This document provides details for a mid-life refit solicitation of the NOAA Ship Ronald H. Brown. The solicitation seeks a firm fixed price contract to complete upgrades and overhauls of various ship systems, including repowering, bow thruster, Z-drive, potable water, chilled water, sewage, science refrigeration, uncontaminated seawater, air handling, tank level indicators, navigational equipment, radar, lighting, and vent renewals. Much of the ship's piping and steel will also be replaced as identified in an ABS report. Questions are due by August 9, 2021 and proposals by August 6, 2021. The refit work will be conducted in accordance with FAR Part 12 for commercial items and FAR Part 15 for negotiation procedures. NOAA is the contracting agency seeking these refit services for the Ronald H. Brown.
View the file
Other files for this federal contract opportunity
Show all 50
NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
1305M221RNMAN01155
9B. DATED (SEE ITEM 11)
04/29/2021
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER
A0003
3. EFFECTIVE DATE
07/14/2021
4. REQUISITION/PURCHASE REQUISITION NUMBER
NMAN2100-20-01155
5. PROJECT NUMBER (If applicable)
CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE 6. ISSUED BY
NOAA/ERAD
200 GRANBY STREET, NORFOLK, VA 23510
Andrew Northcutt, andrew.northcutt@noaa.gov, 757-441-6457
See Block 6
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
is not extended. The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NOAA SHIP RONALD H. BROWN MID-LIFE REFIT
Please see continuation page for details pertaining to this amendment.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES
X
7/14/2021
Andrew Hildebrandt
Continuation Page – Amendment 0003
RONALD BROWN MID-LIFE REFIT
RFP# 1305M221RNMAN01155
The purpose of this Amendment is as follows:
1. Provide RFP Revision 2. Changes made in Revision 2 include:
a. Extended the deadline to submit questions/inquiries regarding the RFP to Monday, August 9, 2021 at 12:00 PM Eastern (Pages 3 and 63)
2. Address questions received from vendors in response to the RFP:
Question 1
Question 1: The sea chest valve replacement drawing-RB-163-001 requires to install Remote
Valve Actuator (EIM Controls- Model No. 2000 M/T 5.50) is now unable to locate, (Obsolete).
Web Site – Permanently Closed, was acquired by Emerson, Emerson Corporate could not provide any information for the Remote Valve Actuator Model No. 2000 M/T 5.50.
Response 1: The updated model for this actuator is an Emerson/Bettis Model No. M2CP, or equal, with the following characteristics:
Pushbutton Controls (3 Pushbuttons - Open/Stop/Close)
Indication Lights (2 Lights – Red Open/Green Close)
Mechanical Dial Position Indicator
Declutchable Manual Override Padlockable in Manual or Motor Mode
Integral Controls Transformer
Capable of remote operation.
Integral Reversing Starter Mechanical & Electrical Interlock
Open/Close Adjustable Over-torque Switches
Jumper Selectable Torque or Position Seating
Enclosure Rating – NEMA 4,6,7
All external hardware is 316 Stainless Steel, except for spring cartridge cap and mounting base.
Handwheel shaft is stainless steel.
Question 2
Question 2: Please provide clarification for WP-35: Radar Renewals in reference to the
FAR2328 25Kw X-Band radar and a FAR2338S 30Kw S-Band Radar. Neither of these are part numbers with Furuno.
Was it the intent to renew the radar unit(s) with the following:
-FAR2228BB 25Kw X-Band ARPA Radar
-FAR2238SBB 30Kw S-Band ARPA Radar
Response 2: The radar equipment identification numbers provided in WP 035 are model numbers derived from Reference 4. The contractor is to utilize the provided model numbers to purchase the equipment. The OEM will be able to provide the appropriate current part numbers for ordering the equipment with this information.
Question 3
Question 3: Please provide clarification for WP-30 Tank Level Indication System
Modifications.
We would like to utilize Vega TLI’s that are a fit, form, function replacement for the renewal, please confirm this is authorized.
Are the existing TLI’s going through intrinsic barriers? If so, can they be re-used? If not, we will need to add them to our proposal.
In WP-30, 400.2 notes “All tank level indicators are to be protected by 0.1A fuses.” Are the fuses located at the Controller I/O Enclosure, or do we need to provide them in a tank top box?
Is there a drawing that depicts the ID of the pipe pictured:
Response 3:
1. The contractor may substitute a system that meets ABS and/or USCG rules and is compatible with the new Siemens Alarm, Monitoring System as an “Or Equal”. Please refer to WP-00 section 3.
2. It is the contractor’s responsibility to determine if an existing TLI is going through an intrinsic barrier or not. If existing extrinsic barriers are found to be in good condition, and will work with the new TLI system, they may be reutilized. If not, they should be modified/renewed.
3. The fuses can be located in the Controller I/O enclosure.
4. The sketch provided in the work package is for guidance purposes only to demonstrate how a typical installation may look. As such no details on sizing are provided.
5. A revised WP-30 is provided as well as an additional reference (Tech Man RB-437-001) to provide more information on the existing TLI system.
Question 4
Question 4: These drawings are listed on the master drawing list but we cannot find the actual drawing. Can you provide link or reference?
1. Multibeam Fairing Installation, Glosten, RB-461A-06
2. Multibeam Fairing Construction, Glosten, RB-461A-07, Rev.A
Response 4: The requested drawings are provided.
Question 5
Question 5: Will there be any additional opportunities to perform a ship check on Ronald
Brown?
Response 5: Amendment 0002 provided for an additional ship check during August 3-6, 2021.
Question 6
Question 6: Please provide clarification for WP-06: Potable Water System Modifications, we received the following feedback from Hubbell Heaters.
The MHX with ASME, stainless steel chambers (options B&F) changes the model designation to TXA. The TXA does not carry ABS Certification at this time.
MHX012-3T4 is not a valid model number. A MHX036-6T4-WYE will give you 12 kW at 480V in a 3-phase wye configuration instead of delta.
Please advise how you would like us to quote this.
Response 6:
The MHX with ASME, stainless steel chambers (options B&F) changes the model designation to TXA. The TXA does not carry ABS Certification at this time – There is no requirement for ABS certification for water heaters, only ASME certification for pressure vessels. The TXA model is acceptable.
MHX012-3T4 is not a valid model number. A MHX036-6T4-WYE will give you 12 kW at 480V in a 3-phase wye configuration instead of delta – The requirements will be satisfied as long as the units are tankless, stainless steel, and meet the required voltage and power output.
Question 7
Question 7: We did not receive References 1 through 18 “NOAAS Ronald H. Brown Midlife
Upgrades” in the drawing and technical package we received from NOAA. Please provide the references cited in the work packages.
Response 7: The requested drawings are provided.
Question 8
Question 8: Please advise regarding the cooling systems drawing: 01-532-01 Seawater Cooling
System Diagram sht 6 of 9
Drawing appears to show raw water into the generator engine then to the heater exchanger and overboard. Are the generator engines set up for raw water cooling?
The work package WP-01 Repower indicates that the generators are set up for keel cooling:
9. Keel cooled engine arrangement with remote mounted heat exchangers to suit the design of the evaporators.
10. Jacket water cooling system: 128 L (33.75 gal).
11. Separate circuit aftercooler system: 26.5 L (7 gal).
In addition I do not see in the dwg. 01-536-01 Freshwater cooling system diagram provisions for fresh water circuit to the engines. Also do not see provisions for separate circuit aftercooler system as noted in WP-01.
Response 8:
The sea water connections to the diesel generators shown on Sheet 6 of drawing 01-532-01 interface with the engine-driven sea water pump that supports remote heat exchanger cooling.
These engines interface with remote heat exchangers and such an arrangement is referred to as a
“keel-cooled” arrangement by the manufacturer.
The freshwater cooling connections to the Jacket Water and SCAC loops on the diesel generators are shown on drawing 01-517-01 Waste Heat Evaporator System. Waste heat from the diesel generators is utilized for potable water generation. On the Ron Brown, only generators #1 and
#2 are connected to an evaporator.
Question 9
Question 9: WP-00 Sect 2.4.2 Owner Provided Design Documents. “Through ship checks, scan data, and ship drawings a 3D model of the refit work has been generated.” Will the 3D Model referenced in WP-00 Section 2.4.2 be provided to offerors prior to award?
Response 9: The 3D modeling was ultimately not pursued by NOAA. A revised WP-00 is provided to remove this language.
Question 10
Question 10: WPs: 07A, 07B, 07C, 08A, 10, 11, 27, 37. We were unable to locate the following references on the Google Drive. Please provide these references:
-R/V Atlantis AC Spaces General Electrical Modification Diagram, 10A-514-01
-R/V Atlantis AC Control System Modification Diagram, Glosten, 10B-514-01, 11 DEC 2018
-R/V Atlantis Chilled Water System Modifications Diagram, Glosten, 12-514-01, 3 DEC 2018
-R/V Atlantis Midlife Refit, WP-10C: AHU-5 Zone Redesign Arrangements, Glosten Inc., Drawing No. 10C-512-01
-R/V Atlantis Midlife Refit, WP-10C: AHU-5 Zone Redesign - AC System Modifications, Glosten, 10C-512-02, -, 11 DEC 2018
-R/V Atlantis Midlife Refit HVAC Makeup Air Upgrades, Glosten, 11A-51-01, 28 NOV 2018
-AGOR 24 Oceanographic Research Ship, Plumbing Sewage & Weather Dk Drains Arr & Det, NAVSEA, 6932929, F, 1 OCT 1993
-NOAA Ship Ronald H. Brown, Sewage Pumps, NOAA, Document: Keen-K4RHX100M2-43-
4.625-Inch-Implr-Pump-Data.pdf
-Ship Stores Refrigeration System Electrical Modifications, ECS, 11-516-03
-Integrated Monitoring and Control System (IMACS) Points List,Glosten, 01-440-02, Rev A, 5
Jun 2019
-Multibeam Fairing Installation, Glosten, RB-461A-06, 18 FEB 2010
-Multibeam Fairing Construction, Glosten, RB-461A-07, Rev. A, 18 FEB 2010
-Multibeam Fairing Construction, Glosten, RB-461A-07, Rev. A, 18 FEB 2010
Response 10: The requested references are made available.
Additional Notes:
An updated Consolidated References document is attached.
Additional Reference, Tech Manual RB-437-00, Tank Level Indicators has been incorporated, see attached.
| 6 ISSUED BY CODE: |
| AJ930073: |
| 5 PROJECT NUMBER If applicableRow1: |
| 8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code: |
| undefined: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER: |
| undefined_2: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER_2: |
| 10B DATED SEE ITEM 13: |
| 11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS: |
| The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off |
| is extended: Off |
| Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: |
| 13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS: |
| undefined_3: |
| B THE ABOVE NUMBERED CONTRACTORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES such as changes in paying office: |
| undefined_4: |
| undefined_5: |
| C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| undefined_6: |
| 1: |
| is not: Off |
| is required to sign this document and return: Off |
| 14 DESCRIPTION OF AMENDMENTMODIFICATION Organized by UCF section headings including solicitationcontract subject matter where feasible: |
| 15B CONTRACTOROFFEROR: |
| 15C DATE SIGNED: |