This amendment modifies a solicitation for the mid-life refit of the NOAA Ship Ronald H. Brown. The amendment provides responses to vendor questions, including additional drawings. The refit will upgrade or overhaul many of the ship's systems, such as repowering, bow thrusters, Z-drive, potable water, chilled water, sewage, science refrigeration, air handling, HVAC, tank level indicators, navigational equipment, radar, lighting, and venting of ballast and fuel tanks. Piping and steelwork identified in an ABS report will also be replaced. Proposals are due by 12:00 PM ET on August 6, 2021 and must be submitted to the NOAA Contracting Officer and Contract Specialist.
View the file
Other files for this federal contract opportunity
Show all 50
NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
1305M221RNMAN01155
9B. DATED (SEE ITEM 11)
04/29/2021
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER
A0005
3. EFFECTIVE DATE
08/09/2021
4. REQUISITION/PURCHASE REQUISITION NUMBER
NMAN2100-20-01155
5. PROJECT NUMBER (If applicable)
CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE 6. ISSUED BY
NOAA/ERAD
200 GRANBY STREET, NORFOLK, VA 23510
Andrew Northcutt, andrew.northcutt@noaa.gov, 757-441-6457
See Block 6
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
is not extended. The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NOAA SHIP RONALD H. BROWN MID-LIFE REFIT
Please see continuation page for details pertaining to this amendment.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES
X
Andrew Hildebrandt
08/09/2021
Continuation Page – Amendment 0005
RONALD BROWN MID-LIFE REFIT
RFP# 1305M221RNMAN01155
The purpose of this Amendment is as follows:
1. Address questions received from vendors in response to the RFP:
Question 1
Question 1: Please provide Sheet 1 for drawing RB-512-6932959. We have sheets 2 and 3.
Response 1: The requested drawing is provided with this amendment.
Question 2
Question 2: Please provide the following drawing: NOAAS Ronald H. Brown Midlife
Upgrades, Bow Thruster Equipment Removal and Installation Plan, Glosten, Drawing No. 02-
501-01.
Response 2: The requested drawing is provided with this amendment.
Question 3
Question 3: WP-07G AHU-9 ADDITION: Please provide Ref. #4 HVAC Diagram (Revelle post PSA), NAVSEA, 6932962, Rev F.
Response 3: Revision E is the latest version of this document. WP-07G AHU-9
ADDITION REV 1 has updated this information and is provided with this amendment.
| 6 ISSUED BY CODE: |
| AJ930073: |
| 5 PROJECT NUMBER If applicableRow1: |
| 8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code: |
| undefined: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER: |
| undefined_2: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER_2: |
| 10B DATED SEE ITEM 13: |
| 11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS: |
| The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off |
| is extended: Off |
| Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: |
| 13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS: |
| undefined_3: |
| B THE ABOVE NUMBERED CONTRACTORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES such as changes in paying office: |
| undefined_4: |
| undefined_5: |
| C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| undefined_6: |
| 1: |
| is not: Off |
| is required to sign this document and return: Off |
| 14 DESCRIPTION OF AMENDMENTMODIFICATION Organized by UCF section headings including solicitationcontract subject matter where feasible: |
| 15B CONTRACTOROFFEROR: |
| 15C DATE SIGNED: |
File details come from the government source that posted it. Updated .