WP-07G AHU-9 Addition V1.pdf

PDF 249 KB Posted

Attached to
NOAA Ship Ronald H. Brown: Mid-Life Refit Federal contract opportunity
Solicitation number
1305M221RNMAN01155
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This solicitation seeks proposals for a firm fixed price contract to complete a mid-life refit of the NOAA Ship RONALD H. BROWN. The refit includes upgrades or overhauls to many ship systems such as repowering, bow thruster, Z-drive, potable water, chilled water, sewage, science refrigeration, uncontaminated seawater, air handling units, HVAC, tank level indicators, navigation, radar, overhead lighting, security lighting, and exterior vent renewals. Much of the ship's piping and steel will also be replaced as identified in an ABS report. Proposals are due by August 6, 2021. Inquiries regarding the solicitation must be submitted to the listed NOAA contracting staff by June 28, 2021. The refit work will be completed under FAR Part 12 for commercial items and FAR Part 15 procedures.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Ship Ronald H. Brown: Mid-Life Refit, newest first.
File Type Posted
SF30_Amendment_0008_RBML_Complete.pdf PDF
SF30_Amendment_0007_RBML_Complete.pdf PDF
SF30_Amendment_0006_RBML_Complete.pdf PDF
20065.01-02-501-01_Bow Thruster Equipment Removal and Installation Plan_Rev(-) signed.pdf PDF
WP-27 Transducer Modifications V1.pdf PDF
428711_EM 124 - SAT procedure.pdf PDF
SF30_Amendment_0004_RBML_Complete.pdf PDF
18038.02-10A-514-01 AC Spaces General Electrical Modifications_Rev-_20201023.pdf PDF
429347_HAT PROCEDURE SBP 27 and SBP 29.pdf PDF
428709_em124_hat_procedure.pdf PDF
RB-528- 6932929.pdf PDF
WP-11 Ships Stores Refrigeration Equipment Replacement V1.pdf PDF
WP 07B - AC Controls Upgrades V1.pdf PDF
SF30_Amendment_0003_RBML_Complete.pdf PDF
Tech Man RB-437-00.pdf PDF
Keen-K4RHX100M2-43-4.625-Inch-Implr-Pump-Data.pdf PDF
18038.02-12-514-01 Chilled Water Diagram_Rev- signed.pdf PDF
6932929.pdf PDF
20065.01-01-201-01 Machinery Arrangements_Rev(P1).pdf PDF
20065.01-01-536-01 FW Cooling Diagram_Rev(P1).pdf PDF
Consolidated References_07142021.pdf PDF
18038.02-01-440-02_Machinery Control System Points List_Rev A_signed.pdf PDF
18038.02-10C-512-01_AHU5 Zone Redesign - Arrangements_Rev- signed.pdf PDF
20065.01-01-300-01_Electrical One-Line Diagram_Rev(P1).pdf PDF
RB_461A_RB-461A-07_RevA_Sht001-024_ABS_MULTIBEAM FAIRING CONSTRUCTION.pdf PDF
18038.02-10C-512-02_AHU5 Zone Redesign - AC System Modifications_Rev- signed.pdf PDF
20065.01-01-517-01 Waste Heat Diagram Rev (P1).pdf PDF
20065.01-01-320-01_Propulsion Switchboard Layout_Rev(P1).pdf PDF
20065.01-01-320-02_Ship Service Switchboard Layout_Rev(P1).pdf PDF
20065.01-01-513-01_Generator Room Ventilation Upgrades_Rev(P1).pdf PDF
18038.02-11A-512-01 HVAC Makeup Air Upgrades_Rev- signed.pdf PDF
20065.01-01-300-06_Electrical One-Line Removals Diagram_Rev(P1).pdf PDF
20065.01-01-551-01 Compressed Air Diagram_Rev(P1).pdf PDF
20065.01-01-543-01 Waste Oil Diagram_ Rev(P1).pdf PDF
20065.01-01-260-01 Fuel Oil System Diagrams_ Rev(P1).pdf PDF
20065.01-01-513-02_Natural Ventilation Trunk Modifications_Rev(P1).pdf PDF
18038.02-10B-514-01_AC Control System Mods Diagram_Rev- signed.pdf PDF
05-521-01_Rev 0.pdf PDF
WP-25 Steel Replacement REV 1.pdf PDF
RB_101-6932803_RevE_SHT001-0013.pdf PDF
20065.01-01-532-01 SW Cooling Diagram_Rev(P1).pdf PDF
J.4 USDL Poster.pdf PDF
J.8 Standard Form 1416 - Payment Bond.pdf PDF
J.1 SF-33_Solicitation_Offer_Award.pdf PDF
J.2 Section B - Schedule of supplies or services.xlsx XLSX spreadsheet
RFP - 1305M221RNMAN01155_RHB Mid-Life.pdf PDF
J.3 Specification (Work Packages and References).zip ZIP file
J.5 Past Performance Information Form.rtf RTF text file
J.6 Past Performance Questionnaire.docx DOCX document
J.7 Standard Form 1418 - Performance Bond.pdf PDF
Show all 50

NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Abstract The intent of this work package is to describe the modification of HVAC currently serving the forward staterooms on the 01 Level (spaces between frames 16-36). The forward staterooms are currently served by AHU-2 which is located in 01-60-2. A new AHU (air handler unit) will be installed in the space that is currently Deck Locker 01-16-4. Deck Locker 01-16-4 will be divided into two spaces. HVAC ducting will be modified such that the newly installed AHU will serve the spaces between Frames 16 and 36 on the 01 Level as well as Scientific Stores (1-8-0). Following these modifications, AHU-2 will serve the Mess, Conference Room, Lounge, and Galley.

These modifications were implemented on two sister ships (Roger Revelle and Atlantis) and resulting as-built drawings were developed. The as-built for the Roger Revelle is shown in Reference 4. This work package will implement the same modifications on the Ronald H. Brown.

Revisions

References

1. Work Package: General Requirements, ECS, WP-00, 18 DEC 2020

2. Drawing: HVAC Arrangement & Detail, 01 Level FR15-64, NAVSEA, 6932953, Rev. D, 1 JUL

3. Drawing: HVAC Arrangement and Detail, 02 Level & Above, NAVSEA, 6932954, Rev. D, 1 JUL

4. Drawing: HVAC Diagram (Revelle post-PSA), NAVSEA, 6932962, Rev E, 29 SEP 1997

5. Work Package: Potable Water System Modifications, ECS, WP-06, 22 SEP 2020

6. Work Package: AC Spaces General Modifications, ECS, WP-07A, 10 DEC 2020

7. Work Package: AC Control Upgrades, ECS, WP-07B, 10 DEC 2020

8. Work Package: HVAC Makeup Air Upgrades, ECS, WP-08A, 10 DEC 2020

9. Work Package: Overhead Lighting Upgrades, ECS, WP-24, 16 DEC 2020

10. Drawing: Electrical One-Line Diagram, Glosten, 01-300-01, Rev. P1, 13 NOV 2020

WP-07G AHU-9 ADDITION

NOAAS Ronald H. Brown | Rev 1

PREPARED FOR: PREPARED BY: ORGANIZATION: DATE:

NOAA Office of Marine & Aviation Operations 8403 Colesville Road, Suite 500 Silver Spring MD 20910-3282

Stephen Laverty ECS 10 Oct 2020

CHECKED BY: DATE:

Jamie LeCompte NOAA 14 Nov 2020

APPROVED BY: DATE:

CONTRACT #: - James Repp NOAA 10 Dec 2020

Section Rev Description Date All References

Initial Release Reference 4 Correction

10 December 2020 09 August 2021

WP-07G AHU-9 Addition NOAAS Ronald H. Brown

1 Rev 1

000 GENERAL REQUIREMENTS

The end result of this work package shall be fully functional, approved heating, air conditioning, and ventilation systems meeting all applicable ABS, USCG, and SOLAS requirements. The Contractor shall be responsible for all removals, inspections, modifications, installations, and testing as described below and in Reference 1. All fees for these services shall be the responsibility of the Contractor and included in the bid.

The Contractor shall include removal and reinstallation of insulation, piping, HVAC components, electrical cables, overheads (those not removed as part of Reference 9), and incidental interferences in way of all work described herein. Upon completing the work, the Contractor shall clean the work area and its surfaces of all work debris and recoat existing coated surfaces damaged by welding and other hotwork in accordance with Reference 1 and this section.

All temporary openings and removals necessary to facilitate the work described in this package shall be carried out as part of this work package. All temporary openings and removals shall be reinstalled and restored to original condition. All affected mechanical and electrical components shall be tested to the Owner’s satisfaction after reinstallation.

Reference 1 contains general design, production, and documentation requirements relevant to the work described in this package. Reference 1 contains Contractor responsibilities for providing or arranging and integrating all required work. The requirements included in Reference 1 shall be applied to all aspects of this work. The requirements described herein shall be considered as additional to the requirements of Reference 1. Unless otherwise noted, all equipment and material permanently removed from the vessel shall become the property of the Contractor.

000.1 NOTES

000.1.1 Related Work Packages

000.1.1.1 WP-06 Potable Water System Modifications (Reference 5)

WP-06 includes replacements of all tank water heaters with new tankless water heaters. A water heater is currently installed in Space 01-16-4. Final location of tankless water heater and related equipment, piping, etc. within Space 01-16-4 shall consider this Work Package.

000.1.1.2 WP-07B AC Spaces General (Reference 6)

WP-07B includes replacement of all eight existing AHUs throughout the vessel, one of which is AHU-2 which currently supplies air to the forward staterooms on the 01 Level. Execution of this WP shall consider the scope of work in WP-07B.

000.1.1.3 WP-07B AC Control Upgrades (Reference 7)

WP-07B includes modifications to A/C temperature controls at AHUs, FCUs (Fan Coil Units), and duct reheaters throughout the vessel. Electrical connections and controls serving the new AHU installed in this Work Package shall be the same as what is installed in WP-07B for other AHUs. All electric reheaters are replaced throughout the vessel in WP-07B, some of which are installed in the 01-Level staterooms. Ducting and control installations shall consider WP-07B.

000.1.1.4 WP-08A Makeup Air Upgrades (Reference 8)

WP-08A includes replacement of makeup air ducting serving AHU-2 which impacts the associated Fan Room 01-60-2. Execution of this WP shall consider work being executed in WP-08A.

000.1.1.5 WP-24 Overhead and Lighting Replacement (Reference 9)

WP-24 includes replacement of ceiling and lighting systems in common areas, staterooms, and laboratory spaces aboard the vessel. The work described in this work package (WP-07G) shall be

2 Rev 1 performed while all of the overheads being replaced in WP-24 are not in place. Installation of interior terminals shall be done in conjunction with WP-24.

000.2 BID REQUIREMENTS

000.2.1 Costs

The Contractor shall include in their bid the following costs:

1. The cost of the effort to complete the work described in this specification.

000.2.2 Documentation

The Contractor shall include in their bid the documentation listed in Reference 1 and the following:

1. Technical specifications including make/model of AHU proposed for AHU-9.

100 HULL STRUCTURE

A new air-conditioning unit (A/C01-18-2) shall be added to serve the accommodation spaces on the 01 Level forward of Frame 36 and scientific storeroom No. 1 (1-8-0) on the upper main deck. The new air-conditioning unit shall be installed in a forward deck locker on the port side (01-16-4) converted to a fan room. The new air-conditioning unit shall share the same space with water heater equipment being modified in Reference 5. Removals and installations shall be performed in conjunction with Reference 5.

All redundant or unused structural foundations, hangers, supports, etc. shall be removed and ground flush with associated structure. All redundant or unused penetrations shall be inserted and welded tight in accordance with Reference 1.

Provide new structural penetrations as required by the new ducting arrangements.

The aft bulkhead of the deck locker (01-16-4) is presently classified as an A-0 fire zone boundary, in excess of regulatory requirements. The bulkhead shall be reclassified as a B-0 boundary to avoid the requirement of additional fire dampers. The Fire Control Plan shall be updated to include this reclassification (Refer to Reference 1 section 6.7.1).

Modify the existing aft bulkhead of the new Fan Room to accommodate a new joiner door (see Section 600.2.1).

100.1 REMOVALS

Remove foundations for existing shelving in way of AHU installation in Deck Locker 01-16-4. Removed foundation structural connections shall be ground smooth and recoated in accordance with Reference 1.

Remove foundation(s) for existing lighting fixtures in Deck Locker 01-16-4. Removed foundation structural connections shall be ground smooth and recoated in accordance with Reference 1.

100.2 INSTALLATIONS

Provide new structural penetrations as required by the new ducting arrangements outlined in Reference 4.

Modify the existing aft bulkhead to accommodate a new joiner door (see section 600.2.1).

Fabricate and install new foundations for new AHU (A/C01-18-2) and new exhaust fan (E01-18-2).

Contractor shall determine details of required foundations.

Provide and install new weather terminals for the following:

3 Rev 1

Natural supply for deck locker 01-16-6.

Natural supply for fan room 01-16-4.

Exhaust terminal for system E01-18-2 in fan room 01-16-4.

Make-up air supply for new air-conditioning unit A/C01-18-2.

Make-up air terminal shall be provided with demisting closures meeting the requirements of Reference

8. Hardware shall be included to secure the covers in the opened and closed positions. Make-up air terminal shall be located on the 02-Level and face aft.

Fabricate and install a new longitudinal bulkhead in Deck Locker 01-16-4 between Frames 16 and 19 on the 01 Level. The bulkhead shall divide the deck locker into a fan room (01-16-4) inboard and a small deck locker (01-16-6) outboard. The bulkhead shall be fabricated from 1/4-inch steel plate with 3" x 2" x 1/4" angle stiffeners on 24-inch centers. The stiffeners shall be located on the inboard (fan room) side of the bulkhead. The bulkhead shall be located approximately 16 feet port of centerline.

Refer to Reference 4 for bulkhead general arrangement.

Fabricate and install lighting fixture foundations in the overhead of the newly created Deck Locker 01- 16-6 and Fan Room 01-16-4.

200 MAIN PROPULSION SYSTEMS

200.1 REMOVALS

No items.

200.2 INSTALLATIONS

No items.

300 ELECTRICAL POWER PLANT

New AHU controls (controllers, valves, thermostats, etc.) are installed for all existing AHUs as part of Reference 7. Controls installed for the new AHU-9 shall be of the same make/model as those installed in Reference 7.

300.1 REMOVALS

In the air-conditioning fan room (02-64-1), remove and dispose of power cables 9P416 and 9P416(M) serving TA Fan #15 (02-68-1) and its motor controller from the fan to the associated power panel P416. Remove and dispose of associated controller. Remove T-50 cable 7P416 from the TA preheater No. 52 (02-66-1) to the associated HVAC power panel, P416. Remove cable 7P2416(T) from the preheater to its duct thermostat, References 3 & 10. Remove and dispose of associated unused HVAC components.

Disconnect power to lighting fixtures serving Deck Locker 01-16-4. Power cable may be retained for reuse. Remove and discard switch(es).

300.2 INSTALLATIONS

Provide 480VAC, 3-Phase, 60 Hz power from a spare circuit in HVAC power panel P416, located on the 01 Level, Frame 36 for the new 5 kW reheater being installed in air conditioning system A/C01-61-2 (see Section 500.2.5).

Provide cabling to connect a new duct thermostat to its reheaters in the galley supply system as part of the modification of the existing air-conditioning system (A/C01-61-2); see Section 500.2.5.

Provide variable speed control to the exhaust fan for existing exhaust system E02-48-1 (see Section 500.2.9), provide and install a new VFD controller.

4 Rev 1

For the new air-conditioning system (A/C01-18-2), provide 480VAC, 3-Phase, 60 Hz power from spare circuits in HVAC power panel P416, located on the 01 Level, Frame 36 for the new AHU and for the new 16.7 kW preheater. Provide and install new control equipment (controller, solenoid valves, thermostat, etc.) meeting the requirements of Reference 7 for the air handling unit. Provide cabling from the new preheater to its new duct thermostat as required.

For the new exhaust system E01-18-2, install new controller meeting the requirements of Reference 7 and provide 480VAC, 3-Phase, 60 Hz power from in HVAC power panel P416. The controller location shall be approved of by the Owner prior to final installation.

Provide new cabling and light switches to serve the new lighting fixtures installed in the newly created Deck Locker (01-16-6) and Fan Room (01-16-4). Lighting fixture installations shall comply with the requirements in Reference 9.

All new cable shall be constructed in accordance with Mil-C-24643A, IEEE-45, or IEC 92-3.

400 COMMAND, COMMUNICATIONS, AND NAVIGATION

400.1 REMOVALS

No items.

400.2 INSTALLATIONS

No items.

500 AUXILIARY SYSTEMS

The work described in this section shall be coordinated with the replacement of ceiling system and lighting fixtures described in WP-24 (Reference 9) to allow access to the overheads.

Incidental relocation of the existing piping systems (including pipe runs, deck drains, etc.) due to the new equipment arrangement described in this Work Package shall be included in the scope of this Work Package.

500.1 REMOVALS

In general, the Contractor shall remove all redundant and dead-ended ducting. All hangers and supports associated with the removed ducting shall also be removed. Unused structural penetrations on bulkheads and decks shall be inserted and welded tight in accordance with Reference 1.

Remove and dispose of HVAC ducting currently serving spaces on the 01-Deck between frames 16-

34. This work shall be performed in conjunction with Reference 9 while overheads are already removed.

Remove the existing 4-inch diameter natural supply and exhaust terminals on the forward and outboard bulkheads of deck locker 01-16-4.

For the existing ventilation system (TA02-68-1) on the 02 Level, remove the existing supply fan, preheater and transition pieces. The preheater shall be saved for re-installation. Preserve the existing ducting on the 01 Level overhead for modifications and connection to the system (A/C01-61-2) to convey tempered air as shown in Reference 4. Insert all unused deck and bulkhead penetrations in accordance with Reference 1.

5 Rev 1

500.2 INSTALLATIONS

500.2.1 Piping

In general, chilled water and deck drain piping shall be provided as needed for the new air- conditioning unit (A/C01-18-2). Potable water piping (to serve the new tankless water heater) within the newly created Fan Room 01-16-4 will be modified as part of Reference 5 and shall consider the work required herein.

500.2.2 Chilled Water System Modifications

Provide new chilled water supply and return piping to the new air-conditioning unit. The new branches shall be sized according to the cooling coil of the new air-conditioning system (A/C01-18-2) and shall be provided with valves for flow balance and isolation.

The new chilled water piping shall be connected to the existing piping serving the forward air-conditioning unit in the main lab on the upper main deck. Provide and install a control valve in the new lines to allow adjustment of the chilled water flow rates. Re-balance the chill water system as part of the overall HVAC modifications.

500.2.3 Gray Water System Modifications

In the newly created deck locker (01-16-6), provide a new deck drain in the after outboard corner of the locker. The drain shall be provided with a trap and tied into the existing gray water system serving the relocated fan room drains.

In the newly created fan room (01-16-4), relocate the two existing deck drains as required to suit the new space arrangement. Connect the condensate drains of the new air-conditioning unit to the new deck drain locations. Tie the new deck drains into the existing gray water drain piping on the upper main deck. Provide new piping and hoses as needed.

500.2.4 HVAC Modifications - General

The Contractor shall note that Reference 4 is provided only as a guideline to illustrate the functionality of the new and modified HVAC systems. Final equipment locations, duct modifications, duct dimension, duct routing and any required interference control shall be the responsibility of the Contractor.

All existing reheaters and controls in the forward accommodations shall be replaced as part of Reference 7. All existing ducting (supply and return) to be served by the new AHU shall be removed along with duct supports and appurtenances.

The size of the new ducting is shown in Reference 4. Equivalent rectangular and/or round ducts with equal friction loss may be used to suit local conditions. The Contractor shall advise the Owner of the final duct dimensions and routes prior to installation.

All new ducts supplying air from the new AHU shall be galvanized sheet metal suitable for marine use in accordance with Reference 1. Ducts for tempered air shall be insulated. A balancing damper shall be provided in each supply, return, and exhaust branch.

All new ducts supplying air to the new AHU from the weather shall be stainless steel and shall be fitted with demisting enclosures at their respective weather terminals. New demisting enclosures shall be Zazz engineering, or approved equal, and shall meet the requirements of Reference 8.

All new ducts carrying tempered air shall be insulated on the exterior in accordance with Reference 1.

As part of Work Package 24 (Reference 9), overhead panels will be removed as part of that item. Work described herein shall consider and be performed in conjunction with Work Package 24.

6 Rev 1

All affected HVAC systems shall be balanced to within 10% of the design flow rates shown in Reference

4. Final flow rates of each system shall be documented and submitted to the Owner. The final setting of each balancing damper shall be marked and secured in accordance with the general requirements of Reference 1.

500.2.5 Air-Conditioning System A/C01-61-2 (Existing)

Modify the existing HVAC system (A/C01-61-2) per Reference 4 to serve the mess (01-49-2), the conference room/library (01-36-2), the lounge (01-36-3), and the galley (01-46-1).

Isolate the supply and return ducts for the forward staterooms and the scientific storeroom No. 1 from the existing system.

Provide and install a 5 kW reheater in the main supply duct for the Galley. Modify the existing supply duct for the existing ventilation ducts for the galley and connect to system A/C01-61-2. Re-balance the system in accordance with Reference 4. Provide and install new adapters and transitions as required.

Provide a thermostat in the galley to control the reheaters in the galley supply ducts. Thermostat shall be the same as those provided in Reference 7.

500.2.6 Air-Conditioning System A/C01-18-2 (New)

Provide and install a new chilled water air-conditioning unit (A/C01-18-2), mixing plenum, and supply and return ductwork per Reference 4 to create a new, independent system serving the following areas:

Eight staterooms forward of Frame 35 on the 01 Level.

Scientific storeroom No. 1 (1-8-0) on the upper main deck.

The new air-conditioning unit (A/C01-18-2) shall be designed for the following conditions:

Marlo Coil, same as new AHUs required in Reference 6.

Equipped with an air handling unit capable of 2,310 cfm at 4" S.P.; the fan unit shall be a resilient mounted centrifugal fan to reduce noise.

Make-up air flow of 340 cfm.

Return air flow of 1,970 cfm.

Total cooling coil load of 96,000 BTU/hr (8.0 R-Tons) with chilled water inlet temperature at

41-degrees Fahrenheit.

Preheater load of 16.7 kW.

Provide new ductwork for supply, return, and make-up air for the new air-conditioning unit as outlined in Reference 4. The Contractor shall note that the new and replacement duct routes shown are preliminary. The Contractor shall be responsible for determining the final duct dimensions and routes prior to installation.

Provide and install two new main supply ducts for the new air-conditioning unit (01-18-2). One duct shall run along the port side, serving the port stateroom distribution branches (near Frames 29 and 36). The other main supply duct shall run to the starboard side, serving the starboard stateroom distribution branches (near Frames 21, 26, 28 and 33). Provide and install new diffusers and all other required material to furnish a fully complete and trimmed system. Diffusers and associated trim shall be compatible with the new ceiling system installed in Reference 9.

For scientific storeroom No. 1 (1-8-0), the existing supply branch below the 01 Level shall be re-used.

The penetration on the 01 Level may need to be relocated to suit the arrangement of the air-conditioning unit (A/C01-18-2). Provide new ducting as required to re-connect the existing duct to the new air-conditioning unit.

7 Rev 1

Two sources of return air shall be installed for A/C01-18-2. One source shall be a return air register in the passageway at Frame 35 on 01 Level. The second source shall be the return register in the scientific storeroom No. 1 (1-8-0). The return ducting below the 01 Deck may be retained.

Disconnect the existing 10-1/2" x 6" return duct from system A/C01-61-2 near the penetration at Frame 36 and provide a new transition to the return air register at Frame 35.

Provide and install a make-up air weather terminal on the overhead of the new fan room (01- 16-4) adjacent to the handrails. The weather terminal shall be fitted with an insect screen and demisting enclosure of the same type as those installed in Reference 8.

Provide and install new ducts from the weather terminal to the mixing plenum on the air-conditioning unit. A volume damper shall be provided for adjusting the make-up air flow. Damper and ducting from weather terminal shall be stainless steel meeting the requirements of Reference 8.

Provide and install a new natural supply weather terminal for the fan room on the overhead of the space, adjacent to the handrails. The weather terminal shall be 8-inch diameter or equivalent and shall be fitted with an insect screen and watertight cover.

500.2.7 Exhaust system E 01-18-2 (New)

Provide a new exhaust system to service the five heads, the new fan room and the cleaning gear locker forward of Frame 20 on the 01 Level as shown in Reference 4.

Provide and install a new exhaust fan in the new fan room (01-16-4). The exhaust fan shall be rated for 600 cfm at 3" S.P., centrifugal type, direct drive and resilient mounted.

Provide new ducting to connect the five heads, fan room (01-16-4), and the cleaning gear locker (01- 16-2) to the new exhaust fan as shown on Reference 4. Provide and install associated terminals and balance dampers as shown in Reference 4.

Provide and install a new exhaust branch with balance damper and terminal in the fan room 01-16-4.

The new exhaust terminal shall be fitted with an insect screen and be positioned over the new water heater.

Provide and install a new weather terminal for the exhaust system. The weather terminal shall have a clear area of at least 9 inches in diameter, with an insect screen and watertight cover. The weather terminal shall be located on the forward bulkhead of the fan room to suit the final arrangement. New ducting between the fan discharge and the weather terminal shall be provided.

Reuse the existing 4-inch natural supply terminal for the deck locker (01-16-6) as the natural exhaust.

Provide and install one new natural supply weather terminal for the same deck locker. The new supply terminal opening shall be at least 4-inch diameter or equivalent, fitted with an insect screen and watertight cover.

500.2.8 Ventilation System TA02-69-1 (Existing)

The ventilation air currently supplied to the galley will be replaced by air-conditioned air from the air-conditioning system (01-61-2) and a natural supply system. Modify the existing ductwork at the 02 Level and above by replacing the supply fan, preheater, and associated transition pieces with sections of new ductwork. Install a new terminal in the galley overhead at Frame 60 as shown on the reference drawings and connect it via ductwork to the new natural supply trunk.

Modify the existing ducts under the 02 Level to distribute air from the air-conditioning system (01-61- 2). Provide new transitions and insulation where required.

8 Rev 1

500.2.9 Exhaust System E-02-48-1 (Existing)

This existing system provides exhaust from various vent hoods in the Galley area. For normal operation, this exhaust system shall be modified and re-balanced for 1925 CFM. The full speed operation of the system shall be retained.

Provide and install a variable speed drive for the existing fan to allow operation at a lower fan rpm. A rheostat type controller shall be provided in the Galley to control fan speed. The correct setting of the rheostat for a 1925 CFM system flow rate shall be marked on the rheostat.

500.2.10 Exhaust System E02-55-1 (Existing)

Modify the existing ducting to isolate the exhaust flow from all spaces forward of Frame 35.

Rebalance the system to maintain the original flow rate of the remaining two exhaust terminals on the 01 Level aft of Frame 35.

500.2.11 Exhaust System E1-19-2 (Existing)

Exhaust system E1-19-2 serving the bio-analytical laboratory shall continue to exhaust through a weather terminal on the forward bulkhead of fan room 01-16-4. No modifications are necessary for this system. However, modifications to ducting may be required to suit installations.

500.2.12 HVAC Noise Requirements

This work item shall not increase the HVAC-generated noise above the existing levels in any of the normally manned compartments affected by this item. Acoustic treatment and noise abatement measures necessary to maintain the HVAC noise criteria shall be included as part of this work item.

To document the HVAC noise levels, the Contractor shall conduct two noise surveys in all spaces affected by this work item: one prior to the modifications and one after all modifications and system balancing have been accomplished. HVAC noise surveys shall be accomplished dockside, on shore power, with all ventilation and air handling equipment at maximum speed and all unnecessary ship’s systems secured. HVAC noise surveys shall be performed at night with no other industrial work being performed. The initial survey shall be performed within the first 7 days following arrival before anything other than crew effects have been removed from the ship. The final survey shall be performed with the ship in as similar a condition as possible. Written reports of the surveys shall be submitted to the Owner. The Owner shall have the option of witnessing the surveys.

After the modifications and balancing are complete, normally manned compartments that exceed the previous HVAC noise levels shall be corrected at no additional expense to the Owner.

600 OUTFIT AND FURNISHINGS

600.1 REMOVALS

Remove and dispose of the two shelving units currently installed in Deck Locker 01-16-4.

Remove existing lighting fixtures and associated switches from Deck Locker 01-16-4.

600.2 INSTALLATIONS

600.2.1 Doors, Windows, and Hatches

Provide and install one new joiner door, 26" x 78" on the aft bulkhead of the new fan room (01-16-4).

The door shall be rated for Class B-0 application, fume-tight, and shall not be provided with a ventilation louver or window. Door shall have a water-resistant core. The door shall be provided with a 1-inch sill, hydraulic automatic closure device, and a door holdback.

9 Rev 1

The location of the new joiner door must be coordinated with the arrangement of the deck locker. Final location of door shall be approved of by Owner prior to final installation.

600.2.2 Paint

Prepare and paint the affected areas as required, including both surfaces of all new structural components installed under this work item. All affected areas shall be sandblasted or mechanically cleaned prior to coating.

All new coating requirements and application shall be in accordance with the Reference 1.

600.2.3 Insulation

In general, insulation that is temporarily removed or damaged while performing the work described in this work item shall be restored with material and finishes similar to the original insulation.

The bulkheads and overhead of the new fan room (01-16-4) shall be insulated as an air-conditioning boundary with 2-inch Faced mineral wool in accordance with Reference 1.

The after bulkhead of the deck locker (01-16-6) shall be insulated as an air-conditioning boundary with 2-inch Faced mineral wool in accordance with Reference 1.

Provide thermal insulation for the new chilled water piping and modified potable water piping in accordance with Reference 1.

Provide thermal insulation for the new ducts that convey tempered air in accordance with Reference 1.

Repair existing duct insulation damaged as a result of modifications.

600.2.4 Labeling

The Contractor shall provide new labels, signs, and access panels for all new or modified systems.

New access panels for concealed dampers and other system components shall be provided in accordance with Reference 9. New space labels shall be provided for the newly created Fan Room and Deck Locker.

600.2.5 Lighting Fixtures

Install one lighting fixture in the newly created Deck Locker 01-16-6 and two new lighting fixtures in the newly created Fan Room 01-16-4. Installation of new lighting fixtures shall be in accordance with those installed in Reference 9.

700 SCIENTIFIC MISSION SYSTEMS

700.1 REMOVALS

No items.

700.2 INSTALLATIONS

No items.

800 INTEGRATION AND ENGINEERING

Reference 1 provides requirements regarding regulatory body inspections and requirements for certificates and other documentation associated with regulatory body certification processes.

Reference 1 provides requirements pertaining to schedule, drawings development and revision, material control, engineering, estimates, purchase technical specifications, technical documentation, 10 Rev 1 signage, paint schedule, test memorandums, instruction books, equipment identification, and spare parts.

800.1 DOCUMENTATION

All documentation shall be revised to the as-built condition at the conclusion of sea trials. Technical documentation necessary for this work package, in accordance with the documentation requirements in Reference 1, shall include, at the minimum:

Drawings and specifications for new ducting.

Drawings and specifications of new heating coil Drawings and specifications of new fan and motor.

Drawings and specifications and Technical Manual for new AHU.

Ducting inspection reports and recommendations.

Ventilation system balancing report in conjunction with Reference 6

The Contractor shall balance all new and modified ventilation systems such that the delivered quantity of air to each compartment is within 10% of the quantity shown on Reference 4. The Contractor shall submit a written test report identifying the final air quantities at each terminal as well as the type and calibration date of all testing equipment.

800.2 TRAINING

No training is required for this work package.

900 TESTS AND TRIALS

The Contractor shall prepare, commission, and test the HVAC system and all modified or disturbed equipment in accordance with ABS and USCG requirements and Reference 1. The testing shall be witnessed by the Owner, and regulatory bodies where required. The Contractor shall conduct testing in conformance with Contractor-developed test memorandums approved by the Owner and meeting the test program requirements of Reference 1.

900.1 STAGE 1 – SHOP INSPECTIONS AND FACTORY ACCEPTANCE TESTS

No Stage 1 tests are required for this work package.

900.2 STAGE 2 – CONSTRUCTION INSPECTIONS AND TESTS

No Stage 2 tests are required for this work package.

900.3 STAGE 3 – OPERATION AND PERFORMANCE TESTS

Stage 3 Operation and Performance Tests for this work package shall include:

Performance testing of newly installed AHU to verify the ability to meet existing design criteria and performance requirements.

Ventilation system balancing and terminal volume testing in accordance Reference 1, Section 2.13.

Noise testing as required in Section 500.2.12.

900.4 STAGE 4 – DOCK TRIALS

No Stage 4 tests are required for this work package.

900.5 STAGE 5 – SEA TRIALS

No Stage 5 tests are required for this work package.

000 General Requirements
000.1 Notes
000.1.1 Related Work Packages
000.1.1.1 WP-06 Potable Water System Modifications (Reference 5)
000.1.1.2 WP-07B AC Spaces General (Reference 6)
000.1.1.3 WP-07B AC Control Upgrades (Reference 7)
000.1.1.4 WP-08A Makeup Air Upgrades (Reference 8)
000.1.1.5 WP-24 Overhead and Lighting Replacement (Reference 9)
000.2 Bid Requirements
000.2.1 Costs
000.2.2 Documentation
100 Hull Structure
100.1 Removals
100.2 Installations
200 Main Propulsion Systems
200.1 Removals
200.2 Installations
300 Electrical Power Plant
300.1 Removals
300.2 Installations
400 Command, Communications, and Navigation
400.1 Removals
400.2 Installations
500 Auxiliary Systems
500.1 Removals
500.2 Installations
500.2.1 Piping
500.2.2 Chilled Water System Modifications
500.2.3 Gray Water System Modifications
500.2.4 HVAC Modifications - General
500.2.5 Air-Conditioning System A/C01-61-2 (Existing)
500.2.6 Air-Conditioning System A/C01-18-2 (New)
500.2.7 Exhaust system E 01-18-2 (New)
500.2.8 Ventilation System TA02-69-1 (Existing)
500.2.9 Exhaust System E-02-48-1 (Existing)
500.2.10 Exhaust System E02-55-1 (Existing)
500.2.11 Exhaust System E1-19-2 (Existing)
500.2.12 HVAC Noise Requirements
600 Outfit and Furnishings
600.1 Removals
600.2 Installations
600.2.1 Doors, Windows, and Hatches
600.2.2 Paint
600.2.3 Insulation
600.2.4 Labeling
600.2.5 Lighting Fixtures
700 Scientific Mission Systems
700.1 Removals
700.2 Installations
800 Integration and Engineering
800.1 Documentation
800.2 Training
900 Tests and Trials
900.1 Stage 1 – Shop Inspections and Factory Acceptance Tests
900.2 Stage 2 – Construction Inspections and Tests
900.3 Stage 3 – Operation and Performance Tests
900.4 Stage 4 – Dock Trials
900.5 Stage 5 – Sea Trials