTION 12829172

213 SS501 CEP-176 COMBI-WALL DETAILS 12829173

214 SS502 CEP-176 H-PILE DETAILS 12829174

215 SS503 PRECAST CONCRETE PILE DETAILS 12829175

216 SS504 CEP-102 COMBI-WALL DETAILS 12829176

217 SS505 CEP-176 TWO WAY SLAB DETAILS - SHEET 1 OF 2 12829177

218 SS506 CEP-176 TWO WAY SLAB DETAILS - SHEET 2 OF 2 12829178

219 SS507 PIER 3 TWO WAY SLAB DETAILS - SHEET 1 OF 2 12829179

220 SS508 PIER 3 TWO WAY SLAB DETAILS - SHEET 2 OF 2 12829180

221 SS509 CEP-102 REINFORCING DETAILS - SHEET 1 OF 2 12829181

222 SS510 CEP-102 REINFORCING DETAILS - SHEET 2 OF 2 12829182

223 SS511 CEP-176 RAMP DETAILS - SHEET 1 OF 2 12829183

224 SS512 CEP-176 RAMP DETAILS - SHEET 2 OF 2 12829184

225 SS513 PIER 3 LIFT STATION DETAILS - SHEET 1 OF 2 12829185

226 SS514 PIER 3 LIFT STATION DETAILS - SHEET 2 OF 2 12829186

227 SS515 CEP-176 UTILITY TRENCH DETAILS - SHEET 1 OF 2 12829187

228 SS516 CEP-176 UTILITY TRENCH DETAILS - SHEET 2 OF 2 12829188

229 SS517 PIER 3 UTILITY TRENCH DETAILS 12829189

230 SS519 UTILITY TRENCH COVER DETAILS - SHEET 1 OF 2 12829190

231 SS520 UTILITY TRENCH COVER DETAILS - SHEET 2 OF 2 12829191

232 SS521 CEP-176 MOORING HARDWARE FOUNDATION DETAILS 12829192

233 SS522 PIER 3 MOORING HARDWARE FOUNDATION DETAILS 12829193

234 SS523 CEP-102 MOORING HARDWARE FOUNDATION DETAILS 12829194

235 SS524 EXPANSION JOINT DETAILS 12829195

236 SS525 ELECTRICAL EQUIPMENT FOUNDATIONS DETAILS SHEET 1 OF 2 12829196

237 SS526 ELECTRICAL EQUIPMENT FOUNDATIONS DETAILS SHEET 2 OF 2 12829197

238 SS527 CEP-176 UTILITY VAULT DETAILS - SHEET 1 OF 2 12829198

239 SS528 CEP-176 UTILITY VAULT DETAILS - SHEET 2 OF 2 12829199

240 SS529 PIER 3 UTILITY VAULT DETAILS - SHEET 1 OF 2 12829200

241 SS530 PIER 3 UTILITY VAULT DETAILS - SHEET 2 OF 2 12829201

242 SS531 UTILITY BOOM DETAILS - SHEET 1 OF 2 12829202

243 SS532 UTILITY BOOM DETAILS - SHEET 2 OF 2 12829203

244 SS533 DRAINAGE STRUCTURES DETAILS SHEET 1 OF 2 12829204

245 SS534 DRAINAGE STRUCTURES DETAILS SHEET 2 OF 2 12829205

246 SS535 LIGHTING FOUNDATION AND PIER MARKING DETAILS 12829206

247 SS536 PRECAST CONCRETE FASCIA PANEL DETAILS 12829207

248 SS537 CEP-176 FASCIA PANEL DETAILS 12829208

249 SS538 PIER 3 FENDER SYSTEM DETAILS - SHEET 1 OF 2 12829209

250 SS539 PIER 3 FENDER SYSTEM DETAILS - SHEET 2 OF 2 12829210

251 SS540 CEP-102 FENDER SYSTEM DETAILS 12829211

252 SS541 CEP-175 REPAIR DETAILS 12829212

253 SS542 CORNER FENDER DETAILS - SHEET 1 OF 2 12829213

254 SS543 CORNER FENDER DETAILS - SHEET 2 OF 2 12829214

255 SS545 MISCELLANEOUS DETAILS - SHEET 1 OF 3 12829215

256 SS546 MISCELLANEOUS DETAILS - SHEET 2 OF 3 12829216

257 SS547 MISCELLANEOUS DETAILS - SHEET 3 OF 3 12829217

258 SS548 LADDER DETAILS - SHEET 1 OF 2 12829218

259 SS549 LADDER DETAILS - SHEET 2 OF 2 12829219

260 SS550 COMPOSITE CAMEL DETAILS 12829220

261 SS551 HEAVY WEATHER MOORING FRP BACKER WALL DETAILS 12829221

262 SS552 STAIR DETAILS 12829222

FIRE PROTECTION - PIER

263 FX001 PIER FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS 12829226

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

264 FX103 FIRE SUPPRESSION PLAN - AREA 103 12829227

265 FX104 FIRE SUPPRESSION PLAN - AREA 104 12829228

266 FX105 FIRE SUPPRESSION PLAN - AREA 105 12829229

267 FX106 FIRE SUPPRESSION PLAN - AREA 106 12829230

268 FX107 FIRE SUPPRESSION PLAN - AREA 107 12829231

269 FX501 FIRE UTILITY CONNECTION HEATED ENCLOSURE 12829232

270 FX502 PIER FIRE PROTECTION DETAILS 12829233

271 FX601 PIER FIRE MAIN SCHEMATIC 1 12829234

272 FX602 PIER FIRE MAIN SCHEMATIC 2 12829235

MECHANICAL - PIER

273 MD100 OVERALL MECHANICAL DEMOLITION PLAN 12829237

274 MD103 MECHANICAL DEMOLITION PLAN - AREA 103 12829238

275 MD104 MECHANICAL DEMOLITION PLAN - AREA 104 12829239

276 MD109 MECHANICAL DEMOLITION PLAN - AREA 109 12829240

277 MD111 MECHANICAL DEMOLITION PLAN - AREA 111 12829241

278 MS001 LEGEND, ABBREVIATIONS AND NOTES 12829242

279 MS100 MECHANICAL SUPPLY OVERALL PLAN 12829243

280 MS103 MECHANICAL SUPPLY UTILITIES - AREA 103 12829244

281 MS104 MECHANICAL SUPPLY UTILITIES - AREA 104 12829245

282 MS105 MECHANICAL SUPPLY UTILITIES - AREA 105 12829246

283 MS106 MECHANICAL SUPPLY UTILITIES - AREA 106 12829247

284 MS107 MECHANICAL SUPPLY UTILITIES - AREA 107 12829248

285 MS120 MECHANICAL DRAINAGE OVERALL PLAN 12829249

286 MS123 MECHANICAL DRAINAGE UTILITIES - AREA 103 12829250

287 MS124 MECHANICAL DRAINAGE UTILITIES - AREA 104 12829251

288 MS125 MECHANICAL DRAINAGE UTILITIES - AREA 105 12829252

289 MS126 MECHANICAL DRAINAGE UTILITIES - AREA 106 12829253

290 MS127 MECHANICAL DRAINAGE UTILITIES - AREA 107 12829254

291 MS300 PIER SECTIONS 12829255

292 MS301 PIER SECTIONS 12829256

293 MS302 PIER SECTIONS 12829257

294 MS303 PIER SECTIONS 12829258

295 MS304 PIER SECTIONS 12829259

296 MS305 PIER SECTIONS 12829260

297 MS306 PIER SECTIONS 12829261

298 MS307 CROSS TRENCH SECTIONS 12829262

299 MS308 PIER SECTIONS 12829263

300 MS309 PIER SECTIONS 12829264

301 MS310 UTILITY STATION SECTIONS 12829265

302 MS401 LIFT STATION PLANS AND SECTIONS 12829266

303 MS402 SUPPLY UTILITY STATION PROTECTION FRAME 12829267

304 MS403 DRAINAGE UTILITY STATION PROTECTION FRAME 12829268

305 MS404 ENLARGED PLAN SECTIONS 12829269

306 MS501 DETAILS 12829270

307 MS502 DETAILS 12829271

308 MS503 DETAILS 12829272

309 MS504 DETAILS 12829273

310 MS505 DETAILS 12829274

311 MS601 MECHANICAL SCHEDULES 12829275

312 MS602 TRENCH PIPE SUPPORT SCHEDULE EAST-WEST 12829276

313 MS603 TRENCH PIPE SUPPORT SCHEDULE NORTH (1 OF 3) 12829277

314 MS604 TRENCH PIPE SUPPORT SCHEDULE NORTH (2 OF 3) 12829278

315 MS605 TRENCH PIPE SUPPORT SCHEDULE NORTH (3 OF 3) 12829279

316 MS606 TRENCH PIPE SUPPORT SCHEDULE SOUTH (1 OF 3) 12829280

317 MS607 TRENCH PIPE SUPPORT SCHEDULE SOUTH (2 OF 3) 12829281

318 MS608 TRENCH PIPE SUPPORT SCHEDULE SOUTH (3 OF 3) 12829282

319 MS701 MECHANICAL UTITLITY DIAGRAM - MEDIUM & HIGH PRESSURE COMPRESSED AIR 12829283

320 MS702 MECHANICAL UTITLITY DIAGRAM - FRESH WATER 12829284

321 MS703 MECHANICAL UTITLITY DIAGRAM - OILY WASTE/WASTE OIL DIAGRAM 12829285

322 MS704 MECHANICAL UTITLITY DIAGRAM - SANITARY SEWER SYSTEM DIAGRAM 12829286

323 MS705 MECHANICAL UTITLITY DIAGRAM - PURE WATER 12829287

324 MS706 CONTROLLER SCHEMATICS 12829288

325 MS707 SEQUENCE OF OPERATION 12829289

326 MS801 MECHANICAL DRAINAGE PROFILES - SHEET 1 OF 5 12829290

327 MS802 MECHANICAL DRAINAGE PROFILES - SHEET 2 OF 5 12829291

328 MS803 MECHANICAL DRAINAGE PROFILES - SHEET 3 OF 5 12829292

329 MS804 MECHANICAL DRAINAGE PROFILES - SHEET 4 OF 5 12829293

330 MS805 MECHANICAL DRAINAGE PROFILES - SHEET 5 OF 5 12829294

ELECTRICAL - PIER

331 E-001 ELECTRICAL LEGEND 12829297

332 E-002 ELECTRICAL GENERAL NOTES 12829298

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

333 ED101 DEMOLITION SITE PLAN - PIER 3T 12829299

334 ED103 DEMOLITION SITE PLAN - AREA 103 12829300

335 ED104 DEMOLITION SITE PLAN - AREA 104 12829301

336 ED105 DEMOLITION SITE PLAN - AREA 105 12829302

337 ED106 DEMOLITION SITE PLAN - AREA 106 12829303

338 ED107 DEMOLITION SITE PLAN - AREA 107 12829304

339 ED109 DEMOLITION SITE PLAN - AREA 109 12829305

340 ED111 DEMOLITION SITE PLAN - AREA 111 12829306

341 ED112 DEMOLITION SITE PLAN - AREA 112 12829307

342 ED113 DEMOLITION SITE PLAN - AREA 113 12829308

343 ED601 DEMOLITION ONE-LINE DIAGRAM 12829309

344 E-100 ELECTRICAL OVERALL KEYPLAN 12829310

345 EL103 LIGHTING AND GROUNDING SITE PLAN - AREA 103 12829311

346 EL104 LIGHTING AND GROUNDING SITE PLAN - AREA 104 12829312

347 EL105 LIGHTING AND GROUNDING SITE PLAN - AREA 105 12829313

348 EL106 LIGHTING AND GROUNDING SITE PLAN - AREA 106 12829314

349 EL107 LIGHTING AND GROUNDING SITE PLAN - AREA 107 12829315

350 EL501 LIGHTING AND GROUNDING DETAILS 12829316

351 EL502 LIGHTING AND GROUNDING DETAILS 12829317

352 EL503 LIGHTING AND GROUNDING DETAILS 12829318

353 EL504 LIGHTING AND GROUNDING DETAILS 12829319

354 EL505 PIER HIGH MAST LIGHTING CALCULATIONS 12829320

355 EP103 POWER SITE PLAN - AREA 103 12829321

356 EP104 POWER SITE PLAN - AREA 104 12829322

357 EP105 POWER SITE PLAN - AREA 105 12829323

358 EP106 POWER SITE PLAN - AREA 106 12829324

359 EP107 POWER SITE PLAN - AREA 107 12829325

360 EP109 POWER SITE PLAN - AREA 109 12829326

361 EP111 POWER SITE PLAN - AREA 111 12829327

362 EP112 POWER SITE PLAN - PIER 4 12829328

363 EP401 ELECTRICAL CLEARANCE PLAN 12829329

364 EP402 POWER ENLARGED PLANS 12829330

365 EP403 POWER ENLARGED PLANS 12829331

366 EP404 POWER ENLARGED PLANS 12829332

367 EP405 ENLARGED EQUIPMENT CABLE WELL PLANS 12829333

368 EP501 ELECTRICAL SPS DETAILS 12829334

369 EP502 ELECTRICAL IPS DETAILS 12829335

370 EP503 TYPICAL CONDUITS IN PIER DECK DETAILS 12829336

371 EP504 TYPICAL DUCTBANK DETAILS 12829337

372 EP506 ELECTRICAL SUBSTATION DETAILS 12829338

373 EP507 SECONDARY UNIT SUBSTATION - SHORE BUS DIAGRAM 12829339

374 EP508 SUBSTATION CONTROLS ONE-LINE DIAGRAM 12829340

375 EP509 ELECTRICAL DETAILS 12829341

376 EP510 ELECTRICAL DETAILS 12829342

377 EP511 ELECTRICAL MEDIUM VOLTAGE DETAILS 12829343

378 EP512 BUILDING ELEVATION 12829344

379 EP513 EXISTING SECONDARY UNIT STUBSTATION ONE-LINE DIAGRAM - PIER 4 12829345

380 EP514 EXISTING SUBSTATION BREAKER CONTROL DIAGRAM - PIER 4 12829346

381 EP517 MANHOLE DETAILS 12829347

382 EP601 OVERALL ONE LINE DIAGRAM - POWER 12829348

383 EP602 15 KV SYSTEM CABLING DIAGRAMS 12829349

384 EP701 ELECTRICAL SCHEDULES 12829350

385 EP702 ELECTRICAL SCHEDULES 12829351

386 ET103 TELECOMMUNICATIONS SITE PLAN - AREA 103 12829352

387 ET104 TELECOMMUNICATIONS SITE PLAN - AREA 104 12829353

388 ET105 TELECOMMUNICATIONS SITE PLAN - AREA 105 12829354

389 ET106 TELECOMMUNICATIONS SITE PLAN - AREA 106 12829355

390 ET107 TELECOMMUNICATIONS SITE PLAN - AREA 107 12829356

391 ET109 TELECOMMUNICATIONS SITE PLAN - AREA 109 12829357

392 ET111 TELECOMMUNICATIONS SITE PLAN - AREA 111 12829358

393 ET401 TELECOMMUNICATIONS ENLARGED PLANS 12829359

394 ET402 TELECOMMUNICATIONS ENLARGED PLANS 12829360

395 ET403 TELECOMMUNICATIONS ENLARGED PLANS 12829361

396 ET501 TELECOMMUNICATIONS CST DETAILS 12829362

397 ET502 TELECOMMUNICATIONS CABINET DETAILS 12829363

398 ET503 TELECOMMUNICATIONS DETAILS 12829364

399 ET601 TELEPHONE CABLING DIAGRAM 12829365

400 ET602 FIBER OPTIC CABLING DIAGRAM 12829366

401 ET603 CATV SYSTEM DIAGRAM 12829367

402 ET604 FIRE ALARM SYSTEM DIAGRAM 12829368

403 ET605 ADVANCED METERING INFRASTRUCTURE (AMI) DIAGRAM 12829369

FI

LE

N

AM

E:

Q

:\N O

R\

0-

\c ad d\

_A ct ive

Pi er

\P

IE

RP

5-

6-

G -0

A.

dw g

L

AY

O

UT

N

AM

E:

IN

DE

X

O F

DR

AW

IN

G

S

- S

HE

ET

O

F

P

LO

TT

ED

: F rid ay , S ep te m be r 1 0,

- 1

0:

am U

SE

R:

w ta fe l

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 12 APRIL 2018

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

N

A V

A L

S

TA

TI

O

N N

O R

FO

LK

N O

R

FO

LK

, V

IR

G

IN

IA

1614696

WMS/IAS

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

-A

TL

AN

TI

C C

I C O

R E

H

A M

P

TO

N R

O A

D S

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

03/05/2021

JAMES E. DONAHUE, R.A.

SRETNIW.EELEKI

M

ENO

RTH CAROL I NA

ENG I NEER

FORP LA

NOISS

SEAL

026433

NC FIRM LICENSE NO. F-0105

IN

DE

X

OF

D

RA

W

IN

GS

SH

EE

T

OF

BA/AC WBT MCM

AS NOTED

12828957

G-003

NBJ

BI

D

OP

TI

ON

S 9/

/2

M

EW

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

404 ET606 AMI CABLING DIAGRAM 12829370

405 ET701 TELECOMMUNICATIONS SCHEDULES 12829371

ARCHITECTURAL - BUILDINGS

406 A-001 USB - ARCHITECTURAL SYMBOLS, LEGEND, ABBREVIATIONS AND NOTES 12829375

407 A-100 USB - ARCHITECTURAL OVERALL PLAN 12829376

408 A-101 USB - GROUND FLOOR PLAN 12829377

409 A-102 USB - ROOF PLAN 12829378

410 A-201 USB - SOUTH & WEST BUILDING ELEVATION 12829379

411 A-202 USB - NORTH & EAST BUILDING ELEVATION 12829380

412 A-301 USB - BUILDING SECTION, WALL SECTIONS AND MISCELLANEOUS DETAILS 12829381

413 A-401 GATEHOUSE FLOOR PLAN 12829382

414 A-402 GATEHOUSE ROOF PLAN & REFLECTED CEILING PLAN 12829383

415 A-403 GUARD BOOTH PLANS AND ELEVATIONS 12829384

416 A-404 CASEWORK DETAILS 12829385

417 A-501 GATEHOUSE BUILDING ELEVATIONS 12829386

418 A-502 GATEHOUSE BUILDING WALL SECTIONS 12829387

419 A-601 FINISH AND DOOR SCHEDULE, DOOR AND WINDOW TYPES, DETAILS 12829388

420 A-602 DOOR & WINDOW DETAILS 12829389

421 A-603 PARTITION TYPES & MISCELLANEOUS DETAILS 12829390

422 A-701 EXTERIOR & INTERIOR SIGNAGE LAYOUT, GENERAL NOTES, LEGEND, SYMBOLS AND TYPES 12829391

STRUCTURAL - BUILDINGS

423 AS001 GENERAL NOTES - SHEET 1 12829393

424 AS002 GENERAL NOTES - SHEET 2 12829394

425 AS003 WIND ISO DIAGRAMS 12829395

426 AS004 USB - PILE LAYOUT PLAN 12829396

427 AS101 USB - FOUNDATION PLAN - SHEET 1 OF 2 12829397

428 AS102 USB - FOUNDATION PLAN - SHEET 2 OF 2 12829398

429 AS103 GATEHOUSE - FOUNDATION PLANS 12829399

430 AS104 GUARD BOOTH - FOUNDATION PLAN AND DETAILS 12829400

431 AS105 USB - FRAMING PLAN 12829401

432 AS106 GATEHOUSE - FRAMING PLAN 12829402

433 AS107 GUARD BOOTH - ROOF FRAMING PLAN AND DETAILS 12829403

434 AS108 DECK FASTENING PLAN 12829404

435 AS201 GATEHOUSE - ELEVATIONS 12829405

436 AS301 USB - FOUNDATION SECTIONS 12829406

437 AS302 GATEHOUSE - FOUNDATION SECTIONS 12829407

438 AS311 USB - FRAMING SECTIONS 12829408

439 AS312 GATEHOUSE - FRAMING SECTIONS 12829409

440 AS501 TYPICAL FOUNDATION DETAILS 12829410

441 AS502 TYPICAL FRAMING DETAILS 12829411

442 AS503 TYPICAL REINFORCED CONCRETE DETAILS 12829412

443 AS504 TYPICAL MASONRY DETAILS 12829413

FIRE PROTECTION - BUILDINGS

444 AF001 USB - FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS 12829415

445 AF100 USB - FIRE ALARM PLAN 12829416

446 AF501 USB - FIRE ALARM DETAILS, FIRE ALARM ONE-LINE DIAGRAM, AND FIRE ALARM MATRIX 12829417

447 AX001 USB - FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS 12829418

448 AX100 USB - FIRE SUPPRESSION PLAN 12829419

449 AX601 USB - FIRE SUPPRESSION RISER DIAGRAM 12829420

MECHANICAL - BUILDINGS

450 AM001 LEGEND, ABBREVIATIONS, AND NOTES 12829422

451 AM100 USB - MECHANICAL OVERALL FLOOR PLAN 12829423

452 AM101 USB - MECHANICAL ENLARGED FLOOR PLAN - SHEET 1 OF 4 12829424

453 AM102 USB - MECHANICAL ENLARGED FLOOR PLAN - SHEET 2 OF 4 12829425

454 AM103 USB - MECHANICAL ENLARGED FLOOR PLAN - SHEET 3 OF 4 12829426

455 AM104 USB - MECHANICAL ENLARGED FLOOR PLAN - SHEET 4 OF 4 12829427

456 AM105 USB - MECHANICAL OVERALL ROOF PLAN 12829428

457 AM106 GATEHOUSE - HVAC FLOOR PLANS 12829429

458 AM107 GUARD BOOTH - HVAC FLOOR PLAN AND SCHEDULE 12829430

459 AM301 USB - MECHANICAL SECTIONS - SHEET 1 OF 2 12829431

460 AM302 USB - MECHANICAL SECTIONS - SHEET 2 OF 2 12829432

461 AM303 GATEHOUSE - MECHANICAL SECTIONS 12829433

462 AM501 MECHANICAL DETAILS - SHEET 1 OF 5 12829434

463 AM502 MECHANICAL DETAILS - SHEET 2 OF 5 12829435

464 AM503 MECHANICAL DETAILS - SHEET 3 OF 5 12829436

465 AM504 MECHANICAL DETAILS - SHEET 4 OF 5 12829437

466 AM505 MECHANICAL DETAILS - SHEET 5 OF 5 12829438

467 AM601 USB - MECHANICAL SCHEDULES 12829439

468 AM602 USB - MECHANICAL SCHEDULES 12829440

469 AM603 GATEHOUSE - MECHANICAL SCHEDULES 12829441

470 AM610 USB - MECHANICAL PIPING DIAGRAM 12829442

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

471 AM701 USB - DDC CONTROLS - LEGEND, ABBREVIATIONS, NOTES, NETWORK ARCHITECTURE 12829443

472 AM702 USB - MECHANICAL CONTROLS - SHEET 1 OF 4 12829444

473 AM703 USB - MECHANICAL CONTROLS - SHEET 2 OF 4 12829445

474 AM704 USB - MECHANICAL CONTROLS - SHEET 3 OF 4 12829446

475 AM705 USB - MECHANICAL CONTROLS - SHEET 4 OF 4 12829447

476 AM706 USB, GATEHOUSE & GUARD BOOTH - MECHANICAL CONTROLS 12829448

PLUMBING - BUILDINGS

477 AP001 PLUMBING LEGEND, ABBREVIATIONS, AND NOTES 12829451

478 AP100 USB - PLUMBING OVERALL PLAN 12829452

479 AP101 USB - PLUMBING ENLARGED FLOOR PLAN - SHEET 1 OF 4 12829453

480 AP102 USB - PLUMBING ENLARGED FLOOR PLAN - SHEET 2 OF 4 12829454

481 AP103 USB - PLUMBING ENLARGED FLOOR PLAN - SHEET 3 OF 4 12829455

482 AP104 USB - PLUMBING ENLARGED FLOOR PLAN - SHEET 4 OF 4 12829456

483 AP105 GATEHOUSE - PLUMBING ENLARGED PLANS 12829457

484 AP110 USB - PROCESS PLUMBING OVERALL PLAN 12829458

485 AP111 USB - PROCESS PLUMBING ENLARGED PLANS - PURE WATER 12829459

486 AP112 USB - PROCESS PLUMBING ENLARGED PLANS - MPCA 12829460

487 AP113 USB - PROCESS PLUMBING ENLARGED PLANS - HPCA 12829461

488 AP114 USB - PROCESS PLUMBING ENLARGED PLANS - PURE WATER - EQUIPMENT LOCATION PLAN 12829462 489 AP115 USB - PROCESS PLUMBING ENLARGED PLANS - PURE WATER HOLDING TANKS 12829463

490 AP116 USB - PROCESS PLUMBING ENLARGED PLANS - POLISHING DEMINERALIZERS AND PURE

WATER DISTRIBUTION PUMPS 12829464

491 AP117 USB - PROCESS PLUMBING ENLARGED PLANS - PURE WATER - INSTRUMENT LOCATION PLAN 12829465

492 AP300 USB - PLUMBING SECTIONS 12829466

493 AP301 USB - PLUMBING SECTIONS 12829467

494 AP302 USB - PLUMBING SECTIONS 12829468

495 AP303 USB - PROCESS SECTIONS 12829469

496 AP304 USB - PROCESS SECTIONS 12829470

497 AP310 USB - PROCESS PLUMBING SECTIONS - PURE WATER - SHEET 1 OF 6 12829471

498 AP311 USB - PROCESS PLUMBING SECTIONS - PURE WATER - SHEET 2 OF 6 12829472

499 AP312 USB - PROCESS PLUMBING SECTIONS - PURE WATER - SHEET 3 OF 6 12829473

500 AP313 USB - PROCESS PLUMBING SECTIONS - PURE WATER - SHEET 4 OF 6 12829474

501 AP314 USB - PROCESS PLUMBING SECTIONS - PURE WATER - SHEET 5 OF 6 12829475

502 AP315 USB - PROCESS PLUMBING SECTIONS - PURE WATER - SHEET 6 OF 6 12829476

503 AP320 USB - PROCESS PLUMBING INSTRUMENTATION SECTIONS - PURE WATER - SHEET 1 OF 4 12829477 504 AP321 USB - PROCESS PLUMBING INSTRUMENTATION SECTIONS - PURE WATER - SHEET 2 OF 4 12829478 505 AP322 USB - PROCESS PLUMBING INSTRUMENTATION SECTIONS - PURE WATER - SHEET 3 OF 4 12829479 506 AP323 USB - PROCESS PLUMBING INSTRUMENTATION SECTIONS - PURE WATER - SHEET 4 OF 4 12829480

507 AP500 USB - PLUMBING DETAILS - SHEET 1 OF 3 12829481

508 AP501 USB - PLUMBING DETAILS - SHEET 2 OF 3 12829482

509 AP502 USB - PLUMBING DETAILS - SHEET 3 OF 3 12829483

510 AP503 GATEHOUSE - PLUMBING DETAILS - SHEET 1 OF 1 12829484

511 AP504 GATEHOUSE - PLUMBING SDETAILS SHEET 2 OF 2 12829485

512 AP505 USB - PROCESS PLUMBING DETAILS - PURE WATER HOLDING TANK DETAIL 12829486 513 AP506 USB - PROCESS PLUMBING DETAILS - POLISHING DEMINERALIZER DETAIL 12829487 514 AP507 USB - PROCESS PLUMBING DETAILS - PURE WATER - INSTRUMENTATION DETAILS 12829488

515 AP508 USB - PROCESS PLUMBING DETAILS - PURE WATER - SCHEMATICS 12829489

516 AP601 USB - PLUMBING SCHEDULES - SHEET 1 OF 2 12829490

517 AP602 USB - PLUMBING SCHEDULES - SHEET 2 OF 2 12829491

518 AP603 USB - PROCESS PLUMBING SCHEDULES - SHEET 1 OF 2 12829492

519 AP604 USB - PROCESS PLUMBING SCHEDULES - SHEET 2 OF 2 12829493

520 AP605 GATEHOUSE - PLUMBING SCHEDULES - SHEET 1 OF 1 12829494

521 AP610 USB - MEDIUM PRESSURE COMPRESSED AIR DIAGRAM 12829495

522 AP611 USB - HIGH PRESSURE COMPRESSED AIR DIAGRAM 12829496

523 AP612 DOMESTIC WATER FLOW DIAGRAM 12829497

524 AP613 USB - FUEL OIL PIPING SCHEMATIC 12829498

525 AP701 USB - PROCESS CONTROLS - LEGEND, ABBREVIATIONS, AND NOTES 12829499

526 AP702 USB - FUEL OIL CONTROLS - SHEET 1 OF 3 12829500

527 AP703 USB - FUEL OIL CONTROLS - SHEET 2 OF 3 12829501

528 AP704 USB - FUEL OIL CONTROLS - SHEET 3 OF 3 12829502

529 AP705 USB - MEDIUM PRESSURE CA CONTROLS 12829503

530 AP706 USB - HIGH PRESSURE CA CONTROLS 12829504

531 AP707 USB - DOMESTIC WATER CONTROLS 12829505

532 AP708 USB - ELECTRIC HEAT TRACE & LIFT STATION CONTROLS 12829506

533 AP800 USB - PURE WATER - P &ID LEGEND - SHEET 1 OF 2 12829507

534 AP801 USB - PURE WATER - P &ID LEGEND - SHEET 2 OF 2 12829508

535 AP802 USB - PURE WATER - P &ID - SHEET 1 OF 6 12829509

536 AP803 USB - PURE WATER - P &ID - SHEET 2 OF 6 12829510

537 AP804 USB - PURE WATER - P &ID - SHEET 3 OF 6 12829511

538 AP805 USB - PURE WATER - P &ID - SHEET 4 OF 6 12829512

539 AP806 USB - PURE WATER - P &ID - SHEET 5 OF 6 12829513

540 AP807 USB - PURE WATER - P &ID - SHEET 6 OF 6 12829514

INDEX OF DRAWINGS

INDEX

NO.

SHEET NO. SHEET TITLE

NAVFAC DWG.

NO.

541 AP808 USB - PURE WATER - PROCESS FLOW DIAGRAM 12829515

542 AP809 USB - PURE WATER - DESCRIPTION OF OPERATION 12829516

543 AP901 USB - DOMESTIC WATER RISER DIAGRAM 12829517

544 AP902 USB - WASTE RISER DIAGRAM 12829518

545 AP903 USB - DIESEL FUEL RISER DIAGRAM 12829519

546 AP904 GATEHOUSE - RISER DIAGRAMS 12829520

ELECTRICAL - BUILDINGS

547 AE001 LEGEND, ABBREVIATIONS AND GENERAL NOTES 12829523

548 AE103 SECURITY SITE LIGHTING AND POWER - AREA 103 12829524

549 AE104 SECURITY SITE LIGHTING AND POWER - AREA 104 12829525

550 AE109 SECURITY SITE LIGHTING AND POWER - AREA 109 12829526

551 AE110 SECURITY SITE LIGHTING AND POWER - AREA 110 12829527

552 AE111 SECURITY SITE LIGHTING AND POWER - AREA 111 12829528

553 AE112 SECURITY SITE LIGHTING AND POWER - AREA 112 12829529

554 AE113 SECURITY SITE LIGHTING AND POWER - AREA 113 12829530

555 AE121 USB - LIGHTING PLAN - SHEET 1 OF 2 12829531

556 AE122 USB - LIGHTING PLAN - SHEET 2 OF 2 12829532

557 AE123 GATEHOUSE - LIGHTING AND POWER PLANS 12829533

558 AE124 GUARD BOOTH - LIGHTING AND POWER PLANS 12829534

559 AE131 USB - LIGHTNING PROTECTION PLAN 12829535

560 AE132 GATEHOUSE - LIGHTNING PROTECTION PLAN 12829536

561 AE133 GUARD BOOTH - LIGHTNING PROTECTION PLAN 12829537

562 AE141 USB - POWER PLAN - SHEET 1 OF 2 12829538

563 AE142 USB - POWER PLAN - SHEET 2 OF 2 12829539

564 AE501 LIGHTING DETAILS 12829540

565 AE502 LIGHTING DETAILS 12829541

566 AE503 LIGHTNING PROTECTION DETAILS 12829542

567 AE504 POWER DETAILS 12829543

568 AE505 GROUNDING DETAILS 12829544

569 AE506 SITE DETAILS 12829545

570 AE601 USB - PANEL SCHEDULES 12829546

571 AE602 USB - PANEL SCHEDULES 12829547

572 AE603 USB - PANEL SCHEDULES 12829548

573 AE604 GATEHOUSE - PANEL SCHEDULES 12829549

574 AE605 GUARD BOOTH - PANEL SCHEDULES 12829550

575 AE701 USB - SINGLE LINE DIAGRAM 12829551

576 AE702 FEEDER SCHEDULE AND RISER DIAGRAMS 12829552

577 AE703 EMERGENCY POWER SCHEMATIC 12829553

ELECTRICAL - TELECOM & SECURITY

578 AT001 TELECOM LEGEND, ABBREVIATIONS AND GENERAL NOTES 12829556

579 AT121 USB – TELECOM PLAN – 1 OF 2 12829557

580 AT122 USB – TELECOM PLAN – 2 OF 2 12829558

581 AT123 GATEHOUSE - TELECOM AND SECURITY PLAN 12829559

582 AT124 GUARD BOOTH - TELELCOM AND SECURITY PLAN 12829560

583 AT401 USB - ENLARGED TELECOM PLANS 12829561

584 AT501 TELECOM DETAILS 12829562

585 AT502 TELECOM DETAILS 12829563

586 AT503 TELECOM DETAILS 12829564

587 AT504 TELECOM GROUNDING DETAILS 12829565

588 AT505 TELECOM GROUNDING DETAILS 12829566

589 AT506 SECURITY DETAILS 12829567

590 AT507 SECURITY AND ACCESS CONTROL DETAILS 12829568

591 AT601 USB - TELECOM ELEVATIONS AND SCHEDULES 12829569

592 AT602 USB - TELECOM ELEVATIONS AND SCHEDULES 12829570

593 AT603 GATEHOUSE - TELECOM ELEVATIONS & SCHEDULES 12829571

594 AT604 GUARD BOOTH - TELECOM ELEVATIONS & SCHEDULES 12829572

595 AT701 GROUNDING RISER AND PHYSICAL SECURITY EQUIPMENT 12829573

596 AT702 ELECTRONIC SECURITY EQUIPMENT – ACCESS CONTROLS 12829574

597 AT703 TELECOM ONE-LINES 12829575

CATHODIC PROTECTION

598 CP101 CATHODIC PROTECTION LAYOUT 12829577

599 CP301 CATHODIC PROTECTION SECTION 12829578

600 CP501 CATHODIC PROTECTION DETAILS 12829579

FI

LE

N

AM

E:

Q

:\N O

R\

0-

\c ad d\

_A ct ive

Pi er

\P

IE

RP

5-

6-

G -0

A.

dw g

L

AY

O

UT

N

AM

E:

IN

DE

X

O F

DR

AW

IN

G

S

- S

HE

ET

O

F

P

LO

TT

ED

: F rid ay , S ep te m be r 1 0,

- 1

0:

am U

SE

R:

w ta fe l

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y N

A V

A L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 12 APRIL 2018

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

N

A V

A L

S

TA

TI

O

N N

O R

FO

LK

N O

R

FO

LK

, V

IR

G

IN

IA

1614696

WMS/IAS

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

-A

TL

AN

TI

C C

I C O

R E

H

A M

P

TO

N R

O A

D S

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

03/05/2021

JAMES E. DONAHUE, R.A.

SRETNIW.EELEKI

M

ENO

RTH CAROL I NA

ENG I NEER

FORP LA

NOISS

SEAL

026433

NC FIRM LICENSE NO. F-0105

IN

DE

X

OF

D

RA

W

IN

GS

SH

EE

T

OF

BA/AC WBT MCM

AS NOTED

12828958

G-004

NBJ

BI

D

OP

TI

ON

S 9/

/2

M

EW

E

E

C

C

C

E

E

C

E

E

W

WV

W

W

OW

S

S

S

OW

OW

OW

S

CO

CO

UPUP

EXIST. PIER 4

UTILITY SERVICE BUILDING,

SEE SHEET AS100

0"

PIER 3 (1323' - 6") CEP-176 BULKHEAD (806' - 6")

MOORING BERTH (575'-6")

DEDICATED HEAVY WEATHER

CEP-176 BULKHEAD

DEMOLITION & CONSTRUCTION,

SEE SHEETS SD100 & SS100

EXISTING PIER 3T DEMOLITION,

SEE SHEET SD100

EXISTING PIER 4 DEMOLITION &

CONSTRUCTION,

SEE SHEETS SD100 & SS100

PIER 3 CONSTRUCTION,

SEE SHEET SS100

CEP-102

BULKHEAD

DEMOLITION &

CONSTRUCTION,

SEE SHEETS

SD100 & SS100

EXIST. PIER 3

EXIST. PIER 3T

CEP-176PIER 3

BERTH 7 BERTH 5 BERTH 3 BERTH 1

BERTH 6 BERTH 4 BERTH 2

EXISTING FLOATING

SECURITY BARRIER

EXISTING PIER 3T BULKHEAD

DEMOLITION & CONSTRUCTION,

SEE SHEETS SD100 & SS100

EXISTING PIER 3 DEMOLITION,

SEE SHEET SD100

GATEHOUSE BUILDING,

SEE SHEET A-401

EAST RAMP

SOUTH RAMP

CE

P-

AL

ON

G

BU

LK

HE

AD

A

LIG

NM

EN

T

CE

P-

2 W

HA

RF

(2

'-1

CE

P-

2 W

HA

RF

B

ID

O

PT

IO

N

(4

'-5

AL

ON

G

BU

LK

HE

AD

AL

IG

NM

EN

TCAMEL, TYP (COMPOSITE CAMEL

BID OPTION @ BERTHS 1, 4 & 6)

CAMEL, TYP

S

RETNIW.E

EL

E

KI

M

E

N O

R

TH

CAROL I N

A

E

NG I NEE

R

FO

R P L

A

NO

ISS

SEAL

026433

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

C I C

O R

E -H

AM

PT

O N

R O

AD

S

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

, V

A

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

O

R

FO

LK

, V

IR

G

IN

IA

AS NOTED

PL

OT

TE

D:

FI

LE

N

AM

E:

DRAWFORM REVISION: 07 AUG 2018

AP

PR

DA

TE

DE

SC

RI

PT

IO

N

SY

M

NC FIRM LICENSE NO. F-0105

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

JAMES E. DONAHUE, R.A.

9/

/2

9:

:0

AM

C

R ev it\

PI

ER

-1

-S

-v

_w ta fe l.r vt

G-101.

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

G

EN

ER

AL

S

IT

E

PL

AN

PRG

12828960

BA/AC JDO

03/05/2021

WMS/IAS

1614696

NBJ

EJA

DSN

BI

D

OP

TI

ON

S 9 /1

0/2

ME

W

SCALE: 1" = 100'-0"1 GENERAL SITE PLAN

PLAN

NORTH

0 100' 200'

BID OPTION GENERAL NOTE:

ALL WORK SHOWN SHALL BE PERFORMED AS A PART OF THE BASE

BID, UNLESS IDENTIFIED AS A BID OPTION OR OTHERWISE NOTED.1

W .V

W.V.

W.V.

W.V.

W.V. W

.V

W.

V.

W.V.

W .V

E. UG. ELEC.

E. O

H. EL

EC.

TC

.11

7.

TC

.13

7.

TC

.16

7.

TC

.3

8.

C O N C

RE

TE

TC

.14

7.

TC

.4

7.

W

WV

W

W

OW

S

S

S

OW

OW

OW

S

CO

CO

UPUP

CEP-176 BULKHEAD (806' - 6")

MOORING BERTH (575' - 6"), SEE SHEET G-403

DEDICATED HEAVY WEATHER

EXIST PIER 4

UTILITY SERVICE BUILDING

0"

PIER 3 (1323' - 6")

BERTH 6

BERTH 7

BERTH 4

BERTH 5

BERTH 2

BERTH 3 BERTH 1

EXISTING FLOATING

SECURITY BARRIER

ENLARGED BERTHING

PLAN, SEE SHEET G-401

CAMEL, TYP (COMPOSITE

CAMEL BID OPTION @

BERTHS 1, 4 & 6)

ELECTRICAL

SUBSTATION,

TYP (7 TOTAL) UTILITY BOOM, TYP

DESIGNATED TEMPORARY

NAVY OPERATIONAL

LAYDOWN ZONE

PIER 4 TEMPORARY

BERTHING

LIFT STATION

GATEHOUSE BUILDING

CE

P-

EAST RAMP

SOUTH RAMP

CEP-176PIER 3

CAMEL, TYP

AL

ON

G

BU

LK

HE

AD

A

LIG

NM

EN

T

CE

P-

2 W

HA

RF

(2

'-1

CE

P-

2 W

HA

RF

B

ID

O

PT

IO

N

(4

'-5

AL

ON

G

BU

LK

NM

EN

T

S

RETNIW.E

EL

E

KI

M

E

N O

R

TH

CAROL I N

A

E

NG I NEE

R

FO

R P L

A

NO

ISS

SEAL

026433

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

C I C

O R

E -H

AM

PT

O N

R O

AD

S

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

, V

A

N

AV

AL

S

TA

TI

O N

N O

R

R

FO

LK

, V

IR

G

IN

IA

AS NOTED

PL

OT

TE

D:

FI

LE

N

AM

E:

DRAWFORM REVISION: 07 AUG 2018

AP

PR

DA

TE

DE

SC

RI

PT

IO

N

SY

M

NC FIRM LICENSE NO. F-0105

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

JAMES E. DONAHUE, R.A.

9/

/2

9:

:5

AM

C

R ev it\

PI

ER

-1

-S

-v

_w ta fe l.r vt

G-111.

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

BE

RT

HI

NG

P

LA

N (S

UB

M

AR

IN

ES

B

O W

-O

UT

PRG

12828961

BA/AC JDO

03/05/2021

WMS/IAS

1614696

NBJ

EJA

DSN

BI

D

OP

TI

ON

S 9 /1

0/2

ME

W

NOTES:

1. BERTHING ARRANGMENT SHOWN IS ONE OF MANY

ALTERNATIVES.

2. DESIGN VESSELS ARE ABLE TO BERTH AT ANY OF THE PIER 3

SIX BERTHS (BERTH 1 AND BERTHS 3-7) AS SHOWN.

3. EACH BERTH (BERTH 1 AND BERTHS 3-7) IS SIZED TO

ACCOMMODATE BOW-IN AND BOW-OUT MOORING OF THE

SUBMARINE. CAMELS CAN BE SHIFTED TO MEET FENDERING

REQUIREMENTS.

PLAN

NORTH

0 100' 200'SCALE: 1" = 100'-0"1 BERTHING PLAN (SUBMARINES BOW-OUT)

BID OPTION GENERAL NOTE:

ALL WORK SHOWN SHALL BE PERFORMED AS A PART OF THE BASE

BID, UNLESS IDENTIFIED AS A BID OPTION OR OTHERWISE NOTED.1

W .V

W.V.

W.V.

W.V.

W.V. W

.V

W.

V.

W.V.

W .V

E. UG. ELEC.

E. O

H. EL

EC.

TC

.11

7.

TC

.13

7.

TC

.16

7.

TC

.3

8.

C O N C

RE

TE

TC

.14

7.

TC

.4

7.

W

WV

W

W

OW

S

S

S

OW

OW

OW

S

CO

CO

UPUP

CEP-176 BULKHEAD (806' - 6")

MOORING BERTH (575' - 6"), SEE SHEET G-403

DEDICATED HEAVY WEATHER

0"

PIER 3 (1323' - 6")

EXISTING FLOATING

SECURITY BARRIER

ENLARGED BERTHING

PLAN, SEE SHEET G-402

PIER 4 TEMPORARY

BERTHING

DESIGNATED TEMPORARY

NAVY OPERATIONAL

LAYDOWN ZONE

UTILITY SERVICE BUILDING

BERTH 6

BERTH 7

BERTH 4

BERTH 5

BERTH 2

BERTH 3 BERTH 1

ELECTRICAL

SUBSTATION,

TYP (7 TOTAL) UTILITY BOOM, TYPLIFT STATION

GATEHOUSE BUILDING

EXIST PIER 4

EAST RAMP

SOUTH RAMP

CEP-176PIER 3

CE

P-

AL

ON

G

BU

LK

HE

AD

A

LIG

NM

EN

T

CE

P-

2 W

HA

RF

(2

'-1

CE

P-

2 W

HA

RF

B

ID

O

PT

IO

N

(4

'-5

AL

ON

G

BU

LK

NM

EN

T

CAMEL, TYP (COMPOSITE

CAMEL BID OPTION @

BERTHS 1, 4 & 6)

CAMEL, TYP

S

RETNIW.E

EL

E

KI

M

E

N O

R

TH

CAROL I N

A

E

NG I NEE

R

FO

R P L

A

NO

ISS

SEAL

026433

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

C I C

O R

E -H

AM

PT

O N

R O

AD

S

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

, V

A

N

AV

AL

S

TA

TI

O N

N O

R

R

FO

LK

, V

IR

G

IN

IA

AS NOTED

PL

OT

TE

D:

FI

LE

N

AM

E:

DRAWFORM REVISION: 07 AUG 2018

AP

PR

DA

TE

DE

SC

RI

PT

IO

N

SY

M

NC FIRM LICENSE NO. F-0105

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

JAMES E. DONAHUE, R.A.

9/

/2

9:

:3

AM

C

R ev it\

PI

ER

-1

-S

-v

_w ta fe l.r vt

G-112.

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

BE

RT

HI

NG

P

LA

N (S

UB

M

AR

IN

ES

B

O W

-IN

PRG

12828962

BA/AC JDO

03/05/2021

WMS/IAS

1614696

NBJ

EJA

DSN

BI

D

OP

TI

ON

S 9 /1

0/2

ME

W

SCALE: 1" = 100'-0"1 BERTHING PLAN (SUBMARINES BOW-IN)

NOTES:

1. BERTHING ARRANGMENT SHOWN IS ONE OF MANY

ALTERNATIVES.

2. DESIGN VESSELS ARE ABLE TO BERTH AT ANY OF THE PIER 3

SIX BERTHS (BERTH 1 AND BERTHS 3-7) AS SHOWN.

3. EACH BERTH (BERTH 1 AND BERTHS 3-7) IS SIZED TO

ACCOMMODATE BOW-IN AND BOW-OUT MOORING OF THE

SUBMARINE. CAMELS CAN BE SHIFTED TO MEET FENDERING

REQUIREMENTS.

PLAN

NORTH

0 100' 200'

BID OPTION GENERAL NOTE:

ALL WORK SHOWN SHALL BE PERFORMED AS A PART OF THE BASE

BID, UNLESS IDENTIFIED AS A BID OPTION OR OTHERWISE NOTED.1

EXIST. PIER 4, SEE NOTE 6

EXIST. PIER 3T

EXIST. PIER 3

A AVENUE

25'-0"

25'-0"

EX

IS

T.

C

EP

-1

B

UL

KH

EA

D

35'-0"

300'-0"

100'-0"

300'-0"

35'-0"

B AVENUE

3R D

ST

RE

ET

EXIST. CEP-175

BULKHEAD 50'-0"50'-0"

CEP-176 BULKHEAD (806'-6") 100'-0"

50'-0"

175'-0"

135'-0" 225'-0"X X X X X

X X X X X X X X X X X X X

X X

X X

X X

CONTRACTOR PARKING

CONTRACTOR LAYDOWN

PLAN

NORTH

SCALE:1" = 100'

CONSTRUCTION PHASE 1 - PLAN

LEGEND:

CONTRACT WORK IN CURRENT PHASE

PHASE 1: WORK LIMITS NOTES:

1. WORK INCLUDED IN THIS PHASE:

A. ESTABLISH TEMPORARY CONSTRUCTION FENCING IN PARKING

LOT ADJACENT TO EXISTING CEP-176 BULKHEAD. SEE NOTE 3

FOR DEFINITION OF SPACE AVAILABLE TO THE CONTRACTOR.

B. DEMOLITION AND CONSTRUCTION OF THE FENDER SYSTEM ON

THE SOUTH SIDE OF EXISTING PIER 4.

C. CONSTRUCTION OF TEMPORARY SECURITY BARRIERS AT THE

ENTRANCE TO EXISTING PIER 4.

D. DEMOLITION AND CONSTRUCTION AT EXISTING PIER 4

SUBSTATIONS AND TELECOMMUNICATIONS SERVICES.

E. DEMOLITION AND CONSTRUCTION OF CEP-176 BULKHEAD

EXCEPT THE SOUTH RAMP AND ANY WORK REQUIRING ACCESS

TO THE WEST OF EXISTING CEP-102 BULKHEAD.

F. DEMOLITION AND CONSTRUCTION OF UTILITIES IN PARKING LOT

ADJACENT TO EXISTING CEP-176 BULKHEAD TO PREPARE FOR

CONSTRUCTION OF UTILITY SERVICES BUILDING. PROTECT

EXISTING ACTIVE UTILITIES TO WITHIN AREA OF WORK.

G.DEMOLISH PIER 3T.

2. THE TRANSITION FROM PHASE 1 TO PHASE 2 CORRESPONDS WITH

COMPLETION AND ACCEPTANCE OF THE WORK ASSOCIATED WITH

EXISTING PIER 4 (SEE NOTES 1.B, 1.C, AND 1.D). ALLOW ONE MONTH

FOR THE CONTRACTING OFFICER TO ACCEPT THE WORK.

3. THE HATCHED AREA PROVIDES THE SPACE AVAILABLE TO THE

CONTRACTOR FOR LAYDOWN, OFFICES, MOORING OF BARGES, AND

CONSTRUCTION/DEMOLITION. THE LIMITS ARE DEFINED AS

FOLLOWS:

A. A MINIMUM OF 300 FT FROM THE NORTH FACE OF EXISTING

PIER 3.

B. THE FACE OF EXISTING CEP-102 BULKHEAD

C. A MAXIMUM OF 35 FT NORTH FROM THE SOUTH FACE OF

EXISTING PIER 4.

D. THE FACE OF EXISTING CEP-175 BULKHEAD EXCEPT A 100 FT

OFFSET NORTH AND A 50 FT OFFSET EAST AND WEST FROM

THE HEAD OF EXISTING PIER 3T.

E. 135 FT SOUTH FROM THE FACE OF EXISTING CEP-176

BULKHEAD FOR THE FIRST 175 FT FROM THE FACE OF EXISTING

CEP-102 BULKHEAD.

F. 225 FT SOUTH FROM THE FACE OF EXISTING CEP-176

BULKHEAD BETWEEN THE OFFSET NOTED IN 3.E AND 25 FT

OFFSET WEST FROM THE EXISTING WEST FACE OF THE

PARKING LOT DRIVE AISLE NORTH OF A AVENUE.

G. 25 FT NORTH FROM THE FACE OF THE NORTH PARKING LOT

DRIVE AISLE CURBING TO 100 FT WEST OF THE DEMOLITION /

CONSTRUCTION EXTENTS OF CEP-176 BULKHEAD.

H. THE PIER 3T BASIN THAT IS WITHIN THE EXTENTS DEFINED

ABOVE.

4. MOVEMENT OF CONTRACTOR BARGES, TUGS, AND OTHER SERVICE

CRAFT WILL REQUIRE COORDINATION WITH CONTRACTING OFFICER.

5. THE ENTIRE BASIN BETWEEN THE CONTRACTOR'S AVAILABLE SPACE

AND THE NORTH SIDE OF EXISTING PIER 3 WILL BE ACTIVELY USED

BY THE NAVY FOR VESSEL (I.E., SUBMARINES, SHIPS, BARGES, AND

OTHER WATERCRAFT) MOVEMENT AND BERTHING THROUGHOUT

THE DURATION OF THE PHASE.

6. EXISTING PIER 3 AND THE NORTH SIDE OF EXISTING PIER 4 MUST

REMAIN IN OPERATION. THE CONTRACTOR MUST ENSURE

UNIMPEDED PERSONNEL, VEHICULAR, AND MOBILE CRANE ACCESS

TO AND ALONG EXISTING PIERS 3 AND 4. FULL UTILITY SERVICES

MUST REMAIN IN OPERATION ALONG EXISTING PIER 3 AND THE

NORTH SIDE OF EXISTING PIER 4.

UPGRADE PIER 4 FENDER

SYSTEM, TYP, SEE NOTE 1.B

EXIST. PIER 3, SEE NOTE 6

CEP-176 BULKHEAD

DEMOLITION AND

CONSTRUCTION, SEE NOTE 1.E

EXISTING PIER 3T

DEMOLITION, SEE NOTE 1.G

200'0 100'

UTILITIES DEMOLITION AND

CONSTRUCTION, SEE NOTE 1.F

TEMPORARY CONSTRUCTION

FENCING, SEE NOTE 1.A

CONSTRUCTION OF TEMPORARY

SECURITY BARRIERS FOR EXISTING

PIER 4, SEE NOTE 1.C

AREA AVAILABLE TO CONTRACTOR IN

CURRENT PHASE

FACE OF EXISTING

CEP-176 BULKHEAD

DEMOLITION AND CONSTRUCTION AT EXISTING PIER 4 SUBSTATIONS

AND TELECOMMUNICATIONS SERVICES, SEE NOTE 1.D

FI

LE

N

AM

E:

Z

:\C lie nt s\

AN

F\

US

Na vy \M id At

\W at er fro nt

ID

IQ

\1

8_ Pi er 3-

De sig n\ De sig n\

Ci vil

\S he et s\

P0

-1

-G -1

.d wg L

AY

O

UT

N

AM

E:

P

HA

SI

NG

P

LA

N

- P

HA

SE

P

LO

TT

ED

: F rid ay

, S ep te m be r 1

0,

- 1 0:

am

U

SE

R:

b wt ur le y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

UNCLASSIFIED

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

DRAWFORM REVISION: 12 APRIL 2018

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

P -0

R

E P

LA

C

E S

U B

M A

R

IN

E P

IE

R

N

A V

A L

S

TA

TI

O

N N

O R

FO

LK

N O

R

FO

LK

, V

IR

G

IN

IA

1614696

WMS/IAS

EJA

DSN

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

-A

TL

AN

TI

C C

I C O

R E

H

A M

P

TO

N R

O A

D S

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N O

R

FO

LK

CHIEF ENG/ARCH

FIRE PROTECTION

GEOFFREY R. MOSS

DIRECTOR OF WARFARE REQUIREMENTS

SUBMARINE FORCES ATLANTIC

03/05/2021

JAMES E. DONAHUE, R.A.

DLB

UTILITIES DEMOLITION AND

CONSTRUCTION, SEE NOTE 1.F

PH

AS

IN

G

PL

AN

PH

AS

E

BWT BWT MLC

AS NOTED

12828963

G-121

B

ID

O

PT

IO

NS

/10

/20

BW

T

C

CC

E E

E

E

E

E

EE

E

UTILITY SERVICES BUILDING UTILITY SERVICES BUILDING

GUARD

BOOTH

FFE=8.75'

GATEHOUSE

FFE=8.5'

X X X X X X X X X X

X

X

X X

X X

X X

X

X X

X

X

X X

X X

XX X

X

E

E

C

C

C

E

E

C

E

E

X X X X X

X X X X X X X X X X X X X

X X

X X

X X

EXIST. PIER 3T

A AVENUE

EXIST. CEP-175

BULKHEAD

B AVENUE

3R D

ST

RE

ET

EX

IS

T.

C

EP

-1

B

UL

KH

EA

D

50'-0"

300'-0"

300'-0"

25'-0"

25'-0"

50'-0"

135'-0" 100'-0"

50'-0"

175'-0"

CEP-176 BULKHEAD (806'-6") 100'-0"

225'-0"

50'-0" 50'-0"

PIER 3 (1323'-6")

50'-0"

EXIST. PIER 3

CONTRACTOR LAYDOWN

CONTRACTOR PARKING

PLAN

NORTH

SCALE:1" = 100'

CONSTRUCTION PHASE 2 - PLAN

LEGEND:

CONTRACT WORK IN CURRENT PHASE

PHASE 2: WORK LIMITS NOTES:

1. WORK INCLUDED IN THIS PHASE:

A. MAINTAIN TEMPORARY CONSTRUCTION FENCING IN PARKING

LOT ADJACENT TO EXISTING CEP-176 BULKHEAD. SEE NOTE 3

FOR DEFINITION OF SPACE AVAILABLE TO THE CONTRACTOR.

B. CONTINUED DEMOLITION AND CONSTRUCTION OF CEP-176

BULKHEAD EXCEPT THE SOUTH RAMP.

C. CONTINUED DEMOLITION AND CONSTRUCTION OF UTILITIES IN

PARKING LOT ADJACENT TO EXISTING CEP-176 BULKHEAD FOR

CONSTRUCTION OF UTILITY SERVICES BUILDING.

D. CONSTRUCTION OF PIER 3.

E. CONTINUED DEMOLITION OF EXISTING PIER 3T.

F. CONSTRUCTION OF UTILITY SERVICES BUILDING.

G. CONSTRUCTION OF GUARD BOOTH.

H. CONSTRUCTION OF INDICATED PORTIONS OF PERMANENT

SECURITY PERIMETER.

I. CONSTRUCTION AND DEMOLISH INDICATED PORTION OF CEP-102

BULKHEAD.

2. THE TRANSITION FROM PHASE 2 TO PHASE 3 CORRESPONDS WITH

BOTH COMPLETION OF THE DEMOLITION OF EXISTING PIER 3T AND

SUBSTANTIAL COMPLETION OF THE CEP-176 STRUCTURAL WORK

INCLUDING SELECT STRUCTURAL FILL TO ALLOW FOR DREDGING OF

THE PIER 3T BASIN. OBTAIN WRITTEN NOTICE TO PROCEED TO PHASE

3 FROM THE CONTRACTING OFFICER.

3. THE HATCHED AREA PROVIDES THE SPACE AVAILABLE TO THE

CONTRACTOR FOR LAYDOWN, OFFICES, MOORING OF BARGES, AND

CONSTRUCTION/DEMOLITION. THE LIMITS ARE DEFINED AS FOLLOWS:

A. A MINIMUM OF 50 FT FROM THE NORTH FACE OF EXISTING PIER 3.

B. A MAXIMUM OF 50 FT WEST OF PIER 3 WEST END.

C. A MINIMUM OF 300 FT SOUTH FROM THE SOUTH FACE OF

EXISTING PIER 4.

D. A MAXIMUM OF 50 FT WEST FROM THE WEST FACE OF EXISTING

PIER 3T WITH LIMITS EXTENDING TO THE CORNER OF EXISTING

CEP-175 BULKHEAD.

E. THE FACE OF EXISTING CEP-175 BULKHEAD EXCEPT A 100'

OFFSET NORTH AND 50 FT OFFSET EAST AND WEST FROM THE

HEAD OF EXISTING PIER 3T.

F. 135 FT SOUTH FROM THE FACE OF EXISTING CEP-176 BULKHEAD

FOR THE FIRST 175 FT FROM THE FACE OF EXISTING CEP-102

BULKHEAD.

G. 225 FT SOUTH FROM THE FACE OF EXISTING CEP-176 BULKHEAD

BETWEEN THE OFFSET NOTED IN 3.F AND 25 FT OFFSET WEST

FROM THE EXISTING WEST FACE OF THE PARKING LOT DRIVE

AISLE NORTH OF A AVENUE.

H. 25 FT NORTH FROM THE FACE OF THE NORTH PARKING LOT

DRIVE AISLE CURBING TO 100 FT EAST PAST THE DEMOLITION /

CONSTRUCTION EXTENTS OF CEP-176 BULKHEAD.

I. THE PIER 3T BASIN THAT IS WITHIN THE EXTENTS DEFINED

ABOVE.

4. MOVEMENT OF CONTRACTOR BARGES, TUGS, AND OTHER SERVICE

CRAFT WILL REQUIRE COORDINATION WITH CONTRACTING OFFICER.

5. THE ENTIRE BASIN BETWEEN THE CONTRACTOR'S AVAILABLE SPACE,

THE SOUTH SIDE OF EXISTING PIER 3, AND THE SOUTH SIDE OF

EXISTING PIER 4 WILL BE ACTIVELY USED BY THE NAVY FOR VESSEL

(I.E., SUBMARINES, SHIPS, BARGES, AND OTHER WATERCRAFT)

MOVEMENT AND BERTHING THROUGHOUT THE DURATION OF THE

PHASE.

6. THE SOUTH SIDE OF EXISTING PIER 3 AND EXISTING PIER 4 MUST

REMAIN IN OPERATION. THE CONTRACTOR MUST ENSURE UNIMPEDED

PERSONNEL, VEHICULAR, AND MOBILE CRANE ACCESS TO AND ALONG

EXI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .