This solicitation requests proposals for a firm fixed price contract to complete a mid-life refit of the NOAA Ship RONALD H. BROWN. The refit includes upgrades to ship systems such as repowering, bow thrusters, science refrigeration, HVAC, piping replacements and other items identified in an ABS report. Proposals are due by August 6, 2021. The scope of work involves replacing and overhauling key ship systems and components. Inquiries are due by June 28, 2021. The refit is intended to extend the service life of the vessel and improve functionality of its scientific research capabilities.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Ship Ronald H. Brown: Mid-Life Refit, newest first.
File Type Posted
SF30_Amendment_0008_RBML_Complete.pdf PDF
6932959_Rev_D_HVAC_Arrangement _Details.pdf PDF
SF30_Amendment_0005_Complete.pdf PDF
WP-07G AHU-9 Addition V1.pdf PDF
429348_SAT PROCEDURE SBP 27 and SBP 29.pdf PDF
458499_em124_maintenance_manual.pdf PDF
WP-27 Transducer Modifications V1.pdf PDF
428711_EM 124 - SAT procedure.pdf PDF
RB-528- 6932929.pdf PDF
WP-11 Ships Stores Refrigeration Equipment Replacement V1.pdf PDF
WP 07B - AC Controls Upgrades V1.pdf PDF
RFP_1305M221RNMAN01155_RHB Mid-Life_REV2_071421.pdf PDF
20065.01-01-211-01 Major Equipment Removal and Installation Plan_Rev(P1).pdf PDF
RB_461A_RB-461A-06_Rev-_Sht001-008_ABS_MULTIBEAM FAIRING INSTALLATION INBOARD PROFILE _ TYPICAL SECTION.pdf PDF
WP-00 General V2.pdf PDF
WP-30 Tank Level Indication Modifications V1.pdf PDF
20065.01-01-262-01 Lube Oil System Diagram_Rev(P1).pdf PDF
SF30_Amendment_0003_RBML_Complete.pdf PDF
Tech Man RB-437-00.pdf PDF
Keen-K4RHX100M2-43-4.625-Inch-Implr-Pump-Data.pdf PDF
18038.02-12-514-01 Chilled Water Diagram_Rev- signed.pdf PDF
6932929.pdf PDF
20065.01-01-201-01 Machinery Arrangements_Rev(P1).pdf PDF
20065.01-01-536-01 FW Cooling Diagram_Rev(P1).pdf PDF
Consolidated References_07142021.pdf PDF
18038.02-01-440-02_Machinery Control System Points List_Rev A_signed.pdf PDF
18038.02-10C-512-01_AHU5 Zone Redesign - Arrangements_Rev- signed.pdf PDF
20065.01-01-300-06_Electrical One-Line Removals Diagram_Rev(P1).pdf PDF
20065.01-01-551-01 Compressed Air Diagram_Rev(P1).pdf PDF
20065.01-01-543-01 Waste Oil Diagram_ Rev(P1).pdf PDF
20065.01-01-260-01 Fuel Oil System Diagrams_ Rev(P1).pdf PDF
20065.01-01-513-02_Natural Ventilation Trunk Modifications_Rev(P1).pdf PDF
18038.02-10B-514-01_AC Control System Mods Diagram_Rev- signed.pdf PDF
20065.01-01-300-01_Electrical One-Line Diagram_Rev(P1).pdf PDF
RFP_1305M221RNMAN01155_RHB Mid-Life_REV1_06112021.pdf PDF
Amendment_0002_Complete.pdf PDF
RB_101-6932803_RevE_SHT001-0013.pdf PDF
20065.01-01-532-01 SW Cooling Diagram_Rev(P1).pdf PDF
05-521-01_Rev 0.pdf PDF
WP-25 Steel Replacement REV 1.pdf PDF
SF-30 Amendment 0001.pdf PDF
RFP - 1305M221RNMAN01155_RHB Mid-Life.pdf PDF
J.3 Specification (Work Packages and References).zip ZIP file
J.5 Past Performance Information Form.rtf RTF text file
J.6 Past Performance Questionnaire.docx DOCX document
J.7 Standard Form 1418 - Performance Bond.pdf PDF
J.4 USDL Poster.pdf PDF
J.8 Standard Form 1416 - Payment Bond.pdf PDF
J.2 Section B - Schedule of supplies or services.xlsx XLSX spreadsheet
J.1 SF-33_Solicitation_Offer_Award.pdf PDF
Show all 50

NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

1305M221RNMAN01155

9B. DATED (SEE ITEM 11)

04/29/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

2. AMENDMENT/MODIFICATION NUMBER

A0004

3. EFFECTIVE DATE

08/02/2021

4. REQUISITION/PURCHASE REQUISITION NUMBER

NMAN2100-20-01155

5. PROJECT NUMBER (If applicable)

CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE 6. ISSUED BY

NOAA/ERAD

200 GRANBY STREET, NORFOLK, VA 23510

Andrew Northcutt, andrew.northcutt@noaa.gov, 757-441-6457

See Block 6

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended. The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NOAA SHIP RONALD H. BROWN MID-LIFE REFIT

Please see continuation page for details pertaining to this amendment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES

X

Andrew Hildebrandt

08/02/2021

Continuation Page – Amendment 0004

RONALD BROWN MID-LIFE REFIT

RFP# 1305M221RNMAN01155

The purpose of this Amendment is as follows:

1. Address questions received from vendors in response to the RFP:

Question 1

Question 1: Please see the attached marked-up Work Package for WP-27 and below email trail.

We sent this to the requested contact / OEM and they had comments/questions that they will need guidance/direction to properly quote this for us. Any information you can provide or clarify would be extremely helpful.

Attached is a doc with some red text where we had comments to add. Most are shipyard tasks that we either had to clarify or make a comment about. Other comments are to be edits to the document. We are ok if this gets passed back to OMAO for review (they may be expecting it, too).

One item in particular we feel they need to modify the yard package is 600.2 - the rubber foam used for acoustic insulation in the RX array casing. Back when this system was installed, this technique was a bit experimental by some customers and noise consultants and found its way onto this ship. Currently, we deliver as standard a baffle plate kit, which is bolted onto the casing. It’s molded high density foam, which is easier to maintain/replace over the long term. So, while they do say the rubber foam coating it needs to be removed we don’t recommend then re-applying it. A photo of these baffles laying on the back of the RX frame has been included in our edit to this doc attached.

There’s also a small but critical comment to never ever use pressure washers on transducers.. too many transducer modules have been punctured by a desire to blast the hull and not carefully clean the transducers. It is noted that in this case, these are the older transducer modules to be replaced, so in theory who cares.. but we just can’t recommend it.

Response 1: A revised Work Package, WP-27 Rev. 1, is provided to address the OEM questions. Additional References 15-19 are also provided.

Question 2

Question 2: Most are shipyard tasks that we either had to clarify or make a comment about.

Other comments are to be edits to the document. We are ok if this gets passed back to OMAO for review (they may be expecting it, too).

One item in particular we feel they need to modify the yard package is 600.2 - the rubber foam used for acoustic insulation in the RX array casing. Back when this system was installed, this technique was a bit experimental by some customers and noise consultants and found its way onto this ship. Currently, we deliver as standard a baffle plate kit, which is bolted onto the casing. It’s molded high density foam, which is easier to maintain/replace over the long term. So, while they do say the rubber foam coating it needs to be removed we don’t recommend then re-applying it. A photo of these baffles laying on the back of the RX frame has been included in our edit to this doc attached.

There’s also a small but critical comment to never ever use pressure washers on transducers.. too many transducer modules have been punctured by a desire to blast the hull and not carefully clean the transducers. It is noted that in this case, these are the older transducer modules to be replaced, so in theory who cares. but we just can’t recommend it.

Response 2: A revised Work Package, WP-27 Rev. 1, is provided to address the OEM questions.

Question 3

Question 3: We are unable to locate the following. Please advise.

WP 10 Ref. #14 Document: Keen-K4RHX100M2-43-4.625-Inch-Implr-Data.pdf

WP 11 Ref. Ref. #3 Ship Stores Refrigeration System Electrical Modifications, ECS, 11-516-03

Response 3: WP 10 Ref. #14 – The document is included in this Amendment. WP 11 Ref. Ref.

#3 – Ref. #3 does not exist. A revised WP 11 Rev. 1 is provided for clarification.

Question 4

Question 4: Please provide the following needed information:

WP 01 – 400.6 Pilot House Console- Provide photos of existing console.

WP 01 – 500.6 Propulsion Motor Room Air Conditioning – Provide information for new Fan

Coil Units – i.e. Make, Model, HP, CFM, etc.

WP 10 – Provide Ref. #5 – We show the folder but there aren’t any drawings when opened.

WP 33 – 000.2 Bid Requirements – 000.2.1 Costs – Line 2 – Prove number of anticipated Joiner

Panel Replacements

Response 4:

WP 01 – 400.6, The ship will be available for pictures during the ship check.

WP 01 – 500.6 The Contractor shall provide the new FCUs in accordance with 500.6.

Engineering efforts necessary to provide suitable equipment should be included in the

Contractor’s bid.

WP 10 – Provide Ref. #5, Drawing RB-528-6932929 is provided.

WP 33 – 000.2 Bid Requirements – 000.2.1 Costs – Line 2, The number of anticipated joiner panel replacements is not known. The contractor is to provide a lot work cost with lot pricing per joiner panel replacement (each).

Question 5

Question 5: Could you provide an estimated ship arrival date? I understand contract award will be in April/May 2022 timeframe. Can we assume the vessel will be transiting from the West

Coast to the contract awardee’s location? Will the vessel be available to start this transit upon contract award?

Response 5: The location of the vessel at the time of award is not known at this time. It is anticipated that the vessel will not physically enter into the shipyard's facility until long lead materials and detailed design work is accomplished after award. The contractor shall include this in their proposed schedule.

Question 6

Question 6:

Per WP-33, Please advise your customer that “Elastoflake” specified in 600.2.1 and “Terrazzo-

M” specified in 600.2.2 are commonly used onboard ship and carry a Mil Spec, they do not have an IMO certification. Should we continue with the bid using these products?

WP-07B section 300.1 says: “The Contractor shall remove and dispose of all existing reheaters

(Refer to Section 000). Reference 8 contains a list and location of reheaters installed during construction. An additional reheater was installed to serve the added AutoSal Room (Space 1-69-

2). Note: not all reheaters included in Reference 8 are applicable to the R/V Ronald H. Brown.”

Please provide information on added reheater in space 1-69-2 and also which reheaters in the provided list and are to be replaced are on the R/V Ronald H. Brown.

Also ask to confirm that the “reheaters” refered to in this section of this WP is what they are calling “Duct Heaters” on the heater list DWG 6932964.

WP-38 Section 500.2.8 : Provide Fire Station sizes and type of material.

Response 6:

WP-33, “Elastoflake” and “Terrazzo-M” are to used in the bid as per the Work Package.

WP-07B, Section 300.1, The reheaters shown in Reference 8, Drawing 6932964 does indicate which reheaters are installed on the NOAA Ship BROWN. Refer to the column in the heater list labeled as "Applicable Hull". The "NOAA" hull is referring to the NOAA Ship Ronald H.

Brown. The "reheaters" in this section are in fact the "Duct Heaters" on the heater list in drawing

6932964. The added “reheater” in space 1-69-2 was discovered to be a fan coil unit, not a reheater. This fan coil unit will be retained. A revised WP-07B Rev. 1 is provided for clarification.

WP-38 Section 500.2.8, The fire station equipment that is to be provided is stated in Table 500.2-

1 “FIRE STATION EQUIPMENT”. The new fire station enclosures sizing shall be similar to the existing enclosures and will be available for inspection during the ship check.

Question 7

Question 7: What format should the Bid Guarantee be in? Who should the obligee be? What should the bond duration be?

Response 7: Please refer to FAR 52.228-1 Bid Guarantee, for the Bid Guarantee format. The

Obligee should be the “National Oceanic and Atmospheric Administration/Office of Marine and

Aviation Operations”. The bond duration should be for the entire Period of Performance.

Question 8

Question 8: Reading through the general requirements, I noticed a section where you may have a 3D model of the refit work. Is it possible we can get a copy of this to assist with estimating?

Response 8: The 3D modeling was ultimately not pursued by NOAA. A revised WP-00 (Rev.

2) was posted in Amendment 003 which removed this language.

6 ISSUED BY CODE:
AJ930073:
5 PROJECT NUMBER If applicableRow1:
8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code:
undefined:
10A MODIFICATION OF CONTRACTORDER NUMBER:
undefined_2:
10A MODIFICATION OF CONTRACTORDER NUMBER_2:
10B DATED SEE ITEM 13:
11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS:
The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off
is extended: Off
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS:
undefined_3:
B THE ABOVE NUMBERED CONTRACTORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES such as changes in paying office:
undefined_4:
undefined_5:
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
undefined_6:
1:
is not: Off
is required to sign this document and return: Off
14 DESCRIPTION OF AMENDMENTMODIFICATION Organized by UCF section headings including solicitationcontract subject matter where feasible:
15B CONTRACTOROFFEROR:
15C DATE SIGNED:

File details come from the government source that posted it. Updated .