Consolidated References_07142021.pdf
PDF 46 KB Posted
- Attached to
- NOAA Ship Ronald H. Brown: Mid-Life Refit Federal contract opportunity
- Solicitation number
- 1305M221RNMAN01155
About this file
This consolidated reference document contains engineering drawings, plans, analyses, reports, manuals, and other technical documents to support the mid-life refit of the NOAA Ship Ronald H. Brown. Key systems and work proposed include repowering the main engines, replacing the bow thruster, overhauling the Z-drive and other machinery, upgrading potable water, chilled water, sewage, science refrigeration, HVAC, tank level indicators, navigation, radar, lighting, and exterior ballast and fuel tank vent systems. Much of the ship's piping and steel will also be replaced as identified in an ABS report.
The federal contract opportunity posting is seeking proposals for the NOAA Ship Ronald H. Brown mid-life refit through solicitation 1305M221RNMAN01155. Proposals are due by 12:00 PM ET on August 6, 2021. The refit will be awarded as a firm fixed price contract utilizing FAR Part 12 for commercial acquisitions and FAR Part 15 for negotiated procurements. The refit scope includes upgrades to main propulsion, bow thruster, science systems, HVAC, piping, tankage and various other shipboard systems. Inquiries are due by June 28, 2021 to multiple NOAA points of contact provided. The refit will be conducted with the Department of Commerce National Oceanic and Atmospheric Administration as the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Type Title Author Doc. / Dwg. No. Rev Date
Contract Document Vessel Record Plans, Analyses, and Reports List
ECS 00
Drawing Fire Zone Boundary NAVSEA 6932704 1 5
Drawing Compartment Area and Volume Booklet
NAVSEA 6932720 26
Drawing Tank Capacity Tables (AGOR-NOAA) NAVSEA 6932729 9 DEC 1996 26
Drawing Machinery Control System Block Diagram
NAVSEA 6932730 F
15 NOV
Drawing Propulsion Control System Elementary Wiring Diagram
NAVSEA 6932733 D 7 FEB 1994 18
Drawing Bonding and Grounding Details NAVSEA 6932739 B
22 SEP
28 35
Drawing Dynamic Positioning System Elementary Wiring Diagram
NAVSEA 6932748 B 3 AUG 1994 18
Drawing Navigation Light Arrangement & Details
NAVSEA 6932749 B
20 SEP
Drawing Gyro Compass System NAVSEA 6932752 C
21 SEP
Drawing Sound Power Telephone Elementary Wiring Diagram
NAVSEA 6932753 18
Drawing Telephone System Elementary Wiring Diagram
NAVSEA 6932754 D
27 OCT
Drawing Electrical One-Line Diagram NAVSEA 6932772 C 5 MAY 1995 28 Drawing Cableway Key Plan NAVSEA 6932774 A 9 MAY 1995 28 Drawing Lighting System Deck Plan NAVSEA 6932778 24
Drawing Pilot House Arrangement NAVSEA 6932779 B
16 AUG
35 37
Drawing Transducer Tube Arrangement and Details
NAVSEA 6932800 A 4 OCT 1993 27
Drawing Structural Module Assembly No. 1 NAVSEA 6932801 B
10 MAY
Drawing Structural Module Assembly No. 2 NAVSEA 6932802 C 5 APR 1993 25 Drawing Structural Module Assembly No. 4 NAVSEA 6932804 A 8 APR 1993 25
Drawing Structural Module Assembly No. 5 NAVSEA 6932805 B
21 APR
Drawing Structural Module Assembly No. 6 NAVSEA 6932806 E
12 AUG
Drawing Structural Module Assembly No.
NAVSEA 6932810 B 23
Affected WP
Document Type Title Author Doc. / Dwg. No. Rev Date Affected WP
Drawing Structural Module Assembly No.
NAVSEA 6932813 D 3 AUG 1993 25
Drawing Structural Module Assembly No.
NAVSEA 6932814 D
22 APR
Drawing Structural Module Assembly No.
NAVSEA 6932815 G 2 NOV 1993 27
Drawing Structural Module Assembly No.
NAVSEA 6932816 B 7 DEC 1993 25
Drawing Structural Module Assembly No.
NAVSEA 6932820 C 7 JAN 1994 25
Drawing Deck Scantlings NAVSEA 6932825 D
25 MAR
18 25 27
Drawing Shell Expansion NAVSEA 6932827 D
26 OCT
25 26
Drawing Z-Drive and Motor Installation NAVSEA 6932836 C
13 SEP
Drawing Anchor Handling NAVSEA 6932843 5 AUG 1993 23
Drawing Hull Markings NAVSEA 6932850 C 27 JUL 1993 26
Drawing Laboratories, Workshops, and Lockers
NAVSEA 6932883 D
11 OCT
Drawing Piping Module Assembly No. 2 NAVSEA 6932902 C
19 APR
Drawing Piping Module Assembly No. 5 NAVSEA 6932905 E
26 APR
Drawing Piping Module Assembly No. 8 NAVSEA 6932908 A 1 MAR 1994 10
Drawing Sea Chests NAVSEA 6932909 C 8 APR 1993 26
Drawing Fills, Vents & Sounds Diagram & Details
NAVSEA 6932919 C 1 MAY 1997 19
Drawing Chilled Water System Arrangement & Details
NAVSEA 6932921 D 34233 07F
Drawing Firemain System Diagram NAVSEA 6932924 C
27 MAY
Drawing Firemain System Arrangement & Details
NAVSEA 6932925 D 6 JUL 1993 5 38
Drawing Uncontaminated Scientific Seawater System Diagram
NAVSEA 6932926 B
20 AUG
Uncontaminated Scientific Seawater System Arrangement & Details
NAVSEA 6932927 B
20 AUG
Drawing AGOR 24 Oceanographic Research Ship, Plumbing Sewage & Weather Dk Drains Arr & Det
NAVSEA 6932929 F 1 OCT 1993 10
Drawing Bilge & Ballast System Diagram NAVSEA 6932930 C
12 AUG
Drawing Watermaker and Potable Water System Diagram
NAVSEA 6932932 C 21 JAN 1993 6
Drawing Watermaker and Potable Water System Arrangement & Details
NAVSEA 6932933 B
12 SEP
Drawing Lube Oil Transfer and Service System Arrangement & Details
NAVSEA 6932937 B 1 JUN 1993 1
Drawing AFFF System NAVSEA 6932945 B
20 DEC
Drawing Reach Rod Arrangement and Details
NAVSEA 6932948 B
21 OCT
Drawing Oily Waste System Arrangement & Details
NAVSEA 6932950 B 1 MAY 1997 1
Drawing HVAC Arrangement & Detail, 01 Level FR15-64
NAVSEA 6932953 D 1 JUL 1996 07A 07G
Drawing HVAC Arrangement and Detail, 02 Level & Above
NAVSEA 6932954 D 1 JUL 1996 07A 07G
Drawing HVAC Arrangement and Detail, Upper Main Deck
NAVSEA 6932955 B 1 MAY 1995 07A
Drawing HVAC Arrangement and Detail, First Platform FR 22-64 & Hold FR 40-60
NAVSEA 6932956 D 1 OCT 1995 07A
Drawing HVAC Arrangement and Detail, Generator Room
NAVSEA 6932958 C 1 OCT 1995 07A
Drawing
HVAC Arrangement and Detail, Propulsion Motor Room, Pump Room, Engineering Stores, Winch Room, and 01 Level FR 64-Aft
NAVSEA 6932959 C 1 OCT 1995 07A
Drawing HVAC Arrangement and Detail, Bosun Stores & Bow Thruster Room
NAVSEA 6932960 C 1 NOV 1995 07A
Drawing HVAC General Notes & Construction Details
NAVSEA 6932961 B 34304 07F
Drawing HVAC Diagram NAVSEA 6932962 E
26 AUG
07A
Drawing HVAC Fan List NAVSEA 6932963 E 34189 07F
Drawing HVAC Electrical Heater List NAVSEA 6932964 E
26 AUG
07B
Drawing Paint Schedule ECS 00-631-001
11 SEP
0 23 24 25 26 27
Drawing Machinery Arrangements Glosten 01-201-01 P1
13 NOV
1 6 10 24 38
Drawing Major Equipment Removal and Installation Plan
Glosten 01-211-01 P1
13 NOV
Drawing Fuel Oil System Diagram Glosten 01-260-01 P1
13 NOV
Drawing Lube Oil System Diagram Glosten 01-262-01 P1
13 NOV
Drawing Electrical One-Line Diagram Glosten 01-300-01 P1
13 NOV
1 2 5 07G 15 28 37
Drawing Electrical Load Analysis Glosten 01-300-02 P1
13 NOV
Drawing Electrical One Line Diagram Removals
Glosten 01-300-06 P1
13 NOV
1 2
Drawing Propulsion Switchboard Layout Glosten 01-320-01 P1
13 NOV
Drawing Ship Service Switchboard Layout Glosten 01-320-02 P1
13 NOV
Drawing Integrated Monitoring and Control System (IMACS) Points List
Glosten 01-440-02 A 5 JUN 2019 11
Drawing Power Management System Description
Glosten 01-440-03 P1
13 NOV
Drawing Generator Room Ventilation Upgrades
Glosten 01-513-01 P1
13 NOV
Drawing Natural Vent Modifications Glosten 01-513-02 P1
13 NOV
Drawing Waste Heat Evaporator System Glosten 01-517-01 P1
13 NOV
Drawing Seawater Cooling System Diagram Glosten 01-532-01 P1
13 NOV
1 2 4 6 10 11
Drawing Freshwater Cooling System Diagram
Glosten 01-536-01 P1
13 NOV
1 2
Drawing Waste Oil System Diagram Glosten 01-543-01 P1
13 NOV
Drawing Compressed Air System Diagram Glosten 01-551-01 P1
13 NOV
Drawing Bow Thruster Electrical Modifications Diagram
Glosten 02-300-01 P1
13 NOV
Drawing Bow Thruster Equipment Removal and Installation Plan
Glosten 02-501-01
13 NOV
Drawing Ballast System Modification Diagram
ECS 04-529-01 4 5
Drawing Potable Water System Piping Diagram
ECS 06-533-01 6
Drawing RO Modular 2X SW6 General Arrangement
Lifestream 091820-120-GA 6
Drawing Sewage & Drains System Mods Diagram
ECS 10-593-01 10
Drawing R/V Atlantis AC Spaces General Electrical Modification Diagram
Glosten 10A-514-01 07A
Drawing R/V Atlantis AC Control System Modification Diagram
Glosten 10B-514-01
11 DEC
07B
Drawing R/V Atlantis Midlife Refit, WP-10C:
AHU-5 Zone Redesign - Arrangements
Glosten 10C-512-01
11 DEC
07C
Drawing R/V Atlantis Midlife Refit, WP-10C:
AHU-5 Zone Redesign – AC System Modifications
Glosten 10C-512-02
11 DEC
07C
Drawing Ship Stores Refrigeration System Piping Modifications
ECS 11-516-01 11
Drawing R/V Atlantis Midlife Refit HVAC Makeup Air Upgrades
Glosten 11A-512-01
28 NOV
08A
Drawing R/V Atlantis Chilled Water System Modifications Diagram
Glosten 12-514-01 3 DEC 2018 07B
Drawing Science Refrigeration System Mods Diagram
ECS 12-516-01 12
Drawing Telephone System Block Diagram ECS 15-432-01 15
Drawing Ballast and Fuel Tank Vent Modifications Details
ECS 19-512-01 19
Drawing Bow Thruster System Modifications Glosten 20065.01-02-WPS
11 DEC
2 13
Oily Waste System Modifications Diagram
ECS 21-593-01 21
Drawing Sewage Holding Tank Expansion ECS 25-113-001 10 25
Drawing 03 Deck Fan Room BERP Installation
ECS 25-154-001 25
Drawing Uncontaminated Scientific Seawater Low Suction Modifications
ECS 26-524-001 26
Drawing Main Deck BERP Installation ECS 28-131-001 28
Drawing Mission Clean Power Modifications ECS 28-314-001 28
Drawing Integrated Bridge System Block Diagram
ECS 37-423-001 37
Drawing R/V Atlantis 2000 Modifications, Potable Water Tank Expansion
Glosten 99079-10 A 6
Drawing Retrofit Outline DUSH-5 Markey Machinery Company
D44840 4 JUN 2020 31
Drawing Booklet of General Plans Art Anderson Associates
RB-085-001 4 NOV 2010 26 28 30 35
Drawing Docking Plan Art Anderson Associates
RB-085-002 1 NOV 2010 26
Drawing Sea Chest Valve Replacement Art Anderson Associates
RB-163-001 26
Drawing Multibeam Fairing Installation Glosten RB-461A-06
18 FEB
Drawing Multibeam Fairing Construction Glosten RB-461A-07 A
18 FEB
27 37
Drawing Third Deck HVAC Improvements and Transducer Void Airflow Addition
Art Anderson Associates
RB-512-003 08C
Winch Room and Propulsion Motor Room HVAC System Modification
Art Anderson Associates
RB-512-004 06 JAN 2021 07F
Drawing Winch Room Chilled Water Cooling Coil Addition
Art Anderson Associates
RB-514-002
21 DEC
07F
Drawing Fire Control Plan Charles A.
Rahn
RB-555-02 G
25 MAR
Drawing Keen K4RHX100M2-43-4.625- Inch Impeller Pump Data
Keen Pump
Form iXBlue Installation Form NAVSEA MU-INS&AHRS-AN-004 37
Form Rescue Boat Righting Device Inspection Form
Guidance iXBlue Inertial Products, Principles & Conventions
Furuno MU–INS&AHRS–AN–003 M 1 NOV 2016 37
Guidance iXBlue Inertial Products, Application Note, Mechanical Integration of Inertial Systems
Furuno MU-MECHAPN-AN-001 H 1 JAN 2015 37
Guidance Furuno CAN-bus Design Guide Furuno TIE-00170-B 37
Guidance Cat Engine Storage and Preservation
Caterpillar 38
Guidance Guide for Crew Habitability on Workboats
American Bureau of Shipping
(ABS)
1 FEB 2016 24
Instruction Military Handbook: Lighting on Naval Ships
US
Departme nt of Defense
(DOD)
DOD-HDBK-289
26 NOV
Instruction Commandant Instruction:
Navigation Rules, International- Inland
United States Coast Guard
(USCG)
M16672.2D 2013 16
Memorandum
Ronald H. Brown – Retrofit/Upgrades to Markey DESH- 5 Winches During FY 2022 Mid- Life Refit
Markey Machinery Company
SIL# A3847 7 OCT 2020 31
Proposal Marlo Coil AHU Replacements 07A
Regulation 46 CFR §111.75-17, Navigation Lights
2009 16
Regulation 46 CFR §118.320, Firehoses and nozzles
Regulation 46 CFR §160.062, Releases.
Lifesaving Equipment, Hydraulic, Manual
Regulation 46 CFR §160.151, Liferafts 38
Regulation
A.761(18) Recommendation on conditions for the approval of servicing stations for inflatable liferafts
Regulation International Rules for Preventing Collisions at Sea (COLREGs)
Internatio nal Maritime Organizati on (IMO)
1972 16
Regulation Marine Vessel Rules
American Bureau of Shipping
(ABS)
0 16
Regulation Rules for Habitability on Workboats
American Bureau of Shipping
(ABS)
Regulation
Safety of Life At Sea (SOLAS), Chapter II-2, Construction, Fire Protection, Fire Detection, and Fire Extinction
Internatio nal Maritime Organizati on (IMO)
24 38
Report Current Life Raft Certifications 38
Report NOAA Ship Ronald H. Brown Cable Penetrations Survey
ECS 38
Report NOAAS Ronald H. Brown (R 104) ABS Service-Life Extension Program (SLEP) Technical Report
American Bureau of Shipping
(ABS)
Standard Shipbuilding and Repair Quality Standard
Internatio nal Associatio n of Classificat ion Societies
(ICAS)
47 7 2013 0
Standard Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships
US
Departme nt of Defense
(DOD)
MIL-STD 1625C(SH) 26
Standard Standard for Marine Navigation Lights
Underwrit ers Laboratori es
UL 1104 1998 16
Standard Standard for Supplemental Requirements for Luminaires for Installation on Marine Vessels
Underwrit ers Laboratori es
UL 1598A 24
Standard ACR, The NADCA Standard for Assessment, Cleaning, Restoration of HVAC Systems
2013 07A
Standard Shipbuilding and Repair Quality Standard for Hull Structures during Construction
American Bureau of Shipping
(ABS)
2007 16
Technical Manual Carrier Marine Model 30HXS136 Screw Chiller R-143a, 123 Tons (432kW) Nominal Cooling Capacity
Carrier 813 38
Technical Manual EM122 Multibeam Echo Sounder Maintenance Manual
Kongsberg 309059 27
Technical Manual EM124 Multibeam Echo Sounder Installation Manual
Kongsberg 443140 27
Technical Manual SBP29 Sub-Bottom Profiler Installation Manual
Kongsberg 451253 27
Technical Manual Furuno IF-NMEA2K2 Installation Manual
Furuno C4459-Z02-C 37
Technical Manual Furuno FI5002 NMEA2K Junction Box Installation Manual
Furuno C72-00702-A 37
Technical Manual Furuno FE800 IMO Navigational Echo Sounder Installation Manual
Furuno IME-23840-G 37
Technical Manual Furuno GP-170 Installation Manual Furuno IME-44280-A 37
Technical Manual Furuno DS60 Doppler Speed Log Installation Manual
Furuno IME-72640-A1 37
Technical Manual MD69/21 Pelorus Stand w/ Compass Bearing Repeater User Manual
Marine Data
MD69-21-MA-v05r00 3 AUG 2017 37
Technical Manual iXBlue NAVBox Technical Manual Furuno MU-BINTGEN-AN-001 37
Technical Manual iXBlue INS3-OCTANS Interface Plates
Furuno MU-INSPLATE-AN-001 C
15 DEC
Technical Manual iXBlue OCTANS 5th Generation User’s Manual
Furuno MU-OCTANS-AN-020 D
15 NOV
Technical Manual Furuno RD-50 Operator’s Manual Furuno OME-44530-4D 37 Technical Manual Furuno RD-33 Operator’s Manual Furuno OME-44590-E 37 Technical Manual Lips Thrusters Volume I & II Lips RB-245 3
Technical Manual Carrier model 30MPW055600000 Carrier
Technical Manual Furuno FAR-23x8 Series Installation Manual
Furuno B
14 FEB
Technical Manual Furuno FAR-23x8 Series Operator’s Manual
Furuno F 28 JAN 2020 35
Technical Manual Furuno FI5002 NMEA2K Junction Box Supplemental Instructions
Furuno 37
Technical Manual NOAA Ship Ronald H. Brown BWMS Technical Manual
Art Anderson Associates
Technical Manual Technical Manual for Electric Duct Heaters, AGOR-24, AGOR-25 &
AGOR NOAA
Halter Marine, Inc.
Test Procedure R/V Roger Revelle, Periodic Safety Test Procedure, Final
Global Maritime
GM-PRJ101469-RTP-9147 C 9 JUN 2020 0
Work Package R/V Atlantis 2000 Modifications, Work Item 10 - Potable Water Tank Modifications
Glosten 99079 3 OCT 2000 6
Work Package General Requirements ECS WP-00 All
Work Package Z-Drive Overhaul NOAA WP-03
21 SEP
Work Package Ballast System Piping ECS WP-04
22 SEP
1 5 26
Work Package Firemain System Piping Replacement
ECS WP-05
22 SEP
1 4 24
Work Package Potable Water System Modifications
ECS WP-06
22 SEP
1 07G
Work Package AC Spaces General Modifications ECS WP-07A
10 DEC
1 07B 07C 07F 07G 08A 08B 08C 24 25
Work Package AC Control Upgrades ECS WP-07B
10 DEC
07A 07C
Work Package AHU-5 Zone Redesign ECS WP-07C
10 DEC
1 07A 07B 08C 10 24 25
Work Package Winch Room HVAC Modifications Art Anderson Associates
WP-07F
22 DEC
Work Package AHU-9 Addition ECS WP-07G
10 OCT
6 07A 07B 08A 24
Work Package HVAC Makeup Air Upgrades ECS WP-08A
10 DEC
1 2 07A 07C 07G 08C 24 25
Work Package Generator Room Supply Fan Noise Mitigation
ECS WP-08B
11 SEP
1 07A
Work Package 3rd Deck HVAC Modifications Art Anderson Associates
WP-08C
21 DEC
Work Package Sewage System And Drain Replacement
ECS WP-10 8 OCT 2020 1 24 25 30
Work Package Ships Stores Refrigeration Equiptment Replacement
ECS WP-11 4 NOV 2020 1 12
Work Package Scientific Refrigeration System Modifications
ECS WP-12 4 NOV 2020 1 11 24 33
Work Package Uncontaminated Scientific SW System Modifications
ECS WP-13 4 NOV 2020 2 26
Work Package Dial Telephone System Modifications
ECS WP-15
30 NOV
1 07C 24 28 38
Work Package Navigation Lighting System Modifications
ECS WP-16 4 NOV 2020 26
Work Package Aft Control Station Console Removal
ECS WP-18
25 AUG
Work Package Exterior Ballast & Fuel Tank Vent Modifications
ECS WP-19 5 NOV 2020 20
Work Package Hydraulic And Gear Oil transfer System Modifications
ECS WP-20 1 3 19 07F
Work Package Oily Water Separator Replacement ECS WP-21 1 JUL 2020 1
Work Package Anchor & Chain Maintenance NOAA WP-23
17 SEP
Work Package Overhead Lighting Upgrades ECS WP-24
16 DEC
1 2 07A 07C 10 15 28
Work Package Steel Replacement ECS WP-25
15 DEC
1 26 07A
Work Package Drydocking ECS WP-26
11 NOV
1 2 3 4 13 19 23 25 27 28 37
Work Package Transducer Modifications ECS WP-27 3 DEC 2020 26 08C 37
Work Package Scientific Power & Network System Modifications
NOAA/ECS WP-28
24 SEP
1 2 15
Work Package Tank Tevel Indication System Modifications
ECS WP-30
12 OCT
Work Package CTD Winch Overhauls ECS WP-31
21 SEP
Work Package Interior Decking Replacements ECS WP-33 9 NOV 2020 24 26
Work Package Radar Renewals ECS WP-35
20 NOV
Work Package Navigation System Renewals NOAA WP-37
27 OCT
26 27 35
Work Package General Maintenance ECS WP-38
14 DEC
1 5 07A 07B 07C 07F 07G 08C 26
File details come from the government source that posted it. Updated .