18038.02-12-514-01 Chilled Water Diagram_Rev- signed.pdf
PDF 2 MB Posted
- Attached to
- NOAA Ship Ronald H. Brown: Mid-Life Refit
- Solicitation number
- 1305M221RNMAN01155
About this file
This solicitation is for a firm fixed price contract to complete a mid-life refit of the NOAA Ship Ronald H. Brown. The refit includes upgrades to systems such as repowering, bow thruster, Z-drive, potable water, chilled water, sewage, science refrigeration, HVAC, tank level indicators, navigational equipment, radar, lighting, and vent renewals. Much of the ship's piping and steel will also be replaced as identified in an ABS report. Proposals are due by August 6, 2021 and shall be submitted to the Contracting Officer and Contract Specialist. Inquiries are due by June 28, 2021 and shall be sent to the listed government points of contact. The refit work will be competed using FAR Part 12 and Part 15.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
REFERENCES
REVISIONS
ZONE REV DESCRIPTION DATE APPD
Work Package
Issue Date
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
FAN COIL LIST
EQUIPMENT LIST
MATERIAL SCHEDULE
5 3
AA
BB
CC
DD
ELECTRICAL
2.3
COOLING CAPACITY
(TONS)
126 TONS A/C CHILLER, TWIN SCREW COMPRESSOR SW COOLED
514P101 4X4X7B
514E102
WALL MOUNTED
24 V, NON-PROGRAMMABLE,DEBONAIR-2 33CSSN2-WC
EQUIPMENT #
A/C CHILLER, TWIN SCREW COMPRESSOR SW COOLED126 TONS
PUMP, CENTRIFUGAL, 718 GPM @ 60.6 PSI MAX
SIZE DESCRIPTION
PRESSURE
MSS-SP-80 VALVES LIMITED
TO 75% OF VALVE DESIGN
514E101
ORIENTATION
RIGHT HAND 120VAC/1P/60HZ
VALVES, AND ISOLATION VALVES. BOTTOM RETURN,
FRONT SUPPLY.
INCLUDING Y-STRAINER, AIR VENT, CIRCUIT SETTER
REMARKS
(2 POSITION) MOTORIZED VALVE PACKAGE
3-SPEED PSC MOTOR & FACTORY WIRED 3-WAY
4-ROW HIGH CAPACITY COIL. WITH STANDARD
1. PIPING SYSTEM DESIGN, MATERIAL, INSTALLATION, TESTING AND WORKMANSHIP
SHALL BE IN ACCORDANCE WITH REFERENCE 1, REGULATORY BODY REQUIREMENTS
OF U.S. COAST GUARD, AMERICAN BUREAU OF SHIPPING, INTERNATIONAL MARITIME
ORGANIZATION, AND INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA
(SOLAS).
2. THIS DRAWING IS A DIAGRAMMATIC ILLUSTRATION OF A PIPING SYSTEM. PIPING
ARRANGEMENTS WITHIN THE VESSEL SHALL BE DEVELOPED BY THE CONTRACTOR
USING EQUIPMENT LOCATIONS PER REFERENCE 9. FLOW RATES AND FLOW
COEFFICIENTS ARE BASED ON EXISTING COOLING COIL NAME PLATE DATA AND NEW
EQUIPMENT WITHIN THE SCOPE OF REFERENCES 3, 4, 5, 6, AND 7. DIAGRAM DATA
SHALL BE CONFIRMED BY THE CONTRACTOR BASED ON THE PROVIDED PIPING
ARRANGEMENTS, EXISTING EQUIPMENT, AND MANUFACTURER'S CERTIFIED DATA
FOR EQUIPMENT SELECTED.
3. BULKHEAD AND DECK PIPING PENETRATIONS SHALL MAINTAIN THE
WATERTIGHT, FUMETIGHT AND FIRE RATING OF THE BOUNDARY PER REGULATORY
BODY REQUIREMENTS. REINFORCING PENETRATION SLEEVES SHALL BE FITTED PER
GENERAL NOTE 4(g) TO MAINTAIN STRUCTURAL INTEGRITY OF THE BOUNDARY.
4. SYSTEM INSTALLATION SHALL COMPLY WITH THE FOLLOWING ASTM
SHIPBUILDING AND MARINE TECHNOLOGY STANDARDS:
a. SYSTEM THERMAL INSULATION SHALL BE IN ACCORDANCE WITH ASTM F683.
b. GAUGE BOARD ASSEMBLIES SHALL BE IN ACCORDANCE WITH ASTM F707.
INSTALL TYPE 1 (3-1/2 SIZE), GRADE A.
c. RIGID PIPE HANGERS SHALL BE IN ACCORDANCE WITH ASTM F708.
EXCEPTION: PARAGRAPH 1.3 IS NOT APPLICABLE.
RESILIENT HANGERS SHALL BE INSTALLED IN ACCORDANCE WITH THE VESSEL
RESILIENT HANGER SCHEDULE. INSTALLATION SHALL BE BETWEEN
RESILIENTLY MOUNTED EQUIPMENT AND THE FIRST RIGID PENETRATION
OR FOR A DISTANCE OF 30'.
d. INSTRUMENTATION PIPING ASSEMBLIES SHALL BE IN ACCORDANCE WITH ASTM
F721. EXCEPTION: INSTALL 1/2-INCH ROOT VALVE WITH = 4 INCH
STAND-OFF. THERMOMETERS AND TEMPERATURE TRANSDUCERS SHALL BE
MOUNTED IN UNION STYLE THERMOWELLS. PRESSURE GAUGES AND PRESSURE
TRANSDUCERS SHALL HAVE ISOLATION VALVES AND MEANS FOR TESTING.
e. PIPE WELDING SHALL BE IN ACCORDANCE WITH ASTM F722. EXCEPTION:
NON-CONSUMABLE BACKING RINGS AND MITERED JOINTS NOT PERMITTED.
f. VALVE LABEL PLATES SHALL BE IN ACCORDANCE WITH ASTM F992. INSTALL
TYPE 1, GRADE E, CLASS 2, LETTER SIZE 2, PLATE SIZE TO SUIT.
g. STRUCTURAL REINFORCING PENETRATION SLEEVES SHALL BE IN ACCORDANCE
WITH ASTM F682.
5. FLEXIBLE CONNECTIONS SHALL BE DESIGNED TO ALLOW FOR MAXIMUM
EXCURSIONS OF RESILIENTLY MOUNTED EQUIPMENT. THE INSTALLATION OF
FLEXIBLE HOSE ASSEMBLIES IS TO BE IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS AND USE LIMITATIONS WITH PARTICULAR ATTENTION TO
ORIENTATION, END CONNECTION SUPPORT (WHERE NECESSARY), AVOIDANCE OF
HOSE CONTACT THAT COULD CAUSE RUBBING AND ABRASION, AND MINIMUM BEND
RADII. FLEXIBLE HOSE SHALL NOT BE USED IN LENGTHS EXCEEDING 30 INCHES.
6. PIPING SHALL NOT BE ROUTED OVER SWITCHBOARDS AND TAKEDOWN JOINTS
SHALL NOT BE LOCATED OVER ANY ELECTRICAL EQUIPMENT.
7. PIPES DESIGNED TO ACCOMMODATE TEMPERATURE VARIATIONS AND PRESSURE
SHALL BE INSTALLED WITH AN EXPANSION LOOP EVERY 20' OF RUN, OR IN EACH
COMPARTMENT OR TANK, WHICHEVER IS SHORTEST.
8. TEFLON SHEETING SHALL BE INSTALLED BETWEEN COPPER OR CNA PIPES AND
STEEL SUPPORTS TO PREVENT COPPER OF CNA PIPING FROM SHAVING.
GENERAL NOTES CONT. ZONE 2-2D
42CG4 1,200
PART NO.MFRCFMCOIL
ROWS
CARRIER
NITRILE
FIBER WITH
FLEX
SOLDERS CONTAININGINORGANIC 90°F75 PSIG
WATER
CHILLED
SOLDER JOINT, ANSI B16.18
OR BRONZE, ASME B62,
ANSI B16.24
SOLDER JOINT,
SB62, CLASS 150, FLANGE,
BRONZE, ASME SB61 OR
ANSI B16.18
UNION, SOLDER JOINT,
OR BRONZE, ASME B62,
SOLDER JOINT, ANSI B16.22
COPPER, ASTM B88, UNION
SEAMLESS
TYPE K OR L,
ASTM B88,
BOLTING
STEEL ASTM A307
GATE/GLOBE/CHECK: MSS-SP-80
BALL: MSS-SP-110
CLASS 150, SOLDER JOINT
BRONZE, ASME SB61 OR SB62,
GR A, ANSI B18.2.2
BINDER,
GR B, ANSI B18.2.1
GARLOCK
OR EQUAL
BRONZE
STEEL
STAINLESS
BRASS OR
CONTROL:
BRONZE
WAFER OR LUG
CONTROL: ASTM B283 C37700
GATE/GLOBE/CHECK: MSS-SP-80
CLASS 150, FLANGE
BRONZE, ASME SB61 OR SB62,
CONTROL: ASTM B283 C37700
SOLDER JOINT, ANSI B16.18
OR BRONZE, ASME B62,
EQUIPMENT #
COPPER, ASTM B88,
APPROVED
ABS
COMPLIANT,
ASTM F1123
EXP JOINTS:
STEEL
STAINLESS
BRASS OR
CONTROL:
COPPER, ASTM B88,
PIPING SYSTEM
PIPE
SIZE MATERIAL
TAKEDOWN JOINTS
MATERIAL GASKETS
VALVES
BODY TRIM
SOLDER JOINT, ANSI B16.22
CONN'S
FITTINGS
TYPE & MATERIAL
MAX WORKING CONDITIONS
SYSTEM PRESSURE TEMP
REMARKS
CHILLED WATER
SYSTEM
(CLASS 2 PIPING)
2" &
BELOW
2-1/2" &
ABOVE
COPPER,
BUTTERFLY: STEEL MSS-SP-67
WORKSHOP
STEEL ASTM A563
514E104 - THERMOSTAT CARRIER
514E103
NOTESPART NO.
3500 RPM, 40 HP 480 VAC 3PH AURORABRONZE
MFR
DESCRIPTION
122 KW 460 VAC 3PH 60HZ, GN 1030HXS146ZZE6-1AACARRIER
LEAD ARE PROHIBITEDSOLDER JOINT, ANSI B16.22
122 KW 460 VAC 3PH 60HZ, GN 1030HXS146ZZE6-1AACARRIER
MATERIAL
1. R/V ATLANTIS MIDLIFE REFIT, SHIPYARD CONTRACT TECHNICAL
SPECIFICATION, GLOSTEN. INC., DOCUMENT NO. 18038.02-S01.
2. R/V ATLANTIS MIDLIFE REFIT, WP-12 – WORK PACKAGE SPECIFICATION,
CHILLER REPLACEMENT, GLOSTEN, INC.
3. R/V ATLANTIS MIDLIFE REFIT, WP-01 – WORK PACKAGE SPECIFICATION,
REPOWER, GLOSTEN, INC.
4. R/V ATLANTIS MIDLIFE REFIT, WP-10B – WORK PACKAGE SPECIFICATION,
A/C CONTROLS UPGRADES, GLOSTEN, INC.
5. R/V ATLANTIS MIDLIFE REFIT, WP-10C – WORK PACKAGE SPECIFICATION,
AHU-5 ZONE REDESIGN, GLOSTEN, INC.
6. R/V ATLANTIS MIDLIFE REFIT, WP-02 – WORK PACKAGE SPECIFICATION,
BOW THRUSTER REPLACEMENT, GLOSTEN, INC.
7. R/V ATLANTIS MIDLIFE REFIT, WP-15 – WORK PACKAGE SPECIFICATION,
SCIENCE REFRIGERATION PLANT REPLACEMENT, GLOSTEN, INC.
8. SS REFRIGERATION PIPING MODS, GLOSTEN, INC., DRAWING NO. 14-516-01
9. MACHINERY ARRANGEMENTS, GLOSTEN, INC., DRAWING NO. 01-201-01.
10. EQUIPMENT REMOVAL AND INSTALLATION PLAN, GLOSTEN, INC.,
DRAWING NO. 01-211-01.
11. SEAWATER COOLING SYSTEM DIAGRAM, GLOSTEN, INC., DRAWING NO. 01-532-01.
12. AMS POINTS LIST, GLOSTEN, INC., DOCUMENT NO. 01-440-02.
13. PROPULSION MOTOR ROOM AIR CONDITIONING, GLOSTEN, INC.,
DRAWING NO. 01-514-01.
14. AC CONTROL SYSTEM MODS DIAGRAM, GLOSTEN, INC., DRAWING NO. 10B-514-01.
15. AHU5 ZONE REDESIGN - A/C SYSTEM MODIFICATIONS, GLOSTEN, INC.,
DRAWING NO. 10C-514-02.
16. BOW THRUSTER ROOM AIR CONDITIONING DIAGRAM, GLOSTEN, INC.,
DRAWING NO. 02-512-01.
17. SCIENCE REFRIGERATION SYSTEM MODIFICATIONS DIAGRAM, GLOSTEN, INC.,
DRAWING NO. 15-516-02.
18. R/V ATLANTIS MIDLIFE RE-FIT 126 TON MARINE CHILLERS,
CARRIER MARINE & OFFSHORE, DOCUMENT NO. 17.GD.125, 6-16-2017.
19. AGOR 24/25/NOAA, TECHNICAL MANULA FOR A/C AIR HANDLING UNITS, HALTER
MARINE INC., CONTRACT NO. H00024-C-2303, 02/1996.
20. AGOR 24 OCEANOGRAPHIC RESEARCH SHIP, CHILLED WATER SYSTEM DIAGRAM,
NAVSEA, DRAWING NO. 6932920, REV E, 04/1998.
21. AGOR 24 OCEANOGRAPHIC RESEARCH SHIP, CHILLED WATER SYS ARR & DETAILS,
NAVSEA, DRAWING NO. 6932921, REV C, 06/1994.
22. R/V ATLANTIS MIDLIFE REFIT, WP-10F - WORK PACKAGE SPECIFICATION, WINCH
ROOM AC, GLOSTEN, INC.
23. WINCH ROOM AIR CONDITIONING, GLOSTEN, INC., DRAWING NO. 10F-512-01.
24. POTABLE WATER PIPING DIAGRAM, GLOSTEN, INC., DRAWING NO. 09-533-01.
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
GENERAL NOTES, MATERIAL SCHEDULE, & REFERENCES
ADV CJF DWL 12/03/18NO SCALE
12-514-01 1 11 -1218038.02
514P102 4X4X7B PUMP, CENTRIFUGAL, 718 GPM @ 60.6 PSI MAX BRONZE AURORA 3500 RPM, 40 HP 480 VAC 3PH
2-57-2
361A AB, 6-9/16" DIAMETER
TRIMMED IMPELLER
361A AB, 6-9/16" DIAMETER
TRIMMED IMPELLER
OFE
OFE
-ALL INITIAL ISSUE 12/03/18 DWL
GENERAL NOTES
Work Package
Issue Date
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
B
B
C
EXPANSION JOINT, BELLOWS OR CORRUGATED
VALVE LIST
FCU-13 BRANCH CBV #1, CV=7.7, GN 12
INSTRUMENT LIST
INSTRUMENTATION KEY
B
D
D
C C
B
A A
7 2
CONTINUED FROM ZONE 1-2B
9. CHILLED WATER PUMPS SHALL BE FULLY REDUNDANT WITH EITHER PUMP
SELECTABLE TO BE PRIMARY WITH THE OTHER PUMP STANDBY. STANDBY PUMP
SHALL START AUTOMATICALLY ON LOW PUMP DISCHARGE PRESSURE.
10. THE A/C CHILLER PLANTS SHALL EACH BE DESIGNED FOR PARALLEL CONSTANT
FLOW OPERATION WITH 359 GPM FLOW RATE THROUGH EACH CHILLER AND A
LEAVING WATER TEMPERATURE OF 42 DEG. F. THE CHILLER UNITS SHALL
INCLUDE THE FOLLOWING CAPABILITIES:
a. CHILLER PLANTS SHALL OPERATE IN PARALLEL IN A LEAD-LAG
CONFIGURATION BASED ON LOAD, WITH EITHER CHILLER SELECTABLE TO
BE LEAD.
b. THE MASTER CHILLER SHALL PROVIDE LEAVING WATER TEMPERATURE RESET
CONTROL FOR THE LEAD CHILLER.
c. CHILLED WATER PUMP INTERLOCK SHALL SHUTDOWN BOTH CHILLER UNITS
WHEN NEITHER CHILLED WATER PUMP IS RUNNING. THIS INTERLOCK
SHALL BE IN ADDITION TO FACTORY SUPPLIED LOW FLOW SHUTDOWN.
d. INTEGRAL CONTROL POWER TRANSFORMER.
e. MINIMUM LOAD CONTROL (DOWN TO 10% OF SINGLE UNIT CAPACITY).
11. THREE-WAY CONTROL VALVES AT COOLING COILS SHALL BE BELIMO B3 SERIES
CHARACTERIZED BALL VALVES OR EQUAL. ALL MODULATING CONTROL VALVES
SHALL HAVE A MINIMUM VALVE AUTHORITY OF 0.5, WITH THE EXCEPTION OF
AHU-4 WHICH SHALL HAVE A MINIMUM VALVE AUTHORITY OF 0.3. ALL CONTROL
VALVES SHALL HAVE REDUCED FLOW THROUGH BYPASS (70% OF FLOW TO LOAD).
CONTROL VALVES SHALL INCLUDE THE FOLLOWING:
a. REDUCED FLOW THROUGH BYPASS (70% OF FLOW TO LOAD). EQUAL
PERCENTAGE CHARACTERIZED FLOW TO LOAD.
b. ACTUATORS SHALL HAVE MINIMUM IP44 RATING. ACTUATORS FOR VALVES
1-1/4" AND SMALLER SHALL BE POWERED BY 120VAC POWER UNLESS
OTHERWISE NOTED. ACTUATORS FOR VALVES LARGER THAN 1-1/4" SHALL
BE POWERED BY 24VAC. SEE REF. 13, 14, 15, & 16 FOR POWER AND
CONTROL DETAILS.
c. THE BELIMO ACTUATORS HAVE THE FOLLOWING POWER DRAWS:
ALL TWO-POSITION AT 1-1/4" OR SMALLER: LRX120-3, 4 VA
(120 VAC, 2 WATTS)
ALL MODULATING AT 1-1/4" OR SMALLER: LRX120-SR, 4.5 VA
(120 VAC, 2.5 WATTS)
ALL MODULATING GREATER THAN 1-1/4": ARX24-SR, 5 VA
(24 VAC, 2.5 WATTS)
12. CIRCUIT BALANCING VALVES SHALL BE BELL & GOSSET 'CIRCUIT
SETTER' OR EQUAL. VALVE SHALL INCLUDE MEASUREMENT PORTS AND PRE-
SETTING WITH NUMERIC SCALE. CONTRACTOR MAY INSTALL A SINGLE CBV WHERE
MORE THAN ONE (1) CBV ARE SHOWN DIRECTLY IN SERIES, PROVIDED PRESSURE
DROP DOES NOT EXCEED MANUFACTURER RECOMMENDATIONS. FLOW
COEFFICIENTS PROVIDED AS GUIDANCE ONLY, CONTRACTOR SHALL BALANCE
SYSTEM IN ACCORDANCE WITH GN 13.
13. THE CONTRACTOR SHALL BALANCE SYSTEM TO WITHIN +/-5% OF DESIGN FLOW
RATES AT EACH BRANCH WITH ALL CONTROL VALVES FULLY OPEN (OPEN TO
LOAD). THE FLOW THROUGH THE COIL BYPASS AT EACH BRANCH SHALL BE
WITHIN 10% OF BRANCH DESIGN FLOW RATE WITH THE CONTROL VALVE FULLY
CLOSED (OPEN TO BYPASS). THE CONTRACTOR SHALL BALANCE SYSTEM TO
WITHIN +/-5% OF DESIGN FLOW RATE THROUGH BOTH CHILLERS.
14. THE CONTRACTOR SHALL PROVIDE NEW VENTS AS SHOWN. NEW VENTS SHOWN
IN THIS DRAWING ARE INTENDED TO BE IN ADDITION TO EXISTING MEANS OF
VENTING AIR FROM THE CHILLED WATER SYSTEM WHICH ARE NOT SHOWN. SEE
REF. 2 FOR REQUIREMENTS FOR INSPECTION AND REPLACEMENT OF EXISTING
AIR VENTS. ALL AIR VENTS SHALL BE INSTALLED WITH A BALL VALVE TO
ALLOW MAINTENANCE/REMOVAL OF AIR VENTS WITHOUT DRAINING THE SYSTEM.
15. INSTALL LOW POINT DRAINS ON EACH CHILLED WATER BRANCH LINE.
VENT, AUTOMATIC FLOAT TYPE, SEE GEN 14
VALVE, ELECTRIC MOTOR OPERATED, TWO POS
VALVE, SOLENOID OPERATED, SPRING CLOSING
RESILIENTLY MOUNTED
CBV
RES
E
INSTALL THERMOWELL FOR
EACH TEMPERATURE
INSTRUMENT
TYPICAL DETAIL:
INSTRUMENT ASSEMBLIES
IN ACCORDANCE WITH
ASTM F721
ROOT VALVE W/
TEST PORT:
DANFOSS MBV
3000 OR MBV
5000 TYPE 3
FOR MULTIPLE
INSTRUMENTS
2"514V098
FCU-13 2-POS. TEMP CNTRL, CV=10, GN 111"514V097
FCU-13 INLET ISOLATION1-1/4"514V096
FCU-12 OUTLET ISOLATION1-1/4"514V095
514I109
514I102
PG
514P001 DISHCHARGE 0/75 PSIG 65 PSIG
514I103
PG
514P002 DISHCHARGE 0/75 PSIG
LOCATION
PSL COMBINED PUMP DISCHARGE 40 PSIG 2-POLE, STANDBY PUMP START, GN 9
514I105 TG 514E101 CHILLED WATER INLET TEMP 32/65 F 49 F
514I106
TG
514E101 CHILLED WATER OUTLET TEMP 32/65 F 42 F
514I107 TG 514E102 CHILLED WATER INLET TEMP 32/65 F
42 F
514I108
TG
514E102 CHILLED WATER OUTLET TEMP
32/65 F
49 F
TT COMBINED CHILLED WATER SUPPLY
42 F
SUPPLIED W/ CHILLER, GN 10
FCU-12 BRANCH CBV #2, CV=7.1, GN 122"514V094
FCU-12 BRANCH CBV #1, CV=7.1, GN 122"514V093
FCU-12 2-POS. TEMP CNTRL, CV=10, GN 111"514V092
FCU-12 INLET ISOLATION1-1/4"514V091
FCU-10 OUTLET ISOLATION
MIN/MAX
65 PSIG
1-1/2"514V085
FCU-10 BRANCH CBV #2, CV=9.6, GN 122"514V084
FCU-10 BRANCH CBV #1, CV=9.6, GN 122"514V083
FCU-10 2-POS. TEMP CNTRL, CV=10, GN 111-1/4"514V082
FCU-10 INLET ISOLATION1-1/2"
NOMINAL/SET POINT
514V081
AHU-9 OUTLET ISOLATION1-1/2"514V079
AHU-9 BRANCH CBV, CV=6.5, GN 121-1/2"514V078
AHU-9 MOD. TEMP CNTRL, CV=10, GN 111-1/4"514V077
AHU-9 INLET ISOLATION1-1/2"514V076
AHU-8 OUTLET ISOLATION1"514V075
AHU-8 BRANCH CBV #2, CV=4.9, GN 121-1/2"514V074
AHU-8 BRANCH CBV #1, CV=4.9, GN121-1/2"514V073
AHU-8 MOD. TEMP CNTRL, CV=7.4, GN 111"514V072
AHU-8 INLET ISOLATION1"514V071
AHU-7 OUTLET ISOLATION2"514V069
AHU-7 BRANCH CBV, CV=15.0, GN 122-1/2"514V068
AHU-7 MOD. TEMP CNTRL, CV=19, GN 111-1/2"514V067
AHU-7 INLET ISOLATION2"514V066
AHU-6 OUTLET ISOLATION2"514V064
AHU-6 BRANCH CBV, CV=13.6, GN 123"514V063
AHU-6 MOD. TEMP CNTRL, CV=19, GN 111-1/2"514V062
AHU-6 INLET ISOLATION2"514V061
AHU-5B OUTLET ISOLATION1-1/4"514V060
AHU-5C BRANCH CBV #1, CV=4.7, GN 121-1/2"514V058
AHU-5C MOD. TEMP CNTRL, CV=7.4, GN 111"514V057
AHU-5C INLET ISOLATION1-1/4"514V056
AHU-5B OUTLET ISOLATION1"514V055
AHU-5B BRANCH CBV #2, CV=3.0, GN 121-1/4"514V054
AHU-5B BRANCH CBV #1, CV=3.0, GN 121-1/4"514V053
AHU-5B MOD. TEMP CNTRL, CV=3, GN 111/2"514V052
AHU-5B INLET ISOLATION1"514V051
AHU-5A OUTLET ISOLATION1"514V050
AHU-5A BRANCH CBV #2, CV=3.7, GN 121-1/4"514V049
AHU-5A BRANCH CBV #1, CV=3.7, GN 121-1/4"514V048
AHU-5A MOD. TEMP CNTRL, CV=4.7, GN 113/4"514V047
AHU-5A INLET ISOLATION1"514V046
AHU-4 OUTLET ISOLATION4"514V045
AHU-4 BRANCH CBV, CV=91.3, GN 124"514V044
AHU-4 BYPASS CBV, CV=47.5, GN 124"514V043
AHU-4 MOD. TEMP CNTRL, CV=46, GN 112"514V042
AHU-4 INLET ISOLATION4"514V041
AHU-3 OUTLET ISOLATION2"514V039
AHU-3 BRANCH CBV, CV=28.8, GN 123"514V038
AHU-3 MOD. TEMP CNTRL, CV=19, GN 111-1/2"514V037
AHU-3 INLET ISOLATION2"514V036
AHU-2 OUTLET ISOLATION2"514V034
AHU-2 BRANCH CBV , CV=23.4, GN 122-1/2"514V033
AHU-2 MOD. TEMP CNTRL, CV=25, GN 111-1/4"514V032
AHU-2 INLET ISOLATION2"514V031
AHU-1 OUTLET ISOLATION2"514V029
AHU-1 BRANCH CBV, CV=39.6, GN 123"514V028
AHU-1 MOD. TEMP CNTRL, CV=25, GN 111-1/4"514V027
AHU-1 INLET ISOLATION2"514V026
516E002 OUTLET ISOLATION3/4"514V025
516E002 CBV, CV=2.0, GN 123/4"514V024
516E002 INLET ISOLATION3/4"514V023
516E001 OUTLET ISOLATION3/4"514V022
516E001 CBV, CV=2.0, GN 123/4"514V021
516E001 INLET ISOLATION3/4"514V020
FCU-5 OUTLET ISOLATION1"514V019
FCU-5 BRANCH CBV, CV=10.8, GN 121-1/4"514V018
FCU-5 2 POS. TEMP CNTRL, CV=4.7, GN 113/4"514V017
FCU-5 INLET ISOLATION1"514V016
PUMP SUCTION SYSTEM DRAIN1-1/4"514V015
SYSTEM FILL ISOLATION1-1/4"514V014
SYSTEM FILL BACKFLOW PREVENTER1-1/4"514V013
514E102 FLOW BALANCING VALVE6"514V012
514E102 OUTLET ISOLATION6"514V011
514E102 INLET ISOLATION4"514V010
514E101 OUTLET ISOLATION6"514V009
514E101 INLET ISOLATION4"514V008
514P102 OUTLET ISOLATION6"514V007
514P102 OUTLET CHECK6"514V006
514P102 INLET ISOLATION
NOTES
6"514V005
514P101 OUTLET ISOLATION6"514V004
514P101 OUTLET CHECK6"
514I104
514I101
PG
PUMP SUCTION
514V003
0/20 PSIG 7 PSIG
INSTRUMENT #
514P101 INLET ISOLATION
FUNCTION
6"514V002
514E101 FLOW BALANCING VALVE6"514V001
VALVE LIST
FUNCTIONSIZEVALVE #
FLOW ARROW, FILLED
NEW MATERIAL
VALVE, SWING CHECK
VALVE, CIRCUIT BALANCE
VALVE, BUTTERFLY
VALVE, BALL, THREE PORT
VALVE, BALL
UNION
STRAINER, Y-TYPE BASKET
PUMP, CENTRIFUGAL
PIPE HOSE CONNECTION, CAPPED
PIPE CONTINUE
514V099 2"
HOSE, FLEXIBLE
FLANGE JOINT
COOLING COIL
BACKFLOW PREVENTER WITH CHECK VALVE
SYMBOL LIST
DESCRIPTIONSYMBOL
VALVE, GATE
PROCESS PIPE
P
SIGNAL CABLE
PIPE, EXISTING
REDUCER CONCENTRIC
VALVE # FUNCTIONSIZE
LOCAL PANEL
STATION
SYMBOL MODIFIER
T=TRANSMIT
PRESSURE INST. DETAILS
BASIC
OTHER INST. DETAILS
CONTROL
SYMBOL
X=OTHER*
C=CONTROL
S=SWITCH
OUTPUT:
SECOND LETTER(S)
I=INDICATION
(RATE)
G=GAUGE
S=SPEED/FREQ.
_D=DIFFERENTIAL
MONITORING X=OTHER*
MODIFIER:
DISCRETE
CONTROL
_Z=SAFETY SYS.
ALARM &
SYSTEM
L=LEVEL
H=HIGH (OPENED)
L=LOW (CLOSED)
P=PRESSURE
MEASUREMENT:
A=ALARM
READOUT: GENERAL:
U=MULTIFUNCTION*
MODIFIERS:
*SEE INSTRUMENT LIST
F=FLOW
FIRST LETTER(S)
T=TEMPERATURE
LL=LOW-LOW
HH=HIGH-HIGH
M=MIDDLE (IN TRAVEL)
FOR MORE INFORMATION SEE ANSI/ISA-5.1(2009)
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
SYMBOL, INSTRUMENT, & VALVE LISTS
ADV CJF DWL 12/03/18NO SCALE
12-514-01 2 11 -1218038.02
FCU-13 BRANCH CBV #2, CV=7.7, GN 12
PIPE, NEW
ABV VALVE, AUTOMATIC BALANCING
514V100 1-1/4" FCU-13 OUTLET ISOLATION
Issue Date
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
C
C
BB
BB
B B
B
B
BB
B
B
BB
B B
TG
TGTG
TG
PG PS PS
PG PS
TG
PS
REMOVALS DIAGRAM 3-5A
D D
C C
B
B
A
A
CHILLED WATER SYSTEM DIAGRAM
FC
U
-5 A
LV
IN
B
AY
SE
E
PI
PI
N G
R
EM
O
VA
L D
ET
AI
L 4-
2A
TO
F C
U -3
AL
VI
N M
AC
H
S H
O P
TO
F
C U
-1
AL
VI
N
E
LE
C S
H O
P
TO
F
C U
-4 W
IN
C
H C
TR
L
H O
U
SE
WINCH ROOM UPPER GENERATOR
PASSAGE
SWITCHBOARD ROOM
SCIENTIFIC STORES
PROP. MOTOR ROOM
2-110-0
3-40-2
2-64-1
2-64-0
2-90-1
2-99-0
PROP. CHILLED
PUMP NO. 1
CHILLED WATER
CHILLED WATER
PUMP NO. 2
WATER PUMP NO. 1
REMOVE REFRIGERANT
SEE REF. 5 FOR DETAILS
RELIEF VENT PIPE BACK TO
AHU-5 ABOVE MAIN DECK
REMOVAL OF PIPING SERVING
MAIN BRANCH IN UPPER
GENERATOR ROOM
SEE REF. 8 FOR
RELIEF PIPE DETAILS
SEE REF. 8
WITHIN SCOPE OF WP-10C
SEE REF. 8
DISCONNECT FROM CHILLER
RETAIN PIPING TO VENT
TO REFRIGERANT RELIEF VENT
RETAIN PIPING TO VENT
DISCONNECT FROM CHILLER
TO REFRIGERANT RELIEF VENT
REMOVALS NOTE:
ALL REMOVALS SHOWN ARE WITHIN THE SCOPE OF WP-12 (SEE REF. 2),
EXCEPT AS NOTED.
THE FOLLOWING CHILLED WATER PIPE REMOVALS SHOWN ON THIS
DIAGRAM ARE OUTSIDE OF THE SCOPE OF WP-12:
WP-01 (REF. 3): ALL CHILLED WATER PIPING IN PROP. MOTOR ROOM
WP-10C (REF. 5): PIPING SERVING AHU-5
WP-02 (REF. 6): MAIN DECK SUPPLY AND RETURN HEADERS
CHILLER NO. 2
CHILLER NO. 1
TO FCU-2
ELECTRONIC WORKSHOP
ROOM
DEVELOPED FROM REF. 20 & 21
PROP. CHILLED
WATER PUMP NO. 2
MAIN DECK - 26'-6" ABL
03 LEVEL - 52' ABL
01 LEVEL - 26'-6" ABL
PIPE REMOVAL IN
SCOPE OF WP-02
SEE REF. 6 FOR
DETAILS
TO AHU-7 (SWBD ROOM)
SEE PIPING REMOVAL DETAIL 4-6C
TO AHU-6 (1ST PLATFORM)
SEE PIPING REMOVAL DETAIL 4-6C
RETAIN EXISTING SUPPLY &
RETURN PIPE BETWEEN
GENERATOR ROOM &
WINCH ROOM
AHU-2 MESS (01-61-2)
SEE PIPING REMOVAL
DETAIL 4-6C
AHU-3 BIO/ANALYTICAL
LAB (1-26-2)
SEE PIPING REMOVAL
DETAIL 4-6C
REMOVE AFT CHILLER
AND CIRCULATION PUMPS
SEE REF. 10 FOR
EQUIPMENT REMOVAL PATH
AHU-4 MAIN LAB (1-42-1)
SEE PIPING REMOVAL
DETAIL 4-6C
AHU-9 FWD
STATEROOMS (01-18-0)
SEE PIPING REMOVAL
DETAIL 4-3C
AHU-1 03 LEVEL (03-69-1)
SEE PIPING REMOVAL
DETAIL 4-6C
AHU-5 HYDRO/COMPUTER LAB (1-70-2)
SEE PIPING REMOVAL DETAIL 4-7A
TO EXPANSION TANK
SEE REF. 20
AHU-8 SICIENTIFIC STOREROOM (2-90-1)
SEE PIPING REMOVAL DETAIL 4-6C
SEAWATER COOLING
SEE REF. 11
FOR REMOVALS
SEAWATER COOLING
SEE REF. 11 FOR REMOVALS
SEAWATER COOLING
SEE REF. 11 FOR REMOVALS
REMOVE TWO (2) CHILLERS
SEE REF. 10 FOR
EQUIPMENT REMOVAL PATH
ALL CHILLED WATER PIPE
REMOVALS FROM PROP.
MOTOR ROOM WITHIN
THE SCOPE OF WP-01
SEE REF. 3 FOR DETAILS
REMOVE EXPANSION TANK
LOCATED IN OVERHEAD OF
MAIN DECK ACCESS (1-88-2)
EXPANSION
TANK
(NOT USED)
CHILLER NO. 3
(AFT)
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
CHILLED WATER PIPING REMOVALS
ADV CJF DWL 12/03/18NO SCALE
12-514-01 3 11 -1218038.02
5"
1-1/2"
4"
5"
4"
3"
3"
1-1/2"
1-1/2"
1-1/2"
5"5"
5"
5"
5"
2-1/2"
1"
2-1/2"
1"
3" 3"
2" 2"
1- 1/
2" 1-
1/ 2"
1- 1/
2"
5"
2"
1-1/2"
2"
2"
1- 1/
2"
1-1/2"
1-1/2"
1"
-5
-0 1.
-5
-0
1.
12-514-01.04
12-514-01.04
12-514-01.04
01-532-01.07
01-532-01.07
12-514-01.04
12-514-01.04
01-532-01.07
01-532-01.07
01-532-01.07
01-532-01.07
12-514-01.04
12-514-01.04
12-514-01.04
12-514-01.04
12-514-01.04
12-514-01.04
12-514-01.04
12-514-01.0412-514-01.04
12-514-01.04 12-514-01.04
12-514-01.04
12-514-01.04
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
C C
C
C
B B
B
B
REMOVAL DETAIL 4-6C
REMOVAL DETAIL 4-7A
REMOVAL DETAIL 4-2A
REMOVAL DETAIL 4-3C
D
C
D
C
B B
A A
FOR FCU-5 (ALVIN BAY DEHUMIDIFIER)
CHILLED WATER REMOVAL DETAIL FOR AHU-5
TYPICAL CHILLED WATER REMOVAL DETAIL
FOR AHU-1, 2, 3, 4, 6, 7, & 8
CHILLED WATER REMOVAL DETAIL FOR AHU-9
CHILLED WATER REMOVAL DETAIL
WATER RETURN
WATER RETURN
TO CHILLED
FROM CHILLED
FROM CHILLED
WATER SUPPLY
TO CHILLED
WATER SUPPLY
WATER RETURN
FROM CHILLED
WATER SUPPLY
TO CHILLED
WATER SUPPLY
FROM CHILLED
TO CHILLED
WATER RETURN
CBV CBV
CBV
CBV
THE CHILLED WATER REMOVALS AT
AHU-5 ARE OUTSIDE OF THE
SCOPE OF WP-12
SEE WP-10B (REF. 5)
SEE REF. 14 FOR
TEMPERATURE
CONTROL
REMOVALS
SEE REF. 15 FOR AIR HANDLER
& TEMPERATURE CONTROL
REMOVALS
REMOVAL DETAIL 4-6C SHOWS TYPICAL
REMOVAL FOR THE FOLLOWING AIR
HANDLERS. THE CHILLED WATER
REMOVALS AT THE AIR HANDLERS ARE
OUTSIDE OF THE SCOPE OF WP-12:
AHU-1: WP-10B (SEE REF. 4)
AHU-2: WP-10B (SEE REF. 4)
AHU-3: WP-10B (SEE REF. 4)
AHU-4: WP-10B (SEE REF. 4)
AHU-6: WP-10B (SEE REF. 4)
AHU-7: WP-10B (SEE REF. 4)
AHU-8: WP-10B (SEE REF. 4)
RETAIN AIR HANDLER COOLING COIL
REMOVE PIPING UP TO FLANGED
CONNECTIONS TO COOLING COIL
REMOVE PIPING AT
AIR HANDLER BETWEEN
SUPPLY AND RETURN
ISOLATION VALVES
RETAIN BRANCH
CONNECTIONS TO
SUPPLY & RETURN
HEADERS. EXCEPT
AS NOTED FOR
AHU-3, 4, 6, & 7
THE CHILLED WATER REMOVALS AT
AHU-9 ARE OUTSIDE OF THE
SCOPE OF WP-12
SEE WP-10B (REF. 4)
RETAIN AIR HANDLER COOLING COIL
REMOVE PIPING UP TO FLANGED
CONNECTIONS TO COOLING COIL
REMOVE PIPING AT
AIR HANDLER BETWEEN
SUPPLY AND RETURN
ISOLATION VALVES
REMOVE THROUGH
MAIN DECK
PENETRATION TO
GENERATOR ROOM
SEE ZONE 3-4C
REMOVE PIPING AT
AIR HANDLER AS NEEDED
FOR INSTALLATION OF
(3) NEW AIR HANDLERS
SEE REF. 14 FOR
TEMPERATURE
CONTROL
REMOVALS
RETAIN BRANCH
CONNECTIONS TO
SUPPLY & RETURN
HEADERS.
SEE ZONE 3-6B
SEE REF. 14 FOR
TEMPERATURE
CONTROL
REMOVALS
REMOVE PIPING AT
AIR HANDLER BETWEEN
SUPPLY AND RETURN
ISOLATION VALVES
RETAIN BRANCH
CONNECTIONS TO
SUPPLY & RETURN
HEADERS
SEE ZONE 3-1D
RETAIN AIR HANDLER COOLING COIL
REMOVE PIPING UP TO FLANGED
CONNECTIONS TO COOLING COIL
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
CHILLED WATER PIPING REMOVAL DETAILS
ADV CJF DWL 12/03/18NO SCALE
12-514-01 4 11 -1218038.02
12-514-01.03
12-514-01.03
12-514-01.03 12-514-01.03
12-514-01.03
12-514-01.03
12-514-01.03
12-514-01.03
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
RES RES
RES RES
RES
RES
B B
B B
BB
BB
B
B
PSL
I104
TG
I106
TG
I105
TG
I107
TG
I108
PG
I102
PG
I103
TT
I109
PG
I101
MODIFICATIONS DIAGRAM 5-5A
D D
C
C
B B
A A
37 4
CHILLED WATER SYSTEM DIAGRAM
NEW
NEW NEW
NEW
NEW
1"
NEW
NEW
NEW
NEW
A/C CHILLER NO. 1
A/C CHILLER NO. 2
ROOM
RUNNING STATUS TO AMS
ABV
TO EXISTING
SUMMARY ALARM &
SEE REF. 12
REFRIGERANT
NEW REFRIGERANT RELIEF
3/4" NPT (2 PLACES)
REFRIGERANT
TO EXISTING
RELIEF VENT
NEW REFRIGERANT RELIEF
RELIEF VENT
(TYP. BOTH CHILLERS)
SEE REF. 8
INTERLOCK, SEE GN. 10
PUMP RUNNING
MASTER CHILLER
TEMP RESET TO
SUPPLY WATER
SEE GN. 10
CHILLER LEAD/
LAG CONTROL
SEE GN. 10
3/4" NPT (2 PLACES)
SUMMARY ALARM &
SEE REF. 12
RUNNING STATUS TO AMS
SEE REF. 8
N
EW
TO
F
C U
-4 W
IN
C
H C
TR
L
H O
U
SE
TO
F
C U
-3
AL
VI
N
M
AC
H
SH
O
P
TO
F
C U
- 5 A
LV
IN
B
AY
SE
E
PI
PI
N G
D
ET
AI
L
7- 3C
TO
F
C U
-1
AL
VI
N
E
LE
C
SH
O
P
WINCH ROOM
BOW THRUSTER RM
WORKSHOP
PASSAGE
MOTOR GENERATOR RM
SCIENTIFIC STORES
PROP. MOTOR ROOM UPPER GENERATOR
SWBD ROOM
2-64-0
2-08-2
2-08-1
2-47-1
2-57-2
2-64-1
2-110-0 2-99-0
2-90-1
AHU-2 MESS (01-61-2)
SEE PIPING DETAIL 6-5C
358 GPM
STANDBY PUMP
START ALARM
TO AMS
SEE REF. 12
CHILLED WATER PIPING MODIFICATIONS
AT AHU-5A, B, & C WITHIN THE SCOPE
OF WP-10C
SEE REF. 5 FOR DETAILS
FCU-11C
SEE PIPING DETAIL 7-7B CHILLED WATER
PUMP NO. 1
TO/FROM SEAWATER
COOLING SYSTEM
SEE REF. 11
CHILLED WATER
SYSTEM FILL
CONNECTION
AHU-5B EC LAB (WORK AREA)
SEE PIPING DETAIL 6-7A
FCU-10 WINCH ROOM
SEE PIPING DETAIL 7-1C
696 GPM
358 GPM
CHILLED WATER
PUMP NO. 2
STANDBY PUMP START
CONTROL, SEE GN. 9
(TYP. BOTH PUMPS)
FCU-11B
SEE PIPING DETAIL 7-7B
FCU-12 PROPULSION
MOTOR ROOM
CHILLED WATER PIPING MODIFICATIONS
IN THE PROPULSION MOTOR ROOM
WITHIN THE SCOPE OF WP-01
SEE REF. 3 FOR DETAILS
SEE DETAIL 7-5A FOR PIPING
AT FCU-12 & FCU-13
FCU-13 PROPULSION
MOTOR ROOM
AHU-5A HYDRO LAB
SEE PIPING DETAIL 6-7A
CHILLED WATER PIPING MODIFICATIONS
AT AHU-11 & SUPPLY AND RETURN HEADERS
IN THE OVERHEAD OF THE FWD MAIN DECK
WITHIN THE SCOPE OF WP-02
SEE REF. 6 FOR DETAILS
FCU-11A
SEE PIPING DETAIL 7-7B
AHU-5C EC LAB
(SERVER AREA)
SEE PIPING DETAIL 6-7A
AHU-3 BIO/ANALYTICAL
LAB (1-26-2)
SEE PIPING DETAIL 6-3C
AHU-8 SICIENTIFIC STOREROOM (2-90-1)
SEE PIPING DETAIL 6-1A
AHU-1 03 LEVEL (03-69-1)
SEE PIPING DETAIL 6-7C
TO/FROM SEAWATER
COOLING SYSTEM
SEE REF. 11
AHU-9 FWD STATEROOMS (01-18-0)
SEE PIPING DETAIL 7-5C
TO AHU-6 1ST PLATFORM
SEE PIPING DETAIL 6-5A
AHU-4 MAIN LAB (1-42-1)
SEE PIPING DETAIL 6-1C
TO AHU-7 SWITCHBOARD ROOM
SEE PIPING DETAIL 6-3A
TO SCIENCE FREEZER
CONDENSER UNITS
SEE PIPING DETAIL 7-2A
CHILLED WATER
SYSTEM DRAIN
LOCATE AT
SYSTEM LOW
POINT
REUSE
EXISTING
PIPE
BETWEEN
GENERATOR
ROOM AND
WINCH ROOM
TO EXISTING
EXPANSION TANK
SEE REF. 20
5.1 GPM
NEW
1"
NEW
NEW
STANDBY PUMP START
ALARM & RUNNING STATUS
TO AMS (EACH PUMP)
SEE REF. 12
TO FCU-9
WORKSHOP
SEE PIPING DETAIL 7-7A
TO FCU-2
ELECTRONIC WORKSHOP
01 LEVEL - 26'-6" ABL
03 LEVEL - 52' ABL
MAIN DECK - 26'-6" ABL
MODIFICATIONS NOTE:
THE INTENT OF THIS DIAGRAM AND RELATED PIPING DETAILS IS TO
SHOW THE ENTIRETY OF THE MODIFIED CHILLED WATER SYSTEM.
EXCEPT WHERE NOTED, INSTALLATIONS AND MODIFICATIONS SHOWN IN THIS DIAGRAM
ARE WITHIN THE SCOPE OF WP-12 (SEE REF. 2).
THE FOLLOWING CHILLED WATER MODIFICATIONS SHOWN IN THIS DIAGRAM ARE OUTSIDE
THE SCOPE OF WP-12:
WP-01 (REF. 3): ALL CHILLED WATER PIPING IN PROP. MOTOR ROOM
WP-10B (REF. 4): PIPING AT THE FOLLOWING AHUS 1, 2, 3, 4, 6, 7, 8, 9
WP-10C (REF. 5): PIPING AT AHU-5A, 5B, & 5C
WP-02 (REF. 6): MAIN DECK SUPPLY AND RETURN HEADERS AND FCU-11A, B, & C
WP-15 (REF. 7): PIPING AT THE SCIENCE FREEZER UNITS
WP-10F (REF. 22): PIPING AT FCU-10
9.
G
PM
.1
G
PM
.1
G
PM
9.
G
PM
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
CHILLED WATER PIPING MODIFICATIONS
ADV CJF DWL 12/03/18NO SCALE
12-514-01 5 11 -1218038.02
514E101
514E102
514P101
514P102
V008 V009
V010 V011
V003 V004V002
V006 V007V005
V014
V015
V013
1" 3/
4"
2- 1/
2" 2"
5"
5"
5" 5"
12-514-01.07
6"
3"
1"
1"
1"
6" 6"
3"4"
SEE REF. 24
3/4"
2- 1/
2"
2- 1/
2"
2-1/2"
2-1/2"
1- 1/
4"
3/ 4"
2"
3/4"
2"
6"
5"
4"
2"
6"
3/4"
4"
1"
1-1/4"
1"
1-1/4"
1"
2"
6"
1"1"
2"
2"
1- 1/
2"
2"
1- 1/
2"
1-1/2"
3/ 4"
12-514-01.07
3/4"
3/4"
1-1/2"
1-1/2"
1- 1/
4"
1/ 2"
3/4"
4" 6"
4" 6"
1-1/4"
3/4"
1/ 2"
2"
3/ 4"
1- 1/
4"
2"
1"
1/ 2"
3/ 4"
2"
4"
4"
-5
-0
1.
-5
-0
1.
01-532-01.08
01-532-01.08
12-514-01.07
12-514-01.07 12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.07
12-514-01.06 12-514-01.06
12-514-01.06 12-514-01.06
12-514-01.06
12-514-01.06
12-514-01.06
12-514-01.06 12-514-01.06 12-514-01.06
01-532-01.08
12-514-01.06 12-514-01.06
12-514-01.06
12-514-01.06
12-514-01.06
12-514-01.06
12-514-01.06 12-514-01.06 12-514-01.06 12-514-01.06 1-
1/ 2"
1- 1/
2"
01-532-01.08
3/4"
3/4"
12-514-01.07
12-514-01.07
2"
2"
TO FCU-6
BOSUN'S LOCKER
3/4"
3/4"
2"
6"
12-514-01.07
12-514-01.07
2-1/2"
2"
ABV
09-533-01.04
V001
1- 1/
4" 1- 1/
4" 1-
1/ 4"
V012
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
C C
C
C C
C C C
C C
E
B
B
E
B
E
E
B
B
B
E
E
B
E B E
B
B
E E
B
B
MODIFICATION DETAIL 6-5C
MODIFICATION DETAIL 6-7A
MODIFICATION DETAIL 6-5A
MODIFICATION DETAIL 6-7C
MODIFICATION DETAIL 6-1AMODIFICATION DETAIL 6-3A
MODIFICATION DETAIL 6-1CMODIFICATION DETAIL 6-3C
D
8 1
D
B
8 17
AA
C
B
C
CHILLED WATER PIPING MODIFICATIONS AT AHU-5A, 5B, & 5C
CHILLED WATER PIPING MODIFICATIONS AT AHU-1 CHILLED WATER PIPING MODIFICATIONS AT AHU-2
CHILLED WATER PIPING MODIFICATIONS AT AHU-6
CHILLED WATER PIPING MODIFICATIONS AT AHU-3
CHILLED WATER PIPING MODIFICATIONS AT AHU-7
CHILLED WATER PIPING MODIFICATIONS AT AHU-4
CHILLED WATER PIPING MODIFICATIONS AT AHU-8
C
BV
CBV CBV
CBV
CBV CBV
CBV
CBV
CBV
CBV
CBV
CBV
CBV
CHILLED WATER PIPING MODIFICATIONS
AT AHU-2 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
NEW CHILLED WATER PIPING AT
AHU-5A, 5B, & 5C WITHIN THE
SCOPE OF WP-10C
SEE REF. 5 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT AHU-7 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT AHU-8 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT AHU-1 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT AHU-3 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT AHU-4 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT AHU-6 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
NEW NEW NEW NEW
NEW NEW NEW
57 GPM
68 GPM87 GPM
20 GPM
129 GPM62 GPM
16 GPM
9 GPM
13 GPM
64 GPM
SUPPLY & RETURN HEADERS
SEE ZONE 5-3C
SUPPLY & RETURN HEADERS
TO/FROM CHILLED WATER
TO/FROM CHILLED WATER
AB
B
NEW
TO/FROM CHILLED WATER
NEW
B
AB
AB
SUPPLY & RETURN HEADERS
EXISTING PIPE EXISTING PIPE
AB
TO/FROM CHILLED WATER
B
SUPPLY & RETURN HEADERS
SEE ZONE 5-7C
SUPPLY & RETURN HEADERS
SEE ZONE 5-5D
SEE ZONE 5-1B
AB
NEW
B
NEW
SEE ZONE 5-1A
AB
SEE ZONE 5-1C
SUPPLY & RETURN HEADERS
TO/FROM CHILLED WATER
B
SUPPLY & RETURN HEADERS
TO/FROM CHILLED WATER
SUPPLY & RETURN HEADERS
SEE ZONE 5-3D
TO/FROM CHILLED WATER
NEW
SEE ZONE 5-7A
AB
NEW
B
B
SUPPLY & RETURN HEADERS
TO/FROM CHILLED WATER
NEW
AB
B
B
SEE ZONE 5-5C
AB
SUPPLY & RETURN HEADERS
TO/FROM CHILLED WATER
AB
B
SEE ZONE 5-6C
TO/FROM CHILLED WATER
CBV
24VAC ACTUATOR POWER
FLANGED CONNECTIONS
CONNECT NEW PIPING TO
CONNECT NEW PIPING TO
EXISTING AHU-6 COOLING COIL
FLANGED CONNECTIONS
CONNECT NEW PIPING TO
SEE REF. 15 FOR
VALVE CONTROL
SEE REF. 15 FOR
VALVE CONTROL
VALVE CONTROL
SEE REF. 15 FOR
FLANGED CONNECTIONS
VALVE CONTROL
SEE REF. 14 FOR
VALVE CONTROL
SEE REF. 14 FOR
VALVE CONTROL
SEE REF. 14 FOR
24VAC ACTUATOR POWER
SEE REF. 14 FOR
VALVE CONTROL
SEE REF. 14 FOR
VALVE CONTROL
SEE REF. 14 FOR
VALVE CONTROLVALVE CONTROL
24VAC ACTUATOR POWER
EXISTING AHU-7 COOLING COIL
FLANGED CONNECTIONS FLANGED CONNECTIONS
EXISTING AHU-8 COOLING COIL
CONNECT NEW PIPING TO
FLANGED CONNECTIONS
CONNECT NEW PIPING TO
CONNECT NEW PIPING TO
SEE REF. 14 FOR
EXISTING AHU-1 COOLING COIL
FLANGED CONNECTIONS
EXISTING AHU-3 COOLING COIL
CONNECT NEW PIPING TO
EXISTING AHU-2 COOLING COIL EXISTING AHU-4 COOLING COIL
A
NEW
1"
A
A
A
NEW
NEW
NEW
A
NEW
NEW
A
A
A
A
A
SE
E
R
EF
. 1
2E
(A H
U -5
B)
SE
E R
EF
. 1
2E
(A
H U
-5 A)
2E
(A H
U -5
C
SE
E
R
EF
. 1
MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)
MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)
MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)
MODIFICATIONS WITHIN SCOPE OF WP-10C (SEE REF. 5)
MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)
MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
CHILLED WATER PIPING MODIFICATION DETAILS (1 OF 2)
ADV CJF DWL 12/03/18NO SCALE
12-514-01 6 11 -1218038.02
V027
V026
V028
V057
V058
V056
V071
V052
V072 V051
V047
V033
V031
V046
V032
V038
V036
V037
V044
V041
V0
V042
V048V049
V062
V061
V063
V054
V074V068
V066
V067
V073
V029 V034 V039 V045
V075V069V064
V050
V055
V060
V053
2"
2"2"
1-1/4"
2- 1/
2"
1- 1/
4"
1- 1/
2"
1- 1/
2"
1- 1/
2"
1"
1"
1/2"
2"
2"
1"
1"
1"
1"
1-1/4"
1- 1/
2" 2-
1/ 2"
1- 1/
2"
3/4"
2"
2"
2"
2"
1- 1/
2"
1- 1/
2"
2"
4" 4"
4" 1"2"
2" 2"
1-1/2"
2"
2-1/2"
2" 2"
2"
1-1/4"
3" 2"
2-1/2" 3"
4"
1-1/4"
3"
1-1/2"
1"
1-1/2"
1"
1-1/4"
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05 12-514-01.05 12-514-01.05
12-514-01.05 12-514-01.05 12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05 12-514-01.05 12-514-01.05
12-514-01.0512-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
2- 1/
2" 2" 2"
1- 1/
2"2"
1- 1/
2" 1"
Sheet RevisionDrawing Number
CheckedDrawn of
Approved
File Number
Scale
C C
C C
C C
C
C
C
B
E
E
B
B
E
B
B
E
B
E
B
E
E
B
B
E
MODIFICATION DETAIL 7-5A
MODIFICATION DETAIL 7-1C
MODIFICATION DETAIL 7-7B
MODIFICATION DETAIL 7-2A
MODIFICATION DETAIL 7-5C MODIFICATION DETAIL 7-3C
MODIFICATION DETAIL 7-7A
AA
BB
CC
DD
CHILLED WATER PIPING MODIFICATIONS AT AHU-9
CHILLED WATER PIPING MODIFICATIONS AT FCU-12 & FCU-13
CHILLED WATER PIPING MODIFICATIONS AT FCU-10CHILLED WATER PIPING MODIFICATIONS AT FCU-5
CHILLED WATER PIPING MODIFICATIONS AT FCU-11A, FCU-11B & FCU-11C
CHILLED WATER PIPING MODIFICATIONS AT FCU-9
CHILLED WATER PIPING MODIFICATIONS AT SCIENTIFIC FREEZER UNITS NO. 1 AND NO. 2
CBV CBVCBV
CBV
CBV
CBV
CBV CBV
CBV
C
BV
C
BV
C
BV
CBV
512E503, FCU-11C
MOTOR GENERATOR ROOM
SEE REF. 16 FOR DETAILS
FCU PROVIDED W/ VALVE
PACKAGE INCLUDING:
INLET ISOLATION VALVE
STRAINER
3-WAY MODULATING VALVE
BRANCH CIRCUIT SETTER VALVE
BYPASS CIRCUIT SETTER VALVE
AIR VENT
CBV
CBV
CBV
12-514-01.05
OVERHEAD
JOINER
SCIENCE CONDENSER UNITS
PROVIDED W/ WATER INLET
SOLENOID VALVE
SEE REF. 17 FOR DETAILS
NEW NEW NEW
CONNECT NEW PIPING TO
VALVE CONTROL
SEE REF. 13 FOR
FLANGED CONNECTIONS
CONNECT NEW PIPING TO
VALVE CONTROL
SEE REF. 13 FOR
ENCLOSURE
CONNECT NEW PIPING TO
FLANGED CONNECTIONS
WITHIN NEW JOINER
EXISTING AHU-9 COOLING COIL EXISTING FCU-5 COOLING COIL EXISTING FCU-10 COOLING COIL
PIPING AND EQUIPMENT
FLANGED CONNECTIONS
516E002
SCIENCE FREEZER 2
CONDENSER UNIT
516E001
SCIENCE FREEZER 1
CONDENSER UNIT
NEW
12-514-01.05
NEW
A
A
A A A
NEW
NEW
4E
(F C
U -1
3)
SE
E R
EF
. 1
SE
E R
EF
. 1
4E
(F
C U
-1 2)
PASSAGE
512E502, FCU-11B
MOTOR GENERATOR ROOM
SEE REF. 16 FOR DETAILS
FCU PROVIDED W/ VALVE
PACKAGE INCLUDING:
INLET ISOLATION VALVE
STRAINER
3-WAY MODULATING VALVE
BRANCH CIRCUIT SETTER VALVE
BYPASS CIRCUIT SETTER VALVE
AIR VENT
FCU CONNECTION SIZE TBD BY CONTRACTOR
FCU CONNECTION SIZE TBD BY CONTRACTOR
512E504, FCU-9
WORKSHOP
FCU PROVIDED W/ VALVE
PACKAGE INCLUDING:
INLET ISOLATION VALVE
STRAINER
3-WAY MODULATING VALVE
BRANCH CIRCUIT SETTER VALVE
BYPASS CIRCUIT SETTER VALVE
AIR VENT
CHILLED WATER PIPING MODIFICATIONS
AT FCU-5 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
CHILLED WATER PIPING MODIFICATIONS
AT FCU-10 WITHIN THE SCOPE OF WP-10F
SEE REF. 22 FOR DETAILS
FCU CONNECTION SIZE TBD BY CONTRACTOR
512E501, FCU-11A
UPPER BOW THRUSTER ROOM
SEE REF. 16 FOR DETAILS
FCU PROVIDED W/ VALVE
PACKAGE INCLUDING:
INLET ISOLATION VALVE
STRAINER
3-WAY MODULATING VALVE
BRANCH CIRCUIT SETTER VALVE
BYPASS CIRCUIT SETTER VALVE
AIR VENT
CHILLED WATER PIPING MODIFICATIONS
AT AHU-9 WITHIN THE SCOPE OF WP-10B
SEE REF. 4 FOR DETAILS
APPROXIMATE 25 PSI PRESSURE
DROP BETWEEN SUPPLY AND RETURN
HEADERS IN BOW THRUSTER ROOM.
NEW CHILLED WATER PIPING AT
FCU-12 & 13 WITHIN THE
SCOPE OF WP-01
SEE REF. 3 FOR DETAILS
FCU CONNECTION SIZE TBD BY CONTRACTOR
NEW CHILLED WATER PIPING AT
SCIENCE FREEZER CONDENSER UNITS
WITHIN THE SCOPE OF WP-15
SEE REF. 7 FOR DETAILS
NEW CHILLED WATER PIPING AT FCU-11A, 11B & 11C
WITHIN THE SCOPE OF WP-02
SEE REF. 6 FOR DETAILS
NEW
SUPPLY & RETURN HEADERS
TO/FROM CHILLED WATER
SEE REF. 23 FOR
SEE ZONE 5-5C
TO/FROM CHILLED WATER
SUPPLY & RETURN HEADERS
NEW PIPE
TO/FROM CHILLED WATER
TO/FROM CHILLED WATER
B
SEE REF. 14 FOR
NEW PIPE
VALVE CONTROL
SEE ZONE 5-7B
AB
VALVE CONTROL
EXISTING PIPE
FROM/TO CHILLED WATER
SEE ZONE 5-2C
SUPPLY & RETURN
AB
TO/FROM CHILLED WATER
SUPPLY & RETURN HEADERS
SEE ZONE 5-1B
SUPPLY & RETURN HEADERS
B
SEE ZONE 5-8B
NEW PIPE
VALVE CONTROL
B
SEE ZONE 5-1C
NEW PIPE
TO/FROM CHILLED WATER
SUPPLY & RETURN HEADERS
AB
24VAC ACTUATOR POWER
NEW PIPE
SEE ZONE 5-7B
NEW PIPE
AB
B
TO/FROM CHILLED WATER
TO/FROM CHILLED WATER
SUPPLY & RETURN HEADERS
SEE ZONE 5-8B
SUPPLY & RETURN HEADERS
SEE ZONE 5-1B
NEW PIPE
AB
NEW
SUPPLY & RETURN HEADERS
SEE ZONE 5-1D
SEE REF. 14 FOR
NEW
TO/FROM CHILLED WATER
B SUPPLY & RETURN HEADERS
NEW PIPE
1-21-2
MODIFICATIONS WITHIN SCOPE OF WP-10F (SEE REF. 22)
MODIFICATIONS WITHIN SCOPE OF THIS WORK PACKAGE
MODIFICATIONS WITHIN SCOPE OF WP-10B (SEE REF. 4)
MODIFICATIONS WITHIN SCOPE OF WP-01 (SEE REF. 3)
MODIFICATIONS WITHIN SCOPE OF WP-02 (SEE REF. 6)
MODIFICATIONS WITHIN SCOPE OF WP-15 (SEE REF. 7)
8.4 GPM
8.4 GPM
7.0 GPM
7.0 GPM
24 GPM 31 GPM
7.0 GPM
7.0 GPM
24 GPM
24 GPM
19 GPM
C
BV
WOODS HOLE OCEANOGRAPHIC INSTITUTION
R/V ATLANTIS MIDLIFE REFIT
WOODS HOLE, MASSACHUSETTS
CHILLED WATER SYSTEM MODIFICATIONS DIAGRAM
CHILLED WATER PIPING MODIFICATION DETAILS (2 OF 2)
ADV CJF DWL 12/03/18NO SCALE
12-514-01 7 11 -1218038.02
V077
V076
V078
V095
V082
V081
V083V085
V099
V097
V098
V096
V092
V091
V094 V093 V020
V021
V023
V024V025
V079 V084
V022
V017
V016
V018V019
3/8"
1-1/4"
2"
1-1/2"
2"
1- 1/
2" 1-1/4"
2" 2"
1- 1/
2"
CBV
2"
2- 1/
2"
V100
1"
2- 1/
2" 2-
1/ 2"
1-1/4"
1"
2"
2- 1/
2"
3/4"
1-1/4"
1-1/4"
2"
3/4"
3/4"
1-1/2"
5/8"
3/8"
5/8"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1-1/4" 3/4"
1"
1-1/4" 1"
1"
1"
1" 1"
3/4"
3/4"
12-514-01.05
12-514-01.05
12-514-01.05 12-514-01.05
12-514-01.05
15-516-01.06
15-516-01.06
15-516-01.06
15-516-01.06
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
12-514-01.05
3/4"
2" 1"
2- 1/
2"
| Binder1 |
| 12-514-01.01 |
| 12-514-01.02 |
| 12-514-01.03 |
| 12-514-01.04 |
| 12-514-01.05 |
| 12-514-01.06 |
| 12-514-01.07 |
18038.02-12-514-01_Chilled Water System Modifications Diagram (Sht 8-10)_Rev-
| 2018-12-13T16:35:35-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:35:59-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:36:24-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:36:49-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:37:46-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:38:09-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:39:20-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:39:48-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:40:14-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:40:40-0800 | |
| COLIN J. FLYNN |
| 2018-12-13T16:41:06-0800 | |
| COLIN J. FLYNN |
File details come from the government source that posted it. Updated .