This document package includes drawings and specifications for a solicitation to recapitalize Pier 3 at Naval Station Norfolk in Virginia. The solicitation number is N4008521R0219 and was issued by the Department of the Navy Naval Facilities Engineering Command. The work involves demolition, dredging, structural repairs, and upgrades to utilities including electrical, plumbing, and mechanical systems. The drawings provide details for civil site work, structural demolition and repairs, structural plans and sections, mechanical, plumbing, and electrical plans. Bidding contractors will use these technical documents to prepare their responses to the solicitation, which is for a firm-fixed price construction contract to recapitalize Pier 3 and modernize its utilities to support continued naval operations.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1614696 Amendment 0001
CONTINUATION SHEET
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
The following NAVFAC Drawing Numbers are added to the list of drawings and accompany Amendment 0001.
NAVFAC DWG NO. TITLE
12828979 CD109B – Civil Demolition & Erosion Control – Area 109 (Bid Option) 12829070 CD111B – Civil Demolition & Erosion Control – Area 111 (Bid Option) 12829071 CD601B – Civil Demolition Control Tables (Bid Option) 12829085 CS109B – Civil Site Plan – Area 109 (Bid Option) 12829101 CS111B – Civil Site Plan – Area 111 (Bid Option) 12829105 CN101B – Dredging Plan (Bid Option) 12829223 SS109B – Pile Plan – Area 109 (Bid Option) 12829224 SS111B – Pile Plan – Area 111 (Bid Option) 12829225 SS129B – Deck Plan – Area 109 (Bid Option) 12829236 SS131B – Deck Plan – Area 111 (Bid Option) 12829295 SS149B – Fender Pile Plan – Area 109 (Bid Option) 12829296 SS151B – Fender Pile Plan – Area 111 (Bid Option)
The following NAVFAC Drawing Numbers are revised as of September 10, 2021. These revised drawings accompany Amendment 0001.
NAVFAC DWG NO. TITLE
12828956 G-002 – Index of Drawings Sheet 1 of 3 12828957 G-003 – Index of Drawings Sheet 2 of 3 12828958 G-004 – Index of Drawings Sheet 3 of 3 12828960 G-101 – General Site Plan 12828961 G-111 – Berthing Plan (Submarines Bow-Out) 12828962 G-112 – Berthing Plan (Submarines Bow-In) 12828963 G-121 – Phasing Plan – Phase 1 12828964 G-122 – Phasing Plan – Phase 2 12828965 G-123 – Phasing Plan – Phase 3 12828966 G-124 – Phasing Plan – Phase 4 12828967 G-125 – Phasing Plan – Phase 5 12828968 G-126 – Phasing Plan – Phase 6 12828969 G-127 – Phasing Plan – Phase 7 12828970 G-128 – Phasing Plan – Phase 8 12828971 G-401 – Enlarged Berthing Plan (Bow-Out) 12828972 G-402 – Enlarged Berthing Plan (Bow-In) 12829022 CD100 – Civil Demolition & Erosion Control Overall Key Plan 12829027 CD109A – Civil Demolition & Erosion Control – Area 109 12829029 CD111A – Civil Demolition & Erosion Control – Area 111 12829030 CD112 – Civil Demolition & Erosion Control – Area 112 12829031 CD113 – Civil Demolition & Erosion Control – Area 113 12829034 CD601A – Civil Demolition Control Tables 12829035 CS100 – Civil Site Overall Key Plan 12829040 CS109A – Civil Site Plan – Area 109 12829042 CS111A – Civil Site Plan – Area 111
12829046 CS202 – Drainage Profiles – Sheet 1 of 2 12829047 CS203 – Drainage Profiles – Sheet 2 of 2 12829103 CN101A – Dredging Plan 12829107 S-002 – Pier Structural Notes – Sheet 2 of 2 12829108 SD100 – Structural Demolition Overall Key Plan 12829112 SD104 – Structural Demolition Plan – Area 104 12829116 SD109 – Structural Demolition Plan – Area 109 12829117 SD111 – Structural Demolition Plan – Area 111 12829121 SD301 – Demolition Section – Pier 3 12829136 SS100 – Structural Overall Key Plan 12829138 SS104 – Pile Plan – Area 104 12829142 SS109A – Pile Plan – Area 109 12829143 SS111A – Pile Plan – Area 111 12829145 SS124 – Deck Plan – Area 104 12829149 SS129A – Deck Plan – Area 109 12829150 SS131A – Deck Plan – Area 111 12829151 SS144 – Fender Pile Plan – Area 104 12829155 SS149A – Fender Pile Plan – Area 109 12829156 SS151A – Fender Pile Plan – Area 111 12829160 SS201 – North Elevation – Sheet 1 of 3 12829163 SS204 – West Elevation – Sheet 1 of 2 12829164 SS205 – West Elevation – Sheet 2 of 2 12829169 SS305 – CEP-102 Section 12829175 SS503 – Precast Concrete Pile Details 12829176 SS504 – CEP-102 Combi-Wall Details 12829179 SS507 – Pier 3 Two Way Slab Details – Sheet 1 of 2 12829182 SS510 – CEP-102 Reinforcing Details – Sheet 2 of 2 12829194 SS523 – CEP-102 Mooring Hardware Foundation Details 12829197 SS526 – Electrical Equipment Foundations Details Sheet 2 of 2 12829201 SS530 – Pier 3 Utility Vault Details – Sheet 2 of 2 12829205 SS534 – Drainage Structures Details Sheet 2 of 2 12829211 SS540 – CEP-102 Fender System Details 12829216 SS546 – Miscellaneous Details – Sheet 2 of 3 12829220 SS550 – Composite Camel Details 12829434 AM501 – Mechanical Details – Sheet 1 of 5 12829440 AM602 – USB – Mechanical Schedules 12829442 AM610 – USB – Mechanical Piping Diagram 12829444 AM702 – USB – Mechanical Controls – Sheet 1 of 4 12829445 AM703 – USB – Mechanical Controls – Sheet 2 of 4 12829459 AP111 – USB – Process Plumbing Enlarged Plans – Pure Water 12829460 AP112 – USB – Process Plumbing Enlarged Plans – MPCA 12829468 AP302 – USB – Plumbing Sections 12829486 AP505 – USB – Process Plumbing Details – Pure Water Holding Tank Detail 12829487 AP506 – USB – Process Plumbing Details – Polishing Demineralizer Detail 12829488 AP507 – USB – Process Plumbing Details – Pure Water – Instrumentation Details 12829489 AP508 – USB – Process Plumbing Details – Pure Water – Schematics 12829492 AP603 – USB – Process Plumbing Schedules – Sheet 1 of 2 12829493 AP604 – USB – Process Plumbing Schedules – Sheet 2 of 2 12829495 AP610 – USB – Medium Pressure Compressed Air Diagram
12829496 AP611 – USB – High Pressure Compressed Air Diagram 12829503 AP705 – USB – Medium Pressure CA Controls 12829504 AP706 – USB – High Pressure CA Controls 12829505 AP707 – USB – Medium & High Pressure CA Controls 12829509 AP802 – USB – Pure Water – P &ID – Sheet 1 of 6 12829510 AP803 – USB – Pure Water – P &ID – Sheet 2 of 6 12829511 AP804 – USB – Pure Water – P &ID – Sheet 3 of 6 12829512 AP805 – USB – Pure Water – P &ID – Sheet 4 of 6 12829513 AP806 – USB – Pure Water – P &ID – Sheet 5 of 6 12829514 AP807 – USB – Pure Water – P &ID – Sheet 6 of 6 12829515 AP808 – USB – Pure Water – Process Flow Diagram 12829516 AP809 – USB – Pure Water – Description of Operation 12829528 AE111 – Security Site Lighting and Power – Area 111 12829529 AE112 – Security Site Lighting and Power – Area 112 12829530 AE113 – Security Site Lighting and Power – Area 113 12829538 AE141 – USB – Power Plan – Sheet 1 of 2 12829539 AE142 – USB – Power Plan – Sheet 2 of 2 12829577 CP101 – Cathodic Protection Layout 12829578 CP301 – Cathodic Protection Section