This consolidated reference document contains engineering drawings, plans, analyses, reports, manuals, and other technical documents to support the mid-life refit of the NOAA Ship Ronald H. Brown. Key systems and work proposed include repowering the main engines, replacing the bow thruster, overhauling the Z-drive and other machinery, upgrading potable water, chilled water, sewage, science refrigeration, HVAC, tank level indicators, navigation, radar, lighting, and exterior ballast and fuel tank vent systems. Much of the ship's piping and steel will also be replaced as identified in an ABS report.

The federal contract opportunity posting is seeking proposals for the NOAA Ship Ronald H. Brown mid-life refit through solicitation 1305M221RNMAN01155. Proposals are due by 12:00 PM ET on August 6, 2021. The refit will be awarded as a firm fixed price contract utilizing FAR Part 12 for commercial acquisitions and FAR Part 15 for negotiated procurements. The refit scope includes upgrades to main propulsion, bow thruster, science systems, HVAC, piping, tankage and various other shipboard systems. Inquiries are due by June 28, 2021 to multiple NOAA points of contact provided. The refit will be conducted with the Department of Commerce National Oceanic and Atmospheric Administration as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to NOAA Ship Ronald H. Brown: Mid-Life Refit, newest first.
File Type Posted
SF30_Amendment_0008_RBML_Complete.pdf PDF
6932959_Rev_D_HVAC_Arrangement _Details.pdf PDF
SF30_Amendment_0005_Complete.pdf PDF
WP-07G AHU-9 Addition V1.pdf PDF
429348_SAT PROCEDURE SBP 27 and SBP 29.pdf PDF
458499_em124_maintenance_manual.pdf PDF
RB-528- 6932929.pdf PDF
WP-11 Ships Stores Refrigeration Equipment Replacement V1.pdf PDF
WP 07B - AC Controls Upgrades V1.pdf PDF
WP-27 Transducer Modifications V1.pdf PDF
428711_EM 124 - SAT procedure.pdf PDF
RFP_1305M221RNMAN01155_RHB Mid-Life_REV2_071421.pdf PDF
20065.01-01-211-01 Major Equipment Removal and Installation Plan_Rev(P1).pdf PDF
RB_461A_RB-461A-06_Rev-_Sht001-008_ABS_MULTIBEAM FAIRING INSTALLATION INBOARD PROFILE _ TYPICAL SECTION.pdf PDF
WP-00 General V2.pdf PDF
WP-30 Tank Level Indication Modifications V1.pdf PDF
20065.01-01-262-01 Lube Oil System Diagram_Rev(P1).pdf PDF
20065.01-01-300-06_Electrical One-Line Removals Diagram_Rev(P1).pdf PDF
20065.01-01-551-01 Compressed Air Diagram_Rev(P1).pdf PDF
20065.01-01-543-01 Waste Oil Diagram_ Rev(P1).pdf PDF
20065.01-01-260-01 Fuel Oil System Diagrams_ Rev(P1).pdf PDF
20065.01-01-513-02_Natural Ventilation Trunk Modifications_Rev(P1).pdf PDF
18038.02-10B-514-01_AC Control System Mods Diagram_Rev- signed.pdf PDF
SF30_Amendment_0003_RBML_Complete.pdf PDF
Tech Man RB-437-00.pdf PDF
Keen-K4RHX100M2-43-4.625-Inch-Implr-Pump-Data.pdf PDF
18038.02-12-514-01 Chilled Water Diagram_Rev- signed.pdf PDF
6932929.pdf PDF
20065.01-01-201-01 Machinery Arrangements_Rev(P1).pdf PDF
20065.01-01-536-01 FW Cooling Diagram_Rev(P1).pdf PDF
18038.02-01-440-02_Machinery Control System Points List_Rev A_signed.pdf PDF
18038.02-10C-512-01_AHU5 Zone Redesign - Arrangements_Rev- signed.pdf PDF
20065.01-01-300-01_Electrical One-Line Diagram_Rev(P1).pdf PDF
RB_461A_RB-461A-07_RevA_Sht001-024_ABS_MULTIBEAM FAIRING CONSTRUCTION.pdf PDF
RFP_1305M221RNMAN01155_RHB Mid-Life_REV1_06112021.pdf PDF
Amendment_0002_Complete.pdf PDF
RB_101-6932803_RevE_SHT001-0013.pdf PDF
20065.01-01-532-01 SW Cooling Diagram_Rev(P1).pdf PDF
05-521-01_Rev 0.pdf PDF
WP-25 Steel Replacement REV 1.pdf PDF
SF-30 Amendment 0001.pdf PDF
RFP - 1305M221RNMAN01155_RHB Mid-Life.pdf PDF
J.3 Specification (Work Packages and References).zip ZIP file
J.5 Past Performance Information Form.rtf RTF text file
J.6 Past Performance Questionnaire.docx DOCX document
J.7 Standard Form 1418 - Performance Bond.pdf PDF
J.2 Section B - Schedule of supplies or services.xlsx XLSX spreadsheet
J.4 USDL Poster.pdf PDF
J.8 Standard Form 1416 - Payment Bond.pdf PDF
J.1 SF-33_Solicitation_Offer_Award.pdf PDF
Show all 50

NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Type Title Author Doc. / Dwg. No. Rev Date

Contract Document Vessel Record Plans, Analyses, and Reports List

ECS 00

Drawing Fire Zone Boundary NAVSEA 6932704 1 5

Drawing Compartment Area and Volume Booklet

NAVSEA 6932720 26

Drawing Tank Capacity Tables (AGOR-NOAA) NAVSEA 6932729 9 DEC 1996 26

Drawing Machinery Control System Block Diagram

NAVSEA 6932730 F

15 NOV

Drawing Propulsion Control System Elementary Wiring Diagram

NAVSEA 6932733 D 7 FEB 1994 18

Drawing Bonding and Grounding Details NAVSEA 6932739 B

22 SEP

28 35

Drawing Dynamic Positioning System Elementary Wiring Diagram

NAVSEA 6932748 B 3 AUG 1994 18

Drawing Navigation Light Arrangement & Details

NAVSEA 6932749 B

20 SEP

Drawing Gyro Compass System NAVSEA 6932752 C

21 SEP

Drawing Sound Power Telephone Elementary Wiring Diagram

NAVSEA 6932753 18

Drawing Telephone System Elementary Wiring Diagram

NAVSEA 6932754 D

27 OCT

Drawing Electrical One-Line Diagram NAVSEA 6932772 C 5 MAY 1995 28 Drawing Cableway Key Plan NAVSEA 6932774 A 9 MAY 1995 28 Drawing Lighting System Deck Plan NAVSEA 6932778 24

Drawing Pilot House Arrangement NAVSEA 6932779 B

16 AUG

35 37

Drawing Transducer Tube Arrangement and Details

NAVSEA 6932800 A 4 OCT 1993 27

Drawing Structural Module Assembly No. 1 NAVSEA 6932801 B

10 MAY

Drawing Structural Module Assembly No. 2 NAVSEA 6932802 C 5 APR 1993 25 Drawing Structural Module Assembly No. 4 NAVSEA 6932804 A 8 APR 1993 25

Drawing Structural Module Assembly No. 5 NAVSEA 6932805 B

21 APR

Drawing Structural Module Assembly No. 6 NAVSEA 6932806 E

12 AUG

Drawing Structural Module Assembly No.

NAVSEA 6932810 B 23

Affected WP

Document Type Title Author Doc. / Dwg. No. Rev Date Affected WP

Drawing Structural Module Assembly No.

NAVSEA 6932813 D 3 AUG 1993 25

Drawing Structural Module Assembly No.

NAVSEA 6932814 D

22 APR

Drawing Structural Module Assembly No.

NAVSEA 6932815 G 2 NOV 1993 27

Drawing Structural Module Assembly No.

NAVSEA 6932816 B 7 DEC 1993 25

Drawing Structural Module Assembly No.

NAVSEA 6932820 C 7 JAN 1994 25

Drawing Deck Scantlings NAVSEA 6932825 D

25 MAR

18 25 27

Drawing Shell Expansion NAVSEA 6932827 D

26 OCT

25 26

Drawing Z-Drive and Motor Installation NAVSEA 6932836 C

13 SEP

Drawing Anchor Handling NAVSEA 6932843 5 AUG 1993 23

Drawing Hull Markings NAVSEA 6932850 C 27 JUL 1993 26

Drawing Laboratories, Workshops, and Lockers

NAVSEA 6932883 D

11 OCT

Drawing Piping Module Assembly No. 2 NAVSEA 6932902 C

19 APR

Drawing Piping Module Assembly No. 5 NAVSEA 6932905 E

26 APR

Drawing Piping Module Assembly No. 8 NAVSEA 6932908 A 1 MAR 1994 10

Drawing Sea Chests NAVSEA 6932909 C 8 APR 1993 26

Drawing Fills, Vents & Sounds Diagram & Details

NAVSEA 6932919 C 1 MAY 1997 19

Drawing Chilled Water System Arrangement & Details

NAVSEA 6932921 D 34233 07F

Drawing Firemain System Diagram NAVSEA 6932924 C

27 MAY

Drawing Firemain System Arrangement & Details

NAVSEA 6932925 D 6 JUL 1993 5 38

Drawing Uncontaminated Scientific Seawater System Diagram

NAVSEA 6932926 B

20 AUG

Uncontaminated Scientific Seawater System Arrangement & Details

NAVSEA 6932927 B

20 AUG

Drawing AGOR 24 Oceanographic Research Ship, Plumbing Sewage & Weather Dk Drains Arr & Det

NAVSEA 6932929 F 1 OCT 1993 10

Drawing Bilge & Ballast System Diagram NAVSEA 6932930 C

12 AUG

Drawing Watermaker and Potable Water System Diagram

NAVSEA 6932932 C 21 JAN 1993 6

Drawing Watermaker and Potable Water System Arrangement & Details

NAVSEA 6932933 B

12 SEP

Drawing Lube Oil Transfer and Service System Arrangement & Details

NAVSEA 6932937 B 1 JUN 1993 1

Drawing AFFF System NAVSEA 6932945 B

20 DEC

Drawing Reach Rod Arrangement and Details

NAVSEA 6932948 B

21 OCT

Drawing Oily Waste System Arrangement & Details

NAVSEA 6932950 B 1 MAY 1997 1

Drawing HVAC Arrangement & Detail, 01 Level FR15-64

NAVSEA 6932953 D 1 JUL 1996 07A 07G

Drawing HVAC Arrangement and Detail, 02 Level & Above

NAVSEA 6932954 D 1 JUL 1996 07A 07G

Drawing HVAC Arrangement and Detail, Upper Main Deck

NAVSEA 6932955 B 1 MAY 1995 07A

Drawing HVAC Arrangement and Detail, First Platform FR 22-64 & Hold FR 40-60

NAVSEA 6932956 D 1 OCT 1995 07A

Drawing HVAC Arrangement and Detail, Generator Room

NAVSEA 6932958 C 1 OCT 1995 07A

Drawing

HVAC Arrangement and Detail, Propulsion Motor Room, Pump Room, Engineering Stores, Winch Room, and 01 Level FR 64-Aft

NAVSEA 6932959 C 1 OCT 1995 07A

Drawing HVAC Arrangement and Detail, Bosun Stores & Bow Thruster Room

NAVSEA 6932960 C 1 NOV 1995 07A

Drawing HVAC General Notes & Construction Details

NAVSEA 6932961 B 34304 07F

Drawing HVAC Diagram NAVSEA 6932962 E

26 AUG

07A

Drawing HVAC Fan List NAVSEA 6932963 E 34189 07F

Drawing HVAC Electrical Heater List NAVSEA 6932964 E

26 AUG

07B

Drawing Paint Schedule ECS 00-631-001

11 SEP

0 23 24 25 26 27

Drawing Machinery Arrangements Glosten 01-201-01 P1

13 NOV

1 6 10 24 38

Drawing Major Equipment Removal and Installation Plan

Glosten 01-211-01 P1

13 NOV

Drawing Fuel Oil System Diagram Glosten 01-260-01 P1

13 NOV

Drawing Lube Oil System Diagram Glosten 01-262-01 P1

13 NOV

Drawing Electrical One-Line Diagram Glosten 01-300-01 P1

13 NOV

1 2 5 07G 15 28 37

Drawing Electrical Load Analysis Glosten 01-300-02 P1

13 NOV

Drawing Electrical One Line Diagram Removals

Glosten 01-300-06 P1

13 NOV

1 2

Drawing Propulsion Switchboard Layout Glosten 01-320-01 P1

13 NOV

Drawing Ship Service Switchboard Layout Glosten 01-320-02 P1

13 NOV

Drawing Integrated Monitoring and Control System (IMACS) Points List

Glosten 01-440-02 A 5 JUN 2019 11

Drawing Power Management System Description

Glosten 01-440-03 P1

13 NOV

Drawing Generator Room Ventilation Upgrades

Glosten 01-513-01 P1

13 NOV

Drawing Natural Vent Modifications Glosten 01-513-02 P1

13 NOV

Drawing Waste Heat Evaporator System Glosten 01-517-01 P1

13 NOV

Drawing Seawater Cooling System Diagram Glosten 01-532-01 P1

13 NOV

1 2 4 6 10 11

Drawing Freshwater Cooling System Diagram

Glosten 01-536-01 P1

13 NOV

1 2

Drawing Waste Oil System Diagram Glosten 01-543-01 P1

13 NOV

Drawing Compressed Air System Diagram Glosten 01-551-01 P1

13 NOV

Drawing Bow Thruster Electrical Modifications Diagram

Glosten 02-300-01 P1

13 NOV

Drawing Bow Thruster Equipment Removal and Installation Plan

Glosten 02-501-01

13 NOV

Drawing Ballast System Modification Diagram

ECS 04-529-01 4 5

Drawing Potable Water System Piping Diagram

ECS 06-533-01 6

Drawing RO Modular 2X SW6 General Arrangement

Lifestream 091820-120-GA 6

Drawing Sewage & Drains System Mods Diagram

ECS 10-593-01 10

Drawing R/V Atlantis AC Spaces General Electrical Modification Diagram

Glosten 10A-514-01 07A

Drawing R/V Atlantis AC Control System Modification Diagram

Glosten 10B-514-01

11 DEC

07B

Drawing R/V Atlantis Midlife Refit, WP-10C:

AHU-5 Zone Redesign - Arrangements

Glosten 10C-512-01

11 DEC

07C

Drawing R/V Atlantis Midlife Refit, WP-10C:

AHU-5 Zone Redesign – AC System Modifications

Glosten 10C-512-02

11 DEC

07C

Drawing Ship Stores Refrigeration System Piping Modifications

ECS 11-516-01 11

Drawing R/V Atlantis Midlife Refit HVAC Makeup Air Upgrades

Glosten 11A-512-01

28 NOV

08A

Drawing R/V Atlantis Chilled Water System Modifications Diagram

Glosten 12-514-01 3 DEC 2018 07B

Drawing Science Refrigeration System Mods Diagram

ECS 12-516-01 12

Drawing Telephone System Block Diagram ECS 15-432-01 15

Drawing Ballast and Fuel Tank Vent Modifications Details

ECS 19-512-01 19

Drawing Bow Thruster System Modifications Glosten 20065.01-02-WPS

11 DEC

2 13

Oily Waste System Modifications Diagram

ECS 21-593-01 21

Drawing Sewage Holding Tank Expansion ECS 25-113-001 10 25

Drawing 03 Deck Fan Room BERP Installation

ECS 25-154-001 25

Drawing Uncontaminated Scientific Seawater Low Suction Modifications

ECS 26-524-001 26

Drawing Main Deck BERP Installation ECS 28-131-001 28

Drawing Mission Clean Power Modifications ECS 28-314-001 28

Drawing Integrated Bridge System Block Diagram

ECS 37-423-001 37

Drawing R/V Atlantis 2000 Modifications, Potable Water Tank Expansion

Glosten 99079-10 A 6

Drawing Retrofit Outline DUSH-5 Markey Machinery Company

D44840 4 JUN 2020 31

Drawing Booklet of General Plans Art Anderson Associates

RB-085-001 4 NOV 2010 26 28 30 35

Drawing Docking Plan Art Anderson Associates

RB-085-002 1 NOV 2010 26

Drawing Sea Chest Valve Replacement Art Anderson Associates

RB-163-001 26

Drawing Multibeam Fairing Installation Glosten RB-461A-06

18 FEB

Drawing Multibeam Fairing Construction Glosten RB-461A-07 A

18 FEB

27 37

Drawing Third Deck HVAC Improvements and Transducer Void Airflow Addition

Art Anderson Associates

RB-512-003 08C

Winch Room and Propulsion Motor Room HVAC System Modification

Art Anderson Associates

RB-512-004 06 JAN 2021 07F

Drawing Winch Room Chilled Water Cooling Coil Addition

Art Anderson Associates

RB-514-002

21 DEC

07F

Drawing Fire Control Plan Charles A.

Rahn

RB-555-02 G

25 MAR

Drawing Keen K4RHX100M2-43-4.625- Inch Impeller Pump Data

Keen Pump

Form iXBlue Installation Form NAVSEA MU-INS&AHRS-AN-004 37

Form Rescue Boat Righting Device Inspection Form

Guidance iXBlue Inertial Products, Principles & Conventions

Furuno MU–INS&AHRS–AN–003 M 1 NOV 2016 37

Guidance iXBlue Inertial Products, Application Note, Mechanical Integration of Inertial Systems

Furuno MU-MECHAPN-AN-001 H 1 JAN 2015 37

Guidance Furuno CAN-bus Design Guide Furuno TIE-00170-B 37

Guidance Cat Engine Storage and Preservation

Caterpillar 38

Guidance Guide for Crew Habitability on Workboats

American Bureau of Shipping

(ABS)

1 FEB 2016 24

Instruction Military Handbook: Lighting on Naval Ships

US

Departme nt of Defense

(DOD)

DOD-HDBK-289

26 NOV

Instruction Commandant Instruction:

Navigation Rules, International- Inland

United States Coast Guard

(USCG)

M16672.2D 2013 16

Memorandum

Ronald H. Brown – Retrofit/Upgrades to Markey DESH- 5 Winches During FY 2022 Mid- Life Refit

Markey Machinery Company

SIL# A3847 7 OCT 2020 31

Proposal Marlo Coil AHU Replacements 07A

Regulation 46 CFR §111.75-17, Navigation Lights

2009 16

Regulation 46 CFR §118.320, Firehoses and nozzles

Regulation 46 CFR §160.062, Releases.

Lifesaving Equipment, Hydraulic, Manual

Regulation 46 CFR §160.151, Liferafts 38

Regulation

A.761(18) Recommendation on conditions for the approval of servicing stations for inflatable liferafts

Regulation International Rules for Preventing Collisions at Sea (COLREGs)

Internatio nal Maritime Organizati on (IMO)

1972 16

Regulation Marine Vessel Rules

American Bureau of Shipping

(ABS)

0 16

Regulation Rules for Habitability on Workboats

American Bureau of Shipping

(ABS)

Regulation

Safety of Life At Sea (SOLAS), Chapter II-2, Construction, Fire Protection, Fire Detection, and Fire Extinction

Internatio nal Maritime Organizati on (IMO)

24 38

Report Current Life Raft Certifications 38

Report NOAA Ship Ronald H. Brown Cable Penetrations Survey

ECS 38

Report NOAAS Ronald H. Brown (R 104) ABS Service-Life Extension Program (SLEP) Technical Report

American Bureau of Shipping

(ABS)

Standard Shipbuilding and Repair Quality Standard

Internatio nal Associatio n of Classificat ion Societies

(ICAS)

47 7 2013 0

Standard Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships

US

Departme nt of Defense

(DOD)

MIL-STD 1625C(SH) 26

Standard Standard for Marine Navigation Lights

Underwrit ers Laboratori es

UL 1104 1998 16

Standard Standard for Supplemental Requirements for Luminaires for Installation on Marine Vessels

Underwrit ers Laboratori es

UL 1598A 24

Standard ACR, The NADCA Standard for Assessment, Cleaning, Restoration of HVAC Systems

2013 07A

Standard Shipbuilding and Repair Quality Standard for Hull Structures during Construction

American Bureau of Shipping

(ABS)

2007 16

Technical Manual Carrier Marine Model 30HXS136 Screw Chiller R-143a, 123 Tons (432kW) Nominal Cooling Capacity

Carrier 813 38

Technical Manual EM122 Multibeam Echo Sounder Maintenance Manual

Kongsberg 309059 27

Technical Manual EM124 Multibeam Echo Sounder Installation Manual

Kongsberg 443140 27

Technical Manual SBP29 Sub-Bottom Profiler Installation Manual

Kongsberg 451253 27

Technical Manual Furuno IF-NMEA2K2 Installation Manual

Furuno C4459-Z02-C 37

Technical Manual Furuno FI5002 NMEA2K Junction Box Installation Manual

Furuno C72-00702-A 37

Technical Manual Furuno FE800 IMO Navigational Echo Sounder Installation Manual

Furuno IME-23840-G 37

Technical Manual Furuno GP-170 Installation Manual Furuno IME-44280-A 37

Technical Manual Furuno DS60 Doppler Speed Log Installation Manual

Furuno IME-72640-A1 37

Technical Manual MD69/21 Pelorus Stand w/ Compass Bearing Repeater User Manual

Marine Data

MD69-21-MA-v05r00 3 AUG 2017 37

Technical Manual iXBlue NAVBox Technical Manual Furuno MU-BINTGEN-AN-001 37

Technical Manual iXBlue INS3-OCTANS Interface Plates

Furuno MU-INSPLATE-AN-001 C

15 DEC

Technical Manual iXBlue OCTANS 5th Generation User’s Manual

Furuno MU-OCTANS-AN-020 D

15 NOV

Technical Manual Furuno RD-50 Operator’s Manual Furuno OME-44530-4D 37 Technical Manual Furuno RD-33 Operator’s Manual Furuno OME-44590-E 37 Technical Manual Lips Thrusters Volume I & II Lips RB-245 3

Technical Manual Carrier model 30MPW055600000 Carrier

Technical Manual Furuno FAR-23x8 Series Installation Manual

Furuno B

14 FEB

Technical Manual Furuno FAR-23x8 Series Operator’s Manual

Furuno F 28 JAN 2020 35

Technical Manual Furuno FI5002 NMEA2K Junction Box Supplemental Instructions

Furuno 37

Technical Manual NOAA Ship Ronald H. Brown BWMS Technical Manual

Art Anderson Associates

Technical Manual Technical Manual for Electric Duct Heaters, AGOR-24, AGOR-25 &

AGOR NOAA

Halter Marine, Inc.

Test Procedure R/V Roger Revelle, Periodic Safety Test Procedure, Final

Global Maritime

GM-PRJ101469-RTP-9147 C 9 JUN 2020 0

Work Package R/V Atlantis 2000 Modifications, Work Item 10 - Potable Water Tank Modifications

Glosten 99079 3 OCT 2000 6

Work Package General Requirements ECS WP-00 All

Work Package Z-Drive Overhaul NOAA WP-03

21 SEP

Work Package Ballast System Piping ECS WP-04

22 SEP

1 5 26

Work Package Firemain System Piping Replacement

ECS WP-05

22 SEP

1 4 24

Work Package Potable Water System Modifications

ECS WP-06

22 SEP

1 07G

Work Package AC Spaces General Modifications ECS WP-07A

10 DEC

1 07B 07C 07F 07G 08A 08B 08C 24 25

Work Package AC Control Upgrades ECS WP-07B

10 DEC

07A 07C

Work Package AHU-5 Zone Redesign ECS WP-07C

10 DEC

1 07A 07B 08C 10 24 25

Work Package Winch Room HVAC Modifications Art Anderson Associates

WP-07F

22 DEC

Work Package AHU-9 Addition ECS WP-07G

10 OCT

6 07A 07B 08A 24

Work Package HVAC Makeup Air Upgrades ECS WP-08A

10 DEC

1 2 07A 07C 07G 08C 24 25

Work Package Generator Room Supply Fan Noise Mitigation

ECS WP-08B

11 SEP

1 07A

Work Package 3rd Deck HVAC Modifications Art Anderson Associates

WP-08C

21 DEC

Work Package Sewage System And Drain Replacement

ECS WP-10 8 OCT 2020 1 24 25 30

Work Package Ships Stores Refrigeration Equiptment Replacement

ECS WP-11 4 NOV 2020 1 12

Work Package Scientific Refrigeration System Modifications

ECS WP-12 4 NOV 2020 1 11 24 33

Work Package Uncontaminated Scientific SW System Modifications

ECS WP-13 4 NOV 2020 2 26

Work Package Dial Telephone System Modifications

ECS WP-15

30 NOV

1 07C 24 28 38

Work Package Navigation Lighting System Modifications

ECS WP-16 4 NOV 2020 26

Work Package Aft Control Station Console Removal

ECS WP-18

25 AUG

Work Package Exterior Ballast & Fuel Tank Vent Modifications

ECS WP-19 5 NOV 2020 20

Work Package Hydraulic And Gear Oil transfer System Modifications

ECS WP-20 1 3 19 07F

Work Package Oily Water Separator Replacement ECS WP-21 1 JUL 2020 1

Work Package Anchor & Chain Maintenance NOAA WP-23

17 SEP

Work Package Overhead Lighting Upgrades ECS WP-24

16 DEC

1 2 07A 07C 10 15 28

Work Package Steel Replacement ECS WP-25

15 DEC

1 26 07A

Work Package Drydocking ECS WP-26

11 NOV

1 2 3 4 13 19 23 25 27 28 37

Work Package Transducer Modifications ECS WP-27 3 DEC 2020 26 08C 37

Work Package Scientific Power & Network System Modifications

NOAA/ECS WP-28

24 SEP

1 2 15

Work Package Tank Tevel Indication System Modifications

ECS WP-30

12 OCT

Work Package CTD Winch Overhauls ECS WP-31

21 SEP

Work Package Interior Decking Replacements ECS WP-33 9 NOV 2020 24 26

Work Package Radar Renewals ECS WP-35

20 NOV

Work Package Navigation System Renewals NOAA WP-37

27 OCT

26 27 35

Work Package General Maintenance ECS WP-38

14 DEC

1 5 07A 07B 07C 07F 07G 08C 26