428709_em124_hat_procedure.pdf
PDF 147 KB Posted
- Attached to
- NOAA Ship Ronald H. Brown: Mid-Life Refit Federal contract opportunity
- Solicitation number
- 1305M221RNMAN01155
About this file
This document outlines requirements for a mid-life refit of the NOAA Ship RONALD H. BROWN. The refit modification will upgrade or overhaul many of the ship's systems including repowering, bow thruster, Z-drive, potable water, chilled water, sewage, science refrigeration, uncontaminated seawater, air conditioning, tank level indicators, navigational equipment, radar renewals, overhead lighting, security perimeter lighting, and exterior ballast and fuel tank vent renewals. Much of the ship's piping will also be replaced along with identified steelwork. The solicitation seeks a firm fixed price contract for all labor, material and equipment to deliver the refit. Interested parties must submit inquiries by June 28, 2021 and fixed price proposals by August 6, 2021 to the National Oceanic and Atmospheric Administration Contracting Officer and Contract Specialist.
View the file
Other files for this federal contract opportunity
Show all 50
NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPANY SHARED
KONGSBERG PROPRIETARY. This document and its accompanying elements contain KONGSBERG information which is proprietary and confidential. Any disclosure, copying, distribution or use is prohibited if not otherwise explicitly agreed with KONGSBERG in writing. Any authorized reproduction, in whole or in part, must include this legend. ©2018 KONGSBERG - All rights reserved.
Harbour Acceptance Test
EM 124 Multibeam Echo Sounder
Doc No: 428709
Revision: A
Status: This document is under configuration control at Kongsberg Maritime.
Kongsberg Maritime AS COMPANY SHARED
KONGSBERG PROPRIETARY – see Statement of Proprietary Information
428709 / A / 2018-03-08 / Page 2 of 12
Document history
Revision Description of Change
A First Issue
References
No Doc No Description
Disclaimer
Kongsberg Maritime AS endeavours to ensure that all information in this document is correct and fairly stated, but does not accept liability for any errors or omissions.
428709 / A / 2018-03-08 / Page 3 of 12
Table of contents
1 Introduction
2 References
3 Test equipment
4 List of items
5 Configuration
6 Changed SW- or HW- modules
7 Interconnection/arrangement
8 Test Procedure
9 Check list
10 Data Records
11 Testimonial
428709 / A / 2018-03-08 / Page 4 of 12
1 Introduction The purpose of this procedure is to verify that the system installed is fully operational. It shall also serve as a record of the successful completion of the Harbour Acceptance Test
(HAT).
2 References A Copy of the Transducer Measurements is to be included with this FAT record.
3 Test equipment The following test equipment is or may be required to perform this test:
Item Equipment Serial number
Calibration expiry date
Test PC with position and attitude simulator NA NA
428709 / A / 2018-03-08 / Page 5 of 12
4 List of items
List of items to be tested Item Manufacturer, type and/or registration number
Equipment Serial number
1 EM 124 Transmitter Unit # 1
2 EM 124 Transmitter Unit # 2
3 EM 124 Receiver Unit # 1
4 EM 124 Receiver Unit # 2
5 EM 124 Processing Unit # 1
6 EM 124 Processing Unit # 2
7 HYDROGRAPHIC WORKSTATION
8 POSITIONING SYSTEM
9 MOTION SENSOR
10 SOUND SPEED PROFILE SENSOR
11 FIXED SOUND SPEED SENSOR
5 Configuration For module serial numbers, refer to the FAT record. Any replaced modules must be documented below.
428709 / A / 2018-03-08 / Page 6 of 12
6 Changed SW- or HW- modules Any software or modules that are replaced after the FAT shall be listed.
Replacement list
Item Equipment Registration number Serial number
7 Interconnection/arrangement The system shall be fully installed and the external sensors shall be connected.
8 Test Procedure Switch on power to the Operator Station and to the Processing Unit. The Processing Unit will turn on the RX and TX Units. Perform all tests as described in the check list and fill in the results for each individual test.
428709 / A / 2018-03-08 / Page 7 of 12
9 Check list Check list
Pos Test operation Result Specification preHAT HAT
1 Start the SIS operator software and select the EM 124 Processing Unit.
The SIS is started and contact with the Processing Unit is established.
2 Verify Transmitter Unit(s) status LEDs
LEDs ok
3 Verify Receiver Unit(s) status
LED
LEDs ok
4 To acquire item reg. number, revision, serial number and software date and revisions for all modules, run the BIST test -> System Information. Save the result as an appendix to this report (ref Data records chapter).
Report printed
5 Self-tests: Start BIST test. Execute the following BIST (Built in system tests) tests, one by one
Verify successful completion of the tests
(Date and versions are stored in Pos 6, write OK if test passes).
5.1 CPU test
5.2 CBMF test
5.3 RX unit test
5.4 TX unit test
5.5 CBMF - CPU link
5.6 RX - CBMF link
5.7 RX channels
5.8 TX channels
428709 / A / 2018-03-08 / Page 8 of 12
Check list
Pos Test operation Result Specification preHAT HAT
5.9 RX noise level
Note the average NL
5.10 RX noise spectrum
5.11 For future test
5.12 For future test
6 Test of navigation input.
Start the navigation system.
Make sure that the navigation output matches the serial line 1 setup, and make this port the active one.
At the Operator Station Numerical display, verify that the sensor fields changes from red to white and that the sensor values are updated.
7 Test of motion sensor input.
Start the motion sensor. Make sure that the motion sensor output matches the serial line 2 setup, and make this port the active one.
At the Operator Station Numerical display, verify that the motion sensor fields changes from red to white and that the sensor values are updated.
428709 / A / 2018-03-08 / Page 9 of 12
Check list
Pos Test operation Result Specification preHAT HAT
8 Move the navigation sensor input to serial line 3.
Make sure that the navigation sensor output matches the serial line 3 setup, and make this port the active one.
At the Operator Station Numerical display, verify that the motion sensor fields changes from red to white and that the sensor values are updated.
9 Move the motion sensor input to serial line 4.
Make sure that the motion sensor output matches the serial line 4 setup, and make this port the active one.
At the Operator Station Numerical display, verify that the motion sensor fields changes from red to white and that the sensor values are updated.
10 Move the motion sensor input to secondary net port.
Make sure that the motion sensor output matches the secondary net, and make this port the active one. Connect the test PC to the PU Secondary net.
At the Operator Station Numerical display, verify that the motion sensor fields changes from red to white and are updated.
11 Connect all sensors (including 1PPS if required) and configure the system for normal use.
At the Operator Station verify all sensor displays and check that all sensor alarms disappear.
12 Test of sound speed probe. If a probe is connected to the echo sounder.
Check the interface to the probe.
13 Test of printer. If a printer is included in the delivery, transfer a file to the printer.
Verify the print of the file (picture) transferred from the Operator Station.
428709 / A / 2018-03-08 / Page 10 of 12
Check list
Pos Test operation Result Specification preHAT HAT
14 Test ping mode (It may be too shallow in the harbour to get good results)
Fill in the installation parameters and start pinging. A position simulator may be used to make the ship move around in the geographical display.
Verify the functionality of the cross track display, the waterfall display, the seabed image display and the geographical display.
Verify that the coverage sector can be adjusted.
13 Start pinging and log data.
Verify data logging.
Performed by (date/sign) Witnessed by (date/sign)
PreHAT:
PreHAT:
HAT:
HAT:
428709 / A / 2018-03-08 / Page 11 of 12
10 Data Records From the Operator station (SIS)
• Run all Built In System Tests. Save the BIST results to file.
• Run the System Info Test and save to file (This contains info about registration numbers, serial numbers, software versions etc.)
• Save the PU parameters to file (this file contains information about runtime and installation parameters).
Transfer these files to Kongsberg maritime head office for update of the ships installation records (Archive).
428709 / A / 2018-03-08 / Page 12 of 12
11 Testimonial The HARBOUR ACCEPTANCE TEST for the EM 124, for ………………………….
has been performed according to the test procedure.
The HAT approval is only valid if the test is performed by an engineer certified by Kongsberg Maritime A/S.
The test is: Accepted / Not accepted (Delete as appropriate)
Remarks:
Please use capital letters:
Test performed by Position Date
Test accepted by Position Date
Signatures
| 1 Introduction |
| 2 References |
| 3 Test equipment |
| 4 List of items |
| 5 Configuration |
| 6 Changed SW- or HW- modules |
| 7 Interconnection/arrangement |
| 8 Test Procedure |
| 9 Check list |
| 10 Data Records |
| 11 Testimonial |